CN201165758Y - 钢柱标高调整装置 - Google Patents

钢柱标高调整装置 Download PDF

Info

Publication number
CN201165758Y
CN201165758Y CNU2007200774900U CN200720077490U CN201165758Y CN 201165758 Y CN201165758 Y CN 201165758Y CN U2007200774900 U CNU2007200774900 U CN U2007200774900U CN 200720077490 U CN200720077490 U CN 200720077490U CN 201165758 Y CN201165758 Y CN 201165758Y
Authority
CN
China
Prior art keywords
steel column
adjusting device
sides
jack
elevation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200774900U
Other languages
English (en)
Inventor
袁金兵
朱宝良
唐兵传
仇宇兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Construction Co Ltd
Original Assignee
Shanghai Baoye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Construction Co Ltd filed Critical Shanghai Baoye Construction Co Ltd
Priority to CNU2007200774900U priority Critical patent/CN201165758Y/zh
Application granted granted Critical
Publication of CN201165758Y publication Critical patent/CN201165758Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型涉及工程建筑,尤其涉及厂房的钢柱调整装置。一种钢柱标高调整装置,它设置在钢柱子两侧地面上,它包括;至少两个顶升支座,它们分别设置在钢柱两侧地面上;至少两个千斤顶,它们各自安装在一个顶升支座上;至少两个传力机构,它们分别设置在钢柱两侧,其一端和钢柱柱体固定连接,另一端连接所述千斤顶顶杆端部。本实用新型能精确调整钢柱的标高,使之符合标高的设计要求,保证厂房建设的质量。

Description

钢柱标高调整装置
技术领域
本实用新型涉及工程建筑,尤其涉及厂房的钢柱调整装置。
背景技术
在厂房施工中,钢柱都是通过吊车将其起吊直立设置,然后依照设计高度将其固定,但是由于其高度较高,重量较大,调整高度比较困难,误差较大,无法满足设计要求。
发明内容
本实用新型旨在克服现有技术的缺陷,提供一种钢柱标高调整装置。本实用新型能精确调整钢柱的标高,使之符合标高的设计要求,保证厂房建设的质量。
本实用新型是这样实现的:
一种钢柱标高调整装置,它设置在钢柱子两侧地面上,它包括;
至少两个顶升支座,它们分别设置在钢柱两侧地面上;
至少两个千斤顶,它们各自安装在一个顶升支座上;
至少两个传力机构,它们分别设置在钢柱两侧,其一端和钢柱柱体固定连接,另一端连接所述千斤顶顶杆端部。
所述的钢柱标高调整装置它还包括若干垫板,所述垫板分别设置在钢柱被顶升后下方形成的空间内和每个千斤顶的底部以垫高钢柱和千斤顶。
本实用新型是对钢柱进行单一的竖向顶升,通过调整钢柱底部的垫板的厚度,从而精确调整柱子标高,保证厂房建设的质量。
附图说明
下面,结合附图进一步说明本实用新型:
图1为本实用新型示意图。
具体实施方式
如图1所示:一种钢柱标高调整装置,它设置在钢柱子1两侧地面上,它包括;
至少两个顶升支座2,它们分别设置在钢柱1两侧地面上;
至少两个千斤顶3,它们各自安装在一个顶升支座2上;
至少两个传力机构4,它们分别设置在钢柱1两侧,其一端和钢柱1柱体固定连接,另一端连接所述千斤顶3顶杆端部。传力机构4的安装位置要合适,以便于安装施工及顶升操作为宜;严格控制焊接质量,确保有足够的连接强度。
若柱子1的标高调整值小于或等于千斤顶3的行程,就直接利于千斤顶3一次性顶升就位;若柱子1的标高调整值大于千斤顶3的行程,须在钢柱1底配置垫板5,将钢柱1临时固定,然后卸载,同时用垫板5垫高千斤顶3后继续顶升,以此反复循环顶升直至达到钢柱1顶升调整值。

Claims (2)

1.一种钢柱标高调整装置,它设置在钢柱子两侧地面上,其特征在于,它包括;
至少两个顶升支座,它们分别设置在钢柱两侧地面上;
至少两个千斤顶,它们各自安装在一个顶升支座上;
至少两个传力机构,它们分别设置在钢柱两侧,其一端和钢柱柱体固定连接,另一端连接所述千斤顶顶杆端部。
2.根据权利要求1所述的钢柱标高调整装置,其特征在于,它还包括若干垫板,所述垫板分别设置在钢柱被顶升后下方形成的空间内,和每个千斤顶的底部以垫高千斤顶。
CNU2007200774900U 2007-12-27 2007-12-27 钢柱标高调整装置 Expired - Fee Related CN201165758Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200774900U CN201165758Y (zh) 2007-12-27 2007-12-27 钢柱标高调整装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200774900U CN201165758Y (zh) 2007-12-27 2007-12-27 钢柱标高调整装置

Publications (1)

Publication Number Publication Date
CN201165758Y true CN201165758Y (zh) 2008-12-17

Family

ID=40191143

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200774900U Expired - Fee Related CN201165758Y (zh) 2007-12-27 2007-12-27 钢柱标高调整装置

Country Status (1)

Country Link
CN (1) CN201165758Y (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101576126B (zh) * 2009-06-23 2011-08-03 大连理工大学 旋转机械轴承标高在线调整装置
CN102519673A (zh) * 2011-11-30 2012-06-27 中国北车集团大连机车车辆有限公司 曲轴动平衡试验传动中心高的调整方法
CN112144427A (zh) * 2020-10-27 2020-12-29 南京工业大学 一种预制涵洞现场错位调节装置及其调节方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101576126B (zh) * 2009-06-23 2011-08-03 大连理工大学 旋转机械轴承标高在线调整装置
CN102519673A (zh) * 2011-11-30 2012-06-27 中国北车集团大连机车车辆有限公司 曲轴动平衡试验传动中心高的调整方法
CN112144427A (zh) * 2020-10-27 2020-12-29 南京工业大学 一种预制涵洞现场错位调节装置及其调节方法

Similar Documents

Publication Publication Date Title
CN202532108U (zh) 可调节垫板
CN101195465A (zh) 一种滚动支撑千斤顶
CN201165758Y (zh) 钢柱标高调整装置
CN201116267Y (zh) 一种内爬塔吊的外挂支承装置
CN201367729Y (zh) 多功能板模板早拆顶托架
CN106115553A (zh) 一种电力设备升降控制装置
CN201184055Y (zh) 钢柱纠偏装置
CN205855911U (zh) 一种电力设备升降控制装置
CN102179786A (zh) 可调节支撑定位装置
CN201501771U (zh) 一种支点可调节的撬杠
CN201334318Y (zh) 一种塔机升降装置
CN114016662B (zh) 装配式结构及装配式结构的施工方法
CN202088128U (zh) 可调节支撑定位装置
CN206319628U (zh) 一种建筑装配式墙板安装机
CN214721835U (zh) 一种超大截面h型钢吊车梁焊接胎架
CN112378649B (zh) 一种用于减速器综合实验台的减速器固定装置
CN204402496U (zh) 一种竖井钢绞线千斤顶吊滑模提升装置
CN101304164A (zh) 35kv隔离开关操作机构的安装装置
CN203807946U (zh) 一种轨道梁的架设装置
CN210238156U (zh) 一种梁式可调无砟轨道系统
CN204151670U (zh) 调压式桥梁支座垫块
CN210559087U (zh) 一种可调节式穿心千斤顶
CN207776427U (zh) 可升降的建筑模板
CN201217779Y (zh) 高架轨道u形梁临时支座
CN206592713U (zh) 一种支承座

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081217

Termination date: 20161227