CN119487264A - 用于在地面中形成基础桩的方法 - Google Patents

用于在地面中形成基础桩的方法 Download PDF

Info

Publication number
CN119487264A
CN119487264A CN202380048041.5A CN202380048041A CN119487264A CN 119487264 A CN119487264 A CN 119487264A CN 202380048041 A CN202380048041 A CN 202380048041A CN 119487264 A CN119487264 A CN 119487264A
Authority
CN
China
Prior art keywords
pile tube
steps
method comprises
pile
hardenable medium
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202380048041.5A
Other languages
English (en)
Chinese (zh)
Inventor
P·谢勒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bao'e Offshore Technology Co ltd
Original Assignee
Bauer Spezialtiefbau GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bauer Spezialtiefbau GmbH filed Critical Bauer Spezialtiefbau GmbH
Publication of CN119487264A publication Critical patent/CN119487264A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/40Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds in open water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/06Placing concrete under water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/08Sinking workpieces into water or soil inasmuch as not provided for elsewhere
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • E02D5/665Mould-pipes or other moulds for making piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0061Production methods for working underwater
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/28Placing of hollow pipes or mould pipes by means arranged inside the piles or pipes

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Piles And Underground Anchors (AREA)
  • Underground Or Underwater Handling Of Building Materials (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
CN202380048041.5A 2022-09-16 2023-07-13 用于在地面中形成基础桩的方法 Pending CN119487264A (zh)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
EP22196156.8A EP4339376B1 (de) 2022-09-16 2022-09-16 Verfahren zum bilden eines gründungspfahles im boden
EP22196156.8 2022-09-16
PCT/EP2023/069445 WO2024056237A1 (de) 2022-09-16 2023-07-13 Verfahren zum bilden eines gründungspfahles im boden

Publications (1)

Publication Number Publication Date
CN119487264A true CN119487264A (zh) 2025-02-18

Family

ID=83360952

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202380048041.5A Pending CN119487264A (zh) 2022-09-16 2023-07-13 用于在地面中形成基础桩的方法

Country Status (6)

Country Link
US (1) US20260015812A1 (https=)
EP (1) EP4339376B1 (https=)
JP (1) JP2025531655A (https=)
KR (1) KR20250069853A (https=)
CN (1) CN119487264A (https=)
WO (1) WO2024056237A1 (https=)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5712803B2 (https=) * 1973-08-17 1982-03-12
EP0151389B1 (de) * 1984-01-11 1990-07-25 Stump Bohr GmbH Verfahren und Vorrichtung zum Herstellen von Bauelementen im Baugrund, wie Pfählen, Injektionsankern, Schlitzwänden oder dergleichen
GB0719484D0 (en) 2007-10-05 2007-11-14 Aquamarine Power Ltd Underwater foundation
DK2650446T3 (da) * 2012-04-12 2014-09-22 Herrenknecht Ag Fremgangsmåde til fremstilling af et fundament til et offshore-anlæg
DK2930275T3 (en) 2014-04-08 2018-04-03 Herrenknecht Ag System and method for making a foundation for a building in water
EP4118269B1 (en) 2020-03-11 2023-12-27 Itrec B.V. Upending and lifting tool

Also Published As

Publication number Publication date
US20260015812A1 (en) 2026-01-15
EP4339376A1 (de) 2024-03-20
EP4339376C0 (de) 2025-09-03
WO2024056237A1 (de) 2024-03-21
JP2025531655A (ja) 2025-09-25
KR20250069853A (ko) 2025-05-20
EP4339376B1 (de) 2025-09-03

Similar Documents

Publication Publication Date Title
US7390144B2 (en) Pre-cast/pre-stressed concrete and steel pile and method for installation
NO313340B1 (no) Fremgangsmåte for å pæle lederør ned i en vannbunn
JP7637135B2 (ja) グラウチング方法
KR102105422B1 (ko) 반력스프링이 내설된 복동식 유압잭을 이용한 말뚝 선단 재하시험장치
CN110644487A (zh) 一种基于箱筒式稳桩平台的施工方法
CN119487264A (zh) 用于在地面中形成基础桩的方法
JP6586213B2 (ja) ジャケット構造体の構築方法
US3091937A (en) Underwater foundation structure and method therefor
US12480271B2 (en) Handling device and method for gripping and inserting a pile tube into a borehole
JP4562927B2 (ja) 作業船における荷重試験方法
CN119137328A (zh) 用于形成基桩的桩管和方法
CN117188477A (zh) 一种ykp工法灌注桩施工方法及制作的灌注桩
JP4467948B2 (ja) 掘削方法
CN108005079B (zh) 植入式预制桩注浆装置和植入式注浆工艺
EP0499737B1 (en) Installation of conductors for offshore well platforms
FI131653B1 (fi) Haspeli kollektoria varten ja menetelmä kollektorin asentamiseksi
JP6568875B2 (ja) 管状基礎部材、組立体、及び、管状基礎部材の地盤内への設置方法
WO2007075035A1 (en) Blaster and blasting a method of underwater base rock
JP2025531655A5 (https=)
EP4726106A1 (en) Buried object removal method, contaminated ground containment method, and buried object removal system
CN117722155A (zh) 一种隔膜泵同径套管固井工艺方法
JPH0748819A (ja) 水中構造物の構築方法
JPH05106387A (ja) 坑井コンダクターの据え付け方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20250415

Address after: German Skei Roben Hallson

Applicant after: Bao'e Offshore Technology Co.,Ltd.

Country or region after: Germany

Address before: German Skei Roben Hallson

Applicant before: Bauer Spezialtiefbau GmbH

Country or region before: Germany

WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20250218