CN1260434A - 多重自动锁定的提升脚手架 - Google Patents

多重自动锁定的提升脚手架 Download PDF

Info

Publication number
CN1260434A
CN1260434A CN 99111613 CN99111613A CN1260434A CN 1260434 A CN1260434 A CN 1260434A CN 99111613 CN99111613 CN 99111613 CN 99111613 A CN99111613 A CN 99111613A CN 1260434 A CN1260434 A CN 1260434A
Authority
CN
China
Prior art keywords
lock
outrigger
scaffold
suspension ring
spring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 99111613
Other languages
English (en)
Other versions
CN1128277C (zh
Inventor
陈胜坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 99111613 priority Critical patent/CN1128277C/zh
Publication of CN1260434A publication Critical patent/CN1260434A/zh
Application granted granted Critical
Publication of CN1128277C publication Critical patent/CN1128277C/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

一种多重自动锁定的提升脚手架,其特征是每个吊点有多道自动锁定装置,防坠装置的原理是:通过对提升过程中电动葫芦起吊重量的测定来确定是否对脚手架进行锁定,当其重量变化达一定值时,多道防坠装置同时动作对脚手架进行锁定,在锁定脚手架的同时,自动切断电源。该种提升脚手架提升速度快、平稳、锁定装置稳妥安全,适合任何建筑结构施工使用。

Description

多重自动锁定的提升脚手架
本发明涉及建筑外墙脚手架,尤其是一种具有多重自动锁定功能的提升脚手架。
目前建筑施工使用的脚手架有多种形式:1.吊篮式脚手架,2.轨道升降脚手架,3.整体提升脚手架,4.落地搭设的脚手架。这些类型的脚手架不同程度存在下列问题:1.操作麻烦,2.成本高,3.防坠措施多为摩擦型,下滑距离大,影响安全,4.缺乏重量预测装置,5.防坠装置虽然有多道,但自动锁定的往往只有一道,其安全性受到影响。
本发明的目的在于提供一种提升速度快,具有多重自动锁定功能,有效预防坠落发生的脚手架,该种脚手架在提升时能预测重量的变化,在脚手架重量变化达一定值时,多重自动锁定装置同时发生作用,将脚手架迅速锁定,在锁定脚手架的同时自动切断电源,防止坠落的发生,其防坠方法稳妥,有效。
为了达到上述目的,本发明采用的方案是:脚手架设主框架13,主框架13由防坠轨道11、小横杆18、横向支撑17和外侧的主框架立杆连成一体,并与脚手架33各种杆件也连成一体,防坠轨道11每隔一定距离开一个圆孔10,自下而上穿过设置于每层楼的导向装置12,每个导向装置12均设置一根锁棒28,锁棒28由锁棒弹簧30盘绕,其后端与锁棒把柄31连接在一起,水平控制杆21位于锁棒把柄31左侧,竖向控制杆32与每一层楼的水平控制杆21连接,并与活动板22相连,活板22与吊环27上端焊接在一起,吊环27由吊环弹簧25盘绕,当吊环弹簧25上下移动时,活动板22,竖向控制杆32,水平控制杆21也发生上下移动,以对锁棒28进行控制,从而达到从多个点进行自动锁定的目的。在挑梁5外端安装闸刀开关37,各个吊点的闸刀开关37串联起来,并与控制电动葫芦15起动的控制电路的启动开关串联在一起,闸刀开关37随活动板22上升、下降而断开和闭合。
本发明与现有的脚手架技术相比有下列突出优点:1.具有多重自动锁定脚手架的功能,2.有重量预测装置,通过重量预测装置控制各层楼锁定装置,3.采用锁棒防坠,承载力大,效果好,4.升降操作方便,速度快,5.适合任何建筑结构使用。
下面结合附图,对本发明作进一步详细描述。
图1为脚手架侧视图
图2为防坠轨道结构图
图3为图2右视图
图4为图2挑梁处1-1位置剖面图
图5为脚手架俯视图
图6为脚手架立面图
图7为挑梁附墙侧视图
图8为图7右视图
图9为图7俯视图
脚手架33由立杆36,小横杆18,大横杆16及剪刀撑34搭设而成,脚手架设底部桁架35,底部桁架35与脚手架33和主框架13连在一起,主框架13由防坠轨道11和外立杆、横向支撑17、小横管18连接而成,纵向每隔一段距离设一道主框架13,防坠轨道11每隔一定距离开一个圆孔10,防坠轨道11穿过每层楼的导向装置12,在导向装置12安装锁棒28,锁棒28由锁棒弹簧30盘绕,其外端有一锁棒外套管9套住,锁棒弹簧压板29与锁棒28焊接在一起,锁棒28后端与锁棒把柄31连结,锁棒弹簧30通过锁棒弹簧压板29压缩,锁棒把柄31位于水平控制杆21右侧,水平控制杆21一端连结支点20,另一端与竖向控制杆32联在一起,通过竖向控制杆32上下移动而发生上下移动,以对锁棒28进行控制。水平控制杆21上下移动时限位板39对其导向,竖向控制杆32与活动板22连接在一起,活动板22与吊环27焊接在一起或用螺栓联结在一起,吊环27由吊环弹簧25盘绕,吊环弹簧25上方由弹簧压板24压住,弹簧压板24和吊环27焊接在一起,下横档26和上横档23与弹簧外套管38焊接在一起,并套在挑梁5外面,用螺栓与挑梁5固定。上横档23和下横档26分别开有圆孔,以便吊环27能从中穿过,吊环27下端悬挂电动葫芦15,电动葫芦15下端钩住支架提手19,支架提手19与底部桁架35固定,脚手架33最上一层楼设加固架1,加固架1外端安装导向装置12,以对防坠轨道11进行导向,在每层楼安装导向横梁6,导向横梁6外端与导向装置12连接在一起,导向装置12对防坠轨道11进行导向,挑梁5一端通过预埋件4与建筑物7固定,另一端由挑梁拉杆3牵拉,挑梁拉杆3通过挑梁支撑2上方,并与预埋件4连结,挑梁拉杆3也可以通过上一层建筑物拉结,挑梁5固定方法还可以在其下方设斜撑支承于挑梁5的外端,挑梁5外端还悬挂自锁装置14,自锁装置14由吊环27,吊环弹簧25,弹簧压板24,活动板22,水平控制杆21,竖向控制杆32,锁棒28,锁棒弹簧30,锁棒弹簧压板29,锁棒把柄31组成,挑梁5外端还安装闸刀开关37,各个挑梁5的闸刀开关37串联在一起,并与控制电动葫芦15起动的控制电路启动开关连结在一起,阐刀开关37通过与活动板22连结的连杆控制断开与闭合。
当大楼进入主体施工时,要对脚手架进行提升时,挑梁5安装在脚手架33第四层楼的位置上,电动葫芦15悬挂于吊环27上,安装在导向装置12的锁棒28呈开锁状态,和控制电路启动开关串联在一起的各个吊点处的闸刀开关37呈闭合状态,保险螺栓8安装在每层楼导向横梁6上方,提升脚手架时保险螺栓8的位置经常移动,以防止碰到导向横梁6。脚手架处于正常的提升状态,锁棒28后端的锁棒把柄31被水平控制杆21档住而不能往前移动,锁棒28处于开锁状态,当脚手架各吊点在起吊过程中发生重量与初始状态的重量有变化时,一些吊点的重量变重,另一些吊点重量变轻,变轻的吊点吊环弹簧25自动将电动葫芦15弹起,吊环27和活动板22也同时被弹起,水平控制杆21,竖向控制杆32随活动板22向上移动而向上移动,从而锁棒28失去控制,锁棒28在锁棒弹簧30释放的能量作用下,迅速往前弹去,并插入防坠轨道11的圆孔10内,从而对脚手架进行多个点锁定,在锁定脚手架的同时,挑梁5外端的闸刀开关37由于活动板22向上移动而呈断开状态,电动葫芦15也随之停止运转,从而避免了可能发生的坠落。
脚手架提升到位后,将防坠轨道11与各层楼的导向横梁6固定,脚手架便可供施工使用。电动葫芦15由控制台统一控制升降,可以同时控制多台电动葫芦15运转。脚手架可采用整体式提升,也可以采用分片式提升。

Claims (8)

1.一种多重自动锁定的提升脚手架由脚手架33、加固架1、挑梁5、导向横梁6和防坠轨道11、自锁装置14、阐刀开关37、电动葫芦15、保险螺栓8和控制台组成,所述自锁装置14由吊环27、吊环弹簧25、弹簧压板24、活动板22、水平控制杆21和竖向控制杆32、锁棒28和锁棒弹簧30、锁棒弹簧压板29、锁棒把柄31组成。
2.根据权利要求1所述的加固架1,其特征在于在脚手架33最上一层楼上架设,并安装导向装置12,以便对脚手架33进行导向。
3.根据权利要求1所述的挑梁5,其特征在于挑梁5一端安装在建筑物7上、另一端通过挑梁拉杆3牵拉,挑梁拉杆3可以通过挑梁支撑2与预埋件4固定,也可以与上一层楼建筑物7拉结,挑梁5固定方法还可以在其下方设斜撑支承于挑梁5的外端。挑梁5的外端悬挂吊环27。
4.根据权利要求1所述的导向横梁6,其特征在于导向横梁6一端安装于建筑物7上,另一端安装导向装置12,导向装置12对防坠轨道11进行导向。
5.根据权利要求1所述的防坠轨道11,其特征在于每隔一定距离开一些圆孔10,防坠轨道11与小横杆18、横向支撑17及外立杆连结成一个主框架13,在脚手架33纵向每隔一定距离设置一个,并与脚手架其它杆件连成一个整体。
6.根据权利要求1所述的自锁装置14,其特征在于自锁装置14由吊环27、吊环弹簧25、弹簧压板24、活动板22、水平控制杆21、竖向控制杆32、锁棒28、锁棒弹簧30、锁棒弹簧压板29和锁棒把柄31组成,吊环27由吊环弹簧25盘绕,吊环弹簧25被弹簧外套管38套住,弹簧外套管38与上横档23,下横档26焊接在一起,用螺丝固定于挑梁5外端。上横档23和下横档26开有孔,以便吊环27能从中穿过。弹簧压板24与吊环27焊接、活动板22与吊环27上端焊接在一起,并与竖向控制杆32连接,竖向控制杆32又与每层楼的水平控制杆21连接;锁棒28安装在导向装置12上,锁棒28外端由锁棒弹簧30盘绕,锁棒28还与锁棒弹簧压板29焊接在一起,锁棒28后端与锁棒把柄31连接,水平控制杆21位于锁棒把柄31的左侧,通过支点20和限位板39上下移动,以对锁棒28进行控制。
7.根据权利要求1所述的阐刀开关37,其特征在于它安装于挑梁5外端,阐刀开关37通过与活动板22连接的连杆控制断开和闭合,各个吊点安装的阐刀开关37串联在一起并与控制电动葫芦15起动的控制电路启动开关串联。
8.根据权利要求1所述的保险螺栓8,其特征在于保险螺栓8位于导向横梁6上方,安装于防坠轨道11上。
CN 99111613 1999-08-23 1999-08-23 多重自动锁定的提升脚手架 Expired - Fee Related CN1128277C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 99111613 CN1128277C (zh) 1999-08-23 1999-08-23 多重自动锁定的提升脚手架

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 99111613 CN1128277C (zh) 1999-08-23 1999-08-23 多重自动锁定的提升脚手架

Publications (2)

Publication Number Publication Date
CN1260434A true CN1260434A (zh) 2000-07-19
CN1128277C CN1128277C (zh) 2003-11-19

Family

ID=5275195

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 99111613 Expired - Fee Related CN1128277C (zh) 1999-08-23 1999-08-23 多重自动锁定的提升脚手架

Country Status (1)

Country Link
CN (1) CN1128277C (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101845883A (zh) * 2010-06-04 2010-09-29 刘玉伟 爬升脚手架体系及施工的方法
CN101852008A (zh) * 2010-06-04 2010-10-06 刘玉伟 一种升降脚手架装置
CN102877637A (zh) * 2012-09-29 2013-01-16 深圳市建工集团股份有限公司 一种解决悬挑梁底部墙面施工操作平台的方法
CN102900228A (zh) * 2012-11-02 2013-01-30 福建翔银工贸有限公司 工程脚手架自锁连接结构
CN106586908A (zh) * 2016-11-16 2017-04-26 上海市建筑装饰工程集团有限公司 外墙脚手架内石材垂直运输吊篮

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101845883A (zh) * 2010-06-04 2010-09-29 刘玉伟 爬升脚手架体系及施工的方法
CN101852008A (zh) * 2010-06-04 2010-10-06 刘玉伟 一种升降脚手架装置
CN101845883B (zh) * 2010-06-04 2012-08-29 刘玉伟 爬升脚手架体系及施工的方法
CN102877637A (zh) * 2012-09-29 2013-01-16 深圳市建工集团股份有限公司 一种解决悬挑梁底部墙面施工操作平台的方法
CN102900228A (zh) * 2012-11-02 2013-01-30 福建翔银工贸有限公司 工程脚手架自锁连接结构
CN102900228B (zh) * 2012-11-02 2015-09-16 福建翔银工贸有限公司 工程脚手架自锁连接结构
CN106586908A (zh) * 2016-11-16 2017-04-26 上海市建筑装饰工程集团有限公司 外墙脚手架内石材垂直运输吊篮
CN106586908B (zh) * 2016-11-16 2019-07-12 上海市建筑装饰工程集团有限公司 外墙脚手架内石材垂直运输吊篮

Also Published As

Publication number Publication date
CN1128277C (zh) 2003-11-19

Similar Documents

Publication Publication Date Title
US4270628A (en) Elevator device preferably an elevator for building facades
CN103375023A (zh) 附着式升降脚手架
CN209538646U (zh) 一种弧形渐变内收结构附着升降脚手架
CN1128277C (zh) 多重自动锁定的提升脚手架
CN204081437U (zh) 爬升脚手架防坠落装置
CN109629813A (zh) 一种弧形渐变内收结构附着升降脚手架
CN110565937A (zh) 一种门式整体提升钢平台
CN203603439U (zh) 一种导座式升降脚手架
CN213418443U (zh) 一种自爬式电梯井道作业平台
CN213651533U (zh) 一种用于无底坑或浅底坑的电梯检修保护结构
CN201148725Y (zh) 附着升降脚手架滑轮式防倾器
CN210825249U (zh) 一种新型自升降式物料平台
CN114703705A (zh) 一种铁路线路龙门吊运智能控制系统
CN1932212A (zh) 一种全自动防坠的提升脚手架
CN109398386A (zh) 具有联控作业回路的轨道车
CN1173109C (zh) 一种全自动防坠的提升脚手架
CN115402922A (zh) 用于铁路箱梁防落梁挡块安装的专用吊具装置及使用方法
WO2003002447A1 (en) Lift especially for mounting on a substantially vertical building and security arrangement for said lift
CN2306284Y (zh) 挑轨式附着升降脚手架
CN216476251U (zh) 一种建筑施工用的安全防护平台
CN214243594U (zh) 一种预防石油电动钻机游车上碰下砸的自动控制装置
CN1059176C (zh) 一种机械、电气防止坠落的提升脚手架
KR200148505Y1 (ko) 교량 점검용 승강장치
US3970287A (en) Guide block for a cable
CN215055155U (zh) 一种超长加长臂外挑吊篮安装结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: Chen Shengkun

Document name: payment instructions

C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: Chen Shengkun

Document name: Notification to Pay the Fees

C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: Chen Shengkun

Document name: Notification to Pay the Fees

DD01 Delivery of document by public notice

Addressee: Chen Shengkun

Document name: Notification to Pay the Fees

DD01 Delivery of document by public notice

Addressee: Chen Yuee

Document name: Notification of Termination of Patent Right

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20031119

Termination date: 20100823