CN102041845B - 一种有效降低尾矿库堆积坝浸润线的联合排渗系统 - Google Patents

一种有效降低尾矿库堆积坝浸润线的联合排渗系统 Download PDF

Info

Publication number
CN102041845B
CN102041845B CN201010559608A CN201010559608A CN102041845B CN 102041845 B CN102041845 B CN 102041845B CN 201010559608 A CN201010559608 A CN 201010559608A CN 201010559608 A CN201010559608 A CN 201010559608A CN 102041845 B CN102041845 B CN 102041845B
Authority
CN
China
Prior art keywords
dam
draining
vertical
row
transverse
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201010559608A
Other languages
English (en)
Other versions
CN102041845A (zh
Inventor
代永新
周敏
刁虎
卢敬标
徐启明
宋光清
赵蒙生
赵武鹍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinosteel Maanshan General Institute of Mining Research Co Ltd
Original Assignee
Sinosteel Maanshan General Institute of Mining Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinosteel Maanshan General Institute of Mining Research Co Ltd filed Critical Sinosteel Maanshan General Institute of Mining Research Co Ltd
Priority to CN201010559608A priority Critical patent/CN102041845B/zh
Publication of CN102041845A publication Critical patent/CN102041845A/zh
Application granted granted Critical
Publication of CN102041845B publication Critical patent/CN102041845B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

本发明公开了一种有效降低尾矿库堆积坝浸润线的联合排渗系统,是由竖向排渗井、平行坝轴线的横向排渗盲沟(2)及垂直坝轴线的纵向排渗管(3)组成;所述的横向排渗盲沟(2)采取在距离坝顶按照设计距离的尾砂沉积滩面平行坝轴线开挖倒梯形断面,铺设土工布(6)后用砂砾石(4)充填;所述的竖向排渗井沿横向排渗盲沟(2)间隔设置,采用竹编或钢筋网或具有类似功能的其它材料做骨架外包土工布(6)、内装砂砾石(4);竖向排渗井与横向排渗盲沟交汇处采用纵向排渗管(3)连接,连接到坝坡排水明沟。本发明采用三向联合排渗,形成一个组合型的能够自流排渗的整体,可以高效的降低堆积坝体内的浸润线,保证尾砂坝的安全运行。

Description

一种有效降低尾矿库堆积坝浸润线的联合排渗系统
技术领域
本发明涉及一种尾矿库后期堆积坝的排渗系统,尤其是涉及一种有效降低尾矿库堆积坝浸润线的联合排渗系统。适用于各类矿山尾矿库采用上游法筑坝的排渗,达到快速降低堆积坝体内的浸润线的目的,保证尾矿坝的安全运行。
背景技术
目前,我国尾矿储量超过100亿吨,且每年新增尾矿8~10亿吨,矿山生产加工过程中产生的尾矿大多排到尾矿库中堆存。尾矿库是重大危险源之一。据对我国具有较大规模的2500多座尾矿库统计表明,80年代以来,发生泥石流和溃坝200余起,特别是2008年9月山西襄汾“9·8”尾矿库溃坝事故造成276人遇难,是迄今为止全世界最大的尾矿库事故,造成了极大的人员伤亡和财产损失。
地下水浸润线埋置深度对上游法尾砂筑坝的安全稳定性影响很大,一般来说,浸润线每下降1m大致可使稳定性系数增加0.05左右,甚至更好一些。若浸润线下降至距坝面8m以下,坝体抗震性能可得到很大提高,在7级地震发生时基本上不会产生振动液化。浸润线偏高是上游法尾矿坝比较普遍的隐患,细粒尾砂筑坝更是如此。而矿山排放的尾砂粒径通常为中细砂以下,其自身渗透性较弱,依靠自身渗透性难以有效降低坝体内地下水,需增设排渗设施。目前一般通过设置排渗系统达到降低浸润线提高尾矿坝稳定性的目的。
降低尾矿堆积坝内浸润线的常用方法有水平排渗、垂直排渗、竖井与水平排渗管联合排渗、井点排渗及辐射井排渗等。其中:水平排渗在坝基范围内或在不同高程的沉积滩面上预埋盲沟、滤管或滤板等排渗体,将渗水引至集水总管,自流排出坝外;竖向排渗是在坝基范围内预设或在尾矿沉积滩上补设渗水竖井,渗入井内的水用机械抽吸或在井底另设水平管自流排出坝外。水平管排渗、垂直排渗、竖井与水平排渗管联合排渗在尾砂堆积子坝时实施,井点排渗及辐射井排渗是在尾砂堆积坝中、后期,根据尾砂坝体内的浸润线高度控制的要求,以降低浸润线。
当尾矿粒径较粗时尾矿坝沉积滩渗透系数一般不低于10-4cm/s,排渗设施容易收到明显的效果。而细粒尾砂堆积坝体内平均渗透系数在10-5~10-6cm/s左右,采用通常的排渗降水设施效果不很明显。
发明内容
本发明的目的就是针对现有尾矿库后期堆积坝的排渗系统难以降低尾矿库堆积坝内的浸润线、影响尾矿库安全运行的不足,而提供一种有效降低尾矿库堆积坝浸润线的联合排渗系统,保证尾矿库的安全运行。
为实现本发明的上述目的,本发明一种有效降低尾矿库堆积坝浸润线的联合排渗系统采用以下技术方案:
本发明一种有效降低尾矿库堆积坝浸润线的联合排渗系统是由竖向排渗井、平行坝轴线的横向排渗盲沟及垂直坝轴线的纵向排渗管组成。所述的横向排渗盲沟采取在距离坝顶按照设计距离的尾砂沉积滩面平行坝轴线开挖倒梯形断面,铺设土工布后用砂砾石充填,砾石之间的空隙即为盲沟中渗水的通道,土工布起到阻砂渗水的反滤作用;竖向排渗井沿横向排渗盲沟间隔设置,采用竹编或钢筋网或具有类似功能的其它材料做骨架外包土工布、内装砂砾石;竖向排渗井与横向排渗盲沟交汇处采用纵向排渗管连接,连接到坝坡排水明沟,纵向排渗管为竖向排渗井和横向排渗盲沟的排水通道。
所述纵向排渗管上半部钻孔制成花管,外包土工布而成,按1%~3%坡比向坝面外侧倾斜,让渗水加速外流,减小管内内压,自身也具有集水排渗的功能,充分发挥排水作用;也可以采用在纵向排渗管的进口段管上部打孔,形成一半的花管,外表面包裹土工布,按1%~3%坡比向坝面外侧倾斜。
在所述竖向排渗井的中间沿高度设有PVC花管。
所述横向排渗盲沟的长度方向根据竖向排渗井的间距2L取中分别向两侧按照坡度i降坡。
本发明一种有效降低尾矿库堆积坝浸润线的联合排渗系统是在后期尾砂堆积过程中分期建设,竖向排渗井随尾砂滩面的升高逐步连续加高,达到设计高度H。
所采用的砂砾石经过反复冲洗除泥。
所述纵向排渗管采用聚丙烯塑料管为佳。
竖向排渗井直径根据尾砂的粒度大小,同时考虑施工条件确定,竖向渗井高度根据尾矿堆积坝浸润线埋置深度经计算确定。
本发明采用以上技术方案,将纵向排渗管、横向排渗盲沟及竖向排渗井对接,便形成了一个组合型的能够自流排渗的整体。三向联合排渗不仅弥补了单独设置纵向排渗管降水效果有限的缺陷,而且也消除了单独设置竖向排渗井不能自流,须借助机械并长期消耗动力排渗,造成浸润线波动频繁,设备维护复杂等弊端。堆积坝体内排渗设施在后期尾砂堆积过程中分期建设。
附图说明
图1为本发明一种有效降低尾矿库堆积坝浸润线的联合排渗系统结构示意图;
图2为图1中①位置的局部剖面图;
图3为图2中a-a向视图;
图4为图3中b-b向视图。
具体实施方式
为进一步描述本发明,下面结合附图和实施例对本发明一种有效降低尾矿库堆积坝浸润线的联合排渗系统作进一步详细描述。
附图标记为:
1-竖向排渗井;2-横向排渗盲沟;3-纵向排渗管;4-竖向排渗井砂砾石;5-竖向排渗井骨架;6-竖向排渗井外包的土工布;7-PVC花管;8-排渗井井座;9-横向排渗盲沟砂砾石;10-横向排渗盲沟四周铺设的土工布;11-尾砂;L-竖向排渗井间距;H-竖向排渗井高度;i-坡比。
由图1所示的本发明一种有效降低尾矿库堆积坝浸润线的联合排渗系统结构示意图并结合图2、图3、图4看出,本发明一种有效降低尾矿库堆积坝浸润线的联合排渗系统采用竖向排渗井1、横向排渗盲沟2、纵向排渗管3三向联合排渗,形成了一个组合型的能够自流排渗的整体。竖向排渗井1采用竹编或根据钢筋网做骨架5,内填砂砾石4,外包土工布6,其目的是防止尾砂11进入竖向排渗井1内,竖向排渗井1随尾砂滩面升高适时接高,达到设计高度H,其间不得漏设;竖向排渗井1下部设有排渗井井座8;竖向排渗井1的中间沿高度H设有PVC花管7,从而加速排渗,PVC花管7采用φ80规格。横向排渗盲沟2采用倒梯形断面,其长度方向根据竖向排渗井的间距2L取中分别向两侧按照坡度i降坡,横向排渗盲沟2四周铺设土工布10,内填砂砾石9。竖向排渗井1与横向排渗盲沟2交汇处采用纵向排渗管3连接,纵向排渗管3向坝外按照1%~3%坡比倾斜,连接到坝坡排水明沟。
本发明一种有效降低尾矿库堆积坝浸润线的联合排渗系统,在矿山尾矿库后期堆积坝体内设置,各系统之间互相关联,实践应用表明,这种新的三向联合排渗系统可以高效的降低尾矿堆积坝体内的浸润线,确保了尾矿库的安全运行。

Claims (3)

1.一种有效降低尾矿库堆积坝浸润线的联合排渗系统,其特征在于是由竖向排渗井(1)、平行坝轴线的横向排渗盲沟(2)及垂直坝轴线的纵向排渗管(3)组成;所述的横向排渗盲沟(2)采取在距离坝顶按照设计距离的尾砂沉积滩面平行坝轴线开挖倒梯形断面,铺设土工布(6)后用砂砾石(4)充填;所述的竖向排渗井(1)沿横向排渗盲沟(2)间隔设置,采用竹编或钢筋网做骨架外包土工布(6)、内装砂砾石(4);竖向排渗井(1)与横向排渗盲沟(1)交汇处采用纵向排渗管(3)连接,连接到坝坡排水明沟;所述纵向排渗管(3)上半部钻孔制成花管,外包土工布而成,按1%~3%坡比向坝面外侧倾斜。
2.如权利要求1所述的一种有效降低尾矿库堆积坝浸润线的联合排渗系统,其特征在于:在所述竖向排渗井(1)的中间沿高度设有PVC花管(7)。
3.如权利要求1或2所述的一种有效降低尾矿库堆积坝浸润线的联合排渗系统,其特征在于:所述横向排渗盲沟(2)的长度方向根据竖向排渗井的间距2L取中分别向两侧按照坡度i降坡。
CN201010559608A 2010-11-18 2010-11-18 一种有效降低尾矿库堆积坝浸润线的联合排渗系统 Expired - Fee Related CN102041845B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010559608A CN102041845B (zh) 2010-11-18 2010-11-18 一种有效降低尾矿库堆积坝浸润线的联合排渗系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010559608A CN102041845B (zh) 2010-11-18 2010-11-18 一种有效降低尾矿库堆积坝浸润线的联合排渗系统

Publications (2)

Publication Number Publication Date
CN102041845A CN102041845A (zh) 2011-05-04
CN102041845B true CN102041845B (zh) 2012-10-03

Family

ID=43908355

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010559608A Expired - Fee Related CN102041845B (zh) 2010-11-18 2010-11-18 一种有效降低尾矿库堆积坝浸润线的联合排渗系统

Country Status (1)

Country Link
CN (1) CN102041845B (zh)

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103122639B (zh) * 2011-11-18 2015-05-27 中冶集团武汉勘察研究院有限公司 一种后置排渗加筋带治理尾矿堆积坝的新工法
CN102787612A (zh) * 2012-08-16 2012-11-21 鞍钢集团矿业公司 排土场基底坝构建工艺
CN102888852B (zh) * 2012-10-19 2014-12-17 中钢集团马鞍山矿山研究院有限公司 一种用于闭库后尾矿库滩面排渗的系统
CN103669550B (zh) * 2013-12-27 2015-12-30 中国水电顾问集团贵阳勘测设计研究院有限公司 一种解决湿法排放铺膜防渗磷石膏堆场底部导渗装置
CN103758135B (zh) * 2014-01-22 2015-10-28 孟凡林 一种岩土工程降水井用竹笼井壁及其制作方法
CN103967496B (zh) * 2014-04-16 2015-11-25 中钢集团马鞍山矿山研究院有限公司 一种适于对山谷型尾矿堆积坝坝坡尾矿进行回采的新方法
CN104179236A (zh) * 2014-08-19 2014-12-03 湖南安化湘安钨业有限责任公司 一种尾矿库快速渗水方法及其装置
CN104631425B (zh) * 2014-12-18 2016-08-17 河南省电力勘测设计院 一种加快粉煤灰排渗固结的方法
CN104674828B (zh) * 2015-01-15 2016-07-06 中冶京诚(秦皇岛)工程技术有限公司 尾矿坝竖向排渗井的施工方法
CN106801414A (zh) * 2017-03-20 2017-06-06 武汉大学 一种带自排水结构的堤防及堤防构建方法
CN108265685A (zh) * 2018-01-18 2018-07-10 南华大学 利用采矿废石降低尾矿库坝体浸润线的排渗系统及其施工方法
CN109235451A (zh) * 2018-10-24 2019-01-18 福建卓越建设工程开发有限公司 装配式柔性面层可回收复合土钉墙及施工方法
CN109537709B (zh) * 2018-12-25 2024-06-14 中国恩菲工程技术有限公司 尾矿库闭库系统及方法、光伏发电系统、生态修复方法
CN109826180B (zh) * 2019-03-21 2023-12-08 北京矿冶科技集团有限公司 尾矿坝排渗加固系统
CN111549776B (zh) * 2020-05-18 2021-09-03 矿冶科技集团有限公司 细粒尾矿库的排渗方法、排渗系统和应用
CN112922040B (zh) * 2020-12-08 2022-07-05 矿冶科技集团有限公司 尾矿排渗用的反滤层结构以及其制备方法和安装方法
CN113882491A (zh) * 2021-10-14 2022-01-04 中钢集团马鞍山矿山研究总院股份有限公司 一种降低尾矿库或磷石膏库浸润线的方法
CN114439090A (zh) * 2021-10-14 2022-05-06 中钢集团马鞍山矿山研究总院股份有限公司 用于降低尾矿库或磷石膏库浸润线的截排渗结构
CN114703799A (zh) * 2022-03-18 2022-07-05 西安理工大学 降低含泥夹层尾矿坝坝坡浸润面的方法

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU926288A1 (ru) * 1980-06-10 1982-05-07 Московский Ордена Трудового Красного Знамени Горный Институт Способ гидравлической укладки горных пород в отвалы и хвостохранилища
CN100516381C (zh) * 2007-08-28 2009-07-22 中国科学院武汉岩土力学研究所 横向半透水排水管及其横向排水网
CN101144275A (zh) * 2007-10-09 2008-03-19 水利部交通部电力工业部南京水利科学研究院 用于软土地基处理的垂直排水通道管
CN201474071U (zh) * 2009-09-09 2010-05-19 中国瑞林工程技术有限公司 一种干式堆存尾矿坝澄清液集排装置

Also Published As

Publication number Publication date
CN102041845A (zh) 2011-05-04

Similar Documents

Publication Publication Date Title
CN102041845B (zh) 一种有效降低尾矿库堆积坝浸润线的联合排渗系统
CN204780819U (zh) 尾矿坝反向预埋盲沟排渗系统
CN103615042B (zh) 一种横纵竖三向网络式排渗装置
CN103422886A (zh) 一种煤矿分布式地下水库的人工挡水坝及其筑坝方法
CN105926576A (zh) 一种用于上游法尾砂冲积筑坝加速尾矿浆脱水固结的方法
CN103046565A (zh) 超深岩基深基坑降排水方法
CN105179011A (zh) 一种隧洞封堵设施及其封堵方法
CN108265685A (zh) 利用采矿废石降低尾矿库坝体浸润线的排渗系统及其施工方法
CN203412629U (zh) 一种煤矿分布式地下水库的人工挡水坝
CN103334371B (zh) 一种路基沉陷注浆处治结构及施工方法
CN104652492A (zh) 一种尾矿库粘性土初期坝的排渗系统
CN103437336A (zh) 一种pvc带孔管碎石桩及其处理软弱地基的方法
CN111622240B (zh) 一种梯形加趾排水抗滑桩及其施工方法
CN111395060A (zh) 岩溶区既有路堑拓宽路基结构及设计与施工方法
CN203924082U (zh) 地下建筑物抗浮结构
CN216640547U (zh) 一种适合弱透水软土地层用的排水减压抗浮系统
CN103343690B (zh) 斜井大断面过含水层井筒防渗漏结构的施工方法
CN104196046B (zh) 降低地下抗浮水位的隔水排水系统
CN211596806U (zh) 适用于高承压地下水地基的暗排水系统
CN204919578U (zh) 特殊地质条件下的真空管井降水系统
CN110805049A (zh) 一种山体边坡超厚度喷锚永久支护结构的施工方法
CN207277313U (zh) 一种可变形的抗粉土液化的排水装置
CN216339715U (zh) 地下工程抗浮处理结构
CN105064384B (zh) 真空管井降水系统
CN110453698B (zh) 一种内接半圆形桩环的方形排水抗滑桩结构及其施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121003

Termination date: 20211118

CF01 Termination of patent right due to non-payment of annual fee