CN201087549Y - Obligate bolt hole reinforcing bar cage of apparatus foundation - Google Patents

Obligate bolt hole reinforcing bar cage of apparatus foundation Download PDF

Info

Publication number
CN201087549Y
CN201087549Y CNU2007201021532U CN200720102153U CN201087549Y CN 201087549 Y CN201087549 Y CN 201087549Y CN U2007201021532 U CNU2007201021532 U CN U2007201021532U CN 200720102153 U CN200720102153 U CN 200720102153U CN 201087549 Y CN201087549 Y CN 201087549Y
Authority
CN
China
Prior art keywords
bolt hole
reinforcing bar
reinforcing
reinforcing steel
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2007201021532U
Other languages
Chinese (zh)
Inventor
许国华
王良骥
朱永清
杨艾生
王美丽
程辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Architecture Engineering(Group) Company
Shanxi four Construction Group Co., Ltd.
Original Assignee
China Shanxi Sijian Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shanxi Sijian Group Co Ltd filed Critical China Shanxi Sijian Group Co Ltd
Priority to CNU2007201021532U priority Critical patent/CN201087549Y/en
Application granted granted Critical
Publication of CN201087549Y publication Critical patent/CN201087549Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model relates to a construction tool, in particular to a reinforcing cage of the bolt hole used for reserving the equipment foundation. The problem that the position of the bolt hole for reserving the equipment foundation is not precise in the process of casting concrete in prior art, and the template is hard to detach is solved. A plurality of regularly-aligned reinforcing steel bars are included, a reinforcing rib is arranged between the adjacent reinforcing steel bars, a galvanized iron wire mesh envelopes the outside and the bottom of the reinforcing steel bars, a cement mortar layer is arranged outside the galvanized iron wire mesh, and the upper end of the reinforcing steel bar is higher than the cement mortar layer. The construction tool provided by the utility model has the advantages of firm fixing, accurate position and simple installing, and the mould is not needed to detach, which avoids the difficulty in detaching, reduces the working, and promotes the protection of finished products.

Description

Equipment Foundations prepared screw-bolt hole hole reinforcing cage
Technical field
The utility model relates to a kind of building operations instrument, is specially a kind of Equipment Foundations prepared screw-bolt hole hole reinforcing cage.
Background technology
The bolt hole of reserving Equipment Foundations in concreting process is a construction Difficulties always, and the degree of accuracy of the position that the bolt hole is reserved, size, the degree of depth, diameter is difficult to be effectively controlled owing to being subjected to construction infection.Prior art adopts usually at pre-designed location point wooden form, and tool making templates such as steel pipe surround out a reserving hole at this location point then.But exist following problem in the practice of construction, make the template positioning such as building the lateral pressure that produces in the concrete process, even collapse under pressure, the concrete setting rear pattern plate is difficult to problems such as taking-up.
Summary of the invention
The utility model is inaccurate for the position of the bolt hole that solves the reservation Equipment Foundations that exist in the prior art, problem such as form removable difficulty and a kind of Equipment Foundations prepared screw-bolt hole hole reinforcing cage is provided.
The utility model is realized by following technical scheme, a kind of Equipment Foundations prepared screw-bolt hole hole reinforcing cage, comprise the some reinforcing bars that are arranged in regular shape, be connected with ribs between the adjacent reinforcing bar, be with lead wire net in all the reinforcing bar outside and bottom, lead wire net is provided with cement sand bed outward, and the reinforcing bar upper end is higher than cement sand bed.
In the practice of construction, according to the location point place of drawing in the prepared screw-bolt hole hole, the steel mesh reinforcement welding that is provided with on an end that exposes reinforcing bar of the present utility model and the building is fixing, install peripheral casting concrete at this then, after the concrete setting, the utility model connects as one with it, and the hole that reinforcing bar surrounds has enough spaces to bury the bolt that is used for fixing equipment underground.
Compared with prior art, the utility model is directly made the mould of hollow with waste and old reinforcing bar and concrete, and whole the placement has fixation, the position is accurate, and simple advantage is installed, and need not remove mould, avoided removing difficulty, reduced recruitment, promoted the finished product protection.
Description of drawings
Fig. 1 is an internal construction schematic diagram of the present utility model
Fig. 2 is the vertical view of Fig. 1
The specific embodiment
Anticipate as illustrated in fig. 1 and 2, a kind of Equipment Foundations prepared screw-bolt hole hole reinforcing cage, comprise the some reinforcing bars 1 that are arranged in regular shape, be connected with ribs 2 between the adjacent reinforcing bar 1, be with lead wire net 3 in all reinforcing bars 1 outside and bottom, be provided with cement sand bed 4 outside the lead wire net 3, and reinforcing bar 1 upper end is higher than cement sand bed 4.Reinforcing bar 1 is more than three.
Distance between the length of reinforcing bar 1 and the adjacent reinforcing bar selects according to actual needs to determine that reinforcing bar can select waste and old reinforcing bar splicing to use.
Ribs 2 between the reinforcing bar 1 is a linear, and plan view shape is a rectangle.
Ribs 2 between the reinforcing bar 1 is a circular arc line, and plan view shape is circular.To adapt to the drawing design is that requirement is the situation of circular port.

Claims (3)

1. Equipment Foundations prepared screw-bolt hole hole reinforcing cage, it is characterized in that: comprise the some reinforcing bars (1) that are arranged in regular shape, be connected with ribs (2) between the adjacent reinforcing bar (1), be with lead wire net (3) in all reinforcing bars (1) outside and bottom, lead wire net (3) is outer to be provided with cement sand bed (4), and reinforcing bar (1) upper end is higher than cement sand bed (4).
2. Equipment Foundations prepared screw-bolt hole according to claim 1 hole reinforcing cage is characterized in that: the ribs (2) between the reinforcing bar (1) is a linear, and plan view shape is a rectangle.
3. Equipment Foundations prepared screw-bolt hole according to claim 1 hole reinforcing cage is characterized in that: the ribs (2) between the reinforcing bar (1) is a circular arc line, and plan view shape is circular.
CNU2007201021532U 2007-08-01 2007-08-01 Obligate bolt hole reinforcing bar cage of apparatus foundation Expired - Lifetime CN201087549Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007201021532U CN201087549Y (en) 2007-08-01 2007-08-01 Obligate bolt hole reinforcing bar cage of apparatus foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007201021532U CN201087549Y (en) 2007-08-01 2007-08-01 Obligate bolt hole reinforcing bar cage of apparatus foundation

Publications (1)

Publication Number Publication Date
CN201087549Y true CN201087549Y (en) 2008-07-16

Family

ID=39635142

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007201021532U Expired - Lifetime CN201087549Y (en) 2007-08-01 2007-08-01 Obligate bolt hole reinforcing bar cage of apparatus foundation

Country Status (1)

Country Link
CN (1) CN201087549Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102518130A (en) * 2011-12-29 2012-06-27 中铁上海工程局华海工程有限公司 Reinforcement cage cement plaster pile casing for sea reclamation fill geological basement and construction process thereof
CN109386009A (en) * 2017-08-04 2019-02-26 上海宝冶集团有限公司 Equipment anchor bolt buries the construction tool and method of reserving hole

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102518130A (en) * 2011-12-29 2012-06-27 中铁上海工程局华海工程有限公司 Reinforcement cage cement plaster pile casing for sea reclamation fill geological basement and construction process thereof
CN102518130B (en) * 2011-12-29 2014-12-17 中铁上海工程局集团华海工程有限公司 Manufacturing method of and construction process of reinforcement cage cement plaster pile casing
CN109386009A (en) * 2017-08-04 2019-02-26 上海宝冶集团有限公司 Equipment anchor bolt buries the construction tool and method of reserving hole

Similar Documents

Publication Publication Date Title
CN104895092B (en) The method that a kind of interim lattice column of inner support is used as permanent structure post
CN202012153U (en) Steel bar positioning fixture
CN112064676A (en) Movable formwork structure and construction method thereof
CN101289866A (en) Construction method for precasting concrete moulding bed in local pit of base pit engineering under soft foundation
CN110552370A (en) Reverse construction method based annular lining wall integral single-side formwork construction method
CN203429641U (en) Single-side supporting formwork reinforcing structure system for building construction
CN108755972B (en) Foot pad for prefabricated part and using method thereof
CN106968692B (en) Tunnel excavation supporting structure and construction method thereof
CN201087549Y (en) Obligate bolt hole reinforcing bar cage of apparatus foundation
CN205976167U (en) Based on cast -in -place floor structures of detachable positioning control spare
CN211817000U (en) Constructional column steel bar positioning mechanism
CN104947853A (en) Built-in stand type cast-in-place reinforced concrete pillar and construction method
CN113006377A (en) Constructional column steel bar construction method
CN112681334A (en) Deep foundation pit side wall concrete pouring construction structure and method
CN104727339A (en) Electrical equipment foundation two-step type construction method
CN202247938U (en) Wedge-shaped foundation bolt preformed hole core formwork device
CN101586810B (en) Secondary mounting method for construction elbow of flue opening
CN103352568A (en) Method for building constructional column on foundation pad
CN213233475U (en) A reinforced structure that is used for mould to build concrete form between stake
CN211421610U (en) Constructional column steel bar connection structure
CN108729456A (en) It is a kind of one concrete revetment pour mold and its pouring construction method
CN211646821U (en) Electronic box equipment supporting device and wall body comprising same
CN211058144U (en) Integral prefabricating and forming structure for embedded part and core cylinder reinforcing mesh of tower crane
CN107574934A (en) Fabricated shear wall embedded sleeve barrel joint bar construction method
CN212801509U (en) Building pile foundation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHANXI SIJIAN GROUP CO., LTD.; PATENTEE

Free format text: FORMER OWNER: SHANXI SIJIAN GROUP CO., LTD.

Effective date: 20080926

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Xu Guohua

Inventor after: Huo Xiao Mei

Inventor after: Wang Liangji

Inventor after: Zhu Yongqing

Inventor after: Yang Aisheng

Inventor after: Wang beauty

Inventor after: Cheng Hui;

Inventor before: Xu Guohua

Inventor before: Wang Liangji

Inventor before: Zhu Yongqing

Inventor before: Yang Aisheng

Inventor before: Wang beauty

Inventor before: Cheng Hui;

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: XU GUOHUA; WANG LIANGJI; ZHU YONGQING; YANG AISHENG; WANG MEILI; CHENG HUI TO: XU GUOHUA; HUO XIAOMEI; WANG LIANGJI; ZHU YONGQING; YANG AISHENG; WANG MEILI; CHENG HUI

TR01 Transfer of patent right

Effective date of registration: 20080926

Address after: No. 7, sports North Street, Taiyuan, Shanxi Province: 030012

Co-patentee after: Shanxi Architecture Engineering(Group) Company

Patentee after: Shanxi four Construction Group Co., Ltd.

Address before: No. 7, sports North Street, Taiyuan, Shanxi Province: 030012

Patentee before: Shanxi Sijian Group Co., Ltd.

CX01 Expiry of patent term

Granted publication date: 20080716

CX01 Expiry of patent term