CN1676761A - 长螺旋后插筋混凝土灌注桩施工方法 - Google Patents
长螺旋后插筋混凝土灌注桩施工方法 Download PDFInfo
- Publication number
- CN1676761A CN1676761A CN 200510017521 CN200510017521A CN1676761A CN 1676761 A CN1676761 A CN 1676761A CN 200510017521 CN200510017521 CN 200510017521 CN 200510017521 A CN200510017521 A CN 200510017521A CN 1676761 A CN1676761 A CN 1676761A
- Authority
- CN
- China
- Prior art keywords
- concrete
- long
- reinforcing cage
- stake
- joint
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
一种适合于水位以和水位以下施工,施工速度快,不需泥浆外运,无须降水,工程造价低,环保的长螺旋后插筋混凝土灌注桩施工方法。技术方案是:包括下列步骤:(1)钻机就位:钻机就位后需平整稳固;(2)钻井成孔:开钻时关闭钻头阀门,当钻至设计标高桩长时,在与动力头底面停留位相对应的钻机塔身处做醒目标记,作为施工同桩长桩孔的控制依据;(3)灌注拔管:当钻管内充满混凝土后,开始拔管;(4)安放钢筋笼:桩孔灌注完毕混凝土后,及时将孔口的泥土清理,然后用副卷扬吊起钢筋笼,将钢筋笼垂直对准桩口,开启震动器,使钢筋笼顶缓慢下沉至设计标高。
Description
技术领域
本发明属于混凝土灌注桩施工方法领域,尤其是一种长螺旋后插筋混凝土灌注桩施工方法。
背景技术
混凝土灌注桩在地下水位以下施工,传统的方法有:泥浆护壁钻孔灌注桩;降低地下水位,然后采用人工挖孔。这两种方法分别具有以下缺点:泥浆护壁钻孔灌注桩,施工工期长,产生大量的泥浆,环境污染厉害,且有泥浆外运,工程造价高;降低地下水位,人工挖孔的施工方法施工工期长,工程造价高,而且施工安全没有保证,长期抽水也容易对相邻建筑物产生不利的影响。
发明内容
本发明的目的是提供一种克服了普通灌注桩的缺点,适合于水位以上,也适合于水位以下施工,施工速度快,工期短,不需泥浆外运,也无须降水,大大降低工程造价,而且没有环境污染的长螺旋后插筋混凝土灌注桩施工方法。
本发明的技术方案是:长螺旋后插筋混凝土灌注桩施工方法,其特征是包括下列步骤:(1)钻机就位:采用空心长螺旋钻杆钻机,钻机就位后需平整稳固,用塔杆上两个垂直方向的磁性线缀,前后左右检查塔身垂直度,校正位置,使钻杆垂直对准桩为中心;(2)钻井成孔:开钻时关闭钻头阀门,向下移动钻杆至钻头触及地面时,启动马达钻进,当钻至设计标高桩长时,在与动力头底面停留位相对应的钻机塔身处做醒目标记,作为施工同桩长桩孔的控制依据;(3)灌注拔管:桩成孔到设计标高后应停止钻进,开始输送混凝土,当钻管内充满混凝土后,开始拔管;(4)安放钢筋笼:桩孔灌注完毕混凝土后,及时将孔口的泥土清理,将钢筋笼装入钢筋笼悬挂器,然后用副卷扬吊起钢筋笼,将钢筋笼垂直对准桩口,开启震动器,使钢筋笼顶缓慢下沉至设计标高。
成桩的拔管速度控制在2-3m/分钟,成桩灌注连续进行。
混凝土为泵送混凝土,塌落度要求在16-20米之间。
桩垂直度偏差小于1%,成孔后桩位偏差小于5厘米;
桩的充盈系数大于等于1。
本发明的效果是:长螺旋后插筋混凝土灌注桩施工方法,同传统的灌注桩相比有以下不同点:1、施工顺序不同,传统混凝土灌注桩施工顺序为:钻孔-----下钢筋笼-----二次清孔----浇注混凝土;长螺旋后插筋混凝土灌注桩施工顺序为:钻孔---浇注混凝土----插入钢筋笼。2、水下施工方法不同,水下施工,传统混凝土灌注桩需要进行泥浆保护壁,或者人工降水,而长螺旋后插筋混凝土灌注桩不需进行泥浆护壁和人工降水,成孔-----浇注----插入钢筋笼一气呵成。3、钢筋笼安放方法不同,传统混凝土灌注桩钢筋笼在浇注混凝土前,就下入孔内安放牢固,长螺旋后插筋混凝土灌注桩钢筋笼在浇注混凝土后,使用平板震动器震动,使钢筋笼插入孔内并固定好。4、施工速度快,长螺旋后插筋混凝土灌注桩由于成孔,混凝土浇注,下笼,一气呵成,成桩时间极短,远远优于传统灌注桩。
长螺旋后插筋混凝土灌注桩具有以下优点和作用:1、没有泥浆外运和人工降水,降低了工程造价;2、本方法没有环境污染;3、施工方便、快捷、工期短;4、同普通灌注桩比单桩承载力高。
下面结合具体实施例对本发明做进一步的说明。
具体实施方式
长螺旋后插筋混凝土灌注桩施工流程为:
1、钻机就位:采用空心长螺旋钻杆钻机,钻机就位后需平整稳固,并用塔杆上两个垂直方向的磁性线缀,前后左右检查塔身垂直度,校正位置,使钻杆垂直对准桩为中心;
2、钻井成孔:开钻时关闭钻头阀门,向下移动钻杆至钻头触及地面时,启动马达钻进,应先慢后快,这样既能减少钻杆摇晃,又能检查钻孔的偏差,以便及时校正。在成孔时发现钻杆摇晃或难钻进时应放慢进尺,否则容易导致桩孔偏斜移位,甚至使钻具损坏。当钻至设计标高桩长时,在与动力头底面停留位相对应的钻机塔身处做醒目标记,作为施工同桩长桩孔的控制依据,但也要考虑场地差异做相应的调整。成孔钻进过程中,必须使用固定支架和滑动支架,确保桩位偏差。
3、灌注拔管
桩成孔到设计标高后应停止钻进,开始输送混凝土,当钻管内充满混凝土后,开始拔管,严禁先拔管后泵料,成桩的拔管速度控制在2-3m/分钟,成桩灌注必须连续进行,以防因较大的速度造成缩径和断桩,同时必须避免因后台供料慢而停机待料。
4、安放钢筋笼
桩孔灌注完毕混凝土后,必须及时将孔口的泥土清理至指定地点,保证桩顶上部没有混杂泥土和孔壁没有活土,将钢筋笼装入钢筋笼悬挂器,然后用副卷扬吊起钢筋笼,将钢筋笼垂直对准桩口,开启震动器,使钢筋笼顶缓慢下沉至设计标高。下笼时必须将钢筋笼对准孔心,确保钢筋笼保护层厚度。
混凝土为泵送混凝土,塌落度要求在16-20米之间;
桩垂直度偏差小于1%,成孔后桩位偏差小于5厘米;
桩实际灌桩混凝土方量必须大于桩理论方量,即桩的充盈系数不得小于1。
Claims (5)
1、长螺旋后插筋混凝土灌注桩施工方法,其特征是包括下列步骤:(1)钻机就位:采用空心长螺旋钻杆钻机,钻机就位后需平整稳固,用塔杆上两个垂直方向的磁性线缀,前后左右检查塔身垂直度,校正位置,使钻杆垂直对准桩位中心;(2)钻井成孔:开钻时关闭钻头阀门,向下移动钻杆至钻头触及地面时,启动马达钻进,当钻至设计标高桩长时,在与动力头底面停留位相对应的钻机塔身处做醒目标记,作为施工桩长的控制依据;(3)灌注拔管:桩成孔到设计标高后应停止钻进,开始输送混凝土,当钻管内充满混凝土后,开始拔管;(4)安放钢筋笼:桩孔灌注完毕混凝土后,及时将孔口的泥土清理,将钢筋笼装入钢筋笼悬挂器,然后用副卷扬吊起钢筋笼,将钢筋笼垂直对准桩口,开启钢筋笼悬挂器的震动器,使钢筋笼顶缓慢下沉至设计标高。
2、根据权利要求1所述的长螺旋后插筋混凝土灌注桩施工方法,其特征是钻孔、浇注、混凝土、安放钢筋笼要连续进行,不得中断。
3、根据权利要求1或2所述的长螺旋后插筋混凝土灌注桩施工方法,其特征是混凝土为泵送混凝土,塌落度要求在16-20米之间。
4、根据权利要求1所述的长螺旋后插筋混凝土灌注桩施工方法,其特征是桩垂直度偏差小于1%,成孔后桩位偏差小于5厘米;
5、根据权利要求1所述的长螺旋后插筋混凝土灌注桩施工方法,其特征是先浇混凝土后安放钢筋笼,钢筋笼是靠震动器震入混凝土内的。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200510017521 CN1676761A (zh) | 2005-04-18 | 2005-04-18 | 长螺旋后插筋混凝土灌注桩施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200510017521 CN1676761A (zh) | 2005-04-18 | 2005-04-18 | 长螺旋后插筋混凝土灌注桩施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN1676761A true CN1676761A (zh) | 2005-10-05 |
Family
ID=35049481
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200510017521 Pending CN1676761A (zh) | 2005-04-18 | 2005-04-18 | 长螺旋后插筋混凝土灌注桩施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1676761A (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101892663A (zh) * | 2010-07-13 | 2010-11-24 | 新疆电力设计院 | 桩式基础制作方法 |
CN104278680A (zh) * | 2013-07-01 | 2015-01-14 | 上海城地建设股份有限公司 | 一种五(六)轴搅拌桩与压灌桩相结合的围护结构及施工方法 |
CN104499480A (zh) * | 2014-12-12 | 2015-04-08 | 董相东 | 钻孔灌注砼空心桩的方法 |
CN108149679A (zh) * | 2018-01-18 | 2018-06-12 | 中国建筑西北设计研究院有限公司 | 一种在cfg桩的素混凝土中后插特制钢筋的施工工法 |
CN110644475A (zh) * | 2019-09-25 | 2020-01-03 | 瑞森新建筑有限公司 | 一种长螺旋钻孔压灌混凝土后插筋灌注桩方法 |
CN113982475A (zh) * | 2021-10-28 | 2022-01-28 | 北京中地恒基建筑工程有限公司 | 降水井成井施工方法 |
CN115369859A (zh) * | 2022-09-29 | 2022-11-22 | 中交四公局第三工程有限公司 | 一种长螺旋钻孔灌注桩的施工方法 |
-
2005
- 2005-04-18 CN CN 200510017521 patent/CN1676761A/zh active Pending
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101892663A (zh) * | 2010-07-13 | 2010-11-24 | 新疆电力设计院 | 桩式基础制作方法 |
CN104278680A (zh) * | 2013-07-01 | 2015-01-14 | 上海城地建设股份有限公司 | 一种五(六)轴搅拌桩与压灌桩相结合的围护结构及施工方法 |
CN104499480A (zh) * | 2014-12-12 | 2015-04-08 | 董相东 | 钻孔灌注砼空心桩的方法 |
CN108149679A (zh) * | 2018-01-18 | 2018-06-12 | 中国建筑西北设计研究院有限公司 | 一种在cfg桩的素混凝土中后插特制钢筋的施工工法 |
CN110644475A (zh) * | 2019-09-25 | 2020-01-03 | 瑞森新建筑有限公司 | 一种长螺旋钻孔压灌混凝土后插筋灌注桩方法 |
CN113982475A (zh) * | 2021-10-28 | 2022-01-28 | 北京中地恒基建筑工程有限公司 | 降水井成井施工方法 |
CN115369859A (zh) * | 2022-09-29 | 2022-11-22 | 中交四公局第三工程有限公司 | 一种长螺旋钻孔灌注桩的施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1676761A (zh) | 长螺旋后插筋混凝土灌注桩施工方法 | |
CN104631438B (zh) | 长螺旋钻孔压灌混凝土抗拔桩施工方法 | |
CN208996025U (zh) | 一种深厚淤泥层双护筒桩基施工结构 | |
CN109371974A (zh) | 一种适用于坚硬地质的phc管桩植入施工方法 | |
CN100473790C (zh) | 一种建筑用塔吊基础及其制造方法 | |
CN204370469U (zh) | 一种钻孔桩长腿导管架海上风机基础 | |
CN110241818A (zh) | 钻孔灌注桩结构及其施工方法 | |
CN106284311B (zh) | 一种旋挖钻机干成孔混凝土灌注桩高效施工工艺 | |
CN101586340A (zh) | 连续墙在微风化岩层成槽施工中的预处理工艺 | |
CN105951747A (zh) | 一种逆作法预埋格构柱的施工方法 | |
CN104047542A (zh) | 嵌岩斜桩冲击钻管锤系统及嵌岩斜桩冲击施工方法 | |
CN105780806A (zh) | 一种钻孔桩长腿导管架海上风机基础及其施工方法 | |
CN112482364A (zh) | 滨海地区强腐蚀性软弱地质条件下的旋挖灌注桩施工工艺 | |
CN107700479A (zh) | 一种大直径钻孔桩的施工方法 | |
CN106677168A (zh) | 一种超流态混凝土灌注桩的施工方法 | |
CN201762702U (zh) | 钻孔咬合桩 | |
CN106400807B (zh) | 海工驳船灌浆方法及其设备 | |
CN106930274B (zh) | 一种钢筋笼位置固定的全套筒回转钻孔灌注桩施工方法 | |
CN117211277A (zh) | 一种软土地基钢筋混凝土灌注桩施工方法 | |
CN205444192U (zh) | 一种桥梁桩冲桩施工系统 | |
CN208088287U (zh) | 半护筒压灌桩施工设备 | |
CN206752413U (zh) | 一种海工驳船作业设备 | |
CN106400745B (zh) | 一种海工驳船作业方法及设备 | |
CN107489140B (zh) | 一种精确控制cfg桩桩顶高程的方法 | |
CN109162758A (zh) | 一种条带开采采空区注浆治理方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |