CN1558130A - 铺设大口径管道下沟施工方法 - Google Patents

铺设大口径管道下沟施工方法 Download PDF

Info

Publication number
CN1558130A
CN1558130A CNA2004100235535A CN200410023553A CN1558130A CN 1558130 A CN1558130 A CN 1558130A CN A2004100235535 A CNA2004100235535 A CN A2004100235535A CN 200410023553 A CN200410023553 A CN 200410023553A CN 1558130 A CN1558130 A CN 1558130A
Authority
CN
China
Prior art keywords
pipeline
pipe
partition wall
pipe trench
trench
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2004100235535A
Other languages
English (en)
Other versions
CN1242194C (zh
Inventor
张克明
王斌
菅宪忠
陈勤功
阎福明
昝吉华
王建华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No3 Plant Of Shengli Oilfield Shengli Petrochemical Construction Co Ltd
Original Assignee
No3 Plant Of Shengli Oilfield Shengli Petrochemical Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No3 Plant Of Shengli Oilfield Shengli Petrochemical Construction Co Ltd filed Critical No3 Plant Of Shengli Oilfield Shengli Petrochemical Construction Co Ltd
Priority to CN 200410023553 priority Critical patent/CN1242194C/zh
Publication of CN1558130A publication Critical patent/CN1558130A/zh
Application granted granted Critical
Publication of CN1242194C publication Critical patent/CN1242194C/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

本发明是一种铺设大口径管道下沟施工方法,属于铺设地下管道的一道重要工序。其特征是在管沟开挖时,每隔一段距离预留一道支撑土隔墙。再用两台吊管机从管道的始端吊起,逐步将管道移到管沟的隔墙上。然后用两台吊管机从始端吊起管道离开隔墙,用挖掘机每挖除一道隔墙,将管道缓缓落于管沟中。依次挖除所有隔墙后,整段预制管即逐步落到沟底。施工工序是:施工准备、管沟一次开挖、移管及检测、管沟二次开挖、管道下沟。主要优点是只用两台管机,节省设备投资,降低能耗;能简化施工程序,缩短工期;能防止施工设备发生倾倒事故,确保人身及设备安全;能保证管道下沟作业质量;有利于在复杂地形施工现场统一指挥协调联合作业;水旱地区均适用。

Description

铺设大口径管道下沟施工方法
(一)技术领域
本发明涉及到铺设地下管道的施工方法,具体而言是一种铺设大口径管道下沟施工方法。
(二)背景技术
2001年开工的西气东输管道工程,西起新疆,东至上海,全长4000多公里。是我国前所未有的大口径、大壁厚、高压力长输天然气管道工程。其直径1016毫米,壁厚26.2毫米,工作压力10MPa,每根10米长的钢管重7.5吨。我公司中标第26标段主干线,长度68公里,地处无锡、苏州江南水网区域,池塘密布,河渠纵横,水旱田交错,给大口径管道铺设带来很多困难,而管道下沟就是主要施工难题之一。过去铺设中、小口径管道采用的“管沟一次挖成,管道整体吊起下沟”的施工方法,已不适用于这样的大口径管道铺设下沟施工。若用那种方法,预制管段下沟,至少要用6台70T吊管机才能同步整体吊起。当时每个施工机组只有两台70T吊管机,若要集中6台70T吊管机联合下沟作业,不但很难调配和增大了施工成本,而且因地形复杂和土质条件不利,很难统一协调指挥,施工安全得不到保证,一旦发生人身或设备安全事故,就会有很大损失。经检索专利文献,只有一篇“支撑位于地沟中的管道的方法”(专利号02119240)可做本发明的弱相关对比文献,但技术特征显著不同。
(三)发明内容
本发明的目的是首创一种适合我国目前铺设大口径管道的下沟施工方法,只用两台70T吊管机和一台短臂挖掘机,就完成直径1米以上大口径管道下沟作业,不增大施工成本,并且安全可靠。
上述目的是由下述技术方案实现的:
该施工方法的基本技术特征是:在管沟开挖时,每隔一段距离预留一道支撑土隔墙。再用两台吊管机从管道的始端吊起,逐步将管道移到管沟的隔墙上,整段预制管道的重量由管沟的数道隔墙共同承担。然后再用两台吊管机从始端吊起管道离开隔墙,用挖掘机每挖除一道隔墙,将管道缓缓落于管沟中。依次挖除所有隔墙后,整段预制管道即逐步落到沟底。基本施工工序是:施工准备、管沟一次开挖、移管及检测、管沟二次开挖、管道下沟。各道工序的简要技术内容(或叫做子工序)分别是:
施工准备:包括管沟中心线及上口线放线;根据管道重量和吊管机的吊重曲线,确定隔墙间距和吊管机站位吊点;如果管沟内有积水,应先用盲板封堵预制管道的两端,并将预制管道置于待挖管沟的一侧,距管沟是上口中心线3米。
管沟一次开挖:挖掘机在待挖管沟的无管道一侧,预留隔墙,分段挖沟;检测合格后再在沟底挖积水坑;利用潜水泵不断抽排沟内积水。挖出的地表层土放置在靠近外边线处,下层生土放置在靠近管沟处,并将生土适当平整,以便于后边工序挖除隔墙时挖掘机行走和稳妥工作。
移管和检测:用两台吊管机从始端吊起预制管道,逐步将管道移位至管沟的隔墙上;用电火花检漏仪全面检测管道外壁防腐层,并及时修补所有损伤和缺陷。
管沟二次开挖:先对挖完的管沟进行清理平整,使其达到设计要求;再用吊管机从始端吊起管道离开隔墙,并逐个挖除隔墙。
管道下沟:用两台吊管机从始端吊起管道离开隔墙,用挖掘机每挖除一道预留隔墙,将管道缓缓落于管沟中,依次挖除所有隔墙,管道即落到沟底;填塞管道下方的悬空;复测管道上顶标高。回填时先填生土再填地表层土。
本发明只用两台吊管机,节省了设备投资并降低了能耗;简化了施工程序,能缩短工期;若吊管机附近出现管沟塌方,由隔墙分担管道重量,可防止施工设备发生倾倒事故,确保人身及设备安全;对塌方处可及时进行清理,保证管道下沟作业质量;有利于在复杂地形施工现场统一指挥,协调联合作业。该下沟施工方法在西气东输管道工程第26标段初试成功后,又在第25和27等标段推广应用,受到工程业主和监理部门好评。经有关权威设计研究院利用AUTOPIPE6.0软件,对各项技术参数进行分析计算,完全满足设计要求。该下沟施工方法不但适用于江南水网区域,在其它平原、荒漠等土质松软地段的大口径管道施工中,也有很好的推广应用前景。
(四)附图说明
附图1是本发明的基本工艺流程及各工序简要技术内容方框图。
附图2是本发明的管沟一次开挖后的横断示意图。
附图3是本发明的管沟二次开挖俯视示意图。
(五)具体实施方式
结合附图说明一个实施例:
由图1所示,本发明的基本施工工序是:施工准备、管沟一次开挖、移管及检测、管沟二次开挖、管道下沟。各工序的简要技术内容(或叫子工序)分别是:
施工准备:包括管道中心及上口放线、确定隔墙间距及吊点、封堵管道两端。
管沟一次开挖:包括预留隔墙分段开挖、沟底挖集水坑、抽排沟内积水。
移管及检测:包括吊管道隔墙上,检测防腐层及修补。
管沟二次开挖:包括清理平整管沟、吊起管道挖出隔墙。
管道下沟:包括吊管由始端逐步下沟、填塞管下悬空、管顶标高复测。
由图2所示,管沟一次开挖前,管道1放置在管沟4左侧的管墩3上,或放在地面2上。用挖掘机挖出的地表层土6放置在最外边积水沟7处,生土5放置在地表层6与管沟4之间,并且进行平整,便于今后施工挖掘机在生土5上行走,挖除隔墙。施工带两边线处各挖一条与管沟平行的积水沟7,使地面2和土壤6、5中的水分集中到水沟7中,有利于施工作业。
由图3所示,管沟一次开挖后,用两台吊管机8由始端吊起预制管道1,逐步移管到管沟4的隔墙10上,并使管道1尽量靠近吊管机8一侧。然后用电火花漏仪全面检测管道外防腐层并及时修补其损伤即缺陷。再对管沟进行清理平整。然后用两台吊管机8由始端(左端)吊起管道1离开第一道隔墙10,同时用挖掘机9挖除第一道隔墙10,使管道1的始端落于管沟4中。再将左边的一台吊管机8移到另一台吊管机8的右边,另一台吊管机8又吊着管道1离开第二道隔墙10,挖掘机9再去挖除第二道隔墙10。依次类推,所有隔墙10逐个挖除后,管道1即全部落到管沟4的底部,若有悬空,用土填塞。再对下沟后的管道1上顶标高全面复测合格后,先回填图2中的生土层土5,最后回填地表层土6,压实恢复原地貌。

Claims (4)

1.一种铺设大口径管道下沟施工方法,其特征是在管沟开挖时,每隔一段距离预留一道支撑土隔墙,再用两台吊管机从管道的始端吊起,逐步将管道移到管沟的隔墙上,然后用两台吊管机从始端吊起管道离开隔墙,用挖掘机每挖除一道隔墙,将管道缓缓落于管沟中,依次挖除所有隔墙后,整段预制管道即逐步落到沟底;基本施工工序是:施工准备、管沟一次开挖、移管及检测、管沟二次开挖、管道下沟,各道工序的简要技术内容(或叫做子工序)分别是:
施工准备:包括管沟中心线及上口线放线,根据管道(1)重量及吊管机(8)的吊重曲线,确定隔墙(10)间距和吊管机(8)站位吊点,如果管沟内有积水,应先用盲板封堵预制管道(1)的两端,并将预制管道(1)置于待挖管沟(4)的一侧;
管沟一次开挖:挖掘机(9)在待挖管沟(4)的无管道一侧,预留隔墙(10),分段挖沟,检验合格再在沟底挖积水坑,用潜水泵抽排沟内积水;
移管和检测:用两台吊管机(8)从始端吊起预制管道(1),逐步将管道(1)移位至管沟(4)的隔墙(10)上,对管道(1)的外壁防腐层全面检测,并及时修补所有损伤和缺陷;
管沟二次开挖:先对挖完的管沟(4)进行清理平整,使其达到设计要求,再用两台吊管机(8)吊起管道(1)离开隔墙(10),并逐个挖除隔墙(10);
管道下沟:用两台吊管机(8)从始端吊起管道(1)离开隔墙(10),用挖掘机(9)每挖除一道预留隔墙(10),将管道(1)缓缓落于管沟(4)中,依次挖除所有隔墙(10),管道(1)即落于沟底,填塞管道(1)下方的悬空,复测管顶标高,合格后回填。
2.根据权利要求1所述的铺设大口径管道下沟施工方法,其特征是管沟一次开挖前,管道(1)放置在管沟(4)左侧的管墩(3)上,或放在地面(2)上。
3.根据权利要求1所述的铺设大口径管道下沟施工方法,其特征是施工带两边线处各挖一条与管沟(4)平行的积水沟(7)。
4.根据权利要求1所述的铺设大口径管道下沟施工方法,其特征是管沟一次开挖后,移动管道(1)到管沟(4)的隔墙(10)上,并使管道(1)靠近吊管机(8)的一侧。
CN 200410023553 2004-01-30 2004-01-30 铺设大口径管道下沟施工方法 Expired - Fee Related CN1242194C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200410023553 CN1242194C (zh) 2004-01-30 2004-01-30 铺设大口径管道下沟施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200410023553 CN1242194C (zh) 2004-01-30 2004-01-30 铺设大口径管道下沟施工方法

Publications (2)

Publication Number Publication Date
CN1558130A true CN1558130A (zh) 2004-12-29
CN1242194C CN1242194C (zh) 2006-02-15

Family

ID=34352181

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200410023553 Expired - Fee Related CN1242194C (zh) 2004-01-30 2004-01-30 铺设大口径管道下沟施工方法

Country Status (1)

Country Link
CN (1) CN1242194C (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101225908B (zh) * 2007-01-15 2011-04-20 陈炯 管子牵引运输安装方法和设备
CN102155585A (zh) * 2011-04-12 2011-08-17 中国十九冶集团有限公司 矿浆管道在狭长地段的敷设方法
CN102182867A (zh) * 2011-04-14 2011-09-14 中国十九冶集团有限公司 矿浆管道在流沙层地段的敷设方法
CN102261519A (zh) * 2011-04-15 2011-11-30 胜利油田胜利石油化工建设有限责任公司 气囊辅助管道滑移漂浮下沟方法
CN102261518A (zh) * 2010-05-24 2011-11-30 中国石油天然气集团公司 在役油气管道遭遇采空区塌陷破坏复位施工方法
CN103851257A (zh) * 2014-03-18 2014-06-11 国家电网公司 基于对电缆排管敷设中的托管施工工艺
CN104948833A (zh) * 2015-06-10 2015-09-30 上海煤气第二管线工程有限公司 一种山地燃气管道施工方法
CN106247007A (zh) * 2016-08-22 2016-12-21 中煤建安第七工程有限公司 远距离大直径工业管道自重变位下置铺设直埋施工方法
CN106351313A (zh) * 2016-08-30 2017-01-25 中铁十九局集团矿业投资有限公司 基于管道铺设架的施工方法和装置
CN108086358A (zh) * 2017-12-13 2018-05-29 中国二冶集团有限公司 大口径长距离多管同沟沉管施工方法
CN113684839A (zh) * 2021-09-07 2021-11-23 中电建十一局工程有限公司 一种复杂条件下深窄管沟的开挖、支护方法

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101225908B (zh) * 2007-01-15 2011-04-20 陈炯 管子牵引运输安装方法和设备
CN102261518B (zh) * 2010-05-24 2014-01-22 中国石油天然气集团公司 在役油气管道遭遇采空区塌陷破坏复位施工方法
CN102261518A (zh) * 2010-05-24 2011-11-30 中国石油天然气集团公司 在役油气管道遭遇采空区塌陷破坏复位施工方法
CN102155585B (zh) * 2011-04-12 2012-08-15 中国十九冶集团有限公司 矿浆管道在狭长地段的敷设方法
CN102155585A (zh) * 2011-04-12 2011-08-17 中国十九冶集团有限公司 矿浆管道在狭长地段的敷设方法
CN102182867B (zh) * 2011-04-14 2012-12-05 中国十九冶集团有限公司 矿浆管道在流沙层地段的敷设方法
CN102182867A (zh) * 2011-04-14 2011-09-14 中国十九冶集团有限公司 矿浆管道在流沙层地段的敷设方法
CN102261519A (zh) * 2011-04-15 2011-11-30 胜利油田胜利石油化工建设有限责任公司 气囊辅助管道滑移漂浮下沟方法
CN102261519B (zh) * 2011-04-15 2012-11-14 胜利油田胜利石油化工建设有限责任公司 气囊辅助管道滑移漂浮下沟方法
CN103851257B (zh) * 2014-03-18 2015-10-28 国家电网公司 基于对电缆排管敷设中的托管施工工艺
CN103851257A (zh) * 2014-03-18 2014-06-11 国家电网公司 基于对电缆排管敷设中的托管施工工艺
CN104948833A (zh) * 2015-06-10 2015-09-30 上海煤气第二管线工程有限公司 一种山地燃气管道施工方法
CN104948833B (zh) * 2015-06-10 2017-01-18 上海煤气第二管线工程有限公司 一种山地燃气管道施工方法
CN106247007A (zh) * 2016-08-22 2016-12-21 中煤建安第七工程有限公司 远距离大直径工业管道自重变位下置铺设直埋施工方法
CN106351313A (zh) * 2016-08-30 2017-01-25 中铁十九局集团矿业投资有限公司 基于管道铺设架的施工方法和装置
CN108086358A (zh) * 2017-12-13 2018-05-29 中国二冶集团有限公司 大口径长距离多管同沟沉管施工方法
CN108086358B (zh) * 2017-12-13 2020-08-11 中国二冶集团有限公司 大口径长距离多管同沟沉管施工方法
CN113684839B (zh) * 2021-09-07 2022-09-16 中电建十一局工程有限公司 一种复杂条件下深窄管沟的开挖、支护方法
CN113684839A (zh) * 2021-09-07 2021-11-23 中电建十一局工程有限公司 一种复杂条件下深窄管沟的开挖、支护方法

Also Published As

Publication number Publication date
CN1242194C (zh) 2006-02-15

Similar Documents

Publication Publication Date Title
CN101315139B (zh) 一种过河管沉管施工工艺
CN107587557A (zh) 室外给水工程施工方法
CN102359123B (zh) 现浇混凝土电力排管施工方法
CN1242194C (zh) 铺设大口径管道下沟施工方法
CN1256531C (zh) 管道穿越河流施工方法
CN108166526A (zh) 市政集成综合布设管道的施工工艺
CN108086358B (zh) 大口径长距离多管同沟沉管施工方法
CN106122589A (zh) 一种土压平衡法
CN107191675A (zh) 铁路站场电化区段管道铺设施工工法
CN113756314B (zh) 一种适用于长三角地区软土地基深大地铁基坑开挖的施工方法
CN102261519B (zh) 气囊辅助管道滑移漂浮下沟方法
CN110029690A (zh) 一种渗滤液检漏收集结构及其施工方法
CN101597888A (zh) 市政排水涵洞沉槽施工方法
CN209652936U (zh) 一种人工顶管检查井钢板箱基坑支护
CN109083100B (zh) 一种吹泥成陆后的河道开挖施工工艺
CN110656621A (zh) 一种河道截流体系构造及施工方法
CN106245652A (zh) 一种临江深基坑土方开挖的施工方法
CN105804048A (zh) 一种软弱地基排水板加固方法
CN105179808B (zh) 长距离海底管线预挖沟后铺管施工方法
CN109577337A (zh) 排水管线的深基坑施工方法
CN106869165A (zh) 城市综合预制管廊明挖式自防护施工法及自推进铺设机
CN101651309A (zh) 现场压实测试机械强度的直埋电力电缆保护管埋设方法
CN105332382A (zh) 邻河基坑筑岛围堰粘土止水施工方法
CN114045796A (zh) 一种陡坡段倒虹吸管布置结构及施工方法
CN114808864A (zh) 水闸翼墙墙后排水失效的解决方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee