CN1865633A - 贮液结构中混凝土的连续浇注方法 - Google Patents
贮液结构中混凝土的连续浇注方法 Download PDFInfo
- Publication number
- CN1865633A CN1865633A CN 200510096460 CN200510096460A CN1865633A CN 1865633 A CN1865633 A CN 1865633A CN 200510096460 CN200510096460 CN 200510096460 CN 200510096460 A CN200510096460 A CN 200510096460A CN 1865633 A CN1865633 A CN 1865633A
- Authority
- CN
- China
- Prior art keywords
- concrete
- construction
- adjacent
- liquid storage
- storage structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
贮液结构中混凝土的连续浇注方法,涉及建筑物墙体的现场浇制,或称浇注,具体是贮液结构中壁板与底板连续浇注,其目的是实现了壁板与底板的连续浇注,缩短施工工期。其方法为:首先浇注底板混凝土,同时绑扎底板和壁板钢筋,完成壁板和底板模板的施工,沿壁板四周均匀对称地分层分段浇注混凝土,其特征在于相邻两施工层中相邻两施工段混凝土的浇注时间间隔不超过所用混凝土的凝结硬化时间。
Description
技术领域
本发明涉及建筑物墙体的现场浇制,或称浇注,具体是贮液结构中壁板与底板连续浇注。
背景技术
在以往贮液结构的混凝土施工中,一般是将壁板和底板分开施工,即欲浇注壁板,需待到底板混凝土达到一定强度后,方能对壁板进行支模并进行混凝土浇注。同时,为了保证壁板与底板间的施工缝不至漏水,通常将底板连同200mm左右的壁板作为一个整体浇注,并在此位置留施工缝。并将施工缝做成凹槽形、加止水金属片、台阶形、遇水膨胀橡胶止水带等四种形式。这些做法在相当程度上对贮液结构中混凝土的施工起到了积极的作用,但不论哪种做法,都存在着施工周期长、技术要求高的缺点。
发明内容
本发明的目的是实现了壁板与底板的连续浇注,缩短施工工期。
本发明是贮液结构中混凝土的连续浇注方法,首先浇注底板混凝土,同时绑扎底板和壁板钢筋,完成壁板和底板模板的施工,沿壁板四周均匀对称地分层分段浇注混凝土,相邻两施工层中相邻两施工段混凝土的浇注时间间隔不超过所用混凝土的凝结硬化时间。
所用混凝土标号为C30及C30以下,并且环境温度低于25℃时,相邻两施工层中相邻两施工段混凝土的浇注时间间隔不超过210分钟。
所用混凝土标号为C30及C30以下,并且环境温度高于25℃时,相邻两施工层中相邻两施工段混凝土的浇注时间间隔不超过180分钟。
所用混凝土标号为C30以上,并且环境温度低于25℃时,相邻两施工层中相邻两施工段混凝土的浇注时间间隔不超过180分钟。
所用混凝土标号为C30以上,并且环境温度高于25℃时,相邻两施工层中相邻两施工段混凝土的浇注时间间隔不超过150分钟。
施工层的高度等于底板的厚度。
本发明的有益效果是:实现了壁板与底板同时浇注,并可连续浇注,无需掺和外加剂,大大地缩短了工期,并保证了贮液结构不漏水,具有良好的经济效益与社会效益。本发明的优点是:
附图说明
图1是本发明施工方法的示意图。
具体实施方式
图1中(1)、(2)、(3)、(4)、(5)、(6)、(7)......代表施工层;(A)、(B)、(C)、(D)、(E)、(F)......代表施工段。
如图1所示,本发明根据混凝土的凝结时间及强度划分施工层和施工段,
1、施工层(1)、(2)、(3)、(4)、(5)、(6)、(7)等施工层的高度等于壁板的厚度。
2、为了便于施工,并保证浇注的持续性,根据表1规定的时间划分施工段(A)、(B)、(C)、(D)、(E)、(F)等施工段。
3、同时绑扎底板和壁板钢筋。
4、完成壁板和底板模板的施工。
5、浇注底板混凝土后,沿壁板四周均匀对称地分层分段浇注混凝土。
为使不同施工层的混凝土能可靠地粘结,相邻两施工层中相邻两施工段混凝土的浇注时间间隔不超过表1规定的时间。如施工层(1)中施工段(B)与施工层(2)中施工段(A)的混凝土浇注时间间隔应不大于表1的规定。
表1.混凝土的凝结时间(分钟)
混凝土标号 | 气温 | |
低于25℃ | 高于25℃ | |
C30及C30以下 | 210 | 180 |
C30以上 | 180 | 150 |
Claims (6)
1、贮液结构中混凝土的连续浇注方法,首先浇注底板混凝土,同时绑扎底板和壁板钢筋,完成壁板和底板模板的施工,沿壁板四周均匀对称地分层分段浇注混凝土,其特征在于相邻两施工层中相邻两施工段混凝土的浇注时间间隔不超过所用混凝土的凝结硬化时间。
2、根据权利要求1所述的贮液结构中混凝土的连续浇注方法,其特征在于所用混凝土标号为C30及C30以下,并且环境温度低于25℃时,相邻两施工层中相邻两施工段混凝土的浇注时间间隔不超过210分钟。
3、根据权利要求1所述的贮液结构中混凝土的连续浇注方法,其特征在于所用混凝土标号为C30及C30以下,并且环境温度高于25℃时,相邻两施工层中相邻两施工段混凝土的浇注时间间隔不超过180分钟。
4、根据权利要求1所述的贮液结构中混凝土的连续浇注方法,其特征在于所用混凝土标号为C30以上,并且环境温度低于25℃时,相邻两施工层中相邻两施工段混凝土的浇注时间间隔不超过180分钟。
5、根据权利要求1所述的贮液结构中混凝土的连续浇注方法,其特征在于所用混凝土标号为C30以上,并且环境温度高于25℃时,相邻两施工层中相邻两施工段混凝土的浇注时间间隔不超过150分钟。
6、根据权利要求1所述的贮液结构中混凝土的连续浇注方法,其特征在于施工层的高度等于底板的厚度。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200510096460 CN1865633A (zh) | 2005-11-28 | 2005-11-28 | 贮液结构中混凝土的连续浇注方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200510096460 CN1865633A (zh) | 2005-11-28 | 2005-11-28 | 贮液结构中混凝土的连续浇注方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN1865633A true CN1865633A (zh) | 2006-11-22 |
Family
ID=37424762
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200510096460 Pending CN1865633A (zh) | 2005-11-28 | 2005-11-28 | 贮液结构中混凝土的连续浇注方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1865633A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102587544A (zh) * | 2012-03-22 | 2012-07-18 | 北京四方如钢混凝土制品有限公司 | 轻质发泡混凝土墙板及其构筑方法 |
CN102852333A (zh) * | 2012-08-17 | 2013-01-02 | 中国十七冶集团有限公司 | 一种混凝土高柱连续浇注施工方法 |
CN105350805A (zh) * | 2015-11-04 | 2016-02-24 | 兰州理工大学 | 混凝土矩形贮液结构防止液体晃动的方法 |
CN107558486A (zh) * | 2017-09-20 | 2018-01-09 | 兰州理工大学 | 高液位混凝土板-壳复合水处理结构的施工方法 |
-
2005
- 2005-11-28 CN CN 200510096460 patent/CN1865633A/zh active Pending
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102587544A (zh) * | 2012-03-22 | 2012-07-18 | 北京四方如钢混凝土制品有限公司 | 轻质发泡混凝土墙板及其构筑方法 |
CN102587544B (zh) * | 2012-03-22 | 2016-08-24 | 北京四方如钢混凝土制品有限公司 | 轻质发泡混凝土墙板及其构筑方法 |
CN102852333A (zh) * | 2012-08-17 | 2013-01-02 | 中国十七冶集团有限公司 | 一种混凝土高柱连续浇注施工方法 |
CN102852333B (zh) * | 2012-08-17 | 2015-05-20 | 中国十七冶集团有限公司 | 一种混凝土高柱连续浇注施工方法 |
CN105350805A (zh) * | 2015-11-04 | 2016-02-24 | 兰州理工大学 | 混凝土矩形贮液结构防止液体晃动的方法 |
CN107558486A (zh) * | 2017-09-20 | 2018-01-09 | 兰州理工大学 | 高液位混凝土板-壳复合水处理结构的施工方法 |
CN107558486B (zh) * | 2017-09-20 | 2019-07-19 | 兰州理工大学 | 高液位混凝土板-壳复合水处理结构的施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20190345715A1 (en) | Regenerated block concrete prefabricated laminated slab and manufacturing process thereof | |
CN103669114B (zh) | 一种道床基底预制板及其应用 | |
CN114109030A (zh) | 清水混凝土片墙异形结构施工方法 | |
CN1865633A (zh) | 贮液结构中混凝土的连续浇注方法 | |
CN108643428A (zh) | 一种可调节高度的装配式预制混凝土叠合楼板 | |
CN108661225A (zh) | 一种可调节高度的预制混凝土叠合楼板 | |
GB2056524A (en) | Building module | |
CN101498136A (zh) | 地下水位较高的后浇带结构 | |
CN112663566B (zh) | 一种超长环形自防水混凝土水道的施工方法 | |
CN210216896U (zh) | 一种预制板骨架及预制板 | |
CN200971587Y (zh) | 梅花形钢筋保护层垫块及其生产模具 | |
CN208803614U (zh) | 轻钢格栅混凝土叠合板 | |
CN108661224B (zh) | 一种可调节高度的装配式混凝土叠合楼板 | |
CN2866677Y (zh) | 密肋网格式钢筋砼剪力墙 | |
CN201137298Y (zh) | 后浇带、施工缝侧向钢质模具 | |
CN111452191B (zh) | 一种混凝土护栏预制装配装置及其施工方法 | |
CN210658659U (zh) | 一种错层预制飘窗与钢结构连接节点 | |
CN209457224U (zh) | 一种具有防水保温效果的叠合楼板 | |
CN106869387A (zh) | 密肋板楼盖结构体系hz砼膜施工方法 | |
CN105269677A (zh) | 一种预制混凝土空心六棱砖制作方法 | |
CN205857241U (zh) | 带有后浇带的不同厚度筏板地下结构 | |
CN110748221A (zh) | 一种预制装配式水池导流墙 | |
CN110409299A (zh) | 一种高强度减薄桥梁护栏的加工方法 | |
CN211228856U (zh) | 一种使用双面叠合墙板的双面叠合低多层坡屋面房屋 | |
CN105568857A (zh) | 防撞墙施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |