CN103266633A - 一种湿法冶金尾渣库防渗漏排污水排洪方法 - Google Patents

一种湿法冶金尾渣库防渗漏排污水排洪方法 Download PDF

Info

Publication number
CN103266633A
CN103266633A CN2013102181030A CN201310218103A CN103266633A CN 103266633 A CN103266633 A CN 103266633A CN 2013102181030 A CN2013102181030 A CN 2013102181030A CN 201310218103 A CN201310218103 A CN 201310218103A CN 103266633 A CN103266633 A CN 103266633A
Authority
CN
China
Prior art keywords
seepage
storehouse
sepage
proof
ditch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102181030A
Other languages
English (en)
Other versions
CN103266633B (zh
Inventor
罗天盛
詹海青
刘廷军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Zunyi Hui Xing Ferroalloy Co Ltd
Original Assignee
Guizhou Zunyi Hui Xing Ferroalloy Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Zunyi Hui Xing Ferroalloy Co Ltd filed Critical Guizhou Zunyi Hui Xing Ferroalloy Co Ltd
Priority to CN201310218103.0A priority Critical patent/CN103266633B/zh
Publication of CN103266633A publication Critical patent/CN103266633A/zh
Application granted granted Critical
Publication of CN103266633B publication Critical patent/CN103266633B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

本发明涉及一种湿法冶金尾渣库防渗漏排污水及排洪方法,即在渣库底依次铺盖防渗支持层、土工膜防渗层、复合防渗膜、土工布防渗层、防渗保护过滤层的防渗防腐结构,将渗液排水管和软式透水集渗管分别竖向、横向预埋于土工布防渗层之上,并和横向截水沟组成网状集排渗系统,渣库内外设有两套排洪系统,库内溢流排洪暗沟,排渣库内污水回收利用,库外的库边截水排洪沟排山体下泄范围内的雨水(清水)至库区下游自然河沟。本发明能截断污水渗透污染地下水并克服库渣内积水造成泥石流等安全隐患,保护了环境、节约了资源,工艺简单,易操作实施,值得推广应用。

Description

一种湿法冶金尾渣库防渗漏排污水排洪方法
技术领域
本发明涉及一种湿法冶金尾渣防渗漏排污水及排洪方法的技术领域。
背景技术
目前,我国湿法冶金企业对冶金尾渣堆放在空地,日晒雨淋,均未对其尾渣库底进行防渗漏处理,即不铺设防渗膜,受到污染的渣库积水可从库底渗漏污染地下水,尾渣库内不分层铺设尾渣库集渗排管道,可造成尾渣库中积水,尾渣形成泥石流,严重影响周边环境和尾渣库安全性,有可能造成尾渣库发生溃坝事故等。
发明内容
本发明针对目前湿法冶金行业中对冶金尾渣未进行防渗处理,不分层铺设尾渣库集渗排水系统进行尾渣库排水,尾渣库造成地下水污染,还有可能造成尾渣库发生溃坝泥石流等弊端,提供了一种防尾渣库渗漏和排污水和排洪的方法。
为解决以上各种问题,本发明的技术方案如下:
在库底设计防渗防腐结构:在坡地或空地上挖坑,对库底原土层进行清理平整及库周边坡地进行修平,依次铺盖防渗支持层即粘土、土工膜防渗层、复合防渗膜、土工布防渗层、防渗保护过滤的防渗防腐技术措施。
在土布防渗层之上竖向预埋渗液排水管、在其上再横向水平预埋软式透水集渗管、软式透水管将收集到的渗液流入渗液排水管,渗液排水管将渗液从渣层送出流入横向截水沟,再自流到坝肩截水沟,坝肩截水沟又将渗液自流进入渗液收集池,至此,渗液通过管(沟)网收集系统完成一次收集过程,收集到的溶液储存到一定量时,泵回生产车间回收利用。
库区排洪方式是渣库设计两套排污水和排洪系统,两套系统各自独立发挥泄洪作用,场外设库边截水排洪沟,场内设有库内溢流排洪暗沟,将渣库内收集到的污水流入库区下游设置的渗液收集池储存回收。
由于本发明采用了以上的技术方案和设计了合理的防渗排污水和排清水两套防洪结构,克服了原湿法冶金尾渣库不进行防渗漏处理,即不铺盖防渗膜,受到污染的渣库积水可从库底渗漏污染地下水,又由于本发明分层铺设集渗排水管道,内外两套排洪系统,避免了尾渣库中积水,尾渣形成泥石流,对尾渣库的安全性造成威协。集渗液回收利用,节约了资源,保护了环境。
附图说明
图1 为管(沟)网及防腐层主视图剖面图的示意图;
图2 为管(沟)网收集系统俯视图的示意图;
图中:1—软水透水集渗管,2—渗液排水管,3—横向截水沟,4—坝肩截水沟,5—渗液收集池,6—库边截水排洪沟,7—库内溢流排洪暗沟,8—库区原土层,9—防渗支持层(新鲜粘土),10—土工膜防渗层,11—复合防渗膜,12—土工布防渗层,13—防渗保护过滤层。
具体实施方式
下面结合附图用实施例说明本发明的方案,但该实施例并不能限定本发明的范围。
在冶炼厂外空地或坡地先作弥散试验,测土质松散层和基岩强风化带含水层饱水带的地下水流速和弥散度,基岩含水层地下水流速和弥散度,根据渣场弥散试验结果选择铺盖防渗材料的型号和防渗膜层数,如图1 选择在坡地上挖坑,对库底原土层直行清理平整及库周边坡进行修平,依次铺盖防渗支持层(即粘地)9、土工布防渗层10、复合防渗膜11、土工布防渗层12 、防渗保护过滤层13的防渗防腐结构。
如图1和图2所示在渣堆积坝内先竖向预埋集渗排水管2于土工布防渗层12之上,在其上再横向水平预埋软式透水管1,每5米布置一根软式透水管1,共3根,软式透水管1收集到的渗液流入渗液排水管2,渗液排水管2又将渗液从渣层送出流入横向截水沟3,横向截水沟3又将渗液自流到坝肩截水沟4,坝肩截水沟4又将渗液自流进入渗液收集池5,至此,渗透通过管(沟)网收集系统完成一次收集过程,收集到的溶液储存到一定量时,泵回生产车间回收利用。
渣库设计有两套排污水和排洪系统,各自独立发挥泄洪作用,场内设库边截水排洪沟6,主要将库区最高堆渣从山体下泄范围内的雨水(清水)外排到库区下游自然河沟,其作用可起到截断雨水流到渣库内与渣接触,减少回水量,并可实现库区清污分流,确保尾渣库外排水达标排放,场内设有库内溢流排洪暗沟7,主要将最高堆积标高以下库区内直接下落渣滩面雨水内排到库区下游的渗液收集池5,其作用一是将渣库内污水收集送至渗液收集池5储存回用,二是避免库区内污水内存占用库容。
防渗材料选择及集渗液管、排水管道型号结构设计为:土工膜防渗层10型号为HDPE,400g/m2,复合防渗膜11型号为THE,膜厚1.2~1.5mm,土工布防渗层12 为丙纶型,400 g/m2,防渗保护过滤层13为细沙石。
软式透水集渗管1为Φ80软式透水管,渗液排水管2为Φ50PE管。横向截水沟3为钢筋砼结构沟宽为0.400~0.500米,沟深为0.400~0.600米,软式透水集渗液管1与渗液排水管2和横向截水沟3组成网状集排渗系统。
库边截水排洪沟6为毛石沟,沟的形式结构为梯形,沟底宽0.5米,沟面宽1米,沟深0.6米,长度按实际设计。
渗液收集池5设于初期坝下游,长×宽×高尺寸为40×15×3(m),容积为1800m3,池壁为M7.5砌M30毛石砌筑,池底为钢筋砼底板,收集池内设Dg50污水潜水泵回水,将池内存水经Φ50UPVC回水管,打回生产车间回收使用。
库内溢流排洪暗沟7为钢筋砼结构,沟壁厚度为350mm,排水断面为双孔溢流沟,单孔尺寸宽×高为0.9×1.5(m),孔顶盖板为C25钢砼半园拱,拱高500mm,厚150mm,长度按实际设计。

Claims (6)

1.一种湿法冶金尾渣库防渗漏排污水排洪方法,其特征在于:在坡地上挖坑,对库底原土层(8)进行清理平整及库周边坡地进行修平,依次铺盖防渗支持层(9),土工膜防渗层(10)、复合防渗膜(11)、土工布防渗层(12)、防渗保护过滤层(13)的防渗防腐结构 ,在土工布防渗层(12)之上,竖向预埋渗液排水管(2),在其上再横向水平预埋软式透水集渗管(1),软式透水管(1)将收集到的渗液流入渗液排水管(2),渗液排水管(2)将渗液从渣层送出流入横向截水沟(3),再自流到坝肩截水沟(4)、坝肩截水沟(4)又将渗液自流进入渗液收集池(5),在场内设有库区溢流排洪暗沟(7),将渣库内收集到的污水流入库区下游设置的渗液收集池(5)储存回收,场外设库边截水排洪沟(6)。
2.根据权利要求1所述的湿法冶金尾渣库防渗漏排污水排洪方法,其特征在于:土工膜防渗层(10)型 号为HDPE,400g/m2,复合防渗膜(11)型号为THE,膜厚1.2~1.5mm,土工布防渗层(12)型号为丙纶型,400 g/m2,防渗保护过滤层(13)为细沙石。
3.根据权利要求1所述的湿法冶金尾渣库防渗漏排污水排洪方法,其特征在于:软式透水集渗管(1)为Φ80软式透水管,渗液排水管(2)为Φ50PE管,横向截水沟(3)为钢筋砼结构,沟宽为0.400~0.500米,沟深为0.400~0.600米。
4.根据权利要求1所述的湿法冶金尾渣库防渗漏排污水排洪方法,其特征在于:库边截水排洪沟(6)为毛石沟,沟的形式结构为梯形,沟底宽0.5米,沟面宽1米,沟深0.6米,长度按实际设计。
5.根据权利要求1所述的湿法冶金尾渣库防渗漏排污水排洪方法,其特征在于:渗液收集池(5)长×宽×高尺寸为40×15×3(m),容积为1800m3,池壁为M7.5砌M30毛石砌筑,池底为钢筋砼底板,收集池内设Dg50污水潜水泵回水,将池内存水经Φ50UPVC回水管,打回生产车间回收使用。
6.根据权利要求1所述的湿法冶金尾渣库防渗漏排污水排洪方法,其特征在于:库内溢流排洪暗沟(7)为钢筋砼结构,沟壁厚度为350mm,排水断面为双孔溢流沟,单孔尺寸宽×高为0.9×1.5(m),孔顶盖板为C25钢砼半园拱,拱高500mm,厚150mm,长度按实际设计。
CN201310218103.0A 2013-06-04 2013-06-04 一种湿法冶金尾渣库防渗漏排污水排洪方法 Expired - Fee Related CN103266633B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310218103.0A CN103266633B (zh) 2013-06-04 2013-06-04 一种湿法冶金尾渣库防渗漏排污水排洪方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310218103.0A CN103266633B (zh) 2013-06-04 2013-06-04 一种湿法冶金尾渣库防渗漏排污水排洪方法

Publications (2)

Publication Number Publication Date
CN103266633A true CN103266633A (zh) 2013-08-28
CN103266633B CN103266633B (zh) 2015-09-09

Family

ID=49010287

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310218103.0A Expired - Fee Related CN103266633B (zh) 2013-06-04 2013-06-04 一种湿法冶金尾渣库防渗漏排污水排洪方法

Country Status (1)

Country Link
CN (1) CN103266633B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103463836A (zh) * 2013-08-30 2013-12-25 中国五环工程有限公司 灰渣场灰水联合沉淀收集装置及其收集方法
CN104775391A (zh) * 2014-09-26 2015-07-15 王恩厚 截聚排稳式坡面泥石流防治
CN106193129A (zh) * 2016-08-26 2016-12-07 上海外经集团控股有限公司 尾矿库渗滤液抽排系统及其施工方法
CN106812528A (zh) * 2016-12-19 2017-06-09 中国神华能源股份有限公司 治理边坡稳定性的方法
CN113050173A (zh) * 2021-03-12 2021-06-29 中国电建集团贵阳勘测设计研究院有限公司 一种渣库渗漏通道口的电法测试方法
CN115007636A (zh) * 2022-05-10 2022-09-06 昆明有色冶金设计研究院股份公司 一种酸性废渣风险管控和生态修复结构及其方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201334669Y (zh) * 2008-12-11 2009-10-28 贵阳铝镁设计研究院 一种尾矿库初期坝顶防渗土工膜的锚固结构
CN101929161A (zh) * 2009-06-24 2010-12-29 鞍钢集团矿业公司 排岩修筑高碾压透水尾矿坝的方法
CN101967835A (zh) * 2009-07-27 2011-02-09 北京仁创科技集团有限公司 一种垃圾填埋防渗系统、垃圾填埋结构及垃圾填埋方法
CN201933503U (zh) * 2011-02-01 2011-08-17 深圳市胜义环保有限公司 工业废渣堆场防渗膜下的地下水导排系统

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1020494A1 (ru) * 1981-02-24 1983-05-30 Всесоюзный научно-исследовательский и проектно-конструкторский институт по осушению месторождений полезных ископаемых, специальным горным работам, рудничной геологии и маркшейдерскому делу Способ складировани отходов обогатительных предпри тий

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201334669Y (zh) * 2008-12-11 2009-10-28 贵阳铝镁设计研究院 一种尾矿库初期坝顶防渗土工膜的锚固结构
CN101929161A (zh) * 2009-06-24 2010-12-29 鞍钢集团矿业公司 排岩修筑高碾压透水尾矿坝的方法
CN101967835A (zh) * 2009-07-27 2011-02-09 北京仁创科技集团有限公司 一种垃圾填埋防渗系统、垃圾填埋结构及垃圾填埋方法
CN201933503U (zh) * 2011-02-01 2011-08-17 深圳市胜义环保有限公司 工业废渣堆场防渗膜下的地下水导排系统

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103463836A (zh) * 2013-08-30 2013-12-25 中国五环工程有限公司 灰渣场灰水联合沉淀收集装置及其收集方法
CN103463836B (zh) * 2013-08-30 2015-05-06 中国五环工程有限公司 灰渣场灰水联合沉淀收集装置及其收集方法
CN104775391A (zh) * 2014-09-26 2015-07-15 王恩厚 截聚排稳式坡面泥石流防治
CN106193129A (zh) * 2016-08-26 2016-12-07 上海外经集团控股有限公司 尾矿库渗滤液抽排系统及其施工方法
CN106193129B (zh) * 2016-08-26 2018-06-19 上海外经集团控股有限公司 尾矿库渗滤液抽排系统及其施工方法
CN106812528A (zh) * 2016-12-19 2017-06-09 中国神华能源股份有限公司 治理边坡稳定性的方法
CN106812528B (zh) * 2016-12-19 2019-11-15 中国神华能源股份有限公司 治理边坡稳定性的方法
CN113050173A (zh) * 2021-03-12 2021-06-29 中国电建集团贵阳勘测设计研究院有限公司 一种渣库渗漏通道口的电法测试方法
CN113050173B (zh) * 2021-03-12 2023-12-12 中国电建集团贵阳勘测设计研究院有限公司 一种渣库渗漏通道口的电法测试方法
CN115007636A (zh) * 2022-05-10 2022-09-06 昆明有色冶金设计研究院股份公司 一种酸性废渣风险管控和生态修复结构及其方法

Also Published As

Publication number Publication date
CN103266633B (zh) 2015-09-09

Similar Documents

Publication Publication Date Title
CN106759825B (zh) 一种海绵城市绿地蓄水系统的施工方法
CN106638918B (zh) 一种海绵城市雨水收集系统的施工方法
CN103266633B (zh) 一种湿法冶金尾渣库防渗漏排污水排洪方法
CN201943173U (zh) 沉槽式透水雨水口设施系统
CN105507112B (zh) 一种防内涝补给地下水的路面系统
CN106192665A (zh) 一种海绵城市道路雨水入渗系统及其施工方法
CN105297872A (zh) 一种lid型城市雨水渗蓄净排水暗渠
CN103953008A (zh) 一种适用于尾矿库的改进型混合坝
WO2018036317A1 (zh) 一种集水排浸系统及其施工方法
CN210827513U (zh) 一种自适应边坡排水防渗结构
CN103061327B (zh) 一种排土场综合治理方法
CN104846774B (zh) 城市小流域河道快储缓释海绵堤岸结构
CN106638917B (zh) 一种分体式雨水回收蓄调系统及其施工方法
CN113107061A (zh) 一种近城市废弃露天矿地层重构方法
CN114718101A (zh) 一种截渗墙联合降水井的尾矿库截渗结构及其修筑方法
CN205224230U (zh) 一种lid型城市雨水渗蓄净排水暗渠
CN206428785U (zh) 一种可除淤的多功能雨水管控设施
CN211472699U (zh) 多泥沙河流新型渗管取水结构
CN205077527U (zh) 一种地下室底板释放水浮力法疏排水系统
CN107724405B (zh) 一种地埋管施工中地基降水施工方法
CN104652595A (zh) 一种城市防洪和洪水资源化的半支撑蓄水型绿地结构
CN204491797U (zh) 一种运动场雨水过滤积聚装置
CN213061752U (zh) 高覆土弃渣场盖板涵结构
CN104196005A (zh) 一种高效防堵塞的含水层补给装置
CN211256846U (zh) 一种可疏通排水的水利工程用挡土墙

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150909

Termination date: 20160604