CN102787612A - 排土场基底坝构建工艺 - Google Patents
排土场基底坝构建工艺 Download PDFInfo
- Publication number
- CN102787612A CN102787612A CN2012102910549A CN201210291054A CN102787612A CN 102787612 A CN102787612 A CN 102787612A CN 2012102910549 A CN2012102910549 A CN 2012102910549A CN 201210291054 A CN201210291054 A CN 201210291054A CN 102787612 A CN102787612 A CN 102787612A
- Authority
- CN
- China
- Prior art keywords
- refuse dump
- substrate
- dam
- substrate dam
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Revetment (AREA)
Abstract
本发明涉及一种排土场基底坝构建工艺,包括以下步骤:1)在排土场范围内,垂直排土场坡度方向,修筑阶梯形基底坝,所述的基底坝是由坚硬的石块、混凝土砌筑而成,基底坝为等腰梯形;2)在基底坝坝基处设置排水孔,在标高最底处的基底坝的排水孔处挖掘排水沟;3)在排水沟与蓄水池之间挖掘导水沟,其排水沟的出口与导水沟相连,导水沟的出口与蓄水池相连,排水沟水通过导水沟汇集于蓄水池。本发明的优点是:由于本发明在基底坝坝基处设置排水孔,并在标高最底处的基底坝的排水孔处,挖掘排水沟,这种排土场基底坝构建工艺,有效地防止了排土场由于积水的浸泡,引起排土场滑坡和排土场垮落现象的发生,并将排土场基底积水汇集存储,以备它用。
Description
技术领域
本发明属于冶金矿山尾矿坝技术领域,特别是涉及一种排土场基底坝构建工艺。
背景技术
露天开采需要剥离覆盖在矿床上部及其周围的表土和岩石,并将这些表土和岩石运至排土场。维持排土场稳定,有许多种方法,如在坡底线处设置石笼子、设置安全台阶、埋设的抗滑挡墙等。目前,加强排土场稳定的工艺:①“石笼子”是用铁丝网将数个大石块罩上,变为一体,堆置于排土场坡底线处,防止水冲涮,对排土场基底造成腐蚀,导致排土场坍塌。②每隔一定高度即设置一定的安全台阶,保持排土场的稳定,主要是防止滑坡。③将坚大块岩石预先堆置于可能产生潜在滑动面的位置上,排土场形成后便成了预先埋设的抗滑挡墙,防止排土场沿滑移面滑动而形成的坍塌。工程量巨大,费用高。④在排土场基地,制造粗糙度,防止排土场沿排土场基地滑动而形成地质灾害。①、④是通过控制排土场基底来加强排土场稳定,但强度不够;②的主要功能是防止滑坡;③通过阻止滑移面贯通,来预防排土场滑坡;但是上述方法都没有彻底解决由于排土场基底排水功能不好,由于积水的浸泡,诱发排土场基底软弱导致承载力不足引起排土场滑坡的问题。
发明内容
本发明的目的是提供一种排土场基底坝构建工艺,通过构建排土场基底坝,预防排土场基底由于洪水侵蚀、沿排土场基底滑移、排土场沿滑移面滑动而发生垮塌。并将排土场基底积水汇集存储,以备它用。
本发明的目的是通过下述技术方案来实现的:
本发明的排土场基底坝构建工艺,包括以下步骤:
1)在排土场范围内,垂直排土场坡度方向,修筑阶梯形基底坝,所述的基底坝是由坚硬的石块、混凝土砌筑而成,基底坝为等腰梯形,
2)在基底坝坝基处设置排水孔,在标高最底处的基底坝的排水孔处挖掘排水沟,
3)在排水沟与蓄水池之间挖掘导水沟,其排水沟的出口与导水沟相连,导水沟有出口与蓄水池相连,排水沟水通过导水沟汇集于蓄水池,
所述的排水孔横断面为S1,排水沟横断面为S2,其S2= S1。
所述的导水沟横断面为S3, S3= S1。
本发明的有益效果是:由于本发明在基底坝坝基处设置排水孔,并在标高最底处的基底坝的排水孔处,挖掘排水沟,这种排土场基底坝构建工艺,有效地防止了排土场由于积水的浸泡,诱发排土场基底软弱,导致承载力不足,引起排土场滑坡和排土场垮落现象的发生,并将排土场基底积水汇集存储,以备它用。
附图说明
图1为本发明的排土场基底坝构建工艺的平面投影图。
图2为本发明的排土场基底坝构建工艺的横截面图。
图3为本发明的基底坝横截面图。
具体实施方式
下面结合附图对本发明作进一步说明。
如图1、2、3所示,本发明的本发明的排土场基底坝构建工艺,包括以下步骤:
1)在排土场范围内,垂直排土场坡度方向,修筑阶梯形基底坝1,其基底坝1之间的间距及尺寸根据排土作业经验而定,
本发明所述的基底坝1是由坚硬的石块、混凝土砌筑而成,基底坝1为等腰梯形,形成采矿废石土和固化尾矿联合混排的排土场;
2)在基底坝1坝基处设置排水孔2,在标高最底处的基底坝的排水孔2处挖掘排水沟3,
3)在排水沟3与蓄水池5之间挖掘导水沟4,其排水沟3的出口与导水沟4相连,导水沟4有出口与蓄水池5相连,排水沟3水通过导水沟4汇集于蓄水池5,所述的导水沟横断面为S3。
本发明所述的排水孔横断面为S1,排水沟横断面为S2,其S2= S1。
所述的导水沟横断面为S3, S3= S1即S1= S2= S3。以保证排水、导水畅通。
例如:某国有企业矿山排土场,排土场范围是963324m2,设计排土标高460 m,排土场容积4130.8万m3,根据《金属非金属矿山安全规程》确定,排土台阶高度是P =15m,排土台阶坡面角γ=65°,岩石坚固性系数为6(根据现场取样,实验测得),年平均降雨量为729.5mm。
其排水孔横断面为S1、排水沟横断面为S2和导水沟横断面为S3是根据暴雨径流量、基底坝横断面计算公式计算而得。
基底坝高H根据排土场设计时的排土段高P而定,
即H =β×P(1.0≤β≤1.5)其中:β为基底坝高H修正系数:1.0≤β≤1.5; P为排土台阶高度P =15m
当β=1.0, H =β×P=1.0×15=15
α基底坝坡面角根据岩石坚固系数,通过类比法,参考土场台阶坡面角γ而定,其中:α
即α=δ×γ(0.9≤δ≤1.1)其中:δ基底坝坡面角α修正系数:0.9≤δ≤1.1; γ排土场台阶坡面角
当δ=1.0,α=δ×γ=1.0×65°=65°
D= H(D基底坝顶面宽度, H基底坝高),基底坝间的间距根据经验一般取200 m—300 m之间。
构建排土场排水基底,在排土场范围内,修筑基底坝,每250米修筑一条基底坝。总共4条基底坝,基底坝的参数H=15(H基底坝高),D=15(D基底坝顶面宽度),α=65°(α基底坝坡面角)。
修筑2km的排水沟、导水沟。
根据暴雨径流量计算采用公式:Q=F×Hp×a 计算降雨量
式中:Q——暴雨径流量(m3)
F——汇水面积(m2)
Hp——二十年一遇暴雨量(mm)
a——暴雨降雨地表径流系数(0.6)
Q=963324×0.7295×0.6=421646.915(m3)
通导水沟横断面(S3) 、排水孔横断面(S1)、排水沟横断面(S2)横断面计算公式:S3=S2=S1=k×(Q/L),其中:L=2000m,L为修筑排水沟、导水沟的长度。
S3=S2=S1=2‰×(421646.915/2000)=0.42 m2
导水沟横断面(S3) 、排水孔横断面(S1)、排水沟横断面(S2)横断面尽量取正方型,同时也应该照顾到施工方便。
排土场使用过程中应将表土、强风化岩另选场地堆放,这样可防止表土、强风化岩随流水渗透至排土场基底堵塞排水孔、排水沟、导水沟。
Claims (4)
1.一种排土场基底坝构建工艺,包括以下步骤:
1)在排土场范围内,垂直排土场坡度方向,修筑阶梯形基底坝,所述的基底坝是由坚硬的石块、混凝土砌筑而成,基底坝为等腰梯形,
2)在基底坝坝基处设置排水孔,在标高最底处的基底坝的排水孔处挖掘排水沟,
3)在排水沟与蓄水池之间挖掘导水沟,其排水沟的出口与导水沟相连,导水沟的出口与蓄水池相连,排水沟水通过导水沟汇集于蓄水池。
2.根据权利要求1所述的排土场基底坝构建工艺,其特征在于所述的排水孔横断面为S1,排水沟横断面为S2,其S2= S1。
3.根据权利要求1所述的排土场基底坝构建工艺,其特征在于所述的导水沟横断面为S3, S3= S1。
4.根据权利要求1所述的排土场基底坝构建工艺,其特征在于所述的基底坝的标高从上到下依次增加。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012102910549A CN102787612A (zh) | 2012-08-16 | 2012-08-16 | 排土场基底坝构建工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012102910549A CN102787612A (zh) | 2012-08-16 | 2012-08-16 | 排土场基底坝构建工艺 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102787612A true CN102787612A (zh) | 2012-11-21 |
Family
ID=47153186
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012102910549A Pending CN102787612A (zh) | 2012-08-16 | 2012-08-16 | 排土场基底坝构建工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102787612A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105040713A (zh) * | 2015-08-03 | 2015-11-11 | 李世海 | 一种露天矿边坡滑坡治理方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002129639A (ja) * | 2000-10-25 | 2002-05-09 | Shinichiro Hayashi | 水排出装置 |
CN1837507A (zh) * | 2005-03-23 | 2006-09-27 | 贵阳铝镁设计研究院 | 干法赤泥堆场子坝的保护方法 |
CN102041845A (zh) * | 2010-11-18 | 2011-05-04 | 中钢集团马鞍山矿山研究院有限公司 | 一种有效降低尾矿库堆积坝浸润线的联合排渗系统 |
-
2012
- 2012-08-16 CN CN2012102910549A patent/CN102787612A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002129639A (ja) * | 2000-10-25 | 2002-05-09 | Shinichiro Hayashi | 水排出装置 |
CN1837507A (zh) * | 2005-03-23 | 2006-09-27 | 贵阳铝镁设计研究院 | 干法赤泥堆场子坝的保护方法 |
CN102041845A (zh) * | 2010-11-18 | 2011-05-04 | 中钢集团马鞍山矿山研究院有限公司 | 一种有效降低尾矿库堆积坝浸润线的联合排渗系统 |
Non-Patent Citations (1)
Title |
---|
王运敏等: "《排土场稳定性及灾害防治》", 31 December 2011 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105040713A (zh) * | 2015-08-03 | 2015-11-11 | 李世海 | 一种露天矿边坡滑坡治理方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103510528B (zh) | 用于地下结构抗浮的盲沟排水结构 | |
CN104480974B (zh) | 一种适用于上游式尾矿库的反向排渗系统及上游式尾矿库 | |
CN104818721A (zh) | 一种适用于陡壁深坑型废弃矿山地质环境治理方法 | |
CN102787236B (zh) | 一种离子吸附型稀土原地浸矿母液回收工艺 | |
CN105464056A (zh) | 一种适应土石坝沉降的防渗结构 | |
CN110904915A (zh) | 一种水库工程岩土体透水及防渗设计方法 | |
CN104775438B (zh) | 喀斯特地貌基础雨季中塔位基坑施工的方法 | |
CN103266633A (zh) | 一种湿法冶金尾渣库防渗漏排污水排洪方法 | |
CN109629582B (zh) | 一种异形排水抗滑桩及其施工方法 | |
CN103046564B (zh) | 一种适于排土场基底内存在承压水的排土场综合治水方法 | |
CN204940314U (zh) | 一种扩大端降压井及其深基坑结构 | |
CN103046536B (zh) | 一种适于软弱地基的排土场综合治水措施 | |
CN111424685A (zh) | 一种大型岩溶洼地内回填地基深部落水洞处理结构及方法 | |
CN203924082U (zh) | 地下建筑物抗浮结构 | |
CN102787612A (zh) | 排土场基底坝构建工艺 | |
CN203625928U (zh) | 一种整体式路堑挡土墙 | |
CN104975610A (zh) | 一种扩大端降压井、深基坑结构及其施工方法 | |
CN113669109B (zh) | 一种露天矿的地下储水系统的修筑方法 | |
CN215441730U (zh) | 一种石笼防冲墙结构 | |
CN205662918U (zh) | 风积沙螺旋钢桩结构 | |
CN212670599U (zh) | 一种岩土工程边坡防渗水结构 | |
CN103999592A (zh) | 一种防止酸性矿区废石场植被退化的方法 | |
CN103774698B (zh) | 土工免排水施工方法 | |
CN113216095A (zh) | 一种采用砒砂岩模块堆叠的淤地坝及其施工方法 | |
CN112523272A (zh) | 用于强风化岩层的抗浮盲沟及其施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |