CN1944826A - Method for building cement frame structure building along hill slope - Google Patents

Method for building cement frame structure building along hill slope Download PDF

Info

Publication number
CN1944826A
CN1944826A CN 200610068415 CN200610068415A CN1944826A CN 1944826 A CN1944826 A CN 1944826A CN 200610068415 CN200610068415 CN 200610068415 CN 200610068415 A CN200610068415 A CN 200610068415A CN 1944826 A CN1944826 A CN 1944826A
Authority
CN
China
Prior art keywords
building
main
hill slope
frame structure
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200610068415
Other languages
Chinese (zh)
Other versions
CN100451255C (en
Inventor
于明江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB2006100684158A priority Critical patent/CN100451255C/en
Publication of CN1944826A publication Critical patent/CN1944826A/en
Application granted granted Critical
Publication of CN100451255C publication Critical patent/CN100451255C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The method of constructing building with cement frame structure along hill slope includes constructing base platform in the slope base, constructing stepped platforms in the slope, constructing cast-in-situ cement building frame on the base platform and the stepped platforms, setting horizontal ventilating ducts connected to the main ventilating duct in the stepped platforms, setting inclined elevator, and setting main power line pipeline, main communication line pipeline, main water pipeline and main drain pipeline. The present invention has the advantages of saving in field land, low cost, wide visual field, etc.

Description

The method of building cement frame structure building along hill slope
Technical field
The present invention relates to a kind of building construction technology, specifically a kind of method of building cement frame structure building along hill slope.
Background technology
At present, known building constructions is all from rising from the level ground, above one deck directly be pressed on following one deck.Successively extend vertically upward, just finished a high-rise building.The construction method of this building, with a long history, technology maturation is accepted by popular.Early stage in urban development built a small amount of high building with this method of building the building, both played the effect of interspersing in city, makes the occupants feel more comfortable again, a kind of good building method of building of can yet be regarded as.But along with the increase of population and the continuous expansion in city, people want to continue to build high building with this building method of building, the one, dwindle the spacing between the Lou Yulou, and the 2nd, enlarge the area that occupies cultivated land.The former has caused the high building in city to stand in great numbers, and is in high building, and visual field has only tens meters; Highdensity housing-group has weakened the anti-strike ability to war.The latter has caused a large amount of arable lands occupied, and environment for human survival is caused very big threat.
As everyone knows, earth surface is covered by " one fen field of six water, three mountains ".With regard to state-of-the art, can not be in this water of 60% as human permanent domicile, 10% arable land should produce the grain that the mankind depend on for existence, also will constantly take up an area of the construction building, can't bear the heavy load already.If 30% mountain region on the earth is used for building building, will make people have ready conditions more spacious and comfortfully, can save a large amount of arable lands simultaneously, be that the mankind's long-term stability development preserves valuable cultivated land resource.
At present, there is a spot of mountaineer on the mountain, to build a house, and path between the main backer of the communication under the mountain; On some mountains in easy flights, have a small amount of villa, externally link up highway among the main backer.On the mountain of some famous scenery points, have buildings such as temple, it is main by the step of marking time that these build externally communication, brought into use instrument and mountain communications down such as cable car in recent years.
So far do not see the report that the house is linked up down by diagonal cabin elevator and mountain on the mountain.
Summary of the invention
The method of a kind of building cement frame structure building along hill slope of the present invention does not account for or accounts for the arable land less, and building is successively built on the mountain.Both save the arable land, and can obtain the building effective utilization again.
Technical scheme of the present invention is: build basic platform in the hill slope bottom, continue then to make up the ladder basic platform by the building highl stratification along hill slope, level makes up the cast-in-place framework of building cement on base foundation platform and ladder basic platform at last, horizontal ventilating duct is set in the ladder basic platform, the end of horizontal ventilating duct connects the main ventilation pipeline of laying along hill slope, horizontal ventilating duct also is provided with each room that the branch branch wind pipe connects each layer, diagonal cabin elevator device is set on the top of main ventilation pipeline, electric power is set in the bottom of main ventilation pipeline, communication cable is laid trunk line and main water supply and sewerage pipeline.
Beneficial effect of the present invention
The invention has the beneficial effects as follows, 1. save and plough, help human long-term stability development; 2. build the building on the deserted mountain, land price is low, and the building cost is also low; 3. the resident carries on the back the mountain and occupies, broad view; 4. all there are a terrace, and comfortable for living in each building unit front; 5. the walking stair are built along mountain shape, and upstairs i.e. mountain-climbing is convenient to people and is taken exercises.For the building that is provided with diagonal elevator and walking stair simultaneously, the climber has tired out and can take a lift, and makes exercise safer; 6. the room all has the wind comes from certainly of can regulating voluntarily at any time; 7. change human account for to plough build the thinking set of living in the building, with deserted mountain, tor as exploitable resources, for the urban planning construction provides inspiration.
Description of drawings
Fig. 1 is that the A-A of building along hill slope building cement frame structure is to the section structure schematic diagram;
Fig. 2 is the plan structure schematic diagram of building along hill slope building cement frame structure;
Fig. 3 is that the B-B of cabin elevator and main ventilation pipeline is to the section structure schematic diagram;
Fig. 4 is the left TV structure schematic diagram of the cabin elevator of building along hill slope.
Description of reference numerals: benchmark basic platform 1; Ladder basic platform 2; Public passage 3; Horizontal airduct 4; Divide branch wind pipe 5; The cast-in-place framework 6 of building cement; Walking step 7; Railway carriage or compartment 8 in the cabin elevator; Main ventilation pipeline 9; The outer protecting crust 10 of main ventilation pipeline; Channel suspending rail 11; Cabin elevator enclosure 12; Water treatment facilities 13; Cabin elevator roller 14; Sewage recycling pond 15; Circular orbit 16; Railway carriage or compartment roller 17 in the cabin elevator; Main drainpipe road 18; Electric power cable trunk line 19; Communication cable trunk line 20; Main feed water pipe road 21; Sawtooth 22.
Embodiment:
With reference to accompanying drawing 1-4 the method for building cement frame structure building along hill slope of the present invention is done following detailed description the in detail.
Shown in Fig. 1-2, build benchmark basic platform 1 in the hill slope bottom, continue then to make up ladder basic platform 2 by the building highl stratification along hill slope, level makes up the cast-in-place framework 6 of building cement on benchmark basic platform 1 and ladder basic platform 2 at last, horizontal ventilating duct 3 is set in the ladder basic platform, the end of horizontal ventilating duct connects the main ventilation pipeline of laying along hill slope 9, horizontal ventilating duct 4 also is connected with each room that branch branch wind pipe 5 connects each layer, the top of protecting crust is provided with diagonal cabin elevator device outside main ventilation pipeline 9, is provided with main drainpipe road 18 in the bottom of main ventilation pipeline 9, electric power cable trunk line 19, communication cable trunk line 20 and main feed water pipe road 21.
Be provided with below horizontal ventilating duct for the public passage 3 of laying plumbing and various cables, this public passage is connected with electric power cable trunk line 19, communication cable trunk line 20 and the main drainpipe road 18 of main ventilation pipeline below.In order to prevent the sanitary sewage polluted underground water, be provided with sewage recovery pond 15 and sewage purifying and treating device 13 in the bottom of benchmark basic platform 1.
As shown in Figure 3, the resident is current for convenience, diagonal cabin elevator device is set between housing-group and housing-group, diagonal cabin elevator device is made up of railway carriage or compartment 8 in track 11, cabin elevator outer container 12 and the cabin elevator, the bottom of cabin elevator outer container 12 is provided with roller 14 and joins with the channel suspending rail 11 that is laid on outer protecting crust 10 tops of ventilation trunk line, and the bottom in the interior railway carriage or compartment 8 of cabin elevator is provided with roller 17 and joins with circular orbit 16 rollings that are arranged on cabin elevator outer container 12 inner bottom parts.
As shown in Figure 2, between the residential quarters, except the cabin elevator device is set, outside the main ventilation pipeline protecting crust 10 above walking step 7 for resident walking also can be set.
In order to improve the fastness of building foundation, the bottom of ladder basic platform 2 is sawtooth 22 shapes and the massif rock combines.
Embodiment:
The esidential building sub-district of building along mountain shape, 60 meters of vertical heights, gradient is spent to the hillside of 60 degree 45, builds up 20 grades of basic platforms along mountain shape, to building floor rooms 20 behind the basic platform broadening.Be connected with the walking stair with the diagonal cabin elevator between the basic platform.Two elevators of each door opening, every platform 4 families, every door opening 72 families.Totally 10 door openings can hold resident family 720 families.B1 is the garage, and one deck and top layer are arranged service facility.
This building has used along the diagonal cabin elevator of mountain shape operation, builds cabin elevator between the Lou Yulou, or builds the walking step.
The advantage of cabin elevator of the present invention is, cost is low, high safety, current and sightseeing and usefulness, gesture slope walking near the mountain, and interior car does not change with the change at outer car walking inclination angle, make human body remain plumbness, thereby strengthened comfort and feeling of freshness.
This building is equivalent to a tilted-putted chimney along the ventilating duct that mountain shape is provided with.Each floor room all links to each other with pipeline by adjustable damper with this ventilating duct, and like this, according to stack effect, calm no matter the external world has, can there be wind in the room, and the big I of wind is regulated voluntarily by conventional air controller.In order to reduce the power consumption of summer air-conditioning refrigeration, the main ventilation pipeline can with the supporting use of the antiaircraft facility in the massif, the cold air that extracts in the bomb shelter comes conditioning chamber interior temperature and appropriateness.

Claims (5)

1. the method for a building cement frame structure building along hill slope, it is characterized in that, build basic platform in the hill slope bottom, continue then to make up the ladder basic platform by the building highl stratification along hill slope, level makes up the cast-in-place framework of building cement on base foundation platform and ladder basic platform at last, horizontal ventilating duct is set in the ladder basic platform, the end of horizontal ventilating duct connects the main ventilation pipeline of laying along hill slope, horizontal ventilating duct also is provided with each room that the branch branch wind pipe connects each layer, diagonal cabin elevator device is set on the top of main ventilation pipeline, main power line cable pipeline is set in the bottom of main ventilation pipeline, main communication cable pipeline, main feed water pipe road and main drainpipe road.
2, the method for building cement frame structure building along hill slope according to claim 1, it is characterized in that being provided with below horizontal ventilating duct the public passage for laying plumbing and various cables, this public passage is connected with the main drainpipe road with main power line cable pipeline, main communication cable pipeline, the main feed water pipe road of main ventilation pipeline below.
3, the method for building cement frame structure building along hill slope according to claim 1, it is characterized in that diagonal cabin elevator device is made up of railway carriage or compartment in track, cabin elevator outer container and the cabin elevator, the bottom of cabin elevator outer container is provided with roller and joins with the channel suspending rail that is laid on ventilation trunk line shell upper, and the bottom in railway carriage or compartment is provided with roller and is arranged on the interior circular orbit rolling of outer container and joins in the cabin elevator.
4, the method for building cement frame structure building along hill slope according to claim 1 is characterized in that being provided with the walking step above the main ventilation pipeline.
5, the method for building cement frame structure building along hill slope according to claim 1 is characterized in that the bottom indentation and the massif of ladder basic platform combines.
CNB2006100684158A 2006-08-22 2006-08-22 Method for building cement frame structure building along hill slope Expired - Fee Related CN100451255C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100684158A CN100451255C (en) 2006-08-22 2006-08-22 Method for building cement frame structure building along hill slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100684158A CN100451255C (en) 2006-08-22 2006-08-22 Method for building cement frame structure building along hill slope

Publications (2)

Publication Number Publication Date
CN1944826A true CN1944826A (en) 2007-04-11
CN100451255C CN100451255C (en) 2009-01-14

Family

ID=38044454

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100684158A Expired - Fee Related CN100451255C (en) 2006-08-22 2006-08-22 Method for building cement frame structure building along hill slope

Country Status (1)

Country Link
CN (1) CN100451255C (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100516382C (en) * 2007-06-18 2009-07-22 于明江 Finishing construction method for sandstone hilly land house foundation
CN102191867A (en) * 2010-03-04 2011-09-21 张孟铸 Construction method of low-carbon green villa
CN103603511A (en) * 2013-11-25 2014-02-26 高原晨曦 Mountain villa and method for constructing same
CN105275224A (en) * 2015-09-22 2016-01-27 高玉宗 Mountain villa
CN108843322A (en) * 2018-06-20 2018-11-20 东北大学秦皇岛分校 It is a kind of to build the opencast mining method combined with villa
CN109898888A (en) * 2017-12-07 2019-06-18 彭辰祺 The ideamonger of urban construction
CN110735536A (en) * 2019-09-30 2020-01-31 广州天力建筑工程有限公司 mountain slope type villa construction method
CN112982653A (en) * 2021-03-17 2021-06-18 中冶建工集团有限公司 Construction method of mountain-based building stable structure

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4141184A (en) * 1977-08-09 1979-02-27 Vidal Henri C Terraced dwellings
YU145786A (en) * 1985-08-20 1991-02-28 Krymniprekt Simferopol Ins Building on a slope
WO1991010029A1 (en) * 1989-12-21 1991-07-11 Simferopolsky Filial Dnepropetrovskogo Inzhenerno-Stroitelnogo Instituta Building or construction erected on slope
JPH09144341A (en) * 1995-11-28 1997-06-03 Fujita Corp Structure of residential quarter utilizing slope
CN1062627C (en) * 1996-10-14 2001-02-28 南映景 Hillside development building technology of building and tunnel integrated structure
JP2001234634A (en) * 2000-02-24 2001-08-31 Ingu:Kk Multi-storied building to be built on slope face land
CN1266361C (en) * 2004-02-18 2006-07-26 黄达余 Assembled method of green ecological village on high mountain

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100516382C (en) * 2007-06-18 2009-07-22 于明江 Finishing construction method for sandstone hilly land house foundation
CN102191867A (en) * 2010-03-04 2011-09-21 张孟铸 Construction method of low-carbon green villa
CN103603511A (en) * 2013-11-25 2014-02-26 高原晨曦 Mountain villa and method for constructing same
CN105275224A (en) * 2015-09-22 2016-01-27 高玉宗 Mountain villa
CN109898888A (en) * 2017-12-07 2019-06-18 彭辰祺 The ideamonger of urban construction
CN108843322A (en) * 2018-06-20 2018-11-20 东北大学秦皇岛分校 It is a kind of to build the opencast mining method combined with villa
CN108843322B (en) * 2018-06-20 2020-10-02 东北大学秦皇岛分校 Strip mine mining method combined with villa construction
CN110735536A (en) * 2019-09-30 2020-01-31 广州天力建筑工程有限公司 mountain slope type villa construction method
CN112982653A (en) * 2021-03-17 2021-06-18 中冶建工集团有限公司 Construction method of mountain-based building stable structure

Also Published As

Publication number Publication date
CN100451255C (en) 2009-01-14

Similar Documents

Publication Publication Date Title
CN100451255C (en) Method for building cement frame structure building along hill slope
Thomas et al. Building design
CN207685859U (en) A kind of underground pipe gallery
CN202023371U (en) Building structure system conforming to human architecture
CN101298810A (en) Aerial garden building
CN100451256C (en) Method for building steel structure environment friendly energy saving building along hill slope
CN101109236A (en) Method for synthetically building intermontane environment protection home building and roadway traffic
CN200943259Y (en) Mountain-reclining constructed building frame structure
CN207296521U (en) A kind of flame-out in flight building
CN110725567A (en) House building structure based on thing networking
CN209908033U (en) City built on stilts park
CN106468106B (en) Grotto hotel
CN107059918A (en) Get down the highway to Double Multi-Arch, pipe gallery and sponge City complex
CN202500346U (en) Reconstruction structures for old building zone multi-unit underground space
CN214402998U (en) Low-floor high-sunlight energy-saving environment-friendly underground garage
CN201053212Y (en) Air courtyard building
CN213204207U (en) Comprehensive pipe rack cross joint containing electric power cross joint
CN207032287U (en) Get down the highway to a kind of Double Multi-Arch, pipe gallery and sponge City complex
Kharismawardani et al. The concept of dynamicity of martial arts office building design with environmentally friendly
CN206607676U (en) A kind of building frame structure built near the mountain
CN107269104B (en) Cinerary casket cemetery placed in mountain
CN207406105U (en) Placement of cinerary casket chamber ceremony park in massif
MORANDI Network station. Integrated complex within the central station of Bari
Singh Development Of Sports Infrastructure In Terms Of Energy And Water Conservation
Crochon Bridging Communities, Building Serendipity.

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090114

Termination date: 20140822

EXPY Termination of patent right or utility model