CN1743558A - Vertical-lifting landscape diversion dam - Google Patents

Vertical-lifting landscape diversion dam Download PDF

Info

Publication number
CN1743558A
CN1743558A CN 200510096076 CN200510096076A CN1743558A CN 1743558 A CN1743558 A CN 1743558A CN 200510096076 CN200510096076 CN 200510096076 CN 200510096076 A CN200510096076 A CN 200510096076A CN 1743558 A CN1743558 A CN 1743558A
Authority
CN
China
Prior art keywords
explain
door
antipriming
lifting
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200510096076
Other languages
Chinese (zh)
Inventor
赵素龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200510096076 priority Critical patent/CN1743558A/en
Publication of CN1743558A publication Critical patent/CN1743558A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Barrages (AREA)

Abstract

This invention relates to a vertical lifting gate dam for sightseeing composed of a vertical lifting double-plane steel gate, a watching operation place, restaurants and entertainments, sightseeing towers, music functions, decoration pictures on the gate plate and a plc programmable computer, which is especially suitable for cities with swift rivers, large quantities of sand and steep slopes in mountain and hill regions.

Description

Vertical-lifting landscape diversion dam
Technical field
The present invention relates to the diversion dam in a kind of hydraulic engineering, be specifically related to a kind of vertical-lifting landscape diversion dam.
Background technology
Existing barrage has: 1, rubber dam, since rubber dam dam bag be very thin rubber, through improving innovation for many years, adopt plated film not lure steel wire to do skeleton, seamless overlap joint, the one-shot forming of hot pressing machinery has reached present world level, still stabs easily or weares and teares, in case cut occurs, be difficult for repairing, the life-span had only about 20 years.Be not suitable in the mountain area, mound Ling, the big current of the gradient are anxious, and sediment charge uses in the big river.Colored dam bag sodium rice material, color begins to fade after 5 years, and or else the color of once finalizing the design can change, and landscape effect is single.Most of heights of dam are below four meters, six meters of heights of dam just in research experiment.Silt is difficult to cleaning in the dam.2, dull and stereotyped steel is explained wicket dam: explain height of dam in the river, resemble wall one, vision is obstructed, damaged the grand imposing manner of river Spring River Flows East, explain on the dam music fountain can't be set, explain a quilt and explain pier and disconnect, can't manufacture on the plate of every blade face that the land is so rich in beauty explaining, draw regional of long standing and well established, the outstanding history culture long paper that countless heroes compete to bow ..., look, listen, landscape effect completely without.The silt cleaning is very difficult in the dam.The height of dam that is located at the downtown area is limited.3, the waterpower self-control turnover panel is explained the dam, and one time design typification is explained a height, can't reduce by the streamflow regime operation and explain a height, artificially controls the depth of water in the dam, the water yield, and is unfavorable to flood discharge water, the desilting difficulty, and landscape effect can't change.The dam of explaining of other pattern is not suitable for adopting in the downtown area.
It is deficiency at the prior art scheme that the technical problem of Xing Decision is Yaoed in this invention, and a kind of vertical-lifting landscape diversion dam is provided.Explain door and go up the formation diversion dam, retaining becomes the lake, can carry out aquatic sports or ice-sports, the activity of travelling.Inlay the mountains and rivers beautiful scenery explaining on the plate of every blade face to draw, the epic hero personage, long, the outstanding history culture of outstanding reflecting regional source convection ... on the dam, music fountain can be set, water screen film, fireworks color lamp, increase festival celebration gas part, improve city taste ..., also can be with about the river, dam, around reaching, two sides, left and right sides river levee is designed to reflecting regional cultural theme park.Make diversified investment, alleviate the governmental investment ratio, all sorts of flowers are put unexpectedly, grand urban construction, literate grade, wound world civilization city ...During chance flood in rainy season, will explain door in advance and fall, flood is passed through smoothly, protect urban safety health and happiness seized with terror.Set up several shunting flood diversion desilting mid-boards in the upstream, dam,, drive the jet ship and penetrate water under high pressure or gas, make silt sand tunnel flood take away the shunting desilting together the flood shunting.Also can explain, form golden waterway at dam outermost side construction biological corridor or ship.Particularly be fit to northern mountain area, Ling downtown area, mound, the gradient is big, current are anxious, and the river that silt is many adopts.Do not have and to explain pier and explain the dam and be suitable for height of dam river below three meters, explain pier and explain the dam and be fit to explain more than three meters the river, dam and use, specifically select for use by local situation.
Wei the Solution above-mentioned technical problem of determining, the present invention takes following technical proposals: its manufacturing, installation, using method and Jie Gou Te Dian are to be that standard is built under the riverbed and explained a chamber with the base plate plane, install several 1, vertical-lifting landscape barrage biplane steel explains door.Can not set up in the river and to explain pier, employing 33, rectangle vertical-lifting biplane steel are explained door, with 11, plc Controlled by Programmable Controller operation worm-type open-close machine system and device operation 33, rectangle vertical-lifting biplane steel explain door and go up into the dam, retaining becomes the lake, fall that to explain header parallel with base plate, flood discharge Bao Cheng.Can set up in the river and to explain pier, adopt 36, trapezoidal vertical-lifting biplane steel explains door, with 40, plc Controlled by Programmable Controller operation gear type headstock gear system and device operation 36, trapezoidal vertical-lifting biplane steel explain and go up into the dam, retaining becomes the lake, fall flood discharge Bao Cheng, at one stroke twenty percent.
Compare with the prior art scheme, the invention has the beneficial effects as follows: the technical scheme mature and reliable can reach as high as more than 20 meter according to He Liu Te Dian design different orifice size, cost compares rubber dam, the waterpower self-control turnover panel is explained height of dam more than 1/3rd, and the life-span is many several times, can control automatically, operate in the time of can also be automatically by the human's demand tunnel, economic performance is than high, and dam width is unlimited, and no matter various dam types can't compare landscape effect.
Description of drawings
Fig. 1 is first kind of scheme product of the present invention: do not have and explain pier vertical-lifting landscape diversion dam side cutaway view.
Fig. 2 is first kind of scheme product of the present invention: do not have and explain pier vertical-lifting landscape diversion dam top plan view.
Fig. 3 is second kind of scheme product of the present invention: explain the pier vertical-lifting landscape diversion dam and face the local figure of section.
Fig. 4 is two kinds of scheme products of this Fa Ming Ti: explain pier vertical-lifting landscape diversion dam top plan view.
Fig. 5 is that this sends out Ti scheme product bright: do not have and explain pier vertical-lifting landscape diversion dam elevation cross-sectional view.
Fig. 6 is this Fa Ming Ti one, two kind of scheme product: plc programmable logic controller flow process functional-block diagram.
Reference numeral is as follows: 1, vertical-lifting biplane steel is explained door, 2, plo Controlled by Programmable Controller operation liftable musical fount system installation, 3 water (flow) directions, 4, gate flap panel and boudle picture scroll, 5, base plate, 6, the sealed access door that enters, 7, back antipriming, 8, preceding antipriming, 9, the sealed access door that enters, 10, go up position and safety pin information sensor, 11plc Controlled by Programmable Controller operation screw opens and closes batch system and device, 12, preceding waterproof metal slider, 13, back waterproof metal slider, 14, the headstock gear standing screw, 15, fall position information sensors, 16, enter the maintenance hole, 17, the standing screw base, 18, pipeline and enter the maintenance tunnel, 19, tunnel infiltration collecting well and automatic water plug information sensor, 20, river levee, 21, explain reveal Zhi Shui Installed and put 22, the music fountain shower nozzle, 23, river levee side antipriming, 24, explain a chamber, 25 under the riverbed base plate, flower stand, 26, view, the video display platform, 27, plc programmable logic controller compute machine and digital information display, 28, observe operation, the year drink amusement, the view high building, 29, music fountain stereo speaker system operating means, 30, bank protection is carried in the river, and 31, pipeline and maintenance enter hole, and 32, water level and flow scale and information sensor, 33, rectangle vertical-lifting biplane steel is explained door, 34, explain door and fall base, 35, shunting flood diversion midfeather, 36, trapezoidal vertical purport ascending/decending biplane steel is explained door, 37, explain pier, 38, explain the interior Zhi Shui Installed of pier and put 39, explain a lifter rack steel plate, 40, plc Controlled by Programmable Controller operation gear type headstock gear Xi Tong Installed puts.
Specifically execute real mode
By Fig. 1-shown in Figure 6, the vertical-lifting diversion dam selects the appropriate location, downtown area building 24 under the riverbed, river, explaining a chamber under the riverbed as can be known, river selection 33, the rectangle vertical lift biplane steel of explaining pier can not be set explain door, energy setting is explained the selection 36 of pier, trapezoidal vertical-lifting biplane steel is explained door, forms two kinds of scheme products.
Shown in Fig. 1,2,5,6, the present invention's first scheme product: by 5, base plate, 7, back antipriming, 12, preceding waterproof metal slider, 13, back waterproof metal slider, 16, enter the maintenance hole, 18, pipeline and enter the thrifty tunnel of repairing, (lower floor is the infiltration ditch, be pipeline above, be tool car again, the superiors are illuminating lamp and electric wire and suspender), 20, river levee, 23, river levee side antipriming, 30, river levee bank protection, 31, pipeline and thrifty repairing enter hole, 34, explain that door falls that base forms 24, explain a chamber under the riverbed base plate.By 4, gate flap panel and Installed decorations picture scroll, 6, sealedly enter the thrifty door of repairing, 8, preceding antipriming, 9, sealedly enter the thrifty door of repairing, 21, explain reveal end water Installed put form 33, rectangle vertical-lifting biplane steel explains a composition and explains the doorframe support body.By 11, plc Controlled by Programmable Controller operation worm-type open-close machine system and device, 14, the headstock gear standing screw, 17, the standing screw base, form to explain and Sheng Jiang Installed and put.By 10, go up position and safety pin information sensor, 15, fall position information sensors, 19, tunnel infiltration collecting well and automatic water plug information sensor, 27, plc programmable logic controller computer and digital information display, 32, water level and flow scale information sensor is formed various information sensings, numeral shows, automatic control operation system.By 2, the happy fountain Xi of plc Controlled by Programmable Controller operation liftable Yin Tong Installed puts, 22, music fountain shower nozzle, 25, flower stand, 26, view, video display platform, 28, observe operation, food and drink amusement, view high building, 29, music fountain stereo speaker operating system composition view food and drink entertainment systems.By 35, shunting flood diversion mid-board plays the desilting effect.Each position, system, device organically combine forms vertical-lifting (nothing is explained pier) landscape diversion dam.
By Fig. 3,4,5,6,1, shown in, second kind of scheme product of the present invention: by 5, base plate, 7, the back antipriming, 16, enter the thrifty hole of repairing, 18, pipeline and enter the maintenance tunnel, 20 river levees, 23, river levee side antipriming, 30, the river levee bank protection, 31, pipeline must overhaul hole, 34, explain and to fall base, 37, explain pier, 38, explain in the pier that antipriming forms 24, explain a chamber under the riverbed base plate.By 4, gate flap panel and Installed decorations picture scroll, 6, sealedly enter the thrifty door of repairing, 8, preceding antipriming, 9, sealing enters the thrifty door of repairing, 21 explain the reveal antipriming, 36, trapezoidal vertical-lifting biplane steel explains a composition and explain the doorframe support body.By 39, explain a lifting tooth batten, 40, the PLC Controlled by Programmable Controller operation gear type headstock gear system Installed of system puts, form and explain Men Sheng and fall Installed and put.By 10, go up position and safety pin information sensor, 15 fall position sensor, 19, tunnel infiltration collecting well and automatic Chou Shui Installed put information sensor, 27, PLC programmable logic controller computer and digital information display, 32, water level and flow scale information sensor is formed various information sensings, demonstration, automatic control operation system.By 2, the happy fountain Xi of PLC Controlled by Programmable Controller operation liftable Yin Tong Installed puts, 22, music fountain shower nozzle, 5 flower stands, 26, view, video display platform, 28, observe operation, food and drink amusement, view high building, 29, music fountain stereo speaker behaviour makes the system Installed of system and put and form the view embedding entertainment systems of eating.Close partition wall by 35, in the flood diversion of shunting and play the desilting effect.Each position, system, device organically combine forms vertical-lifting (explaining pier) landscape diversion dam.

Claims (7)

1, a kind of vertical-lifting landscape diversion dam, its both sides have, (20) river levee, (30) river levee protects glass, have on the riverbed, (5) base plate, (7) back antipriming, it is characterized in that: can not set up the diversion dam of explaining pier to have in the river, (12) preceding waterproof metal slider, (13) the back waterproof belongs to slide plate entirely, (16) advance the people and overhaul hole, (18) pipeline and advance the people and overhaul the tunnel, (23) river levee side antipriming, (31) pipeline and the thrifty enter hole hole of repairing, (34) explain door and fall base, form under (24) riverbed base plate and explain a chamber, by (4) gate flap panel and boudle picture scroll, (6) the thrifty door of repairing of the sealed people of advancing, (8) preceding antipriming, (9) the thrifty door of repairing of the sealed people of advancing, (21 explain the reveal antipriming, form (33) rectangle vertical lift biplane steel and explain the door frame main body, by (11) plc Controlled by Programmable Controller operation worm-type open-close machine system and device, (14) headstock gear standing screw, (17) standing screw base, form and explain a lifting gear, go up position and safety pin information sensor by (10), (15) fall position information sensors, (19) tunnel infiltration collecting well and automatic water plug information sensor, (27) plc programmable logic controller computer and digital display, (32) water level and flow scale information sensor is formed various information sensings, numeral shows, automatically liftable musical fount system installation, (22) music fountain shower nozzle are operated by (2) plc Controlled by Programmable Controller by the control operation system, (25) flower stand, (26) view, video display platform, (28) are observed the amusement of operation As-E drink, the view high building, (29) music fountain stereo speaker operating system, form Jing Guan As-E drink entertainment systems, by (35) shunting flood diversion mid-board, cooperate shunting desilting, each position with explaining, system, device organically combines forms first kind of scheme product of vertical-lifting landscape diversion dam.
2, second kind of scheme product of a kind of vertical-lifting landscape diversion dam, its both sides have, (20) river levee, (30) river levee protects and drapes over one's shoulders, have on the riverbed, (5) base plate, (7) back antipriming, it is characterized in that: can set up the diversion dam of explaining pier to have in the river, (16) advance the people and overhaul hole, (18) pipeline and advance the people and overhaul the tunnel, (23) the side antipriming is carried in the river, (31) pipeline and the thrifty enter hole hole of repairing, (34) explain door and can fall base, (37) explain pier, (38) explain pier side antipriming, form under several (24) riverbed base plates and explain a chamber, draw by (4) gate flap panel and boudle, (6) the thrifty door of repairing of the sealed people of advancing, (8) preceding antipriming, (9) sealedly advance people's access door, (21) explain the reveal antipriming, form (36) trapezoidal vertical-lifting biplane steel and explain the door frame main body, explain a lifter rack version by (39), (40) plc Controlled by Programmable Controller operation gear type headstock gear system and device, form and explain a lifting gear, go up position sensor and safety pin information sensor by (10), (15) fall position sensor, (19) tunnel infiltration collecting well and automatic water plug information sensor, (27) plc programmable logic controller computer and mathematics display, (32) water level and flow scale information sensor, form various information sensings, numeral shows, automatic control operation system, by (2) plc Controlled by Programmable Controller operation liftable musical fount system installation, (22) music fountain shower nozzle, (25) flower stand, (26) view, the video display platform, (28) observe the amusement of operation As-E drink, the tower of measurement of sun's shadow grand-mother, (29) music fountain stereo speaker operating system is formed Jing Guan As-E drink entertainment systems, by (35) shunting flood diversion mid-board, cooperate the shunting desilting with explaining, each position, system, device You machine Jie He Group becomes second kind of scheme product of vertical-lifting landscape diversion dam.
3, according to claim 1,2 product: (33) rectangle vertical-lifting biplane steel is explained and can be explained door with (36) trapezoidal vertical-lifting biplane steel, it is characterized in that: sealing, waterproof metal material is trembled and is made.
4, require 1,2 product according to uncle's profit: (18) pipeline and enter the thrifty tunnel of repairing, it is characterized in that: orlop is the infiltration ditch in the tunnel, is pipeline above, is thrifty repairing on again, the superiors are illuminating line, light fixture and Current Collector Sleave composition.
5, according to claim 1,2 product: each position antipriming is characterized in that: a side is a rubber, and opposite side is that waterproof metal material is trembled and made.
6, according to the product of claim 2: (37) explain pier, it is characterized in that: the front is exposed (5) base plate and is pulled and equally have boudle to draw with explaining every blade face with upper part, is drawn as a whole with view picture.
7; product according to claim 2: (36) trapezoidal ascending/decending biplane steel is explained door; it is characterized in that: this is explained door and can go up approximately (37) and explain pier 1/2nd height; from explaining a bottom flood discharge or sluicing into a view; needing increases by one, and dismantled and assembled water guide is pulled, and two; pull scalable steel flat board, explain things such as a chamber does not intake, silt to protect under (24) riverbed base plate, the increase landscape effect at the parallel end.
CN 200510096076 2005-09-28 2005-09-28 Vertical-lifting landscape diversion dam Pending CN1743558A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200510096076 CN1743558A (en) 2005-09-28 2005-09-28 Vertical-lifting landscape diversion dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200510096076 CN1743558A (en) 2005-09-28 2005-09-28 Vertical-lifting landscape diversion dam

Publications (1)

Publication Number Publication Date
CN1743558A true CN1743558A (en) 2006-03-08

Family

ID=36139067

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200510096076 Pending CN1743558A (en) 2005-09-28 2005-09-28 Vertical-lifting landscape diversion dam

Country Status (1)

Country Link
CN (1) CN1743558A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106946193A (en) * 2017-03-23 2017-07-14 梧州市海迪贸易有限公司 A kind of landscape platform equipment of height adjusting
CN107130563A (en) * 2017-05-27 2017-09-05 郑州德威机械设备有限公司 Block water dam and flood control constructions
CN108474188A (en) * 2015-12-17 2018-08-31 株式会社大力F.A.S. Pipeline gate module

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108474188A (en) * 2015-12-17 2018-08-31 株式会社大力F.A.S. Pipeline gate module
CN108474188B (en) * 2015-12-17 2020-06-16 株式会社大力F.A.S. Pipeline gate module
CN106946193A (en) * 2017-03-23 2017-07-14 梧州市海迪贸易有限公司 A kind of landscape platform equipment of height adjusting
CN106946193B (en) * 2017-03-23 2019-02-05 新沂市芭缇雅商贸有限公司 A kind of landscape platform equipment of height adjusting
CN107130563A (en) * 2017-05-27 2017-09-05 郑州德威机械设备有限公司 Block water dam and flood control constructions

Similar Documents

Publication Publication Date Title
CN108243938B (en) Intelligent urban three-dimensional greening building convenient to replace
CN107905186B (en) Spiral building type fishway system integrating sightseeing and drifting functions
CN103960086B (en) A kind of Multifunctional solar greenhouse
CN1743558A (en) Vertical-lifting landscape diversion dam
CN105464058B (en) Tunnel formula imitates nature fish pass
CN106468055A (en) A kind of program control circulating jet for ship lock or ship lift and lamp attracting system
CN114481978B (en) Multi-way energy dissipation and resistance reduction type ecological fishway
CN1740452A (en) Rotating elevated panorama barrage gate
CN109555275A (en) A kind of roof garden Intelligent rain Collection utilization system
CN107792943A (en) A kind of artificial floating island for integrating water purification and light brightening
CN1948630A (en) Hydro electric generation landscape diversion dam bridge
CN207052179U (en) A kind of flooded pond exhibiting device and its control system
CN206641067U (en) A kind of vertical greening wall
CN205776113U (en) Tunnel formula is imitated nature fish pass and is combined the comprehensive layout of fish lock
CN216587398U (en) Rain and sewage flow divider
CN206173980U (en) High slope biological protection device
CN205314073U (en) Imitative nature fishway of tunnel style combines arranging of lifting means
CN211152915U (en) Step-in plant planting system for simulating intertidal zone water level
CN208577998U (en) The quick defeated shifting disposal plant of water temperature delamination reservoir bloom
CN2876970Y (en) Water controlled display screen
CN206916711U (en) Automatic water valve
CN207322256U (en) One main laver deep-sea breeding shines net device automatically
CN110258449A (en) Urban Water Environment landscape gentle slope water-retaining structure
CN217870311U (en) Ecological dam
CN205530122U (en) Hydraulic engineering uses ecological bank protection

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication