CN1850666A - 一种拜耳法赤泥干法堆场的子坝构筑方法 - Google Patents

一种拜耳法赤泥干法堆场的子坝构筑方法 Download PDF

Info

Publication number
CN1850666A
CN1850666A CN 200610200463 CN200610200463A CN1850666A CN 1850666 A CN1850666 A CN 1850666A CN 200610200463 CN200610200463 CN 200610200463 CN 200610200463 A CN200610200463 A CN 200610200463A CN 1850666 A CN1850666 A CN 1850666A
Authority
CN
China
Prior art keywords
dam
sub
red mud
mud
red
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200610200463
Other languages
English (en)
Other versions
CN100534935C (zh
Inventor
李明阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CNB2006102004638A priority Critical patent/CN100534935C/zh
Publication of CN1850666A publication Critical patent/CN1850666A/zh
Application granted granted Critical
Publication of CN100534935C publication Critical patent/CN100534935C/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

本发明公开了一种拜耳法赤泥干法堆场的子坝构筑方法,子坝(1)构筑在已经堆满赤泥的初期坝内沿的赤泥之上,子坝的构筑方法通过以下几个步骤完成:备料、加固坝基、碾压成型坝体、坝体修整。本发明是针对拜耳法生产中产生的赤泥干法堆存方式而发明的子坝构筑方法,可满足赤泥的干法堆存方式的堆场稳定所需要的力学强度,可以在有限的堆场面积上获得更大的库容。

Description

一种拜耳法赤泥干法堆场的子坝构筑方法
技术领域
本发明涉及一种赤泥干法堆场的子坝构筑方法,特别是一种拜耳法赤泥干法堆场的子坝构筑方法。
背景技术
氧化铝生产中,随原料的不同而采用不同的生产工艺。目前普遍采用的是碱法生产工艺,在碱法生产工艺中,具体还可分为拜耳法、烧结法和联合法。氧化铝生产中产生的废渣即为赤泥,需送往专门的赤泥堆场堆存。赤泥堆场靠筑坝获得库容,一般先用土石等材料构筑初期坝,初期坝堆满后再用赤泥构筑子坝逐级加高,以便在有限的堆场面积上获得更大的库容。
烧结法和联合法赤泥的物质组成中含β-2CaO·SiO2(硅酸二钙)在50%以上,一定条件下具有水硬胶凝性,其力学指标接近低标号水泥。目前,烧结法和联合法赤泥均采用湿法堆存方式,初期坝堆满后堆场的加高采用水力冲填法形成子坝,即在排料的同时随时间增长自然形成坚固的子坝,每级子坝的坝高大都超过6m,子坝外坡坡度在45°以上。
用拜耳法生产工艺产生的赤泥中,CaO和SiO2的化学成份含量低,分别在20%和7%左右,与烧结法和联合法赤泥相比,力学指标要低得多。为保证堆置体的稳定性,拜耳法赤泥适宜采用干法堆存方式,即控制送到堆场的赤泥浆其含水率在47%以下(相当于土力学意义上的含水量89%),并在堆场进行自然晾晒、机械辅助翻晒等一系列作业。
拜耳法赤泥堆场在初期坝堆满后要继续向上堆存,就必须再构筑子坝。由于拜耳法赤泥在力学性能上与烧结法和联合法赤泥存在较大差异,因此,在子坝的筑坝方式、坝高、坝坡比等方面均不能套用国内普遍采用的烧结法和联合法赤泥堆场的经验数据,而且现有的赤泥堆场的子坝构筑方法均不太适应拜耳法赤泥干法堆场的子坝构筑。
发明内容
本发明的目的在于:提供一种用拜耳法生产氧化铝过程中排放的赤泥干法堆场的子坝构筑方法,以便拜耳法赤泥堆场在初期坝堆满后能够实现在赤泥坝基上用干赤泥作筑坝材料构筑子坝,实现堆场的持续堆放。
本发明是这样构成的:一种拜耳法赤泥干法堆场的子坝构筑方法,子坝构筑在已经堆满赤泥的初期坝内沿的赤泥之上,子坝1的构筑方法通过以下几个步骤完成:备料、加固坝基、碾压成型坝体、坝体修整。
上述的拜耳法赤泥干法堆场的子坝构筑方法,在备料步骤中,选用含水量25%~35%的赤泥作筑坝材料,将筑坝材料堆放在子坝坝址附近,并在含水量25%~35%的赤泥表面排放湿赤泥浆将其表面覆盖,待用。
前述的拜耳法赤泥干法堆场的子坝构筑方法,在加固坝基步骤中,先用推土机对处于坝基2范围内的赤泥层进行破壳和初步碾压作业,再用振动式压路机进一步碾压,直至经抽样检测在坝基范围3m深度以内的赤泥含水量达到35%以下时,完成坝基加固。
前述的拜耳法赤泥干法堆场的子坝构筑方法,在碾压成型坝体步骤中,将选好待用的材料运到子坝位置,并进行破碎、摊平,然后分层进行振动碾压作业,每层碾压厚度控制在300~400mm,压实到每层赤泥的含水量20%~23%时为合格,由下层至上层的宽度逐层递减,但应比完成后的坝体两侧宽0.5~2m,直至子坝的高度达到5.5~6.5M。
前述的拜耳法赤泥干法堆场的子坝构筑方法,在坝体修整步骤中,子坝碾压完成后对坝体进行修边处理,内、外侧各修整掉多余部分3,子坝外、内坡均修整为1∶2~1∶2.5的坡度,子坝的坝顶宽度4.5~6M,修整后的子坝沿坝轴线方向两面应对称。
与现有技术相比,本发明是针对拜耳法生产中产生的赤泥干法堆存方式,而发明的子坝构筑方法,可满足干法堆存方式的堆场稳定所需要的力学强度,可以在有限的堆场面积上获得更大的库容。
附图说明
附图1是本发明的子坝形成示意图。
具体实施方式
本发明的实施例:如附图1所示,首先,准备筑坝材料,将堆场赤泥层中已翻晒好的、含水量达到25%~35%的赤泥选出来,用推土机、挖掘机等机械运送到待构筑的子坝附近堆放,并采取措施(如在表面排放少量赤泥浆)加以保护,以保持其含水量。
其次,对子坝的坝基进行加固,子坝1是坐落在赤泥层上的,以赤泥层作为子坝基础。先用推土机对处于坝基2范围内的赤泥层进行破壳和初步碾压作业,再用振动式压路机进一步碾压,直至经抽样检测坝基范围内3m深度以内的赤泥含水量达到35%以下时,完成坝基加固。
然后,在加固后的坝基上进行筑坝作业,将堆放好作为筑坝材料的赤泥,用推土机、挖掘机等机械运到子坝位置,并进行破碎、摊平,然后分层用振动式压路机进行碾压作业,每层碾压厚度300mm,压实到子坝坝体赤泥含水量20%时为合格。每层的宽度逐步递减,碾压宽度应比坝体所需宽度多2m(内侧、外侧各多出1m),以保证整个子坝的坝体的压实强度和压路机的作业安全。当子坝高度达到6m时完成子坝压实作业。
最后,对坝体进行修边处理,内、外侧各修整掉多余部分3,子坝外坡、内坡均修整为1∶2的坡度,子坝的顶宽为5m,保证机械通行需要。修整后沿坝轴线方向每个剖面的坝顶宽和内外坝坡为同一数值。
经过以上步骤,完成6m高子坝的构筑,子坝上可进行放料作业投入使用。子坝的坝基赤泥含水量每隔30m取样检测,子坝的坝体赤泥含水量每隔15m取样检测。碾压作业时下层赤泥检测合格后方可摊布、碾压上一层赤泥。子坝外坡面的坡度应根据堆置体稳定计算核定。

Claims (5)

1.一种拜耳法赤泥干法堆场的子坝构筑方法,其特征在于:子坝(1)构筑在已经堆满赤泥的初期坝内沿的赤泥之上,子坝(1)的构筑方法通过以下几个步骤完成:备料、加固坝基、碾压成型坝体、坝体修整。
2.根据权利要求1所述的拜耳法赤泥干法堆场的子坝构筑方法,其特征在于:在备料步骤中,选用含水量25%~35%的赤泥作筑坝材料,将筑坝材料堆放在子坝坝址附近,并在含水量25%~35%的赤泥表面排放湿赤泥浆将其表面覆盖,待用。
3.根据权利要求1所述的拜耳法赤泥干法堆场的子坝构筑方法,其特征在于:在加固坝基步骤中,先用推土机对处于坝基(2)范围内的赤泥层进行破壳和初步碾压作业,再用振动式压路机进一步碾压,直至经抽样检测在坝基范围3m深度以内的赤泥含水量达到35%以下时,完成坝基加固。
4.根据权利要求1或2所述的拜耳法赤泥干法堆场的子坝构筑方法,其特征在于:在碾压成型坝体步骤中,将选好待用的材料运到子坝位置,并进行破碎、摊平,然后分层进行振动碾压作业,每层碾压厚度控制在300~400mm,压实到每层赤泥的含水量20%~23%时为合格,由下层至上层的宽度逐层递减,但应比完成后的坝体两侧宽0.5~2m,直至子坝的高度达到5.5~6.5M。
5.根据权利要求1或4所述的拜耳法赤泥干法堆场的子坝构筑方法,其特征在于:在坝体修整步骤中,子坝碾压完成后对坝体进行修边处理,内、外侧各修整掉多余部分(3),子坝外、内坡均修整为1∶2~1∶2.5的坡度,子坝的坝顶宽度4.5~6M,修整后的子坝沿坝轴线方向两面应对称。
CNB2006102004638A 2006-05-18 2006-05-18 一种拜耳法赤泥干法堆场的子坝构筑方法 Active CN100534935C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006102004638A CN100534935C (zh) 2006-05-18 2006-05-18 一种拜耳法赤泥干法堆场的子坝构筑方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006102004638A CN100534935C (zh) 2006-05-18 2006-05-18 一种拜耳法赤泥干法堆场的子坝构筑方法

Publications (2)

Publication Number Publication Date
CN1850666A true CN1850666A (zh) 2006-10-25
CN100534935C CN100534935C (zh) 2009-09-02

Family

ID=37132168

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006102004638A Active CN100534935C (zh) 2006-05-18 2006-05-18 一种拜耳法赤泥干法堆场的子坝构筑方法

Country Status (1)

Country Link
CN (1) CN100534935C (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008116375A1 (fr) * 2007-02-13 2008-10-02 China Aluminium International Engineering Corporation Limited Procédé de décantation avec construction de digues pour des boues rouges issues de frittage, et décantation de boues rouges du procédé bayer
WO2009018719A1 (fr) * 2007-08-09 2009-02-12 China Aluminium International Engineering Corporation Limited Procédé de construction de digue de boues rouges perméables provenant d'un procédé de frittage
CN101871216A (zh) * 2010-06-13 2010-10-27 中国铝业股份有限公司 一种冬季赤泥筑坝方法
CN101929160B (zh) * 2009-06-24 2012-05-23 鞍钢集团矿业公司 排岩修筑高散堆不透水尾矿坝的方法
CN104631386A (zh) * 2015-01-16 2015-05-20 中冶京诚(秦皇岛)工程技术有限公司 冬季放矿筑坝方法
CN106284373A (zh) * 2016-08-30 2017-01-04 金堆城钼业股份有限公司 一种尾矿库的建造方法
CN112655515A (zh) * 2020-12-16 2021-04-16 中铝环保生态技术(湖南)有限公司 赤泥土壤化的方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102409684B (zh) * 2011-08-04 2014-08-13 中国铝业股份有限公司 赤泥混合自凝干法堆场筑坝方法

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008116375A1 (fr) * 2007-02-13 2008-10-02 China Aluminium International Engineering Corporation Limited Procédé de décantation avec construction de digues pour des boues rouges issues de frittage, et décantation de boues rouges du procédé bayer
WO2009018719A1 (fr) * 2007-08-09 2009-02-12 China Aluminium International Engineering Corporation Limited Procédé de construction de digue de boues rouges perméables provenant d'un procédé de frittage
CN101929160B (zh) * 2009-06-24 2012-05-23 鞍钢集团矿业公司 排岩修筑高散堆不透水尾矿坝的方法
CN101871216A (zh) * 2010-06-13 2010-10-27 中国铝业股份有限公司 一种冬季赤泥筑坝方法
CN104631386A (zh) * 2015-01-16 2015-05-20 中冶京诚(秦皇岛)工程技术有限公司 冬季放矿筑坝方法
CN104631386B (zh) * 2015-01-16 2016-06-15 中冶京诚(秦皇岛)工程技术有限公司 冬季放矿筑坝方法
CN106284373A (zh) * 2016-08-30 2017-01-04 金堆城钼业股份有限公司 一种尾矿库的建造方法
CN112655515A (zh) * 2020-12-16 2021-04-16 中铝环保生态技术(湖南)有限公司 赤泥土壤化的方法

Also Published As

Publication number Publication date
CN100534935C (zh) 2009-09-02

Similar Documents

Publication Publication Date Title
CN100534935C (zh) 一种拜耳法赤泥干法堆场的子坝构筑方法
CN101718086B (zh) 一种混凝土-堆石混合坝及其施工方法
CN100572686C (zh) 坑中坑支护体系的施工工艺
CN106759388A (zh) 一种浆体干法赤泥堆场构筑堆积坝的方法及其结构
CN102864782A (zh) 一种粘土心墙堆石坝坝体快速填筑施工方法
CN104762949B (zh) 一种秸秆固化吹填淤泥桩的成形方法
CN103572966B (zh) 筒仓漏斗内衬的施工方法
CN104556766A (zh) 利用再生混凝土的建筑基础垫层施工方法
CN106116199A (zh) 碱渣制工程土及其制备方法
CN109972468A (zh) 一种加固吹填砂路堤的施工方法
CN106592363B (zh) 一种市政软土路基的施工方法
CN103215950A (zh) 回填区桩基接长施工方法
CN109747024A (zh) 一种轻质复合墙板及其制备工艺
CN206986906U (zh) 一种浆体干法赤泥堆场构筑堆积坝的结构
CN102409660A (zh) 多节扩大头散粒材料桩复合地基予力工法
CN108941145B (zh) 垃圾填埋场中间覆盖层及其制备方法和应用
CN102102367A (zh) 一种用三水铝矿生产氧化铝产生的赤泥为材料的堆场堤坝结构
CN206503069U (zh) 栈桥排水系统
CN209620076U (zh) 一种火力发电厂石膏作为灰场堆积坝坝基的构筑结构
CN115613595A (zh) 一种废旧混凝土作为回填材料的应用及其回填施工方法
WO2008116375A1 (fr) Procédé de décantation avec construction de digues pour des boues rouges issues de frittage, et décantation de boues rouges du procédé bayer
CN111535323B (zh) 一种全断面准三级配长龄期碾压混凝土施工方法
CN210658434U (zh) 一种钢筋石笼与三维复合排水网结合的挡土墙
CN101838992B (zh) 一种山谷型湿法赤泥堆场进行干法增容的方法
CN101446087A (zh) 分解分级高桩承台的施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INSTITUTE C

Free format text: FORMER OWNER: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

Effective date: 20110524

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 550004 NO. 208, BEIJING ROAD, GUIYANG CITY, GUIZHOU PROVINCE TO: 550081 NO.2, JINZHU ROAD, JINYANG NEW DISTRICT, GUIYANG CITY

TR01 Transfer of patent right

Effective date of registration: 20110524

Address after: 550081 2 Jin Zhu Road, Jinyang New District, Guiyang

Patentee after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

Address before: 550004 No. 208, Beijing Road, Guiyang, Guizhou

Patentee before: Guiyang Aluminium and Magnesium Design Inst.