A kind of telescopic elevating construction platform Download PDFInfo
- Publication number
- CN104420641B CN104420641B CN201310395169.7A CN201310395169A CN104420641B CN 104420641 B CN104420641 B CN 104420641B CN 201310395169 A CN201310395169 A CN 201310395169A CN 104420641 B CN104420641 B CN 104420641B
- Authority
- CN
- China
- Prior art keywords
- telescopic
- screen frame
- construction platform
- telescopic leg
- scaffold board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Movable Scaffolding (AREA)
Abstract
本发明公开了一种可伸缩的升降施工平台,包括至少一个架体,所述架体包括脚手板、防护网框和至少两平行的立杆,所述脚手板可拆卸地与所述立杆相连,所述防护网框固定在所述立杆外侧;其特征在于:所述脚手板至少一侧内设置有可伸缩的第一伸缩脚手板,所述防护网框还包括设置在所述防护网框内并与所述第一伸缩脚手板同侧的第一伸缩防护网框。本发明针对现有施工平台组装完成后,其外饶外墙的整体施工架体不能随外墙的变化而变化,提供一种在平台升降过程中施工架体自动伸缩,不需人工手动操作,能很好的适应建筑主体结构变化的伸缩升降施工平台。
The invention discloses a retractable elevating construction platform, which comprises at least one frame body, and the frame body includes a scaffolding board, a protective net frame and at least two parallel uprights, and the scaffolding board is detachably connected to the uprights Connected, the protective net frame is fixed on the outside of the pole; it is characterized in that: at least one side of the scaffolding board is provided with a first telescopic telescopic scaffolding board, and the protective netting frame also includes a The first telescopic protective net frame in the net frame and on the same side as the first telescopic scaffolding board. The present invention aims at the fact that after the assembly of the existing construction platform, the overall construction frame of the outer wall of the outer wall cannot change with the change of the outer wall, and provides a construction frame that automatically expands and contracts during the lifting process of the platform without manual operation. A telescopic lifting construction platform that can well adapt to changes in the main structure of the building.
Description
技术领域technical field
本发明涉及一种升降施工平台,尤其涉及一种可伸缩的升降施工平台。The invention relates to a lifting construction platform, in particular to a retractable lifting construction platform.
背景技术Background technique
在建筑施工领域,广泛使用的各种类型脚手板,一般存在着使用材料多、搭设时间长、操作平台高度不便于施工操作、安全施工隐患多等诸多问题,尤其在高层、超高层工程中问题更为突出。目前,在高层建筑施工中,一般采用升降施工平台,以便于将一些材料移动和运送到施工中的各个楼层去。升降施工平台是一种大型自升降式高空作业平台,它仅需搭设一个平台,沿着附着在建筑物上的导轨通过升降装置实现升降,平台运行平稳,工作人员可根据工作需要把施工平台沿着导轨升降到理想的高度。然而,受到建筑主体结构的影响,在高层建筑施工中,在施工平台升降过程中,需要手动调节整个脚手板的宽度。现有技术中,施工平台组装完成后,由于围绕外墙的整体施工脚手板的大小是确定的,其不能随外墙的变化而变化,这就需要施工人员对脚手板大小进行调节,另一方面,在保证相同施工进度的条件下,不得不使用大量的劳动力资源,增加单个施工人员的劳动强度。此外,这种架体的调节不仅过程复杂而且难度较大。In the field of building construction, various types of scaffolding boards are widely used. Generally, there are many problems such as the use of more materials, long erection time, the height of the operating platform is not convenient for construction operations, and many hidden dangers in safe construction, especially in high-rise and super high-rise projects. more prominent. At present, in the construction of high-rise buildings, lifting construction platforms are generally used to move and transport some materials to each floor under construction. The elevating construction platform is a large self-elevating aerial work platform. It only needs to build a platform, and it can be lifted along the guide rail attached to the building through the lifting device. The platform runs smoothly. The staff can move the construction platform along the Lift to the ideal height along the guide rail. However, due to the influence of the main structure of the building, in the construction of high-rise buildings, the width of the entire scaffolding board needs to be manually adjusted during the lifting process of the construction platform. In the prior art, after the construction platform is assembled, since the size of the overall construction scaffolding around the outer wall is determined, it cannot change with the change of the outer wall, which requires the construction personnel to adjust the size of the scaffolding, another On the one hand, under the condition of ensuring the same construction progress, a large number of labor resources have to be used, which increases the labor intensity of individual construction personnel. In addition, the adjustment of this frame is not only complicated but also difficult.
发明内容Contents of the invention
本发明要解决的技术问题在于,针对现有施工平台组装完成后,其围饶外墙的施工架体不能随外墙的变化而变化,提供一种在平台升降过程中围饶外墙的施工架体自动伸缩,不需人工手动操作,能很好的适应建筑主体结构变化的伸缩升降施工平台。The technical problem to be solved by the present invention is that, after the assembly of the existing construction platform is completed, the construction frame of the outer wall of the enclosure cannot change with the change of the outer wall. The frame automatically expands and contracts without manual operation, and is a telescopic lifting construction platform that can well adapt to changes in the main structure of the building.
本发明解决其技术问题所采用的技术方案是:一种可伸缩的升降施工平台,包括至少一个架体,所述架体包括脚手板、防护网框和至少两平行的立杆,所述脚手板可拆卸地与所述立杆相连,所述防护网框固定在所述立杆外侧;其特征在于:所述脚手板至少一侧内设置有可伸缩的第一伸缩脚手板,所述防护网框还包括设置在所述防护网框内并与所述第一伸缩脚手板同侧的第一伸缩防护网框。The technical solution adopted by the present invention to solve the technical problem is: a telescopic lifting construction platform, including at least one frame body, the frame body includes a scaffolding board, a protective net frame and at least two parallel vertical rods, the feet The hand board is detachably connected to the vertical pole, and the protective net frame is fixed on the outside of the vertical pole; it is characterized in that: at least one side of the scaffold board is provided with a first retractable telescopic scaffold board, and the protective net frame The net frame also includes a first telescopic protective net frame arranged in the protective net frame and on the same side as the first telescopic scaffolding board.
所述可伸缩的升降施工平台中,所述脚手板上相对于所述第一伸缩脚手板的另一侧可伸缩地设置第二伸缩脚手板,与所述第二伸缩脚手板相对应位置处的所述防护网框上设置有第二伸缩防护网框;In the telescopic lifting construction platform, a second telescopic scaffold board is telescopically arranged on the other side of the scaffold board relative to the first telescopic scaffold board, and a position corresponding to the second telescopic scaffold board The second telescopic protective net frame is arranged on the said protective net frame;
所述脚手板内设置有供所述第一伸缩脚手板和第二伸缩脚手板相向或背向移动的第一滑槽,所述防护网框内设置有使所述第一伸缩防护网框和第二伸缩防护网框相向或背向移动的第二滑槽;The scaffolding board is provided with a first chute for the first telescopic scaffolding board and the second telescopic scaffolding board to move toward or back to each other, and the protective net frame is provided with the first telescopic protective net frame and the second telescopic scaffolding board. The second chute for the second telescopic protective screen frame to move towards or back to each other;
所述施工平台还包括分别与所述脚手板和立杆固定连接的斜拉杆。The construction platform also includes diagonal tie rods fixedly connected with the scaffolding board and the vertical pole respectively.
所述可伸缩的升降施工平台中,相邻两所述架体上位于同一平面的所述脚手板之间的连接为单自由度连接和/或多自由度连接。In the telescopic elevating construction platform, the connection between the scaffold boards on the same plane on two adjacent frames is a single-degree-of-freedom connection and/or a multi-degree-of-freedom connection.
所述可伸缩的升降施工平台中,将分设在两个相邻的所述脚手板中的所述第一伸缩脚手板和第二伸缩脚手板通过销轴、销钉或卡扣连接,所述连接为所述单自由度连接,使所述两个脚手板之间可相对转动。In the telescopic lifting construction platform, the first telescopic scaffold board and the second telescopic scaffold board arranged in two adjacent scaffold boards are connected by pins, pins or buckles, and the connection For the single-degree-of-freedom connection, relative rotation between the two scaffolding boards is enabled.
所述可伸缩的升降施工平台中,相邻两所述架体上位于同一平面的所述脚手板之间还包括连接板,所述连接板分别将分设在两个所述脚手板中相邻的所述第一伸缩脚手板和第二伸缩脚手板通过销轴、销钉、螺栓或卡扣连接,所述连接为单自由度连接或多自由度连接,使每一所述脚手板之间可在同一平面上相对移动或转动。In the telescopic elevating construction platform, a connecting plate is further included between the scaffolding boards on the same plane on two adjacent frames, and the connecting boards are separately arranged on two adjacent scaffolding boards. The first telescopic scaffold board and the second telescopic scaffold board are connected by pins, pins, bolts or buckles, and the connection is a single-degree-of-freedom connection or a multi-degree-of-freedom connection, so that each of the scaffold boards can be connected Relative movement or rotation on the same plane.
所述可伸缩的升降施工平台中,相邻两所述架体上位于同一平面的所述防护网框之间还包括连接网框,所述连接网框的两端分别连接至两相邻的所述第一伸缩防护网框和第二伸缩防护网框上。In the telescopic lifting construction platform, a connecting screen frame is also included between the protective screen frames on the same plane on two adjacent frames, and the two ends of the connecting screen frame are respectively connected to two adjacent On the first telescopic protective net frame and the second telescopic protective net frame.
所述可伸缩的升降施工平台中,所述连接板上设有2个连接孔,两个所述连接孔分别对应连接至分设在两个所述脚手板中相邻的所述第一伸缩脚手板和所述第二伸缩脚手板上构成所述多自由度连接。In the telescopic lifting construction platform, the connecting plate is provided with two connecting holes, and the two connecting holes are respectively connected to the first telescopic feet adjacent to the two scaffolding boards. The hand board and the second telescopic scaffold board form the multi-degree-of-freedom connection.
所述可伸缩的升降施工平台中,所述连接板上设有3个连接孔,所述连接板一侧设有二个所述连接孔,所述连接板另一侧设有一个所述连接孔,三个所述连接孔中的其中位于同侧的两个连接孔连接至分设在两个所述脚手板中相邻的所述第一伸缩脚手板或所述第二伸缩脚手板上,所述另一侧连接孔连接至相邻的所述第二伸缩脚手板或所述第一伸缩脚手板上构成所述单自由度连接。In the telescopic lifting construction platform, the connecting plate is provided with three connecting holes, one side of the connecting plate is provided with two connecting holes, and the other side of the connecting plate is provided with one connecting hole. Two connection holes on the same side among the three connecting holes are connected to the first telescopic scaffold board or the second telescopic scaffold board adjacent to the two scaffold boards, The connection hole on the other side is connected to the adjacent second telescopic scaffold board or the first telescopic scaffold board to form the single-degree-of-freedom connection.
所述可伸缩的升降施工平台中,所述脚手板和所述防护网框内分别设置有限位装置。In the telescopic elevating construction platform, limiting devices are respectively arranged in the scaffold board and the protective net frame.
所述可伸缩的升降施工平台中,所述脚手板包括多个,多个所述脚手板沿所述防护网框间隔并相互平行设置在所述立杆上,每一所述脚手板远离所述防护网框的一侧安装有转动翻板。In the telescopic elevating construction platform, the scaffold boards include a plurality of scaffold boards spaced along the protective net frame and arranged parallel to each other on the poles, and each of the scaffold boards is far away from all the scaffold boards. A rotating flap is installed on one side of the protective screen frame.
实施本发明的自动式万向伸缩升降施工平台,具有以下有益效果:本发明可伸缩的升降施工平台,在平台升降过程中相互连接的第一架体可以在同一平面内相对移动或转动,且所述第一架体可以自动伸缩,调整整个施工架体的大小,不需人工手动操作,能很好的适应建筑主体结构的变化,有效的提高了工作效率,降低所需人工数量和操作人员的劳动强度,具有结构简单、工艺性好、拆装快捷和使用安全的特点。The automatic universal telescopic elevating construction platform of the present invention has the following beneficial effects: the telescopic elevating construction platform of the present invention can relatively move or rotate in the same plane with the first frame body connected to each other during the platform elevating process, and The first frame can be automatically extended and retracted to adjust the size of the entire construction frame without manual operation, which can well adapt to changes in the main structure of the building, effectively improve work efficiency, and reduce the number of labor and operators required It has the characteristics of simple structure, good workmanship, quick disassembly and assembly and safe use.
附图说明Description of drawings
下面将结合附图及实施例对本发明作进一步说明,附图中:The present invention will be further described below in conjunction with accompanying drawing and embodiment, in the accompanying drawing:
图1是本发明一种可伸缩的升降施工平台的结构示意图;Fig. 1 is a structural schematic diagram of a telescopic lifting construction platform of the present invention;
图2是本发明一种可伸缩的升降施工平台的另一种结构示意图;Fig. 2 is another structural schematic diagram of a telescopic elevating construction platform of the present invention;
图3是本发明一种可伸缩的升降施工平台的侧视图;Fig. 3 is a side view of a telescopic lifting construction platform of the present invention;
图4是图3中的A部结构示意图;Fig. 4 is a structural schematic diagram of part A in Fig. 3;
图5是图3中的B部结构示意图;Fig. 5 is a schematic diagram of the structure of part B in Fig. 3;
图6是图3中的C部结构示意图;Fig. 6 is a schematic structural view of part C in Fig. 3;
图7a是本发明一种可伸缩的升降施工平台的通过连接板连接后相邻两架体滑动之前的结构示意图;Fig. 7a is a structural schematic diagram of a telescopic elevating construction platform of the present invention before two adjacent frames slide after being connected by a connecting plate;
图7b是本发明一种可伸缩的升降施工平台的通过连接板连接后相邻两架体滑动之后的结构示意图;Fig. 7b is a structural schematic diagram of a telescopic elevating construction platform of the present invention after two adjacent frames slide after being connected by a connecting plate;
图8是本发明一种可伸缩的升降施工平台的第二实施例的结构示意图;Fig. 8 is a schematic structural view of the second embodiment of a telescopic elevating construction platform of the present invention;
图9是本发明一种可伸缩的升降施工平台的第三实施例的结构示意图;Fig. 9 is a schematic structural view of a third embodiment of a retractable elevating construction platform of the present invention;
图10是本发明一种可伸缩的升降施工平台的第四实施例的结构示意图;Fig. 10 is a schematic structural view of a fourth embodiment of a retractable elevating construction platform of the present invention;
附图中:In the attached picture:
1 架体;1 frame body;
100 脚手板 101 第一伸缩脚手板 102 第二伸缩脚手板;100 Scaffolding board 101 The first telescopic scaffolding board 102 The second telescopic scaffolding board;
104 转动翻版 105 限位装置;104 Rotate replica 105 Limiting device;
200 防护网框 201 第一伸缩防护网框 202 第二伸缩防护网框;200 protective net frame 201 first telescopic protective net frame 202 second telescopic protective net frame;
300 立杆;300 poles;
400 斜拉杆;400 diagonal stay rod;
500 连接板;500 connection plate;
600 连接网框。600 Connect the network frame.
具体实施方式detailed description
为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.
如图1所示,本发明涉及一种可伸缩的升降施工平台,包括至少一个架体1,所述架体1包括脚手板100、防护网框200和至少两平行的立杆300,所述脚手板100可拆卸地与所述立杆300相连,所述防护网框200固定在所述立杆300外侧;所述脚手板100至少一侧内设置有可伸缩的第一伸缩脚手板101,所述防护网框200还包括设置在所述防护网框200内并与所述第一伸缩脚手板101同侧的第一伸缩防护网框201。多个所述脚手板100沿所述防护网框200间隔并相互平行设置在所述立杆300上。As shown in Figure 1, the present invention relates to a telescopic lifting construction platform, including at least one frame body 1, the frame body 1 includes a scaffolding board 100, a protective net frame 200 and at least two parallel vertical poles 300, the The scaffolding board 100 is detachably connected to the vertical pole 300, and the protective net frame 200 is fixed on the outside of the vertical pole 300; at least one side of the scaffolding board 100 is provided with a telescopic first telescopic scaffolding board 101, The protective net frame 200 also includes a first telescopic protective net frame 201 arranged in the protective net frame 200 and on the same side as the first telescopic scaffolding board 101 . A plurality of the scaffold boards 100 are spaced apart along the protective net frame 200 and arranged on the pole 300 parallel to each other.
如图2所示,所述脚手板100相对于所述第一伸缩脚手板101的另一侧可伸缩地设置有第二伸缩脚手板102,与所述第二伸缩脚手板102相对应位置处(即同侧)的防护网框200上设置有第二伸缩防护网框202。As shown in FIG. 2 , the second telescopic scaffold board 102 is telescopically arranged on the other side of the first telescopic scaffold board 101 relative to the first telescopic scaffold board 101 , at the position corresponding to the second telescopic scaffold board 102 (ie on the same side) the protective screen frame 200 is provided with a second retractable protective screen frame 202 .
如图3、图4、图5、图6所示,每一所述脚手板100内设置有供所述第一伸缩脚手板101或第二伸缩脚手板102相向或背向移动的第一滑槽(图上未显示,省略),所述脚手板100内部中空,第一滑槽设置在沿脚手板101内长度方向的两侧位置,即所述第一滑槽平行于防护网框200;第一伸缩脚手板101和第二伸缩脚手板102内置在中空的脚手板100内,可沿所述第一滑槽在脚手板100上滑动。每一所述防护网框200上也设置有供所述第一伸缩防护网框201或第二伸缩防护网框202相向或背向移动的第二滑槽(图上未显示,省略),所述第一伸缩防护网框201和第二伸缩防护网框202可在所述第二滑槽内沿防护网框200滑动。如图10所示,若将架体1上所述脚手板100的第一伸缩脚手板101和所述防护网框200上的第一伸缩防护网框201连接到同一根与所述立杆300平行的活动立杆上,则所述第一伸缩脚手板101和第一伸缩防护网框201在活动立杆的作用下能沿着各自滑槽同步滑动。As shown in Fig. 3, Fig. 4, Fig. 5, and Fig. 6, each of the scaffold boards 100 is provided with a first slide for the first telescopic scaffold board 101 or the second telescopic scaffold board 102 to move toward or back. Groove (not shown in the figure, omitted), the interior of the scaffolding board 100 is hollow, and the first chute is arranged on both sides along the inner length direction of the scaffolding board 101, that is, the first chute is parallel to the protective net frame 200; The first telescopic scaffold board 101 and the second telescopic scaffold board 102 are built in the hollow scaffold board 100 and can slide on the scaffold board 100 along the first chute. Each of the protective net frames 200 is also provided with a second chute (not shown in the figure, omitted) for the first telescopic protective net frame 201 or the second telescopic protective net frame 202 to move toward or backward. The first telescopic protective net frame 201 and the second telescopic protective net frame 202 can slide along the protective net frame 200 in the second chute. As shown in Figure 10, if the first telescopic scaffold board 101 of the scaffold board 100 on the frame body 1 and the first telescopic protective net frame 201 on the protective net frame 200 are connected to the same pole 300 On the parallel movable poles, the first telescopic scaffold board 101 and the first telescopic protective net frame 201 can slide synchronously along the respective chute under the action of the movable poles.
如图4所示,所述施工平台还包括分别与所述脚手板100和立杆300固定连接的斜拉杆400,用以增强脚手架的整体稳定性,斜拉杆400与所述脚手板100和立杆300固定连接的方式有多种,例如采用卡扣、销轴或螺栓等连接方式。每一所述脚手板100远离防护网框200的一侧安装有转动翻板104,所述转动翻板104展开时可以减小架体与墙体之间的间隙,折叠时置于脚手板100上可以节省空间,转动翻版104的连接方式有多种,例如铰链连接等。As shown in Figure 4, the construction platform also includes diagonal stay rods 400 fixedly connected with the scaffolding board 100 and the vertical rod 300 respectively, so as to enhance the overall stability of the scaffolding. There are many ways for the rod 300 to be fixedly connected, for example, buckle, pin or bolt. Each of said scaffold boards 100 is equipped with a rotating flap 104 away from the side of the protective net frame 200. When said rotating flap 104 is unfolded, the gap between the frame body and the wall can be reduced, and it is placed on the scaffold board 100 when folded. On the other hand, space can be saved, and there are many ways to connect the rotating replica 104, such as hinge connections.
此外,每一所述脚手板100内的第一滑槽上均设置有限位装置105,所述脚手板100内的限位装置105用以限制所述第一伸缩脚手板101和第二伸缩脚手板102在第一滑槽内的滑动行程,限制第一伸缩脚手板101和第二伸缩脚手板102的限位装置105可以是一个或两个等。由于所述脚手板101为内部中空,因此可以在脚手板100的底部或侧面槽钢上安装焊接螺母,将螺栓拧入所述焊接螺母并穿过底部或侧面槽钢,顶紧所述第一伸缩脚手板101或第二伸缩脚手板102,防止第一伸缩脚手板101或第二伸缩脚手板102被拉出,起到限位的作用。所述防护网框200内的第二滑槽上也设有限位装置(图上未显示,省略)用以限制所述第一伸缩防护网框201或第二伸缩防护网框202在第二滑槽内的滑动行程,限制第一伸缩防护网框201和第二伸缩防护网框202的限位装置可以是一个或两个等,由于所述防护网框200为内部中控,侧面为网状物,可以在所述第二滑槽的侧面槽钢上安装焊接螺母,将螺栓拧入所述焊接螺母并穿过侧面槽钢,顶紧所述第一伸缩防护网框201和第二伸缩防护网框202,防止所述第一伸缩防护网框201和第二伸缩防护网框202被拉出,起到限位的作用。In addition, a limiting device 105 is provided on the first chute in each of the scaffolding boards 100, and the limiting device 105 in the scaffolding board 100 is used to limit the first telescopic scaffolding board 101 and the second telescopic foot The sliding stroke of the hand board 102 in the first chute, the limiting device 105 for limiting the first telescopic scaffold board 101 and the second telescopic scaffold board 102 can be one or two, etc. Because described scaffold board 101 is inner hollow, therefore can install welding nut on the bottom or side channel steel of scaffold board 100, bolt is screwed into described weld nut and passes through bottom or side channel steel, and tightens described first The telescopic scaffolding board 101 or the second telescopic scaffolding board 102 prevents the first telescopic scaffolding board 101 or the second telescopic scaffolding board 102 from being pulled out, and acts as a limiter. The second chute in the protective net frame 200 is also provided with a limiting device (not shown in the figure, omitted) to limit the first telescopic protective net frame 201 or the second telescopic protective net frame 202 in the second slideway. The sliding stroke in the groove, the limiting device for limiting the first telescopic protective screen frame 201 and the second telescopic protective screen frame 202 can be one or two, etc., because the protective screen frame 200 is an internal control, and the side is mesh can install welding nuts on the side channel steel of the second chute, screw the bolts into the welding nuts and pass through the side channel steel, and tighten the first telescopic protective net frame 201 and the second telescopic protective net frame 201. The screen frame 202 prevents the first telescopic protection screen frame 201 and the second telescopic protection screen frame 202 from being pulled out, and acts as a limiter.
进一步的,第一架体100上还连接有导轨(图上未显示,省略),所述导轨与第一架体100之间通过连接件固定连接,导轨安装在固定在墙面上的附墙导向座(图上未显示,省略)上,在升降装置(图上未显示,省略)的作用下,实现导轨和第一架体100的升降。附墙导向座、导轨和升降装置的具体结构和装配是现有技术,在此不再赘述。Further, guide rails (not shown in the figure, omitted) are connected to the first frame body 100, and the guide rails are fixedly connected to the first frame body 100 through connectors, and the guide rails are installed on the attached wall fixed on the wall. On the guide seat (not shown in the figure, omitted), under the action of the lifting device (not shown in the figure, omitted), the lifting of the guide rail and the first frame body 100 is realized. The specific structure and assembly of the wall-attached guide seat, guide rail and lifting device are prior art, and will not be repeated here.
在实际使用过程中,一般将多个所述架体1连接使用,即将相邻两所述架体1上位于同一平面的所述脚手板100连接,同时将相邻两所述架体1上的所述防护网框200连接。使得所述升降施工平台在升降过程中,相互连接的相邻两所述脚手板100和防护网框200之间可以相对移动或转动,且相互连接的相邻两所述脚手板100中的第一伸缩脚手板101或第二伸缩脚手板102可与在其对应的第一滑槽内滑动,相邻所述防护网框200中的第一伸缩防护网框201或第二伸缩防护网框202可在其对应的第二滑槽内滑动。如图7a、图7b所示,图7a为相互连接的多个所述架体1上第一伸缩脚手板101、第二伸缩脚手板102、第一伸缩防护网框201和第二伸缩防护网框202在其对应滑槽内滑动之前的示意图。图7b为相互连接的多个所述架体1上的第一伸缩脚手板101、第二伸缩脚手板102、第一伸缩防护网框201和第二伸缩防护网框202在其对应滑槽内滑动之后的示意图。In actual use, a plurality of frames 1 are generally used in connection, that is, the scaffolding boards 100 on the same plane on two adjacent frames 1 are connected, and at the same time, two adjacent frames 1 are connected to each other. The protective screen frame 200 is connected. During the lifting process of the lifting construction platform, the two adjacent scaffolding boards 100 and the protective net frame 200 that are connected to each other can move or rotate relative to each other, and the first of the two adjacent scaffolding boards 100 that are connected to each other A telescopic scaffold board 101 or a second telescopic scaffold board 102 can slide in its corresponding first chute, adjacent to the first telescopic protective net frame 201 or the second telescopic protective net frame 202 in the protective net frame 200 Can slide in its corresponding second chute. As shown in Figure 7a and Figure 7b, Figure 7a shows the first telescopic scaffolding board 101, the second telescopic scaffolding board 102, the first telescopic protective net frame 201 and the second telescopic protective net on a plurality of interconnected frames 1 A schematic diagram of the frame 202 before sliding in its corresponding chute. Fig. 7b shows the first telescopic scaffold board 101, the second telescopic scaffold board 102, the first telescopic protective net frame 201 and the second telescopic protective net frame 202 on the plurality of frame bodies 1 connected to each other in their corresponding chute Schematic diagram after sliding.
因此,在升降过程中,两架体1上相互连接的脚手板100和防护网框200的大小和相互之间的夹角可以随着建筑主体结构的变化而发生改变,使得架体1更好地包覆在建筑外墙上。例如:在升降过程中,建筑体的外围直径逐渐变大,则围绕外墙的架体1的长度也应逐渐变大,这时相互连接的第一伸缩脚手板101和第二伸缩脚手板102在其各自对应的第一滑道内向外滑动,相互连接的第一伸缩防护网框201和第二伸缩防护网框202在其各自对应的第二滑道向外滑动,相互连接的两架体1之间的夹角相对应的逐渐变大,使得相互连接的架体1很好的贴合在外墙上。Therefore, in the lifting process, the size and the angle between the interconnected scaffolding board 100 and the protective net frame 200 on the two frames 1 can be changed along with the change of the main structure of the building, so that the frames 1 are better clad on the exterior of the building. For example: in the lifting process, the outer diameter of the building gradually increases, and the length of the frame body 1 around the outer wall should also gradually increase. Sliding outwards in their corresponding first slideways, the interconnected first telescopic protection net frame 201 and the second telescopic protection net frame 202 slide outwards in their respective corresponding second slideways, and the two interconnected frames The included angles between 1 gradually become larger correspondingly, so that the interconnected frame bodies 1 fit well on the outer wall.
相邻两所述脚手板100之间的连接分为单自由度连接和多自由度连接:单自由度连接的两脚手板100之间不能在同一平面相对移动,但可以相对转动;而多自由度连接,使得连接的两脚手板100之间可以在同一平面上相对移动或转动。The connection between two adjacent scaffold boards 100 is divided into single-degree-of-freedom connection and multi-degree-of-freedom connection: the two scaffold boards 100 connected by single degree of freedom cannot relatively move on the same plane, but can relatively rotate; degree connection, so that the two connected scaffolding boards 100 can be relatively moved or rotated on the same plane.
单自由度连接有两种方式:一种是直接将分设在两个所述脚手板100中相邻的所述第一伸缩脚手板101和第二伸缩脚手板102通过销轴、销钉或卡扣连接;另一种是使用连接板500分别将分设在两个所述脚手板100中相邻的所述第一伸缩脚手板101和第二伸缩脚手板102连接,连接方式可以采用销轴、销钉、螺栓或卡扣连接等。There are two ways of single-degree-of-freedom connection: one is to directly connect the first telescopic scaffold board 101 and the second telescopic scaffold board 102 that are adjacent to each other in the two scaffold boards 100 through pin shafts, pins or buckles. connection; the other is to use connecting plate 500 to respectively connect the first telescopic scaffold board 101 and the second telescopic scaffold board 102 adjacent to each other in the two scaffold boards 100, and the connection method can be a pin shaft or a pin , bolt or snap connection, etc.
所述连接板500上设有3个连接孔(如图8所述),所述连接板500一侧设有二个所述连接孔b和c,另一侧设有一个所述连接孔a,三个所述连接孔中的其中位于同侧的两个连接孔b和c连接至分设在两个所述脚手板100中相邻的所述第一伸缩脚手板101或第二伸缩脚手板102上,所述另一侧连接孔a连接至相邻的所述第二伸缩脚手板102或第一伸缩脚手板101上。The connecting plate 500 is provided with three connecting holes (as shown in FIG. 8 ), the connecting plate 500 is provided with two connecting holes b and c on one side, and one connecting hole a on the other side. Among the three connection holes, the two connection holes b and c on the same side are connected to the first telescopic scaffold board 101 or the second telescopic scaffold board adjacent to each other in the two scaffold boards 100 102 , the connecting hole a on the other side is connected to the adjacent second telescopic scaffold board 102 or the first telescopic scaffold board 101 .
多自由度连接,即使用连接板500将分设在两个所述脚手板100中相邻的所述第一伸缩脚手板101和第二伸缩脚手板102连接,所述连接板500上设有2个连接孔(如图7a,图7b所述),两个所述连接孔分别对应连接至分设在两个所述脚手板100中相邻的所述第一伸缩脚手板101和第二伸缩脚手板102。Multi-degree-of-freedom connection, that is, use the connecting plate 500 to connect the first telescopic scaffolding board 101 and the second telescopic scaffolding board 102 adjacent to each other in the two scaffolding boards 100, and the connecting board 500 is provided with 2 Two connection holes (as shown in Fig. 7a, Fig. 7b), the two connection holes are respectively connected to the first telescopic scaffold board 101 and the second telescopic foot board adjacent to each other in the two scaffold boards 100 Prototype102.
图7a,图7b示出了本发明的第一实施例的结构示意图,相邻的多个所述架体1上位于同一平面的所述脚手板100之间通过连接板500进行多自由度连接,即所述连接板500上设有2个连接孔,两个所述连接孔分别对应连接至分设在两个所述脚手板100中相邻的所述第一伸缩脚手板101和第二伸缩脚手板102上。多个所述架体1上层高相同的所述脚手板100之间的连接,即将左边所述脚手板100的第一伸缩脚手板101与中间所述脚手板100的第二伸缩脚手板102连接,将中间所述脚手板100的第一伸缩脚手板101与右边所述脚手板100的第二伸缩脚手板102连接。Fig. 7a and Fig. 7b show the schematic structural diagram of the first embodiment of the present invention, and the scaffold boards 100 on the same plane on a plurality of adjacent frame bodies 1 are connected by multi-degree-of-freedom through the connecting board 500 , that is, the connecting plate 500 is provided with two connecting holes, and the two connecting holes are connected to the first telescopic scaffolding board 101 and the second telescopic scaffolding board 101 adjacent to each other in the two scaffolding boards 100 respectively. On the scaffolding board 102. The connection between the scaffolds 100 with the same upper layer height of the plurality of frames 1 is to connect the first telescopic scaffold 101 of the left scaffold 100 with the second telescopic scaffold 102 of the middle scaffold 100 , connect the first telescopic scaffold board 101 of the scaffold board 100 in the middle with the second telescopic scaffold board 102 of the scaffold board 100 on the right.
相邻所述两个防护网框200之间还包括连接网框600,将所述连接网框600的两端通过铰接的形式分别对应连接至两个相邻所述第一伸缩防护网框201和第二伸缩防护网框202上。相邻所述两个防护网框200连接,即将左边所述第一伸缩防护网框201与中间所述第二伸缩防护网框202连接,将中间所述第一伸缩防护网框201与右边所述第二伸缩防护网框202连接。A connecting screen frame 600 is also included between the two adjacent protective screen frames 200, and the two ends of the connecting screen frame 600 are respectively connected to two adjacent first telescopic protective screen frames 201 in the form of hinges. And on the second telescopic protective screen frame 202. The two adjacent protective net frames 200 are connected, that is, the first telescopic protective net frame 201 on the left is connected with the second telescopic protective net frame 202 in the middle, and the first telescopic protective net frame 201 in the middle is connected with the second telescopic protective net frame 202 in the middle. The second telescopic protective screen frame 202 is connected.
图8示出了本发明的第二实施例的结构示意图,相邻的多个所述架体1上位于同一平面的所述脚手板100之间通过连接板500进行单自由度连接。所述连接板500上设有3个连接孔,所述连接板500一侧设有二个所述连接孔b和c,另一侧设有一个所述连接孔a,三个所述连接孔中的其中位于同侧的两个连接孔b和c连接至分设在两个所述脚手板100中相邻的所述第一伸缩脚手板101或第二伸缩脚手板102上,所述另一侧连接孔a连接至相邻的所述第二伸缩脚手板102或第一伸缩脚手板101上。其余结构同实施例一,在此不再赘述。FIG. 8 shows a schematic structural diagram of the second embodiment of the present invention. The scaffolding boards 100 on the same plane on adjacent frames 1 are connected by a single degree of freedom through a connecting board 500 . The connecting plate 500 is provided with three connecting holes, one side of the connecting plate 500 is provided with two connecting holes b and c, the other side is provided with one connecting hole a, and three connecting holes Among them, the two connection holes b and c on the same side are connected to the first telescopic scaffold board 101 or the second telescopic scaffold board 102 adjacent to each other in the two scaffold boards 100, and the other The side connection hole a is connected to the adjacent second telescopic scaffold board 102 or the first telescopic scaffold board 101 . The rest of the structure is the same as that of Embodiment 1, and will not be repeated here.
可见,所述单自由度连接和多自由度连接可以相互转化,当使用单自由度连接时将连接板2上三个连接孔全部连接,当使用多自由度连接时只需连接a和b两个连接孔。It can be seen that the single-degree-of-freedom connection and the multi-degree-of-freedom connection can be transformed into each other. When a single-degree-of-freedom connection is used, all the three connection holes on the connecting plate 2 are connected. When a multi-degree-of-freedom connection is used, only two holes a and b need to be connected. connection holes.
图9示出了本发明的第三实施例的结构示意图,相邻的多个所述架体1上位于同一平面的所述脚手板100之间直接通过销轴、销钉或卡扣连接,构成所述单自由度连接。其余结构同实施例一,在此不再赘述。Fig. 9 shows a schematic structural view of the third embodiment of the present invention. The scaffolding boards 100 on the same plane on a plurality of adjacent frames 1 are directly connected by pin shafts, pins or buckles to form a The single degree of freedom connection. The rest of the structure is the same as that of Embodiment 1, and will not be repeated here.
图10示出了本发明的第四实施例的结构示意图,所述第一伸缩脚手板101和第一伸缩防护网框201沿着各自对应滑槽同步滑动。将所述脚手板100上的第一伸缩脚手板101和所述防护网框200上的第一伸缩防护网框201连接到同一根活动立杆上,所述活动立杆与两平行的立杆300平行,所述第一伸缩脚手板101和第一伸缩防护网框201在活动立杆的作用下能沿着各自滑槽同步滑动,此时相互连接的两架体1之间只能在同一平面内沿直线做伸缩运动,相互连接的两架体1之间不能进行转动。Fig. 10 shows a schematic structural diagram of the fourth embodiment of the present invention, the first telescopic scaffolding board 101 and the first telescopic protective net frame 201 slide synchronously along their corresponding chute. Connect the first telescopic scaffold board 101 on the scaffold board 100 and the first telescopic protective net frame 201 on the protective net frame 200 to the same movable pole, and the movable pole is connected to two parallel poles 300 parallel, the first telescopic scaffolding board 101 and the first telescopic protective net frame 201 can slide synchronously along the respective chute under the action of the movable pole, and at this time the two frames 1 connected to each other can only be in the same The telescopic movement is performed along a straight line in the plane, and the two connected frame bodies 1 cannot be rotated.
虽然本发明是通过具体实施例进行说明的,本领域技术人员应当明白,在不脱离本发明范围的情况下,还可以对本发明进行各种变换及等同替代。另外,针对特定情形或材料,可以对本发明做各种修改,而不脱离本发明的范围。因此,本发明不局限于所公开的具体实施例,而应当包括落入本发明权利要求范围内的全部实施方式。Although the present invention is described through specific embodiments, those skilled in the art should understand that various changes and equivalent substitutions can be made to the present invention without departing from the scope of the present invention. In addition, various modifications may be made to the invention for a particular situation or material without departing from the scope of the invention. Therefore, it is intended that the invention not be limited to the particular embodiments disclosed, but should include all implementations falling within the scope of the appended claims.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310395169.7A CN104420641B (en) | 2013-09-03 | 2013-09-03 | A kind of telescopic elevating construction platform |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310395169.7A CN104420641B (en) | 2013-09-03 | 2013-09-03 | A kind of telescopic elevating construction platform |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN104420641A CN104420641A (en) | 2015-03-18 |
| CN104420641B true CN104420641B (en) | 2016-08-24 |
Family
ID=52970696
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201310395169.7A Active CN104420641B (en) | 2013-09-03 | 2013-09-03 | A kind of telescopic elevating construction platform |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104420641B (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR3090713A1 (en) * | 2018-12-14 | 2020-06-26 | Batiroc Protect | Removable fall protection device vis-à-vis openings on the ground, serving as a passageway and adaptable to different dimensions of openings |
Families Citing this family (19)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106320724B (en) * | 2015-07-03 | 2019-01-18 | 深圳市特辰科技股份有限公司 | Auto Deformation construction protection Platform Machinery people and its method for building upper movement and deformation in curved shape |
| CN105804384B (en) * | 2016-03-15 | 2018-05-29 | 深圳前海特辰科技有限公司 | A kind of light construction protection robot |
| CN105781085B (en) * | 2016-05-13 | 2018-01-05 | 范昕昀 | A kind of bracket device with flipping compensating pedal |
| CN106351436B (en) * | 2016-06-28 | 2019-09-27 | 中建三局第二建设工程有限责任公司 | One kind is for outer climbing frame horizontal extension torsion self-checking device and construction method |
| GB2553560B (en) * | 2016-09-08 | 2018-11-28 | Ischebeck Titan Ltd | Climbing screen |
| GB2555490A (en) * | 2016-11-01 | 2018-05-02 | Brand Energy & Infrastructure Services Uk Ltd | A safety screen |
| CN106437121B (en) * | 2016-11-21 | 2019-04-16 | 成都建工集团有限公司 | It industrializes the anti-object strike of assembled engineering and builds outer construction operation platform |
| CN107724666A (en) * | 2017-11-08 | 2018-02-23 | 厦门康柏机械集团有限公司 | Pedal extension rod |
| CN108166742A (en) * | 2018-01-08 | 2018-06-15 | 中建三局集团有限公司 | A kind of scalable climbing platforms |
| CN109944430A (en) * | 2019-04-15 | 2019-06-28 | 青岛一建集团有限公司 | A kind of electric lifting platform construction method for special-shaped exterior walls of buildings operation |
| CN110158940A (en) * | 2019-05-09 | 2019-08-23 | 上海建工一建集团有限公司 | The telescopic foot palm and construction method of skyscraper protective frame obstacle avoidance object |
| CN110778096B (en) * | 2019-09-25 | 2022-05-17 | 中建四局第六建筑工程有限公司 | Attached type lifting scaffold adjustable telescopic scaffold board for internal contraction structure |
| CN113513149A (en) * | 2020-04-09 | 2021-10-19 | 广东博智林机器人有限公司 | Attached type protection platform |
| CN112746737B (en) * | 2020-12-12 | 2023-04-07 | 重庆新久融工程机械设备有限公司 | A turn over board subassembly for lifting foot hand rack protection |
| CN112942776B (en) * | 2021-02-02 | 2024-01-26 | 郭娇龙 | Aluminum alloy climbing frame with guide rail and guide wheel |
| CN113775160A (en) * | 2021-08-07 | 2021-12-10 | 范俊峰 | A liftable support protection platform for in construction wall construction |
| CN113882648A (en) * | 2021-10-26 | 2022-01-04 | 中建三局第一建设工程有限责任公司 | All-steel attached lifting scaffold equipment and construction method thereof |
| CN114046034A (en) * | 2021-11-19 | 2022-02-15 | 上海宝冶集团有限公司 | Method for erecting disk buckle type scaffold during curtain wall construction |
| CN115450405A (en) * | 2022-08-22 | 2022-12-09 | 中车大连机车车辆有限公司 | Double-layer platform for roof operation |
Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN87206173U (en) * | 1987-04-07 | 1988-08-17 | 孙守连 | Suspension working platform out of wall |
| US6155525A (en) * | 1999-03-10 | 2000-12-05 | Joanisse; Denis | Adjustable, telescopic, support |
| CN201176566Y (en) * | 2007-12-27 | 2009-01-07 | 中交第二航务工程局有限公司 | External tower type retractable construction platform at end of staying cable tower |
| CN201339310Y (en) * | 2008-12-23 | 2009-11-04 | 中国建筑第四工程局有限公司 | Expansion plate device of hanging rack |
| CN201635380U (en) * | 2010-04-23 | 2010-11-17 | 中国建筑第八工程局有限公司 | Baffle for scaffold |
| CN102383588A (en) * | 2011-08-25 | 2012-03-21 | 深圳市特辰科技股份有限公司 | Lifting platform for protecting safety of high-level construction |
| CN102635227A (en) * | 2012-04-28 | 2012-08-15 | 深圳市特辰科技股份有限公司 | Aluminum alloy lifting scaffold |
| CN202450762U (en) * | 2011-12-12 | 2012-09-26 | 深圳市特辰科技股份有限公司 | Construction lifting platform |
| CN202467155U (en) * | 2012-01-18 | 2012-10-03 | 南通纺织职业技术学院 | Retractable scaffold pedal |
| CN102926529A (en) * | 2011-08-11 | 2013-02-13 | 北京建筑工程学院 | Self-elevating scaffold provided with telescoping platforms for building construction |
| CN203097255U (en) * | 2012-12-27 | 2013-07-31 | 德州职业技术学院 | Extensible building platform |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| NO319351B1 (en) * | 2003-05-21 | 2005-07-18 | Walter Aanonsen | Device for telescopic mounting rail for use in concealed mounting of electrical and plumbing equipment. |
-
2013
- 2013-09-03 CN CN201310395169.7A patent/CN104420641B/en active Active
Patent Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN87206173U (en) * | 1987-04-07 | 1988-08-17 | 孙守连 | Suspension working platform out of wall |
| US6155525A (en) * | 1999-03-10 | 2000-12-05 | Joanisse; Denis | Adjustable, telescopic, support |
| CN201176566Y (en) * | 2007-12-27 | 2009-01-07 | 中交第二航务工程局有限公司 | External tower type retractable construction platform at end of staying cable tower |
| CN201339310Y (en) * | 2008-12-23 | 2009-11-04 | 中国建筑第四工程局有限公司 | Expansion plate device of hanging rack |
| CN201635380U (en) * | 2010-04-23 | 2010-11-17 | 中国建筑第八工程局有限公司 | Baffle for scaffold |
| CN102926529A (en) * | 2011-08-11 | 2013-02-13 | 北京建筑工程学院 | Self-elevating scaffold provided with telescoping platforms for building construction |
| CN102383588A (en) * | 2011-08-25 | 2012-03-21 | 深圳市特辰科技股份有限公司 | Lifting platform for protecting safety of high-level construction |
| CN202450762U (en) * | 2011-12-12 | 2012-09-26 | 深圳市特辰科技股份有限公司 | Construction lifting platform |
| CN202467155U (en) * | 2012-01-18 | 2012-10-03 | 南通纺织职业技术学院 | Retractable scaffold pedal |
| CN102635227A (en) * | 2012-04-28 | 2012-08-15 | 深圳市特辰科技股份有限公司 | Aluminum alloy lifting scaffold |
| CN203097255U (en) * | 2012-12-27 | 2013-07-31 | 德州职业技术学院 | Extensible building platform |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR3090713A1 (en) * | 2018-12-14 | 2020-06-26 | Batiroc Protect | Removable fall protection device vis-à-vis openings on the ground, serving as a passageway and adaptable to different dimensions of openings |
Also Published As
| Publication number | Publication date |
|---|---|
| CN104420641A (en) | 2015-03-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104420641A (en) | Extensible lifting construction platform | |
| KR20150052207A (en) | A panel support bracket | |
| GB2510880A (en) | Climbing screen | |
| CN116733209B (en) | Attached lifting scaffold | |
| DE202014106139U1 (en) | platform | |
| CN108589773A (en) | A kind of construction system and form of construction work of piping lane engineering | |
| GB2510881A (en) | Safety screen | |
| CN104790644B (en) | Extending and contracting sliding support frame for roof decorative bottom boards | |
| CN108412187A (en) | A kind of superelevation connects the constructing device and construction method of body group tower frame structure | |
| US20130263549A1 (en) | Safety screen system for steel erection work | |
| CN107975251B (en) | Assembled building wallboard joint support device | |
| CN204662931U (en) | Roof decorations base plate retractility sliding support frame | |
| CN204778237U (en) | Can have enough to meet need construction elevator layer door connects material platform | |
| CN204476295U (en) | Multifunctional hole-drilling sectional shelf-unit | |
| CN210289072U (en) | Adjustable instrument formula elevartor shaft protection operation platform and operation are strutted | |
| KR200378217Y1 (en) | Scaffolding for the high ground working | |
| CN205604084U (en) | Hanging flower basket device of prefabricated little case roof beam construction usefulness | |
| JP2015203223A (en) | Height adjustment column for framework scaffold | |
| CN218668655U (en) | Modular assembly type edge concrete construction protection tool | |
| CN213774398U (en) | Elevator shaft operating platform | |
| CN203701552U (en) | Attached scaffold for lifted through worm, gear and screw rod | |
| CN205046572U (en) | Bulky concrete removes over -and -under type construction platform | |
| CN221524177U (en) | An adjustable platform for high-rise exterior wall construction | |
| CN103821339B (en) | Operation platform modular unit and operation platform thereof | |
| CN207609155U (en) | Hydraulic pressure is from climbing construction operation platform |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| PP01 | Preservation of patent right | ||
| PP01 | Preservation of patent right |
Effective date of registration: 20230214 Granted publication date: 20160824 |
|
| PD01 | Discharge of preservation of patent | ||
| PD01 | Discharge of preservation of patent |
Date of cancellation: 20260214 Granted publication date: 20160824 |