CN1970677A - 辐射交联聚乙烯热收缩包覆片材及其制备方法 - Google Patents
辐射交联聚乙烯热收缩包覆片材及其制备方法 Download PDFInfo
- Publication number
- CN1970677A CN1970677A CN 200510123490 CN200510123490A CN1970677A CN 1970677 A CN1970677 A CN 1970677A CN 200510123490 CN200510123490 CN 200510123490 CN 200510123490 A CN200510123490 A CN 200510123490A CN 1970677 A CN1970677 A CN 1970677A
- Authority
- CN
- China
- Prior art keywords
- polyethylene
- crosslinked polyethylene
- shrinkable
- sheet materials
- radiation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Laminated Bodies (AREA)
Abstract
本发明涉及一种石油、化工、采暖保温管道的防水用辐射交联聚乙烯热收缩包覆片材,特征是其由聚乙烯基材和热熔胶胶层构成,聚乙烯、炭黑、氯化石蜡经过热熔、交联挤塑成型,经过横向拉伸并进行核辐照射;将热熔胶均匀的涂在基材内表面或内表面四周上;包覆片沿两侧每间隔一定距离打一个小孔,用来固定包覆片的接口,适用于泡沫夹克保温管道、聚乙烯夹克涂层管道的补口,也适用于环氧粉末、环氧煤沥青、聚乙烯粘胶带、沥青玻璃布涂层管道的补口,包覆在管线的保温层外,经火焰烘烤后迅速收缩,将保温管壳包覆的非常紧密,增强了保温管壳的密封性能,在使用过程中辐射交联聚乙烯热收缩带收缩方向由原来的纵向收缩变为横向收缩。
Description
技术领域
本发明涉及一种石油、化工、采暖保温管道的防水用辐射交联聚乙烯热收缩包覆片材及其制备方法。
背景技术
石油、化工管道为了保证介质的正常输送,通常采用管道外加保温层进行保温输送,油田集油管线采用掺输或伴热流程以保证原油的正常输送,伴热管线保温预制成硬质聚氨酯泡沫塑料夹克管存在很多无法解决的问题,站内管线由于距离短,焊接接口、弯头较多,使用硬质聚氨酯泡沫塑料夹克管十分不便。伴热管线和站内管线的保温、防水材料的选择和使用上受到一定的限制,石油、化工行业、管线通用的方法是保温管线外防水层采用铁丝网抹沥青马蹄脂在进行玻璃丝布刷防水涂料。
上述方法在应用中存在着如下致命的缺点:1.施工工艺复杂;2.施工困难,无法保证防水层的完整性;3.北方油田大部分管线需要穿越稻田、水渠等低洼地带,致使保温层进水,保温效能失效能耗增加,4.并由此引起的管线腐蚀穿孔;这些问题至今没能得到很好地解决。
保温管线的防水层是保温层保温的屏障,再好的保温材料一旦防水层出现纰漏,就会造成保温层进水,保温效能降低。要选择好的保温材料来保证输送介质的输送温度,更要选择性能优异的防水材料和防水结构以及合理的施工方法又是防水层起到防水作用的根本保证。
发明内容
本发明的目的是研制一种性能优异的辐射交联聚乙烯热收缩包覆片材防水材料,结合合理的施工方法,保证防水层起到防水作用和输送介质的输送温度。
辐射交联聚乙烯热收缩包覆片材的组成是由聚乙烯基材和热熔胶胶层构成。聚乙烯基材按要求的宽度和厚度挤塑成型,经过横向拉伸并进行核辐照射,成为基材。
辐射交联聚乙烯热收缩包覆片材由如下方法制备:
(1)聚乙烯基材由聚乙烯、碳黑、氯化石蜡①按重量比例聚乙烯∶碳黑∶氯化石蜡=80∶4∶1配料;②经过热熔、热熔温度为120~170℃;③用滚动轨道角度机械拉伸装置进行横向拉伸;④采用原子能钴60进行核辐射,改变聚乙烯的分子结构生成大分子网状结构;经过如上处理后,本发明的辐射交联聚乙烯热收缩带的收缩方向发生了改变,由原来的纵向收缩变为横向收缩,当其再次受热时,将会收缩回到原来的状态。
2、将热熔胶均匀的涂在基材内表面的四周上,也就是辐射交联聚乙烯热收缩包覆片的对接口和搭接处。
3、辐射交联聚乙烯热收缩包覆片沿两侧每间隔5cm打一个小孔,用来固定辐射交联聚乙烯热收缩包覆片的接口。
辐射交联热收缩包覆片防水材料优点:
近年来,聚乙烯材料被广泛应用,辐射交联热收缩带具有优秀的防水密封性能、优秀的耐环境应力开裂性能和热老化性能、优秀的耐候性及耐紫外线性能、优秀的施工性能及较长的使用寿命。它适用于泡沫夹克保温管道、聚乙烯(夹克)涂层管道的补口,也适用于环氧粉末、环氧煤沥青、聚乙烯粘胶带、沥青玻璃布等涂层管道的补口。它有非常优异防水性能,尤其聚乙烯热收缩带在防水补口的应用,被防腐界广泛认可。但作为管线的防水层还没有先例,聚乙烯热收缩带包覆在管线的保温层外,经火焰烘烤后迅速收缩,将保温管壳包覆的非常紧密,增强了保温管壳的密封性能,这是采用其它方法办不到的。在使用过程中最关键的是,辐射交联聚乙烯热收缩带收缩方向由原来的纵向收缩变为横向收缩。
具体实施方式
实施例1
聚乙烯基材由聚乙烯7750EVA、碳黑、氯化石蜡(1)按重量比例聚乙烯∶碳黑∶氯化石蜡=80∶4∶1配料;(2)经过热熔、热熔温度为120℃~170℃;(3)用滚动轨道角度机械拉伸装置EY1400进行横向拉伸;(4)采用原子能钴60进行核辐射,使聚乙烯分子结构变成网状结构称之为辐射交联。经过如上处理后,本发明的辐射交联聚乙烯热收缩带的收缩方向发生了改变,由原来的纵向收缩变为横向收缩,当其再次受热时,将会收缩回到原来的状态。
2、将热熔胶M903EVA胶均匀的涂在基材内表面的四周上,也就是辐射交联聚乙烯热收缩包覆片的对接口和搭接处。
3、辐射交联聚乙烯热收缩包覆片沿两侧每间隔5cm打一个小孔,用来固定辐射交联聚乙烯热收缩包覆片的接口。
在施工过程中,是将辐射交联聚乙烯热缩包覆片两端接口处的圆孔分别套入聚乙烯扣齿密封条的公扣上,在将母扣条扣上,并用专用钳子将聚乙烯扣齿密封条夹紧。接口处采用火焰进行烘烤,辐射交联聚乙烯热收缩包覆片受热收缩将保温层包紧,辐射交联聚乙烯热收缩包覆片接口处的热熔胶熔融溢出,达到彻底密封的目的。
辐射交联聚乙烯热缩包覆片和辐射交联聚乙烯热缩包覆片对接处搭接100mm,再用火焰环向烘烤也使热熔胶熔融溢出,粘接密封牢固。
Claims (2)
1.一种辐射交联聚乙烯热收缩包覆片材的制备方法,其特征在于:辐射交联聚乙烯热收缩包覆片材由如下方法制备:
(1)聚乙烯基材由聚乙烯、碳黑、氯化石蜡①按重量比例聚乙烯∶碳黑∶氯化石蜡=80∶4∶1配料;②经过热熔、热熔温度为120~170℃;③用滚动轨道角度机械拉伸装置进行横向拉伸;④采用原子能钴60进行核辐射,改变聚乙烯的分子结构生成大分子网状结构;
(2)将热熔胶均匀的涂在基材内表面的四周上,也就是辐射交联聚乙烯热收缩包覆片的对接口和搭接处;
(3)辐射交联聚乙烯热收缩包覆片沿两侧每间隔5cm打一个小孔。
2.一种辐射交联聚乙烯热收缩包覆片材,其特征在于:是根据权利要求1所述的方法制备的。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200510123490 CN1970677A (zh) | 2005-11-23 | 2005-11-23 | 辐射交联聚乙烯热收缩包覆片材及其制备方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200510123490 CN1970677A (zh) | 2005-11-23 | 2005-11-23 | 辐射交联聚乙烯热收缩包覆片材及其制备方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN1970677A true CN1970677A (zh) | 2007-05-30 |
Family
ID=38111705
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200510123490 Pending CN1970677A (zh) | 2005-11-23 | 2005-11-23 | 辐射交联聚乙烯热收缩包覆片材及其制备方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1970677A (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104061402A (zh) * | 2009-05-27 | 2014-09-24 | 江苏达胜热缩材料有限公司 | 一种防腐热收缩缠绕带 |
CN104210098A (zh) * | 2013-06-05 | 2014-12-17 | 中国石油天然气集团公司 | 一种热熔胶熔融预粘结3lpe管道涂层工艺方法 |
CN104266039A (zh) * | 2009-05-27 | 2015-01-07 | 江苏达胜热缩材料有限公司 | 一种热收缩缠绕带 |
CN104266038A (zh) * | 2009-05-27 | 2015-01-07 | 江苏达胜热缩材料有限公司 | 一种管道防腐热收缩套 |
CN104279398A (zh) * | 2009-05-27 | 2015-01-14 | 江苏达胜热缩材料有限公司 | 一种管道防腐热收缩缠绕带 |
CN115056550A (zh) * | 2022-05-27 | 2022-09-16 | 青岛天智达高科产业发展有限公司 | 一种辐射交联聚乙烯热缩式卡套的制备方法 |
-
2005
- 2005-11-23 CN CN 200510123490 patent/CN1970677A/zh active Pending
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104061402A (zh) * | 2009-05-27 | 2014-09-24 | 江苏达胜热缩材料有限公司 | 一种防腐热收缩缠绕带 |
CN104266039A (zh) * | 2009-05-27 | 2015-01-07 | 江苏达胜热缩材料有限公司 | 一种热收缩缠绕带 |
CN104266038A (zh) * | 2009-05-27 | 2015-01-07 | 江苏达胜热缩材料有限公司 | 一种管道防腐热收缩套 |
CN104279398A (zh) * | 2009-05-27 | 2015-01-14 | 江苏达胜热缩材料有限公司 | 一种管道防腐热收缩缠绕带 |
CN104210098A (zh) * | 2013-06-05 | 2014-12-17 | 中国石油天然气集团公司 | 一种热熔胶熔融预粘结3lpe管道涂层工艺方法 |
CN104210098B (zh) * | 2013-06-05 | 2017-07-14 | 中国石油天然气集团公司 | 一种热熔胶熔融预粘结3lpe管道涂层工艺方法 |
CN115056550A (zh) * | 2022-05-27 | 2022-09-16 | 青岛天智达高科产业发展有限公司 | 一种辐射交联聚乙烯热缩式卡套的制备方法 |
CN115056550B (zh) * | 2022-05-27 | 2023-12-01 | 青岛天智达高科产业发展有限公司 | 一种辐射交联聚乙烯热缩式卡套的制备方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1970677A (zh) | 辐射交联聚乙烯热收缩包覆片材及其制备方法 | |
US4624879A (en) | Recoverable article | |
CA2222651C (en) | Heat recoverable article | |
CA3067846C (en) | Coated closed-cell foam tube insulations and methods for producing the same | |
EP0615487A1 (en) | METHOD AND ARTICLE FOR MICROWAVE LINKING OF SPLICE CLOSURES. | |
US4252849A (en) | Heat shrinkable covers | |
AU2001234836B2 (en) | Apparatus for forming field joints on plastic coated pipe | |
CA1286869C (en) | Heat recoverable article | |
CN1361851A (zh) | 一种对两个管子之间的接头进行密封的方法 | |
RU2341717C1 (ru) | Термоусаживающаяся муфта | |
AU2001234836A1 (en) | Apparatus for forming field joints on plastic coated pipe | |
JP2008075809A (ja) | ロードヒーティングの配管接続構造、それに用いる防蝕スリーブおよびそれによる接続方法 | |
CN101514771A (zh) | 带热塑管端连接法兰的金属塑料复合管 | |
JPH01152038A (ja) | 熱回復性物品 | |
RU2282781C2 (ru) | Способ выполнения стыка трубопроводов в полимерной оболочке и устройство для его осуществления | |
CN2384351Y (zh) | 热收缩与热熔融复合双壁管 | |
KR20090095693A (ko) | 합성수지관 분기용 새들 및 이를 이용한 합성수지관의분기방법 | |
CN107795795A (zh) | 一种预制保温直管与异形管件的现场保温结构及施工方法 | |
CN209800899U (zh) | 一种保温管补口接头 | |
KR101400290B1 (ko) | 관이음용 열수축 슬리이브 | |
CN207661313U (zh) | 一种预制保温直管与异形管件的现场保温结构 | |
CN217240221U (zh) | 一种钢塑复合电缆护套管及其连接结构 | |
CN2912055Y (zh) | 一种防潮型电力电缆中间接头 | |
CN210041300U (zh) | 一种光缆接续用复合型热收缩套管 | |
CN201330933Y (zh) | 热流体用金属骨架增强塑料复合管网 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |