CN1827285A - Welding method for steel rail and ship deck - Google Patents

Welding method for steel rail and ship deck Download PDF

Info

Publication number
CN1827285A
CN1827285A CN 200610013341 CN200610013341A CN1827285A CN 1827285 A CN1827285 A CN 1827285A CN 200610013341 CN200610013341 CN 200610013341 CN 200610013341 A CN200610013341 A CN 200610013341A CN 1827285 A CN1827285 A CN 1827285A
Authority
CN
China
Prior art keywords
welding
track
rail
moulding bed
sternum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200610013341
Other languages
Chinese (zh)
Other versions
CN100395071C (en
Inventor
康双喜
王莲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Xingang Shipbuilding Heavy Industry Co., Ltd.
Original Assignee
TIANJIN XINGANG SHIP FACTORY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN XINGANG SHIP FACTORY filed Critical TIANJIN XINGANG SHIP FACTORY
Priority to CNB2006100133418A priority Critical patent/CN100395071C/en
Publication of CN1827285A publication Critical patent/CN1827285A/en
Application granted granted Critical
Publication of CN100395071C publication Critical patent/CN100395071C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Arc Welding In General (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The invention relates to a method for welding the steel rail and deck, which comprises: first, arranging the prepared support; then processing point welding, assembling, preheating, welding, heating, treating and detaching; detaching the rail in room temperature to be welded with the deck, while the connection is realized by sternum. The sternum and the deck are made from same material with better welding property. The invention has the advantages that: since the sternum is small with lower heat conductive speed, the rail and sternum can reach needed temperature before heating, to slow down the cooling speed of weld seam, and reduce the possibility and hardenability of martensite. And in heating, it can confirm the needed temperature of steel rail and sternum, to reduce the restrain stress of weld, to avoid the weld seam crack.

Description

The welding method of rail and ship deck
Technical field
The present invention relates to the welding method of a kind of rail and ship deck.
Background technology
The demand that be to adapt to social development, two industries of railway and boats and ships are intersected extension mutually, are exactly a new branch of ro-ro passenger ship as " train ferry ".
Up to now, in the train ferry that other shipyard is made, the U71Mn rail is placed directly on the ship deck and welds at home, after having welded, on the angle welding direction, crackle can occur, and, also not find the method that prevents that crackle from occurring so far in the longitudinal fracture of track.For this reason, they have used steel rail material instead, have used the 16MnRe steel instead by the U71Mn material, and the rail solderability of 16MnRe is relatively good, after directly having welded with ship deck, have avoided the appearance of Welding Crack and rail vertically to temper situation.But the 16MnRe rail has the drawback of a maximum, and its hardness and intensity are far below the U71Mn rail, and service time, long back 16MnRe rail was yielding.At this problem, also do not find the solution of external relevant this respect maturation at present.
Summary of the invention
For solving the problem that exists in the above-mentioned technology, the purpose of this invention is to provide the welding method of a kind of U71Mn rail and ship deck, crackle that occurs on the angle welding direction when solving rail with the ship deck welding and track be the crack problem of appearance vertically.
For achieving the above object, the technical solution used in the present invention provides the welding method of a kind of rail and ship deck, and this method concrete operations step is as follows:
1., at first place prefabricated moulding bed;
2., spot welding: the good track 1 of will polishing on moulding bed assembles with web 2, and with CO2 welding wire DW-55E track 1 and web 2 is carried out spot welding;
3., assembling: track 1 is fixed on the moulding bed with dividing plate 4 every 600mm, and tightens with chock 5;
4., preheating: with flame track 1 is evenly heated from the middle to both ends on the both sides of track 1 respectively by the gas welder, heating-up temperature is 250 ℃~300 ℃;
5., welding: weld from the middle to both ends on the both sides of track 1 respectively by the electric welder;
6., postheating: with flame the track 1 that welds is heated from the middle to both ends on the both sides of track 1 respectively by the gas welder, heating-up temperature is 300 ℃~350 ℃, carries out air cooling then;
7., after welding treatment: use the asbestos insulation, temperature retention time: about 12 hours;
8., dismounting: air cooling to the track 1 of room temperature is pulled down and ship deck 3 welding, and the track 1 that will weld presses above-mentioned steps and circulate, refill and be fitted on the moulding bed.
Effect of the present invention is to adopt this welding method, utilize because the area of web is little, therefore heat-transfer rate is slow, during weld preheating, can guarantee that track and web reach required temperature, the cooling velocity of weld seam is slowed down, and martensitic possibility of generation and tendency of hardenability also reduce in the weld seam, thereby have reduced the possibility that weld seam cracks.During postheating, can guarantee the temperature that rail and web are required equally, both slow down the cooling velocity of weld seam, reduce again because the constraint stress that welding produces.Thereby avoid the generation of Welding Crack and the fracture of rail fully.
Description of drawings
Fig. 1 is the Welding Structure schematic diagram of rail of the present invention and web;
Fig. 2 for of the present invention weld behind the web rail with the Welding Structure schematic diagram on deck;
Fig. 3 is a moulding bed structural representation of the present invention;
Fig. 4 is track and web assembly structure schematic diagram on the moulding bed of the present invention;
Fig. 5 is the local enlarged diagram of Fig. 3.
Among the figure:
1, rail, 2, web, 3, ship deck
4, dividing plate 5, chock 6, moulding bed
The specific embodiment
Reaching embodiment in conjunction with the accompanying drawings is illustrated the welding method operating process of rail of the present invention and ship deck.
This method is the reason at U71Mn rail and deck of boat welded seam crackle and track longitudinal fracture, through repetition test, from reducing weld seam constraint stress angle, realize being connected of track and deck by web, its method is earlier track and web to be welded under ship, and then the track that will weld web is placed on the deck and welds.
Shown in Fig. 1,2,3,4,5, track 1 is as follows with the concrete operations step of web 2 welding:
1., at first place prefabricated moulding bed as shown in Figure 3;
2., spot welding: the good track 1 of will polishing on moulding bed assembles with web 2, and with CO2 welding wire DW-55E track 1 and web 2 is carried out spot welding, as shown in Figure 1;
3., assembling: track 1 is fixed on the moulding bed with dividing plate 4 every 600mm, and carries on the back tightly, as shown in Figure 4 with chock 5;
4., preheating: with flame track 1 is evenly heated from the middle to both ends on the both sides of track 1 respectively by the gas welder, heating-up temperature is 250 ℃~300 ℃;
5., welding: weld from the middle to both ends on the both sides of track 1 respectively by the electric welder;
6., postheating: with flame the track 1 that welds is heated from the middle to both ends on the both sides of track 1 respectively by the gas welder, heating-up temperature is 300 ℃~350 ℃, carries out air cooling then;
7., after welding treatment: use the asbestos insulation, temperature retention time: about 12 hours;
8., dismounting: air cooling to the track 1 of room temperature is pulled down and ship deck welding, and as shown in Figure 2, and the track 1 that will weld presses above-mentioned steps and circulates, and refills to be fitted on the moulding bed.
This method welding operation:
1., joint geometry:
Welding method: FCAW (CO 2The gas shield semiautomatic welding)
Welds types: corner connection
Single welding or welding by both sides: single welding
Whether the back side back chipping: not
2., mother metal
Material trademark: the U71Mn+A step,
Material specification: U71Mn:70mm * 70mm
A step: 10mm * 70mm
3., fill metal:
Fill the metal trade mark: DW-55E
Fill compliant metal: φ=1.4mm
4., gas shield:
Protective gas: CO2
Gas flow: the 20-25 liter/minute
5., welding position:
Angle welding position: horizontal position welding
6., preheating:
Preheat temperature: 250 ℃~300 ℃
Pre-heating mean: flame heat
Interlayer temperature: can not be greater than 300 ℃
Single track or multiple tracks: multiple tracks
Whether interlayer is cleared up: be.
The welding conditions of concrete welding parameter according to the form below:
Figure A20061001334100071

Claims (1)

1, the welding method of a kind of rail and ship deck, this method concrete operations step is as follows:
1., at first place prefabricated moulding bed;
2., spot welding: the good rail (1) of will polishing on moulding bed assembles with web (2), and with CO2 welding wire (DW-55E) rail (1) and web (2) is carried out spot welding;
3., assembling: track (1) is fixed on the moulding bed (6) with dividing plate (4) every 600mm, and tightens with chock (5);
4., preheating: with flame track (1) is evenly heated from the middle to both ends on the both sides of track (1) respectively by the gas welder, heating-up temperature is 250 ℃~300 ℃;
5., welding: weld from the middle to both ends on the both sides of track (1) respectively by the electric welder;
6., postheating: with flame the track (1) that welds is heated from the middle to both ends on the both sides of track (1) respectively by the gas welder, heating-up temperature is 300 ℃~350 ℃, carries out air cooling then;
7., after welding treatment: use the asbestos insulation, temperature retention time: about 12 hours;
8., dismounting: air cooling to the track (1) of room temperature is pulled down and ship deck (3) welding, and the track that will weld (1) presses above-mentioned steps and circulate, refill and be fitted on the moulding bed.
CNB2006100133418A 2006-03-21 2006-03-21 Welding method for steel rail and ship deck Expired - Fee Related CN100395071C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100133418A CN100395071C (en) 2006-03-21 2006-03-21 Welding method for steel rail and ship deck

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100133418A CN100395071C (en) 2006-03-21 2006-03-21 Welding method for steel rail and ship deck

Publications (2)

Publication Number Publication Date
CN1827285A true CN1827285A (en) 2006-09-06
CN100395071C CN100395071C (en) 2008-06-18

Family

ID=36945948

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100133418A Expired - Fee Related CN100395071C (en) 2006-03-21 2006-03-21 Welding method for steel rail and ship deck

Country Status (1)

Country Link
CN (1) CN100395071C (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101804522A (en) * 2010-04-09 2010-08-18 中冶实久建设有限公司 Method for manufacturing deck plate
CN102489889A (en) * 2011-12-14 2012-06-13 扬州大洋造船有限公司 High-efficiency welding method for shipbuilding
CN104625639A (en) * 2014-12-31 2015-05-20 广州文冲船厂有限责任公司 Manufacture method for dredger steel pile trolley rail section
CN109108588A (en) * 2018-10-31 2019-01-01 广船国际有限公司 A kind of installation method of ship upper sheer strake
CN112916985A (en) * 2021-01-28 2021-06-08 广州文冲船厂有限责任公司 Welding method for steel pile trolley rail

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111673374A (en) * 2020-05-22 2020-09-18 国家电投集团黄河上游水电开发有限责任公司 Aluminum cell cradle rack cracking repair method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1116955C (en) * 2000-07-21 2003-08-06 燕山大学 Medium flash welding method for high manganese steel frog and carbon steel rail
US6659017B2 (en) * 2000-11-02 2003-12-09 National Steel Car Limited Dropped deck center beam rail road car structure
NL1023486C1 (en) * 2003-05-21 2004-11-24 Ihc Holland Nv Method for connecting an elongated element, such as a rail, to a substrate by welding.
CN1481966A (en) * 2003-07-29 2004-03-17 沪东中华造船(集团)有限公司 Steel rail welding technology
CN2747153Y (en) * 2004-07-29 2005-12-21 上海交通大学 Installation structure of rail for plate-vehicle in Qing-Piao boat transporting equipment

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101804522A (en) * 2010-04-09 2010-08-18 中冶实久建设有限公司 Method for manufacturing deck plate
CN101804522B (en) * 2010-04-09 2012-05-09 中国十九冶集团有限公司 Deck plate manufacturing method
CN102489889A (en) * 2011-12-14 2012-06-13 扬州大洋造船有限公司 High-efficiency welding method for shipbuilding
CN102489889B (en) * 2011-12-14 2013-09-04 扬州大洋造船有限公司 Welding method for shipbuilding building
CN104625639A (en) * 2014-12-31 2015-05-20 广州文冲船厂有限责任公司 Manufacture method for dredger steel pile trolley rail section
CN109108588A (en) * 2018-10-31 2019-01-01 广船国际有限公司 A kind of installation method of ship upper sheer strake
CN112916985A (en) * 2021-01-28 2021-06-08 广州文冲船厂有限责任公司 Welding method for steel pile trolley rail

Also Published As

Publication number Publication date
CN100395071C (en) 2008-06-18

Similar Documents

Publication Publication Date Title
CN1827285A (en) Welding method for steel rail and ship deck
CN102240841B (en) Submerged-arc welding process for T-type joint for extra thick steel plate
CN103572283B (en) The laser reinforcing process of perforating head
CN101987399B (en) Method for welding pile leg main board pipe
CN105478970B (en) A kind of same steel grade welding procedure of weathering steel and its application
CN102744498A (en) Method for welding specially-thick high-strength bridge steel plate
CN101073849A (en) Composite method for controlling electronic-beam welding thermal circulation of TiAl intermetallic compound
CN101310908A (en) High intensity steel gas shielded welding technique method
CN101905365A (en) Welding method of ultra-thick and high-strength water-power steel
CN101073850A (en) Composite method for controlling electronic-beam welding thermal circulation of TiA/TiAl heterolytic material
CN101104234A (en) Water wheel generating set cast steel part defect repair welding crackle processing method
CN103317218A (en) Double-sided dual-narrow-gap non-back-gouging welding method for large thick plates
CN102049626A (en) Preparation method of ultra-thick titanium/steel composite tube plate with large area and high properties
CN111659980A (en) Nickel-based high-corrosion-resistance composite steel pipe welding method
CN209759587U (en) Equipment for laser cladding processing
CN101972882A (en) Carbon-dioxide arc welding process of automotive iron casting
CN114734125A (en) Preheating-free welding method suitable for 500 HB-grade wear-resistant steel
CN1569378A (en) Angular end-to-end welding method for super long and thick steel plates
CN1867418A (en) Weld structure having excellent brittle crack propagation resistance and method of welding the weld structure
CN103572280B (en) Without the need to the laser reinforcing process of the perforating head of preheating before laser melting coating
CN108817617B (en) Welding method of Q500qE high-strength bridge steel angle joint
CN1113726C (en) Electric welding electrode of refractory pearlitic steel
CN110695563A (en) Welding method for tank wall plate of soil covering tank
CN112372118B (en) Submerged arc welding method for low-Mo refractory steel
KR101294919B1 (en) Welding apparatus with shield box

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: TIANJIN XINGANG SHIPBUILDING HEAVY INDUSTRY CO., L

Free format text: FORMER OWNER: TIANJIN XINGANG SHIPYARD

Effective date: 20111205

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20111205

Address after: 300456 No. 1 Factory Street, Tanggu, Tianjin, Binhai New Area, Xingang, China

Patentee after: Tianjin Xingang Shipbuilding Heavy Industry Co., Ltd.

Address before: 300456, No. 1, Factory Street, Xingang, Tanggu, Tianjin

Patentee before: Tianjin Xingang Ship Factory

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080618

Termination date: 20210321

CF01 Termination of patent right due to non-payment of annual fee