CN1211658A - 灌注桩钢筋砼防洪堤的施工方法 - Google Patents
灌注桩钢筋砼防洪堤的施工方法 Download PDFInfo
- Publication number
- CN1211658A CN1211658A CN98121623A CN98121623A CN1211658A CN 1211658 A CN1211658 A CN 1211658A CN 98121623 A CN98121623 A CN 98121623A CN 98121623 A CN98121623 A CN 98121623A CN 1211658 A CN1211658 A CN 1211658A
- Authority
- CN
- China
- Prior art keywords
- binder
- dike
- king pile
- job practices
- pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/30—Flood prevention; Flood or storm water management, e.g. using flood barriers
Landscapes
- Revetment (AREA)
Abstract
灌注桩钢筋砼防洪堤的施工方法,是在河堤迎水面内冲掘出长方形深孔,灌注砼形成主桩,主桩连续成堤。主桩内侧堤面间断掘孔灌注副桩。主、副桩上各分布系梁,系梁间分段浇注砼。本发明方法适宜在险要江、湖、河段防洪堤采用,所建造的防洪堤基础深,基脚可经受激流的冲刷,主桩钢筋砼堤身可经受风浪的冲击。本发明方法可利用于旧堤的改造。
Description
本发明涉及一种钢筋砼防洪堤的施工方法。
1998年长江流域、松花江、嫩江流域的特大洪水对生命财产造成了极大危害,其主要险段的溃堤、破堤损害严重,还有小形式的管涌等溃堤先兆出现,因此修建深基础、高标准的防洪堤,特别是在险要的江、河、湖段尤为重要。
本人曾设计出《冲切掘孔灌注桩成孔装置》(专利号95202022.x)和《可配置不同宽度铲斗的冲切掘孔灌注桩成孔装置》(专利申请号98235874.1),能冲切出长方形、方形等各种形状的孔,冲切效率高,可增加成孔侧摩阻面,提高桩基质量。
本发明的目的旨在提供一种利用现有的冲切掘孔灌注桩装置冲切掘孔,在孔内灌注钢筋混凝土成桩,形成深基础、高质量的防洪堤的施工方法。
本发明的目的是以下述方式实现的,灌注桩钢筋砼防洪堤的施工方法,在堤迎水面内冲切掘出长方形垂直深孔,向孔内下钢筋笼,灌注砼成主桩1,主桩与主桩紧密连接成堤。主桩内侧堤面内冲切掘孔、下钢筋笼,灌注砼成副桩2,副桩间断布设。主、副桩上端分别布系梁3、4,系梁3、4之间布横向系梁5,三梁分段整体灌注砼。
下面参照附图详述本发明。
图1防洪堤正视图。
图2防洪堤堤面俯视图。
图3防洪堤堤身横断面图。
参照附图,迎水面内主桩1长2m、宽0.6~0.8m,嵌入地面以下的深度为地面堤高的2~3倍,主桩连续形成防洪堤。具体施工方法是,先在主桩单号位置掘孔,成孔时间约4小时,孔内布钢筋笼、灌注砼,待砼达到强度后,再浇注双号主桩,使连续成堤。主桩内侧堤面内的副桩2长1.3m、宽0.5~0.6m,嵌入地面以下深度为地面堤高的1~1.5倍。每3根主桩浇注1根副桩。
主桩1上的系梁3高1.7m、宽0.6~0.8m,水平高度高出横向系梁1.2m。副桩2上的系梁4高0.5m、宽0.5~0.6m。系梁3、4之间有横向系梁5,横向系梁5高0.5m、宽0.5m。系梁、横向系梁20m一段整体浇注,以加固主、副梁上端的整体应力。
主副桩之间筑土为土堤6,内有土堤扩坡7。本方法可在旧堤上施工,可保留原堤迎水面的土堤护坡8。如新建堤,则不需护坡8。图中9为地面水平线。
地面堤高低于10M,只需用灌注桩1连续成堤,桩顶用系梁3加固,内侧用土堤、护坡6、7支撑。
本发明方法适宜在险要江、湖、河段防洪堤采用,所建造的防洪堤基础深、基脚可经受激流的冲刷,主桩钢筋砼堤堤身可经受风浪的冲击。
Claims (7)
1、灌注桩钢筋砼防洪堤的施工方法,其特征在于在堤迎水面内冲切掘出长方形垂直深孔,向孔内下钢筋笼,灌注砼成主桩(1),主桩与主桩紧密连接成堤,主桩内侧堤面内冲切掘孔、下钢筋笼,灌注砼成副桩(2),副桩间断布设,主、副桩上端分别布系梁(3)、(4),系梁(3)、(4)之间布横向系梁(5),三梁分段整体灌注砼。
2、根据权利要求1所述的施工方法,其特征在于主桩(1)施工方法为:先在主桩单号位置掘孔,布钢筋笼、灌注砼,待达到强度后,再浇注双号主桩。
3、根据权利要求2所述的施工方法,其特征在于主桩(1)长2m、宽0.6~0.8m,地面以下深度为地面堤高的2~3倍。
4、根据权利要求1所述的施工方法,其特征在于主桩(1)上的系梁(3)高1.7m、宽0.6~0.8m,水平高度高出横向系梁(5)1.2m。
5、根据权利要求1所述的施工方法,其特征在于每3根主桩(1)浇注1根副桩(2),副桩(2)长1.3m、宽0.5~0.6m,地面以下深度为地面高度的1~1.5倍。
6、根据权利要求1所述的施工方法,其特征在于副桩(2)上的系梁(4)高0.5m、宽0.5~0.6m。
7、根据权利要求4、6所述的施工方法,其特征在于横向系梁(5)高0.5m、宽0.5m,系梁、横向系梁20m一段整体浇注。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN98121623A CN1211658A (zh) | 1998-10-07 | 1998-10-07 | 灌注桩钢筋砼防洪堤的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN98121623A CN1211658A (zh) | 1998-10-07 | 1998-10-07 | 灌注桩钢筋砼防洪堤的施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN1211658A true CN1211658A (zh) | 1999-03-24 |
Family
ID=5227193
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN98121623A Pending CN1211658A (zh) | 1998-10-07 | 1998-10-07 | 灌注桩钢筋砼防洪堤的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1211658A (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101565931B (zh) * | 2009-05-27 | 2011-01-05 | 重庆市勘测院 | 钻孔灌注桩加固桥梁墩台结构及构造方法 |
CN105220649A (zh) * | 2015-09-09 | 2016-01-06 | 孟庆业 | T形灌注坝 |
CN105350500A (zh) * | 2015-11-06 | 2016-02-24 | 孟现坤 | 灌注闸 |
CN105421291A (zh) * | 2015-11-09 | 2016-03-23 | 孟现坤 | 不透水t形灌注坝及施工方法 |
CN105780725A (zh) * | 2016-05-18 | 2016-07-20 | 周进 | 一种水上建堤方法 |
CN105780726A (zh) * | 2016-05-18 | 2016-07-20 | 周进 | 一种砖及使用该砖在水上建堤的方法 |
-
1998
- 1998-10-07 CN CN98121623A patent/CN1211658A/zh active Pending
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101565931B (zh) * | 2009-05-27 | 2011-01-05 | 重庆市勘测院 | 钻孔灌注桩加固桥梁墩台结构及构造方法 |
CN105220649A (zh) * | 2015-09-09 | 2016-01-06 | 孟庆业 | T形灌注坝 |
CN105350500A (zh) * | 2015-11-06 | 2016-02-24 | 孟现坤 | 灌注闸 |
CN105421291A (zh) * | 2015-11-09 | 2016-03-23 | 孟现坤 | 不透水t形灌注坝及施工方法 |
CN105421291B (zh) * | 2015-11-09 | 2017-10-27 | 孟现坤 | 不透水t形灌注坝及施工方法 |
CN105780725A (zh) * | 2016-05-18 | 2016-07-20 | 周进 | 一种水上建堤方法 |
CN105780726A (zh) * | 2016-05-18 | 2016-07-20 | 周进 | 一种砖及使用该砖在水上建堤的方法 |
CN105780726B (zh) * | 2016-05-18 | 2018-10-23 | 周进 | 一种砖及使用该砖在水上建堤的方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5697736A (en) | Seawalls and shoreline reinforcement systems | |
US4666334A (en) | Erosion control system for bluffs located adjacent a body of water | |
CN108193642B (zh) | 一种驳岸加固设施及其施工方法 | |
CN102080364B (zh) | 桩承式沉箱海堤的施工方法 | |
CN201962644U (zh) | 桩承式沉箱海堤 | |
CN1211658A (zh) | 灌注桩钢筋砼防洪堤的施工方法 | |
JPH04504151A (ja) | 透水形防波堤 | |
JP3301739B2 (ja) | ケーソン式海洋構造物 | |
JPH0629495B2 (ja) | 大洋の浜を上げて広げる方法 | |
CN212506156U (zh) | 一种可快速施工的抗冲防护结构 | |
CN210887094U (zh) | 一种重力式码头升级结构 | |
CN109610407B (zh) | 一种基于自重平衡的防滑坡生态挡墙 | |
CN1380469A (zh) | 组合插板堤坝及建筑工艺 | |
CN109653223A (zh) | 河道抗浮压重板施工方法 | |
CN202181539U (zh) | 坝后设弃渣场的土石坝坝体渗流监测结构 | |
CN209989781U (zh) | 一种粉细砂地层防洪堤坝新型结构 | |
CN220414126U (zh) | 一种适用于水治理工程的埋石混凝土挡墙护岸 | |
JP6659489B2 (ja) | 防波構造物 | |
CN112267703A (zh) | 一种混合结构旧码头改扩建施工方法及结构 | |
CN1446988A (zh) | 水下钢筋混凝土构筑物的施工方法 | |
CN217203965U (zh) | 一种基于纵横拉杆和底支撑的整体式闸室结构 | |
CN212223757U (zh) | 水利工程防护河堤 | |
CN218952240U (zh) | 一种挡墙与路基排水沟的连通结构 | |
CN221142830U (zh) | 一种基坑底土层快速降水装置 | |
CN221236073U (zh) | 一种基坑施工用基础承托台 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
AD01 | Patent right deemed abandoned | ||
C20 | Patent right or utility model deemed to be abandoned or is abandoned |