CN202012153U - Steel bar positioning fixture - Google Patents

Steel bar positioning fixture Download PDF

Info

Publication number
CN202012153U
CN202012153U CN2010206688370U CN201020668837U CN202012153U CN 202012153 U CN202012153 U CN 202012153U CN 2010206688370 U CN2010206688370 U CN 2010206688370U CN 201020668837 U CN201020668837 U CN 201020668837U CN 202012153 U CN202012153 U CN 202012153U
Authority
CN
China
Prior art keywords
steel bars
steel bar
positioning fixture
plate
wall body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206688370U
Other languages
Chinese (zh)
Inventor
葛磊
迟凯
郑直
路强
张鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING JIANGONG GROUP Co Ltd
Beijing Building Construction Research Institute Co Ltd
Beijing Construction Engineering Group Co Ltd
Original Assignee
BEIJING JIANGONG GROUP Co Ltd
Beijing Building Construction Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING JIANGONG GROUP Co Ltd, Beijing Building Construction Research Institute Co Ltd filed Critical BEIJING JIANGONG GROUP Co Ltd
Priority to CN2010206688370U priority Critical patent/CN202012153U/en
Application granted granted Critical
Publication of CN202012153U publication Critical patent/CN202012153U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model relates to a steel bar positioning fixture. The steel bar positioning fixture comprises a positioning plate and handrails, wherein a plurality of positioning through holes for the penetration of steel bars are formed at a proper interval (based on the positions of prefabricated wall body connecting steel bars) on the positioning plate; two Omega-shaped handrails are welded at the two ends of the positioning plate and used for detaching and installing the positioning fixture. Before concrete of the wall body is cast, the steel bar positioning fixture is used for positioning the steel bars and detecting whether the positions of embedded steel bars in a cast-in-situ layer are correct; and when concrete of a top slab is cast, the fixture is sleeved onto the embedded steel bars at the top part of the prefabricated wall body and tolerance is revised so as to ensure the accuracy of the positions of the embedded steel bars of the prefabricated wall body. The steel bar positioning fixture is simple in structure and can accurately position the embedded steel bars; concrete is not required to be eliminated; construction waste is avoided; the steel bar positioning fixture is environment-friendly, labor-saving and time-saving; and the schedule of a constructional engineering and the working quality of the embedded steel bars are ensured.

Description

The bar spacers tool
Technical field the utility model relates to a kind of building engineering construction facility, a kind of specifically bar spacers tool that is used for the precast wall body installation.
Energy-conserving and environment-protective and demand for security that background technology is accompanied by the building green construction improve constantly, requirement to the building engineering construction facility is more and more higher, particularly develop the facility of prefabricated units installation rapidly these years, it has become accelerating construction progress, guarantees one of construction quality and reflection construction civilization degree sign.At present, the traditional direct joint bar job practices of body of wall of main employing in the precast wall body installation.The direct joint bar job practices of body of wall is reinforcing bar to be arranged according to preset space length be embedded in the body of wall, places outside the body of wall with the floor bar binding end.This method advantage is to reserve easy construction, but the formwork difficulty, reinforcement location moves easily when building concrete, needs the straightening reinforcing bar in the construction in later period process, removes the concrete that has hardened, and time-consuming, building waste is many, is unfavorable for the green construction of job site.
The summary of the invention the purpose of this utility model is to overcome the deficiency that prior art exists, and a kind of bar spacers tool is provided, and guarantees the accurate of reinforcement location when the precast wall body installation, has avoided a large amount of rejectings of concrete in work progress, reduces building waste.
The technical solution of the utility model is: a kind of bar spacers tool comprises location-plate and handrail.Location-plate is dull and stereotyped.The spacing appropriate intervals offers two registration holes on location-plate.This locating hole can pass for reserved steel bar; Two handrails lay respectively at the two ends of location-plate, and weld vertical with location-plate.Concrete form be on the described location-plate at interval suitably distance (according to precast wall body connecting reinforcement position) offer a plurality of elongated locating holes that pass for reinforcing bar, respectively be welded with a handrail at the two ends of location-plate, handrail is Ω shape, is used for this positioning fixture of dismounting.Before building walls concrete, reinforcing bar is positioned, check whether the position of embedded bar in the in-situ layer is correct with this bar spacers tool; When building concrete roof, again this jig is enclosed within on the reserved steel bar of precast wall body top,, guarantees the accurate of precast wall body reserved steel bar position overproof revising.
The characteristics that the utlity model has are: simple in structure, and reserved steel bar is accurately located, need not carry out concrete and reject, there is not building waste to be beneficial to environmental protection, save man-hour, help guaranteeing the progress of construction work and the operation quality of reserved steel bar.
Appended drawings is the utility model structural representation.
Serial number name is respectively among the figure: (1) location-plate, (2) handrail, (101) locating hole.
Specific embodiment Figure of description is the optimal way that the utility model is implemented, below in conjunction with description of drawings the utility model.
Referring to accompanying drawing, the composition mode of bar spacers tool: comprise location-plate (1) and handrail (2), location-plate (1) is dull and stereotyped, goes up the spacing appropriate intervals at location-plate (1) and offers two registration holes (101), and this locating hole (101) can pass for reserved steel bar; Two handrails (2) lay respectively at the two ends of location-plate (1), and with the vertical welding of location-plate (1).Locating hole (101) quantity on the location-plate (1), row's number and spacing distance thereof design according to precast wall body connecting reinforcement position, are not limited to row's number and locating hole quantity in this accompanying drawing.

Claims (1)

1. bar spacers tool is characterized in that: comprise location-plate (1) and handrail (2), location-plate (1) is dull and stereotyped, goes up the spacing appropriate intervals at location-plate (1) and offers two registration holes (101), and this locating hole (101) can pass for reserved steel bar; Two handrails (2) lay respectively at the two ends of location-plate (1), and with the vertical welding of location-plate (1).
CN2010206688370U 2010-12-20 2010-12-20 Steel bar positioning fixture Expired - Fee Related CN202012153U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206688370U CN202012153U (en) 2010-12-20 2010-12-20 Steel bar positioning fixture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206688370U CN202012153U (en) 2010-12-20 2010-12-20 Steel bar positioning fixture

Publications (1)

Publication Number Publication Date
CN202012153U true CN202012153U (en) 2011-10-19

Family

ID=44782764

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206688370U Expired - Fee Related CN202012153U (en) 2010-12-20 2010-12-20 Steel bar positioning fixture

Country Status (1)

Country Link
CN (1) CN202012153U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104453242A (en) * 2014-10-25 2015-03-25 中国二十二冶集团有限公司 Method for binding vertical reinforced bars of concrete tube structure
CN105003029A (en) * 2015-07-22 2015-10-28 山东明达建筑科技有限公司 Sleeve bar straightening butt joint formwork
CN105133640A (en) * 2015-09-21 2015-12-09 山东送变电工程公司 Locating device for electrical embedded pipe penetrated concrete foundation
CN105643791A (en) * 2016-02-04 2016-06-08 龙信建设集团有限公司 Accurate positioning die for prefabricated wall body grouting sleeve stripy closely spaced exposed steel bar
CN111112924A (en) * 2020-02-18 2020-05-08 中交路桥建设有限公司 Shear force nail fixed-position welding mould
CN112049329A (en) * 2020-08-31 2020-12-08 上海家树建筑工程有限公司 Prefabricated post roof beam component reinforcing bar stop device
CN114541785A (en) * 2022-03-31 2022-05-27 中铁城建集团第一工程有限公司 Positioning structure and positioning method for pc component on cast-in-place concrete floor
CN114892992A (en) * 2022-06-24 2022-08-12 北京博大新元房地产开发有限公司 Precision control device and construction process for embedded steel bars of assembled wall conversion layer

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104453242A (en) * 2014-10-25 2015-03-25 中国二十二冶集团有限公司 Method for binding vertical reinforced bars of concrete tube structure
CN105003029A (en) * 2015-07-22 2015-10-28 山东明达建筑科技有限公司 Sleeve bar straightening butt joint formwork
CN105133640A (en) * 2015-09-21 2015-12-09 山东送变电工程公司 Locating device for electrical embedded pipe penetrated concrete foundation
CN105643791A (en) * 2016-02-04 2016-06-08 龙信建设集团有限公司 Accurate positioning die for prefabricated wall body grouting sleeve stripy closely spaced exposed steel bar
CN111112924A (en) * 2020-02-18 2020-05-08 中交路桥建设有限公司 Shear force nail fixed-position welding mould
CN112049329A (en) * 2020-08-31 2020-12-08 上海家树建筑工程有限公司 Prefabricated post roof beam component reinforcing bar stop device
CN112049329B (en) * 2020-08-31 2022-04-19 上海家树建设集团有限公司 Prefabricated post roof beam component reinforcing bar stop device
CN114541785A (en) * 2022-03-31 2022-05-27 中铁城建集团第一工程有限公司 Positioning structure and positioning method for pc component on cast-in-place concrete floor
CN114541785B (en) * 2022-03-31 2024-09-17 中铁城建集团第一工程有限公司 Pc component positioning structure and positioning method on cast-in-place concrete floor slab
CN114892992A (en) * 2022-06-24 2022-08-12 北京博大新元房地产开发有限公司 Precision control device and construction process for embedded steel bars of assembled wall conversion layer
CN114892992B (en) * 2022-06-24 2024-04-02 北京博大新元房地产开发有限公司 Precision control device for embedded bars of assembled wall conversion layer and construction process

Similar Documents

Publication Publication Date Title
CN202012153U (en) Steel bar positioning fixture
CN110439137B (en) Prefabricated wall board, wall body, prefabricated wall board production method and prefabricated wall body construction method
CN206174146U (en) Assembly type structure's assembly node
CN110552440B (en) Safe and environment-friendly construction process for high-strength assembled integral sandwich heat-insulating shear wall
CN110792164B (en) Transverse assembling device and method for assembled shear wall
CN203429641U (en) Single-side supporting formwork reinforcing structure system for building construction
CN103603362A (en) Prefabricated independent foundation and construction method thereof
CN208965714U (en) A kind of prefabricated piping lane main frame structure of assembly concrete
CN208068549U (en) A kind of prefabricated piping lane segment framework of steel reinforcement installation molding bed rack
CN209227836U (en) Prefabricated concrete structure wall-column all steel is keyed structure
CN202391140U (en) Thickness control mould of cast-in-place concrete floor
CN112302209B (en) Steel and concrete shear wall mixed structure and manufacturing method thereof
CN101353920A (en) Method for binding steel bars of high-rise shear wall
CN103225402A (en) Construction method for long-span cast-in-situ unbonded prestressed hollow floor slabs
CN206599994U (en) One kind is exempted to pierce formula form bracing system branch head part
CN203499262U (en) One-off pouring structure of door and window hole lintel structure and vertical plate strip concrete structure
CN103225312B (en) Prefabricated assembled foundation of tower mast structure
CN202882227U (en) Pre-embedded zigzag concrete horse-shaped stool
CN103572891B (en) A kind of pregroove plate
CN102864937B (en) Construction method of rear added insert of prefabricated pillar
CN105421780B (en) A kind of construction method of prefabricated concrete structure
CN211229204U (en) Spacing fixed plate of prestressing force coincide floor reinforcing bar
CN209760295U (en) Pre-buried T type bolt fixed knot of underground pipe gallery electric power support constructs
CN209760457U (en) steel bar formwork integrated wall and connecting beam splicing connection structure
CN203924484U (en) A kind of precast beam and there is the reinforced concrete structure of tenon anchor system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111019

Termination date: 20111220