CN104631386B - 冬季放矿筑坝方法 - Google Patents
冬季放矿筑坝方法 Download PDFInfo
- Publication number
- CN104631386B CN104631386B CN201510021881.XA CN201510021881A CN104631386B CN 104631386 B CN104631386 B CN 104631386B CN 201510021881 A CN201510021881 A CN 201510021881A CN 104631386 B CN104631386 B CN 104631386B
- Authority
- CN
- China
- Prior art keywords
- dam
- holder
- winter
- ore drawing
- wide
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/10—Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Barrages (AREA)
- Manufacture And Refinement Of Metals (AREA)
Abstract
本发明提供了一种冬季放矿筑坝方法,包括以下步骤:步骤1、确定宽顶子坝(7)的顶宽度,宽顶子坝(7)的顶宽度大于等于尾矿坝的坝高;步骤2、根据冬季生产作业计划确定堆筑宽顶子坝(7)的高度;步骤3、根据确定的该宽顶子坝(7)的顶宽度、宽顶子坝(7)的高度以及宽顶子坝(7)的轴线长度,计算宽顶子坝(7)的体积;步骤4、在冬季上冻前,堆筑该宽顶子坝(7)。该方法简单,易于操作,可有效避免在尾矿坝边棱体内形成冰夹层或尾矿冰冻层,提高了尾矿坝边棱体的强度,保证了尾矿库的稳定安全。
Description
技术领域
本发明涉及矿山开采中的尾矿堆积技术领域,具体是一种冬季放矿筑坝方法。
背景技术
在《尾矿设施设计参考资料》(冶金工业出版社,出版日期1980年4月)中,要求在冰冻期采取库内冰下集中放矿。该方法适用于严寒地区,而对于偏寒冷、较寒冷地区根本无法实现冰下放矿,即使在严寒地区实现冰下放矿条件时,也存在冰下库容能否满足放矿量要求以及冰下放矿能否满足回水水质要求。
另外,在偏寒冷、较寒冷地区也有采取集中交替放矿的,放矿管接至滩面,保证矿浆流量。对于集中交替放矿,往往造成滩面不平整影响春季筑坝,另外也会在坝前滩面一定范围内形成冰冻带影响坝体强度。
发明内容
为了解决冬季尾矿库采用常规坝顶滩前均匀分散放矿很容易在尾矿沉积滩上形成冰夹层或尾矿冰冻层而影响坝体强度的问题,本发明提供了一种冬季放矿筑坝方法,该方法简单,易于操作,可有效避免在尾矿坝边棱体内形成冰夹层或尾矿冰冻层,提高了尾矿坝边棱体的强度,保证了尾矿库的稳定安全。
本发明解决其技术问题所采用的技术方案是:一种冬季放矿筑坝方法,包括以下步骤:
步骤1、确定宽顶子坝的顶宽度,宽顶子坝的顶宽度大于等于尾矿坝的坝高;
步骤2、根据冬季生产作业计划确定堆筑宽顶子坝的高度;
步骤3、根据确定的该宽顶子坝的顶宽度、宽顶子坝的高度以及宽顶子坝的轴线长度,计算宽顶子坝的体积;
步骤4、在冬季上冻前,堆筑该宽顶子坝。
在步骤1中,宽顶子坝的顶宽度等于所述尾矿坝的坝高。
在步骤2中,宽顶子坝的高度等于冬季放矿量除以尾矿库的库区占用面积。
在步骤4中,宽顶子坝采用池填法或渠槽法放矿堆筑。
在步骤4中,宽顶子坝采用尾矿砂或废石料堆筑。
当宽顶子坝采用池填法或渠槽法堆筑时,在堆筑该宽顶子坝前需要确定宽顶子坝的筑坝天数,宽顶子坝的筑坝天数等于宽顶子坝的体积除以选矿厂日排尾矿量。
所述冬季放矿筑坝方法包括步骤5、在冬季时,将放矿管道移至已筑好的宽顶子坝的内侧进行放矿作业。
在步骤5后,当尾矿库内存在支沟并且该支沟内存水时,在冬季将放矿管道铺设到该支沟处进行集中放矿,将该支沟内的存水排到主库区。
本发明的有益效果是,该方法简单,易于操作,可有效避免在尾矿坝边棱体内形成冰夹层或尾矿冰冻层,提高了尾矿坝边棱体的强度,保证了尾矿库的稳定安全。
附图说明
下面结合附图对本发明作进一步详细的描述。
图1为本发明所述冬季放矿筑坝方法的示意图。
其中1.初期坝,2.排水井,3.排水管,4.消力池,5.水区,6.尾矿砂,7.宽顶子坝,8.放矿管道;
L.宽顶子坝的顶宽度,H.宽顶子坝的高度。
具体实施方式
需要说明的是,在不冲突的情况下,本申请中的实施例及实施例中的特征可以相互组合。下面将参考附图并结合实施例来详细说明本发明。
一种冬季放矿筑坝方法,该方法是在初期坝1建好及坝顶滩前均匀分散放矿后进行以下步骤:
步骤1、确定宽顶子坝7的顶宽度,宽顶子坝7的顶宽度应该大于等于尾矿坝的坝高;
步骤2、根据冬季生产作业计划确定堆筑宽顶子坝7的高度H;
步骤3、根据确定的该宽顶子坝7的顶宽度L、宽顶子坝7的高度H以及宽顶子坝7的轴线长度,计算宽顶子坝7的体积;
步骤4、在冬季上冻前,堆筑该宽顶子坝7。
在本发明中,初期坝1和尾矿砂6的堆筑为现有技术不再详细介绍。本发明中通过加宽子坝的方式堆筑出能够覆盖边棱体的宽顶子坝7,防止宽顶子坝7内侧的放矿管道8排出的矿浆在边棱体上形成冰冻层,从而提高了冬季放矿堆筑尾矿坝边棱体的强度,保证尾矿库的稳定安全,解决了常规坝顶滩前均匀分散放矿很容易在尾矿沉积滩上形成冰夹层或尾矿冰冻层而影响坝体强度的问题。
在步骤1中,宽顶子坝7的顶宽L度等于所述尾矿坝的坝高。
在步骤2中,宽顶子坝7的高度H=冬季放矿量(拟占用库容)÷尾矿库的库区占用面积(不包含宽顶子坝占用面积)。
在步骤3中,根据确定的该宽顶子坝7的顶宽度、宽顶子坝7的高度以及宽顶子坝7的轴线长度,计算宽顶子坝7的体积。
宽顶子坝7的体积(所需尾矿量)=(宽顶子坝7的顶宽度+宽顶子坝7的底宽度)×宽顶子坝7的高度÷2×宽顶子坝7的轴线长度;宽顶子坝7的底宽度根据子坝设计的内外坡比计算所得。
在步骤4中,宽顶子坝7采用池填法或渠槽法放矿堆筑,或者宽顶子坝7也可以采用尾矿砂或废石料堆筑。
根据选矿厂日排尾矿量计划以及堆筑宽顶子坝7所需尾矿量计算确定提前放矿时间,提前放矿时间即堆筑宽顶子坝天数,宽顶子坝7的筑坝天数=宽顶子坝7所需尾矿量÷选矿厂日排尾矿量,具体是选择池填法还是渠槽法放矿堆筑宽顶子坝可根据各选矿厂生产经验决定,冬季上冻时间根据选矿厂的地理位置而定,如选矿厂一般每年12月10日左右开始上冻,宽顶子坝7的筑坝天数需要30天,则需要在11月10日左右开始堆筑宽顶子坝7。
所述冬季放矿筑坝方法包括以下步骤:
步骤5、在冬季时,将放矿管道8移至已筑好的宽顶子坝7的内侧进行放矿作业。此时要求库长满足回水水质要求,并要求尾矿库处于低水位运行,要加强排洪构筑物进水口、出水口的检查,遇有结冰影响回水时,必须及时破冰处理,确保回水系统畅通。
此时尾矿坝含有初期坝1、排水井2、排水管3、消力池4、水区5、尾矿砂6、宽顶子坝7,如图1所示。
在步骤5后,当尾矿库内存在支沟并且该支沟内存水时,在冬季将放矿管道铺设到该支沟处进行集中放矿,将该支沟内的存水排到主库区。但要注意控制主库区的干滩长度和安全超高符合规范要求。
以上所述,仅为本发明的具体实施例,不能以其限定发明实施的范围,所以其等同组件的置换,或依本发明专利保护范围所作的等同变化与修饰,都应仍属于本专利涵盖的范畴。另外,本发明中的技术特征与技术特征之间、技术特征与技术方案之间、技术方案与技术方案之间均可以自由组合使用。
Claims (7)
1.一种冬季放矿筑坝方法,其特征在于,所述冬季放矿筑坝方法包括以下步骤:
步骤1、确定宽顶子坝(7)的顶宽度,宽顶子坝(7)的顶宽度大于等于尾矿坝的坝高;
步骤2、根据冬季生产作业计划确定堆筑宽顶子坝(7)的高度,宽顶子坝(7)的高度等于冬季放矿量除以尾矿库的库区占用面积;
步骤3、根据确定的该宽顶子坝(7)的顶宽度、宽顶子坝(7)的高度以及宽顶子坝(7)的轴线长度,计算宽顶子坝(7)的体积;
步骤4、在冬季上冻前,堆筑完成该宽顶子坝(7)。
2.根据权利要求1所述的冬季放矿筑坝方法,其特征在于,在步骤1中,宽顶子坝(7)的顶宽度等于所述尾矿坝的坝高。
3.根据权利要求1所述的冬季放矿筑坝方法,其特征在于,在步骤4中,宽顶子坝(7)采用池填法或渠槽法放矿堆筑。
4.根据权利要求1所述的冬季放矿筑坝方法,其特征在于,在步骤4中,宽顶子坝(7)采用尾矿砂或废石料堆筑。
5.根据权利要求3所述的冬季放矿筑坝方法,其特征在于,当宽顶子坝(7)采用池填法或渠槽法堆筑时,在堆筑该宽顶子坝(7)前需要确定宽顶子坝(7)的筑坝天数,宽顶子坝(7)的筑坝天数等于宽顶子坝(7)的体积除以选矿厂日排尾矿量。
6.根据权利要求1所述的冬季放矿筑坝方法,其特征在于,所述冬季放矿筑坝方法还包括以下步骤:
步骤5、在冬季时,将放矿管道移至已筑好的宽顶子坝(7)的内侧进行放矿作业。
7.根据权利要求6所述的冬季放矿筑坝方法,其特征在于,在步骤5后,当尾矿库内存在支沟并且该支沟内存水时,在冬季将放矿管道铺设到该支沟处进行集中放矿,将该支沟内的存水排到主库区。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510021881.XA CN104631386B (zh) | 2015-01-16 | 2015-01-16 | 冬季放矿筑坝方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510021881.XA CN104631386B (zh) | 2015-01-16 | 2015-01-16 | 冬季放矿筑坝方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104631386A CN104631386A (zh) | 2015-05-20 |
CN104631386B true CN104631386B (zh) | 2016-06-15 |
Family
ID=53210587
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510021881.XA Active CN104631386B (zh) | 2015-01-16 | 2015-01-16 | 冬季放矿筑坝方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104631386B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107740428A (zh) * | 2017-09-08 | 2018-02-27 | 瓮福达州化工有限责任公司 | 一种堆积坝结构及其筑坝工艺 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3818465A1 (de) * | 1987-06-02 | 1988-12-22 | Gfr Aufbereitung Reststoffe | Baumaterial, verfahren zu seiner herstellung und seine verwendungen |
CN1850666A (zh) * | 2006-05-18 | 2006-10-25 | 贵阳铝镁设计研究院 | 一种拜耳法赤泥干法堆场的子坝构筑方法 |
CN101871216A (zh) * | 2010-06-13 | 2010-10-27 | 中国铝业股份有限公司 | 一种冬季赤泥筑坝方法 |
CN102102367A (zh) * | 2009-12-16 | 2011-06-22 | 贵阳铝镁设计研究院 | 一种用三水铝矿生产氧化铝产生的赤泥为材料的堆场堤坝结构 |
-
2015
- 2015-01-16 CN CN201510021881.XA patent/CN104631386B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3818465A1 (de) * | 1987-06-02 | 1988-12-22 | Gfr Aufbereitung Reststoffe | Baumaterial, verfahren zu seiner herstellung und seine verwendungen |
CN1850666A (zh) * | 2006-05-18 | 2006-10-25 | 贵阳铝镁设计研究院 | 一种拜耳法赤泥干法堆场的子坝构筑方法 |
CN102102367A (zh) * | 2009-12-16 | 2011-06-22 | 贵阳铝镁设计研究院 | 一种用三水铝矿生产氧化铝产生的赤泥为材料的堆场堤坝结构 |
CN101871216A (zh) * | 2010-06-13 | 2010-10-27 | 中国铝业股份有限公司 | 一种冬季赤泥筑坝方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104631386A (zh) | 2015-05-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102041845B (zh) | 一种有效降低尾矿库堆积坝浸润线的联合排渗系统 | |
CN105350498A (zh) | 一种节水的尾矿排放方法 | |
CN103422886A (zh) | 一种煤矿分布式地下水库的人工挡水坝及其筑坝方法 | |
CN104405436B (zh) | 一种提高矿体充填接顶率的方法 | |
CN104912087B (zh) | 一种应用模袋的中线式尾矿筑坝法 | |
CN104480949B (zh) | 基于强排渗上游式的尾矿库两级坝结构及其应用 | |
CN204185871U (zh) | 一种免动力逆向压水的自恢复边坡高扬程虹吸排水系统 | |
CN102644288A (zh) | 一种节约清洁安全的无水尾矿库的建造方法 | |
CN108797652B (zh) | 一种磷石膏库调节回水方法 | |
CN203412629U (zh) | 一种煤矿分布式地下水库的人工挡水坝 | |
CN104652492A (zh) | 一种尾矿库粘性土初期坝的排渗系统 | |
CN107975044A (zh) | 一种崩落法矿山利用尾矿地表塌陷坑回填的方法 | |
CN104631386B (zh) | 冬季放矿筑坝方法 | |
CN104652383B (zh) | 尾矿库坝体自流排水装置 | |
CN104711953A (zh) | 一种用废石筑的尾矿坝 | |
CN1232130A (zh) | 一种尾矿坝及灰渣坝的双坝安全堆筑法 | |
CN113027522A (zh) | 一种煤矿疏水同层回灌方法 | |
CN204626468U (zh) | 一种尾矿库排渗装置 | |
CN209227555U (zh) | 湿排尾矿库干式排放结构 | |
RU2569100C1 (ru) | Способ складирования зернистых отходов | |
CN103999592B (zh) | 一种防止酸性矿区废石场植被退化的方法 | |
CN104631425B (zh) | 一种加快粉煤灰排渗固结的方法 | |
CN204023529U (zh) | 尾矿库坝体自流排水装置 | |
CN102261082B (zh) | 高水位地区渣场铺膜防渗的方法和铺膜渣场及其使用方法 | |
CN201485845U (zh) | 一种尾矿坝淤泥质地基加固装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 066004 No. 71, Longhai Road, Qinhuangdao economic and Technological Development Zone, Hebei Patentee after: MCC Qinhuangdao engineering design & Research Institute Co Ltd Address before: 066004 No. 71, Longhai Road, Qinhuangdao economic and Technological Development Zone, Hebei Patentee before: CERI (Qinhuangdao) Engineering Technology Co. Ltd. |