CN204151670U - 调压式桥梁支座垫块 - Google Patents

调压式桥梁支座垫块 Download PDF

Info

Publication number
CN204151670U
CN204151670U CN201420267763.8U CN201420267763U CN204151670U CN 204151670 U CN204151670 U CN 204151670U CN 201420267763 U CN201420267763 U CN 201420267763U CN 204151670 U CN204151670 U CN 204151670U
Authority
CN
China
Prior art keywords
bearing
jack
cushion block
pressure
top cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420267763.8U
Other languages
English (en)
Inventor
程青现
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420267763.8U priority Critical patent/CN204151670U/zh
Application granted granted Critical
Publication of CN204151670U publication Critical patent/CN204151670U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

一种可以调整桥梁支座支撑力大小的支座垫块,采用千斤顶调整支座高程,根据千斤顶油表读数推算支座支撑力大小,在支座支撑力满足设计要求时用水泥砂浆填实支座垫块套筒部分。可以确保支座受力满足设计要求,避免由于不均匀受力产生的破坏。

Description

调压式桥梁支座垫块
 技术领域
      本实用新型涉及一种公路桥梁支座的调压装置,尤其是能调整桥梁大梁对支座压力的支座垫块。 
背景技术
      公路桥梁的使用过程中,桥梁支座的破坏是一个比较突出的问题,很多桥梁投入使用很短时间,支座就发生破坏,远远未得到设计寿命,就其破坏的一个主要原因是大梁下面支座不能均衡受力。目前关于桥梁支座设计一般是:在墩(台)帽上用钢筋混凝土做支座垫块,支座放置在垫块上,然后安装梁,由于常常是高空作用等原因,混凝土支座垫块高程和设计有偏差,致使支座高程偏差,最后导致支座不能平衡受力,比设计高程低的支座受力小,比设计高程高的支座受力大,当受力超过支座容许荷载时,就加速了支座的破坏;同时由于大梁支撑条件和设计不一致,大梁也要产生扭曲变形,产生比较大的额外的内应力,形成对大梁的破坏。 
发明内容
    为了克服由于支座高程偏差引起的支座不均匀受力,致使支座过早破坏,梁体产生额外荷载的现象,本实用新型提供的调压式支座垫块,通过调整支座压力的办法,能够使支座按照设计计算的大小承受荷载,不会发生支座过早破坏和由于支座高程偏差引起的梁体额外内力。 
本实用新型解决其技术问题所采用的技术方案是: 
对梁体支座支撑受力进行分析,把其中部分支座的支座垫块换成调压式支座垫块,在调压式支座垫块下面采用千斤顶顶起,根据千斤顶的油压来测算支座反力的大小,如果油压值偏小,说明该支座偏低,用千斤顶调整支座高度,直到满足事先计算好的设计支座反力值对应的油压值,然后把支座垫块用混凝土砂浆填实。如果油压值偏大,说明该支座高程偏高,和该支座相邻的支座偏低,那么直接把该支座垫块用混凝土砂浆填实,把相邻的偏低的支座进行调整。这样就可以确保每块支座受力均匀。 
本实用新型的有益效果是:通过千斤顶油压值推算支座反力,用千斤顶调整高程的办法调整支座支撑反力,使其满足设计要求,很好解决支座不均匀受力问题。该办法既可以在新建桥梁是采用,也可以再对已通车桥梁的支座维修是使用。 
附图说明
   下面结合附图和实施例对本实用新型进一步说明 
图1 简支板梁支座布置图 
  图中 ①—桥墩(台)   ②---梁     a、b、c、d---支座 
图2 调压式支座垫块安装图 
图中 ①—支座    ②—梁   ③---调压式支座垫块  ④—桥墩(台) 
图3 调压式支座构造图 
图4 调压式支座底托构造图 
    图5调压式支座顶盖构造图 
具体实施方式
图1:一般情况下,一片梁有几个支座,梁型不一样支座数量不一样,比如简支板梁有4个支座,经过受力分析,只要调整任意一个桥墩(台)上的两个支座垫块,就可以保证4个支座正确受力。也就是只要把a、b支座垫块或c、d支座垫块任意两个由原来混凝土垫块换成调压式垫块,就能保证支座受力正确。 
图2:桥梁结构,下面是桥墩或桥台,在墩帽或台帽上设置支座垫石,常见支座垫石一般是钢筋混凝土构件,支座上面放置支座,支座上面是大梁。调压式支座垫块就是把原来的钢筋混凝土垫块替换为调压式混凝土垫块。 
图3:是调压式支座垫块构造示意图,支座垫块为钢构件,有底托(图4)和顶盖(图5)两部分组成,顶盖和底托两端是两个套筒,相互套在一起,底托下面有压浆孔,顶盖上面有出气孔,底托和顶盖中间是放置千斤顶的支持处。 
工作原理:调压式支座垫块的底托和桥墩的预埋钢筋相连,进行固定,底托上面是顶盖,顶盖上面是支座,支座上面是大梁,安装完成后,将千斤顶放置在底托和顶盖中间预留的位置,启动千斤顶,将顶盖以上的构件顶起,观察千斤顶液压油表读数。在这之前要设计院提供每个支座位置的设计支座反力,并将支座反力换算为千斤顶油表读数。将实际支座的压力油表读数和设计值比较,如果实际值小于设计值,说明该支座高程偏低,大梁对该支座压力小于设计值,这时候,要把支座用千斤顶顶起,提高支座高程,一直顶到油压表实际读数和设计值一致,然后,在底托的压浆孔用高压的办法压入高标号水泥砂浆,把垫块两侧的套筒内充满砂浆,砂浆中应加入早强剂,等到砂浆强度达到一定值后就可以拆除千斤顶,用混凝土将放置千斤顶的位置填实。 
相反,如果千斤顶油表读数大于设计值,说明该支座高程偏高,那只能是同桥墩(台)的另一个支座偏低,偏高的支座可以直接用水泥砂浆压实套筒,用混凝土填实垫块预留的千斤顶位置,把另一侧偏低的支座进行上述处理。 

Claims (2)

1.一种桥梁支座垫块,有顶盖和底托,安装在桥梁支座下面,其特征是根据设计院大梁设计计算书中每个支座的支撑力大小,和千斤顶使用说明书中满足支撑力对应的油压读数,用千斤顶在顶盖和底托之间顶起,当千斤顶达到需要的油压读数时,千斤顶顶起顶盖的高度即为支座垫块应有的高度。
2.根据权利要求1所述的支座垫块,其特征是顶盖和底托要加工成套筒,在千斤顶顶起油压表显示满足支座承载力时,在套筒中填充水泥砂浆;同时在底托和顶盖之间有可以放置千斤顶的位置。
CN201420267763.8U 2014-05-25 2014-05-25 调压式桥梁支座垫块 Expired - Fee Related CN204151670U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420267763.8U CN204151670U (zh) 2014-05-25 2014-05-25 调压式桥梁支座垫块

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420267763.8U CN204151670U (zh) 2014-05-25 2014-05-25 调压式桥梁支座垫块

Publications (1)

Publication Number Publication Date
CN204151670U true CN204151670U (zh) 2015-02-11

Family

ID=52509798

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420267763.8U Expired - Fee Related CN204151670U (zh) 2014-05-25 2014-05-25 调压式桥梁支座垫块

Country Status (1)

Country Link
CN (1) CN204151670U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086143A (zh) * 2018-01-17 2018-05-29 薛秋香 一种装配式板桥橡胶支座垫石支承力精确控制方法
CN111505251A (zh) * 2019-01-30 2020-08-07 南京交通职业技术学院 一种水泥混凝土强度的预测方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086143A (zh) * 2018-01-17 2018-05-29 薛秋香 一种装配式板桥橡胶支座垫石支承力精确控制方法
CN111505251A (zh) * 2019-01-30 2020-08-07 南京交通职业技术学院 一种水泥混凝土强度的预测方法

Similar Documents

Publication Publication Date Title
CN101429820B (zh) 建筑物整体移位方法
CN103726450B (zh) 简支板桥顶高方法及其可调高组合垫石结构
CN103216114B (zh) 建筑物的平移施工方法
CN203546626U (zh) 钢管混凝土拱桥吊杆更换装置
CN104404882B (zh) 一种支座辅助安装模具及其施工方法
CN107190637B (zh) 便于更换的桥梁支座
CN203452266U (zh) H型钢柱的固定和调平结构
CN206233276U (zh) 一种预试桩静压施加装置
CN110847026A (zh) 一种大行程可调支座
CN102704412B (zh) 桥梁断柱顶升施工方法
CN204151670U (zh) 调压式桥梁支座垫块
CN102817328A (zh) 一种用于支座的调高方法
CN206800220U (zh) 一种用于跨高速公路旧桥拆除快速安装可调支架
CN104775366B (zh) 一种盆式支座位置空间较低情况下的支座更换方法
CN204252023U (zh) 一种支座辅助安装模具
CN204609319U (zh) 一种大吨位预应力张拉施工调节装置
CN104278624B (zh) 一种变高程桥梁支座
CN113373817A (zh) 一种预制梁纵横坡楔形块精确调节施工方法及装置
CN203065967U (zh) 一种桥梁盖梁现浇混凝土的受力结构
CN201110804Y (zh) 多功能试验架
CN209907206U (zh) 一种哑铃形拱肋安装的辅助装置
CN105297643B (zh) 空心板式桥梁支座更换方法
CN207525625U (zh) 砂箱预压机
CN102704398B (zh) 盖梁顶升施工方法
CN202509414U (zh) 桥梁断柱顶升施工装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150211

Termination date: 20160525