CN201149374Y - 废气焚烧热风炉 - Google Patents
废气焚烧热风炉 Download PDFInfo
- Publication number
- CN201149374Y CN201149374Y CNU200820060411XU CN200820060411U CN201149374Y CN 201149374 Y CN201149374 Y CN 201149374Y CN U200820060411X U CNU200820060411X U CN U200820060411XU CN 200820060411 U CN200820060411 U CN 200820060411U CN 201149374 Y CN201149374 Y CN 201149374Y
- Authority
- CN
- China
- Prior art keywords
- waste gas
- hot
- oven
- incinerator
- outlet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Drying Of Solid Materials (AREA)
Abstract
本实用新型由:烘箱,焚烧炉,其中烘箱包括:热风进口,废气出口,废气进口,热风出口;焚烧炉包括:燃烧机,新鲜风引风机,干燥机废气抽引风机,废气换热器,空气换热器,烟囱,排烟风机,其特征在于:烘箱通过热风进口,热风出口连接到焚烧炉,焚烧炉通过废气进口,废气出口与烘箱连接。其开始利用热能对烘箱进行加热,等正常工作了利用分解的废气焚烧发出的热传输给烘箱,提供分解废气所需要的热源,无需对烘箱进行额外能源加热,使得焚烧产生的热能得到充分利用,最终排出的烟气达到国家环保要求。
Description
技术领域
本实用新型公开了一种对可燃性气体进行回收,在高温下燃烧产生的热量对空气进行加热、热能量再进行利用的一种环保型废气回收、分解热能再利用装置,属于环保节能设备范畴。
背景技术
废气焚烧热风炉是将废弃物干燥过程中产生的可燃烧的废气(如甲醇、乙醇、丙酮等)经过充分的预热,而后经过炉膛进行燃烧。这一过程是连续的,当有充足的废气产生时,所产生的废气经过预热后燃烧所产生的热能量能维持干燥箱内所需的热源。现有的设备是废气不能经过充分的预热,预热后的温度达不到充分燃烧前必须的温度,一旦预热温度不够,即会使废气不能充分分解、热量不能充分利用,最终排出的烟气达不到国家环保要求;另一个方面废气的热量不能充分分解利用导致能源浪费,还额外需增加能源。
实用新型内容
鉴于以上的原因本实用新型对原有设备进行改进,能使得上述环保和废气能源再利用得以实现。本实用新型由:烘箱1,焚烧炉2,其中烘箱1包括:热风进口11,废气出口12,废气进口21,热风出口22;焚烧炉2包括:燃烧机3,新鲜风引风机4,干燥机废气抽引风机5,废气换热器6,空气换热器7,烟囱8,排烟风机9,其特征在于:烘箱1通过热风进口11,热风出口22连接到焚烧炉2,焚烧炉2通过废气进口21,废气出口12与烘箱1连接。其技术特征为:废气换热器6置于靠近炉膛的部位,热空换热器7置于后部;废气单支预热管道总截面积必须≥废气总管道的面积;炉膛燃烧室必须建立缓冲燃烧室。
本实用新型在开始利用烘箱进行加热,等正常工作了能利用分解的废气焚烧发出的热传输给烘箱,提供分解废气所需要的热源,无需对烘箱进行加热,无需额外需增加能源,使得焚烧产生的热能得到充分利用,最终排出的烟气达到国家环保要求。
附图说明
图1为本实用新型整体结构原理图。
图1中1为烘箱,11为热风进口,12为废气出口;2为焚烧炉,21为废气进口,22为热风出口,3为燃烧机。
图2为本实用新型焚烧炉2结构图。
图2中,4为新鲜风引风机,5为干燥机废气抽引风机,6为废气换热器,7为空气换热器,8为烟囱,9为排烟风机。
具体实施方式
废气焚烧热风炉,其包括:烘箱1,焚烧炉2,其中烘箱1包括:热风进口11,废气出口12,废气进口21,热风出口22;焚烧炉2包括:燃烧机3,新鲜风引风机4,干燥机废气抽引风机5,废气换热器6,空气换热器7,烟囱8,排烟风机9,其特征在于:烘箱1通过热风进口11,热风出口22连接到焚烧炉2,焚烧炉2通过废气进口21,废气出口12与烘箱1连接。
其特征在于:废气预热管道置于靠近炉膛燃烧室的部位,热空气管置于后部,废气预热管道由一支或一支以上组成,废气单支预热管道总截面积必须≥废气总管道的面积,炉膛燃烧室内部建有缓冲燃烧室,排烟风机、废气风机及燃烧机通过PLC程序控制。
其原理及工作情况为:当干燥机内的废气通过管道及废气风机输送到有足够预热能率的耐高温不锈钢管道内,外壁被加温,使得废气预热后的温度≥560℃。此时废气接近临界分解状态,而后进入到炉膛,在炉膛中部遇到≥780℃的高温即进行充分的燃烧。
当充分燃烧后,放出大量的热量,使得炉膛温度升高超过设定的温度,此时PLC接受到信号关闭燃烧机(即不需供油燃烧)。下一步的燃烧就是靠这不断的废气循环的工作所产生的热能将置于预热管后部的热空气管加热,热量被干燥机利用。同时废气在高温下充分分解通过风机烟囱排出到大气中去,不会对环境造成污染。
Claims (3)
1、一种废气焚烧热风炉,其由:烘箱(1),焚烧炉(2),其中烘箱(1)包括:热风进口(11),废气出口(12),废气进口(21),热风出口(22);焚烧炉(2)包括:燃烧机(3),新鲜风引风机(4),干燥机废气抽引风机(5),废气换热器(6),空气换热器(7),烟囱(8),排烟风机(9),其特征在于:烘箱(1)通过热风进口(11),热风出口(22)连接到焚烧炉(2),焚烧炉(2)通过废气进口(21),废气出口(12)与烘箱(1)连接。
2、根据权利要求1所述的一种废气焚烧热风炉,其特征在于:废气换热器(6)置于靠近炉膛的部位,热空换热器(7)置于后部。
3、根据权利要求1所述的一种废气焚烧热风炉,其特征在于:废气单支预热管道总截面积≥废气总管道的面积。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU200820060411XU CN201149374Y (zh) | 2008-01-04 | 2008-01-04 | 废气焚烧热风炉 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU200820060411XU CN201149374Y (zh) | 2008-01-04 | 2008-01-04 | 废气焚烧热风炉 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201149374Y true CN201149374Y (zh) | 2008-11-12 |
Family
ID=40117144
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNU200820060411XU Expired - Fee Related CN201149374Y (zh) | 2008-01-04 | 2008-01-04 | 废气焚烧热风炉 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201149374Y (zh) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101858600A (zh) * | 2010-06-30 | 2010-10-13 | 南通凯迪自动机械有限公司 | 蓄热式废气焚烧炉 |
| CN102235814A (zh) * | 2011-04-20 | 2011-11-09 | 江苏剑桥涂装工程有限公司 | 直燃式热风炉 |
| CN105953243A (zh) * | 2016-06-27 | 2016-09-21 | 南通图海机械有限公司 | 一种废气焚烧炉 |
| CN108644794A (zh) * | 2018-05-13 | 2018-10-12 | 佛山市佳威节能环保设备有限公司 | 一种治理VOCs系统 |
| CN109681892A (zh) * | 2017-10-18 | 2019-04-26 | 佛山安洁保节能设备有限公司 | 废气焚烧装置 |
| CN110608445A (zh) * | 2019-10-22 | 2019-12-24 | 南通四通林业机械制造安装有限公司 | 一种蓄热式废气焚烧炉 |
-
2008
- 2008-01-04 CN CNU200820060411XU patent/CN201149374Y/zh not_active Expired - Fee Related
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101858600A (zh) * | 2010-06-30 | 2010-10-13 | 南通凯迪自动机械有限公司 | 蓄热式废气焚烧炉 |
| CN102235814A (zh) * | 2011-04-20 | 2011-11-09 | 江苏剑桥涂装工程有限公司 | 直燃式热风炉 |
| CN102235814B (zh) * | 2011-04-20 | 2013-10-30 | 江苏剑桥涂装工程有限公司 | 直燃式热风炉 |
| CN105953243A (zh) * | 2016-06-27 | 2016-09-21 | 南通图海机械有限公司 | 一种废气焚烧炉 |
| CN109681892A (zh) * | 2017-10-18 | 2019-04-26 | 佛山安洁保节能设备有限公司 | 废气焚烧装置 |
| CN109681892B (zh) * | 2017-10-18 | 2024-03-22 | 中山大宇环保技术有限公司 | 废气焚烧装置 |
| CN108644794A (zh) * | 2018-05-13 | 2018-10-12 | 佛山市佳威节能环保设备有限公司 | 一种治理VOCs系统 |
| CN110608445A (zh) * | 2019-10-22 | 2019-12-24 | 南通四通林业机械制造安装有限公司 | 一种蓄热式废气焚烧炉 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201149374Y (zh) | 废气焚烧热风炉 | |
| CN203190418U (zh) | 一种新型垃圾热解焚烧设备 | |
| CN106678830A (zh) | 垃圾焚烧烟风系统及焚烧控制方法 | |
| CN205077099U (zh) | 一种带有烟气处理装置的节能回火炉 | |
| CN203719432U (zh) | 隧道窑烟道余热回收系统 | |
| CN201866776U (zh) | 彩镀钢板生产线油漆废气高温裂解循环固化装置 | |
| CN109028989A (zh) | 窑炉废热综合利用系统 | |
| CN204285474U (zh) | 一种垃圾焚烧炉结构 | |
| CN203116031U (zh) | 利用垃圾焚烧发电烟气余热焚烧污泥的系统 | |
| CN202074693U (zh) | 可燃废气再利用热风炉 | |
| CN201093881Y (zh) | 节能减排工业窑炉系统 | |
| CN106871636B (zh) | 工业窑炉有机废气焚烧再利用生产工艺 | |
| CN215929619U (zh) | 一种能有效利用二次热风的燃烧装置 | |
| CN203010631U (zh) | 三段式马丁炉排垃圾焚烧炉 | |
| CN204535441U (zh) | 一种余热助燃的节能燃气窑炉 | |
| CN104034029A (zh) | 一种热风炉 | |
| CN203980295U (zh) | 生活垃圾焚烧炉的燃烧空气温度提升装置 | |
| CN206803189U (zh) | 一种新型的多种异味有毒废气同步焚烧装置 | |
| CN100381756C (zh) | 高温焚烧垃圾的方法及其设备 | |
| CN100434796C (zh) | 蓄热式加热炉炉墙内的烧嘴、空气通道、煤气通道施工方法 | |
| CN203586225U (zh) | 一种经微波预处理后的废弃物再处理的焚烧装置 | |
| CN220436519U (zh) | 高温热解垃圾焚烧炉 | |
| CN102966955A (zh) | 机械炉排垃圾焚烧炉高温烟气循环系统 | |
| CN207741101U (zh) | 一种火化机余热利用装置 | |
| CN201569161U (zh) | 碳氢有机质燃料烘烤设备 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20081112 Termination date: 20130104 |