CN102888852B - 一种用于闭库后尾矿库滩面排渗的系统 - Google Patents

一种用于闭库后尾矿库滩面排渗的系统 Download PDF

Info

Publication number
CN102888852B
CN102888852B CN201210398940.1A CN201210398940A CN102888852B CN 102888852 B CN102888852 B CN 102888852B CN 201210398940 A CN201210398940 A CN 201210398940A CN 102888852 B CN102888852 B CN 102888852B
Authority
CN
China
Prior art keywords
floral tube
upvc
geotextiles
beach face
crushed stone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210398940.1A
Other languages
English (en)
Other versions
CN102888852A (zh
Inventor
王运敏
汪斌
寿震宇
曾霄祥
朱君星
刘涛
曹其光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinosteel Maanshan General Institute of Mining Research Co Ltd
Original Assignee
Sinosteel Maanshan General Institute of Mining Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinosteel Maanshan General Institute of Mining Research Co Ltd filed Critical Sinosteel Maanshan General Institute of Mining Research Co Ltd
Priority to CN201210398940.1A priority Critical patent/CN102888852B/zh
Publication of CN102888852A publication Critical patent/CN102888852A/zh
Application granted granted Critical
Publication of CN102888852B publication Critical patent/CN102888852B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

本发明公开了一种用于闭库后尾矿库滩面排渗的系统,含有布设于尾矿库沉积滩内的碎石排水井,所述碎石排水井采用粒径为20~40mm的卵石(4)构筑成直径为700—900mmmm的碎石桩,长度为14—16m,在碎石桩的中心处设置直径为90—110mm的UPVC花管(1),花管(1)外用土工布(3)包裹住并用麻丝绑扎牢固;在花管(1)内安装自动感应抽水泵;在碎石桩的周身也用土工布(5)包裹,在该土工布(5)的周身再包有钢塑复合土工格栅(6);花管(1)上部露出地表部分的高度为0.15~0.3米。本发明应用于闭库后尾矿库滩面排渗,具有较强的集水能力、耐用性强、较好的适用于闭库后尾矿库滩面排渗,具有自动排水、使用年限较长,不受天气、温度等因素影响的特点,能满足各类型尾矿库闭库后滩面排渗的需要。

Description

一种用于闭库后尾矿库滩面排渗的系统
技术领域
本发明涉及一种尾矿库的排渗系统,尤其是涉及闭库尾矿库滩面的排渗系统,能满足各类型尾矿库闭库后滩面排渗的需要,实现闭库后尾矿库滩面地下水位的显著降低。
背景技术
尾矿库在堆积至最终设计高程后需要进行闭库。目前,闭库后的尾矿库滩面常常改作农业、工业、房地产用地,以实现土地资源的循环利用。由于尾矿库常年处于饱水状态,造成闭库后的尾矿库滩面呈现软弱基础特性,既在尾矿库自身安全上形成一定隐患,又不利于闭库后尾矿库再利用工程的开展。故在开展尾矿库再利用前,需要采取工程措施降低库内滩面地下水位。
尾矿库内的水沿尾矿颗粒间的孔隙向坝体下游方向不断渗透形成渗流。稳定渗流的自由水面线称为浸润线。尾矿库滩面地下水位越高,坝体浸润线逸出位置越高,尾矿库的稳定性就越差。对于上游式尾矿筑坝的尾矿库而言,尾矿库滩面地下水位高度直接关系到坝体稳定及其安全性,及时、准确地获得浸润线埋深数据,对判明尾矿库运行状态、确保尾矿库安全有重要意义。
目前,降低尾矿库滩面地下水位的方法主要为采用水平排渗管在尾矿库坝体外坡排渗,即:在尾矿坝体一定高程处布设数根水平排渗管,采用直径100mm左右的UPVC花管,花管外包裹土工布,通过钻孔机向库内钻凿水平钻孔,将花管埋置在钻孔中。排渗管高程以上的尾矿水会渗到管内,然后沿着排渗管汇集到坝面排水沟进行排除。
实际应用中发现,水平排渗管降低尾矿库滩面地下水位存在如下问题:
(1)水平排水管直径只有100mm左右,排水断面较小,纵向长度受到钻孔距离及花管安置的限制,其排水能力有限。
(2)水平排渗管容易淤堵,随着使用年限延长,其排水效果显著降低。
(3)排渗管断面尺寸较小,随着滩面沉降固结,在水平方向上易产生弯曲变形、甚至被破坏等。
发明内容
为了克服现有水平排渗管在闭库后尾矿库滩面排水上存在的上述缺陷,本发明提供一种可靠性高、布设简单、操作方便、耐久性强的用于闭库后尾矿库滩面排渗的系统,特别适用于闭库后尾矿库滩面排渗降低其地下水位的需要。
为实现本发明的上述目的,本发明一种用于闭库后尾矿库滩面排渗的系统采用以下技术方案实现:
本发明一种用于闭库后尾矿库滩面排渗的系统,含有布设于尾矿库沉积滩内的碎石排水井,碎石排水井采用粒径为20~40mm的卵石构筑成直径为700—900mm mm的碎石桩,长度为14—16m,碎石桩的中心处设置直径为90—110mm的UPVC花管,UPVC花管外用土工布包裹住并用麻丝绑扎牢固。在UPVC花管内安装自动感应抽水泵,当碎石排水井内汇集的水达到UPVC花管的一定高度时,水泵会自动开始抽水,以降低尾矿库滩面地下水水位。在所述碎石桩的周身也用土工布包裹,并用麻丝绑扎牢固,在该土工布的周身再包有钢塑复合土工格栅。所述UPVC花管上部露出地表部分的高度为0.15~0.3米。
UPVC花管底部采用螺帽旋紧牢固并用土工布包裹。
所述的土工布的规格为200g/㎡,所述UPVC管型号为DN100,所述的钢塑复合土工格栅为GSZ50-50(B)钢塑复合土工格栅。
所述花管的花眼按60°间距等弧度布置,花眼的孔径φ为7—9mm,以8mm为宜;花眼的纵向间距45—55mm,以50mm为佳。
所述钻孔的深度高于花管的长度,在花管下部的钻孔部分也布设有Ф20~40mm的卵石。
所述碎石桩的直径800mm为佳;所述花管的长度为14m,所述钻孔的深度为15m,因此,花管下部的钻孔部分布设的卵石厚度为1m。
本发明一种用于闭库后尾矿库滩面排渗的系统,采用以上技术方案后,具有以下效果:
(1)该装置具有施工安装简单,造价低,较好的适用于闭库后尾矿库的排渗特点;
(2)该装置具有耐用性强、排渗效果好、适应范围广的特点;
(3)该装置具有易于随时增补,能够在尾矿库滩面大范围布设的特点。
附图说明
图1为本发明一种用于闭库后尾矿库滩面排渗的系统纵剖面结构示意图。
图2为本发明一种用于闭库后尾矿库滩面排渗的系统横剖面结构示意图。
附图标记为:1-花管;2—花眼;3—土工布;4—卵石;5—土工布;6—钢塑复合土工格栅;7—钻孔。
具体实施方式
为进一步描述本发明,下面结合附图和实施例对本发明一种用于闭库后尾矿库滩面排渗的系统的结构作进一步详细描述。
由图1所示的本发明一种用于闭库后尾矿库滩面排渗的系统纵剖面结构示意图看出,本发明一种用于闭库后尾矿库滩面排渗的系统,含有布设于尾矿库沉积滩内的碎石排水井,碎石排水井采用粒径为20~40mm的卵石4构筑成直径为800mm mm的碎石桩,长度为15m,碎石桩的中心处设置直径为100mm的UPVC花管1,花管1外用200g/m2的土工布3包裹住并用麻丝绑扎牢固。UPVC花管1底部采用螺帽旋紧牢固并用200g/m2的土工布3包裹。所述的碎石桩也用200g/m2的土工布5包裹,最后再用GSZ50-50(B)钢塑复合土工格栅6包住外周。在所述的UPVC花管1内安装自动感应抽水泵。
所述UPVC管1的型号为DN100。      
由图2所示的本发明一种用于闭库后尾矿库滩面排渗的系统结构示意图看出,其断面为圆形,由圆心向外依次为UPVC花管1、200g/m2土工布3、Ф20~40mm卵石4构成的碎石桩、200g/m2土工布5和GSZ50-50(B)钢塑复合土工格栅6等构成,UPVC花管1布设花眼2,花眼2按60°间距等弧度布置。
本发明一种用于闭库后尾矿库滩面排渗的系统在实际应用中,先采用Φ800钻机成孔。安装后的应用结果表明,这种新型的用于闭库后尾矿库滩面排渗的系统具有较强的汲水能力、耐用性强、较好的适用于闭库后尾矿库滩面排渗特点,并且具有自动排水、使用年限较长,不受天气、温度等因素影响的特点,能满足各类型尾矿库闭库后滩面排渗的需要。

Claims (1)

1.一种用于闭库后尾矿库滩面排渗的系统                                               其特征在于:它含有布设于尾矿库沉积滩内的钻孔(7)、碎石排水井所述的碎石排水井布设于钻孔(7)内碎石排水井采用粒径为20~40mm的卵石(4)构筑成直径为700—900mm的碎石桩长度为14—16m在所述碎石桩的中心处设置直径为90—110mm的UPVC花管(1)UPVC花管(1)外用土工布(3)包裹住并用麻丝绑扎牢固;在UPVC花管(1)内安装自动感应抽水泵;在所述碎石桩的周身也用土工布(5)包裹并用麻丝绑扎牢固在该土工布(5)的周身再包有钢塑复合土工格栅(6);所述UPVC花管(1)上部露出地表部分的高度为0.15~0.3m;所述的钻孔(7)的深度高于UPVC花管(1)的长度UPVC花管(1)底部采用螺帽旋紧牢固并用土工布(3)包裹在UPVC花管(1)下部的钻孔(7)部分也布设有Ф20~40mm的卵石;所述UPVC花管(1)的花眼(2)按60°间距等弧度布置;所述的土工布(3)、土工布(5)的规格为200g/㎡所述UPVC花管(1)型号为DN100所述的钢塑复合土工格栅(6)为GSZ50-50(B)钢塑复合土工格栅。 
CN201210398940.1A 2012-10-19 2012-10-19 一种用于闭库后尾矿库滩面排渗的系统 Active CN102888852B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210398940.1A CN102888852B (zh) 2012-10-19 2012-10-19 一种用于闭库后尾矿库滩面排渗的系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210398940.1A CN102888852B (zh) 2012-10-19 2012-10-19 一种用于闭库后尾矿库滩面排渗的系统

Publications (2)

Publication Number Publication Date
CN102888852A CN102888852A (zh) 2013-01-23
CN102888852B true CN102888852B (zh) 2014-12-17

Family

ID=47532519

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210398940.1A Active CN102888852B (zh) 2012-10-19 2012-10-19 一种用于闭库后尾矿库滩面排渗的系统

Country Status (1)

Country Link
CN (1) CN102888852B (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103967496B (zh) * 2014-04-16 2015-11-25 中钢集团马鞍山矿山研究院有限公司 一种适于对山谷型尾矿堆积坝坝坡尾矿进行回采的新方法
CN104179236A (zh) * 2014-08-19 2014-12-03 湖南安化湘安钨业有限责任公司 一种尾矿库快速渗水方法及其装置
CN108252278B (zh) * 2018-02-01 2019-09-10 河海大学 尾矿库中可更换过滤芯的排渗装置及过滤芯更换方法
CN112252273B (zh) * 2020-10-28 2021-12-21 中国有色金属工业西安勘察设计研究院有限公司 尾矿库坝体中尾矿砂渗漏的防治方法
CN117161636B (zh) * 2023-11-03 2024-01-19 矿冶科技集团有限公司 一种排渗管组加工系统

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101480656A (zh) * 2009-02-06 2009-07-15 南京大学 垃圾填埋场抽气井与渗滤液原位回灌复合系统
CN201485847U (zh) * 2009-08-19 2010-05-26 中国瑞林工程技术有限公司 一种新型尾矿坝同步排渗加固装置
CN102041845A (zh) * 2010-11-18 2011-05-04 中钢集团马鞍山矿山研究院有限公司 一种有效降低尾矿库堆积坝浸润线的联合排渗系统
CN202390860U (zh) * 2011-11-25 2012-08-22 华侨大学 垃圾卫生填埋场渗滤液垂直导排防渗系统

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61211414A (ja) * 1985-03-18 1986-09-19 Takenaka Komuten Co Ltd 還元井戸工法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101480656A (zh) * 2009-02-06 2009-07-15 南京大学 垃圾填埋场抽气井与渗滤液原位回灌复合系统
CN201485847U (zh) * 2009-08-19 2010-05-26 中国瑞林工程技术有限公司 一种新型尾矿坝同步排渗加固装置
CN102041845A (zh) * 2010-11-18 2011-05-04 中钢集团马鞍山矿山研究院有限公司 一种有效降低尾矿库堆积坝浸润线的联合排渗系统
CN202390860U (zh) * 2011-11-25 2012-08-22 华侨大学 垃圾卫生填埋场渗滤液垂直导排防渗系统

Also Published As

Publication number Publication date
CN102888852A (zh) 2013-01-23

Similar Documents

Publication Publication Date Title
CN102888852B (zh) 一种用于闭库后尾矿库滩面排渗的系统
CN102041845B (zh) 一种有效降低尾矿库堆积坝浸润线的联合排渗系统
CN204780819U (zh) 尾矿坝反向预埋盲沟排渗系统
CN104878760B (zh) 一种边坡自排水电渗锚杆及施工方法
CN201943173U (zh) 沉槽式透水雨水口设施系统
CN205677631U (zh) 具有疏水功能的箱式隧底复合拱形隧道衬砌构造
CN208072351U (zh) 一种排出斜坡地下水的虹吸装置
CN104480974A (zh) 一种适用于上游式尾矿库的反向排渗系统及上游式尾矿库
CN203569576U (zh) 一种塑排抗滑式轻型井点管
CN202040445U (zh) 一种用于土壤改良的排盐管
CN202936802U (zh) 一种用于闭库后尾矿库滩面排渗的装置
CN107956221B (zh) 降水井管道保护装置及施工方法
CN208533546U (zh) 一种适用于边滑坡工程的串并联地下立体排水系统
CN106193249B (zh) 一种集水排浸系统及其施工方法
CN204139159U (zh) 边坡深层排水管
CN202767100U (zh) 挡土墙排水结构
CN203441529U (zh) 竖井多段并联式截水装置
CN202745066U (zh) 一种降低边坡土体地下水位和含水率的疏排结构
CN203924082U (zh) 地下建筑物抗浮结构
CN205591201U (zh) 一种内排土场涌水治理系统
CN104196046A (zh) 降低地下抗浮水位的隔水排水系统
CN204898465U (zh) 冻土区碟形生态排水设施
CN203625928U (zh) 一种整体式路堑挡土墙
CN103774639A (zh) 一种堆载预压系统及施工方法
CN204919578U (zh) 特殊地质条件下的真空管井降水系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 243000 Xitang Road, Ma'anshan Economic Development Zone, Anhui, No. 666

Patentee after: MAANSHAN Mine Research Institute Co.,Ltd.

Address before: 243000 Xitang Road, Ma'anshan Economic Development Zone, Anhui, No. 666

Patentee before: SINOSTEEL MAANSHAN INSTITUTE OF MINING RESEARCH Co.,Ltd.

CP01 Change in the name or title of a patent holder