CN116384946A - Method and system for project field management based on mobile terminal program - Google Patents

Method and system for project field management based on mobile terminal program Download PDF

Info

Publication number
CN116384946A
CN116384946A CN202310632007.4A CN202310632007A CN116384946A CN 116384946 A CN116384946 A CN 116384946A CN 202310632007 A CN202310632007 A CN 202310632007A CN 116384946 A CN116384946 A CN 116384946A
Authority
CN
China
Prior art keywords
information
project
site
risk
attendance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310632007.4A
Other languages
Chinese (zh)
Inventor
侯勇
李家华
武警
夏立伟
杨彪
黄黎明
林宁
万浩然
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC FHDI Engineering Co Ltd
Original Assignee
CCCC FHDI Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC FHDI Engineering Co Ltd filed Critical CCCC FHDI Engineering Co Ltd
Priority to CN202310632007.4A priority Critical patent/CN116384946A/en
Publication of CN116384946A publication Critical patent/CN116384946A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F21/00Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F21/30Authentication, i.e. establishing the identity or authorisation of security principals
    • G06F21/31User authentication
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F21/00Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F21/30Authentication, i.e. establishing the identity or authorisation of security principals
    • G06F21/31User authentication
    • G06F21/32User authentication using biometric data, e.g. fingerprints, iris scans or voiceprints
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/109Time management, e.g. calendars, reminders, meetings or time accounting
    • G06Q10/1091Recording time for administrative or management purposes

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Computer Security & Cryptography (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Data Mining & Analysis (AREA)
  • Computer Hardware Design (AREA)
  • Software Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a method and a system for project field management based on a mobile terminal program, wherein the method comprises the following steps: carrying out project field management through different operation authorities by adopting a hierarchical management method; acquiring real-time site position information and current time information of the sub-account, and managing and inquiring attendance conditions of the sub-account; according to different retrieval types, retrieval keywords and different operation authorities and operation types, retrieving related item information and files or uploading item files, and previewing the retrieved related item information and files on line; the project site picture information is collected and uploaded in real time, so that the project site conditions are managed, the project site safety wind control information is issued, and the basic conditions of the project site are monitored and inspected remotely; according to different flows Cheng Moban, different flows are issued, the work execution steps of the project are remotely arranged, and various administrative flow information and notification information are issued at the same time, so that the efficiency and the instantaneity of project field management are improved.

Description

Method and system for project field management based on mobile terminal program
Technical Field
The invention relates to the technical field of project engineering management, in particular to a method and a system for project management based on a mobile terminal program.
Background
In the rapid age background of technological development, information transmission technology and Internet of things technology are rapidly developed, and in the background, compared with the information transmission mode of the prior age background, the information transmission is performed through a network, so that the information transmission speed is high, and meanwhile, the requirement on the space position is low. When carrying out project field management, how to solve the problem that important files of projects can be carried about and checked at any time, and meanwhile, informing all workers of project field information and matters at the first time is an important problem.
Because the information is often time-efficient, the important problem of the project site can be solved more rapidly only by notifying workers in a very short time, so that the important information of the project site can be transmitted at the first time and the first place by combining the network information transmission technology with the Internet of things technology, the workers can know the project site information conveniently, and better management and project construction are facilitated.
Disclosure of Invention
The invention overcomes the defects of the prior art, and provides a method and a system for project field management based on a mobile terminal program, which mainly aim at improving the efficiency and convenience of project management.
To achieve the above object, a first aspect of the present invention provides a method for performing project management based on a mobile terminal program, including:
setting three operation authorities of a decision layer, a management layer and an implementation layer by adopting a hierarchical management method, and carrying out project field management through different operation authorities;
acquiring real-time field position information and current time information of a sub-account, and managing and inquiring attendance conditions of the sub-account according to the acquired space distance between the real-time field position information and preset position information;
according to different retrieval types, retrieval keywords and different operation authorities and operation types, retrieving related item information and files or uploading item files, and previewing the retrieved related item information and files on line;
the project site picture information is collected and uploaded in real time, so that the project site conditions are managed, the project site safety wind control information is issued, and the condition of the project site is monitored and inspected remotely;
according to different flows Cheng Moban, issuing different flows, remotely arranging the work execution steps of the project, and simultaneously issuing various administrative flow information and notification information;
in this scheme, the hierarchical management method is adopted, three operation authorities of a decision layer, a management layer and an implementation layer are set, and project field management is performed through different operation authorities, specifically:
giving authority to each sub-account implementation layer, having operation authority to use all basic functions, and giving higher operation authority to each sub-account through a management platform webpage end;
the implementation layer authority comprises the use authority of the basic function, the management layer authority comprises the daily information of the management platform, the basic function and the authority for inputting various information, and the decision layer authority comprises the use authority and the approval flow of the basic function, the auditing risk correction progress and the authority for checking attendance information;
the hierarchical and layered management project field information is formed by reporting project field information by an implementation layer, managing daily information input by a management layer, maintaining basic functions, approving and checking various information by a decision layer.
In this scheme, the real-time on-site location information and the current time information of the sub-account are obtained, and the attendance status of the sub-account is managed and queried according to the obtained spatial distance between the real-time on-site location information and the preset location information, specifically:
an attendance model is built, and the attendance condition of a user is judged through the obtained real-time on-site position information and the current time information of the sub-account;
calculating according to the spatial distance between the acquired real-time position information and the preset position information and the distance between the preset attendance range to obtain the attendance condition of the user;
comparing the obtained current time information with preset attendance time to judge whether the attendance of the user is delayed or not;
and classifying all attendance data of different sub-accounts by adopting a clustering algorithm to obtain an attendance information summary table of the different sub-accounts, wherein the attendance information summary table is used for managing and inquiring attendance conditions of users.
In this solution, according to different search types, search keywords, and different operation authorities and operation types, the related item information and files are searched or uploaded, and the searched related item information and files are previewed online, specifically:
establishing a data storage library, and storing various project file information, project progress information, project flow information, account information, attendance information, facial image characteristic information of a prisoner, facial characteristic information of a labor worker and project risk management and control information;
and matching and searching the project files containing the corresponding keywords according to the input different query keywords, and automatically transmitting the uploaded project files to the corresponding category folders according to the category information of the uploaded project files.
In this scheme, through the project scene picture information that gathers and upload in real time, manage project scene situation and release project scene safety wind control information, the remote monitoring and the condition of inspection project scene specifically do:
acquiring project site picture information through a mobile terminal, and publishing or reporting project site conditions;
according to the risk information of the project site, issuing a safety wind control early warning modification, combining picture information, risk level information, position information of risks, risk concrete description information and limiting modification period information of the project site to issue a risk modification list, and early warning the risk of the project site;
and carrying out risk modification on the project site according to the issued risk modification list, issuing modification execution information, checking and accepting the modified risk area, issuing checking and accepting result information, and checking the risk modification progress and result through the checking and accepting result information by a decision layer.
In this scheme, carry out the risk to the project scene according to the risk of release and reform the list to the record is reformed and is carried out the information, carries out the acceptance to the risk area after reforming, release acceptance result information, and decision-making layer is through acceptance result information audit risk reform progress and result, still includes:
the face recognition model is established and used for opening the authority of the sub-account decision-making layer, so that the supervision personnel can conveniently record and audit the risk situation or the correction situation of the project site in real time;
auditing and supervising the project site risk area by adopting a remote monitoring or site monitoring mode;
and extracting characteristic information of the collected face image information of the on-site supervision personnel through the collected face image information of the on-site supervision personnel, comparing the characteristic information with the face image characteristic information of the supervision personnel which is pre-recorded in a storage database, and judging whether to open decision layer authority to the current sub-account.
In this scheme, the issuing of different flows according to different flows Cheng Moban remotely schedules the work execution steps of the project, and issues various administrative flow information and notification information at the same time, specifically:
remotely arranging the work execution steps of the project by issuing a flow of the work step of the project on site;
the various administrative flow information published include: holiday application, tune-away application, and emergency instruction application;
by issuing a notification flow, a person responsible for project site supervision or enforcing a project of personnel is notified of the event or workflow step flow.
The second aspect of the present invention provides a system for project field management based on a mobile terminal program, comprising:
the login and attendance module is divided into a login unit and an attendance unit, wherein the login unit inputs an account number and a password to login, directly enters a home page interface, inputs a mobile phone number to login and jumps to the attendance unit, and performs attendance card punching;
the flow distribution module: according to different flows Cheng Moban, different administrative flow information, project work execution step information and notification information are published;
a document management module: the method is used for viewing and uploading project related files in real time, and previewing the related files on line through keyword retrieval or category retrieval;
quality and safety module: the method is used for issuing risk early warning of project sites, issuing a risk modification list and managing quality and safety problems of projects according to three flow steps of modification, acceptance and approval;
the notification announcement module: and displaying project progress information, flow progress information, risk early warning correction progress information and published information related to the project.
The invention discloses a method and a system for project field management based on a mobile terminal program, wherein the method comprises the following steps: carrying out project field management through different operation authorities by adopting a hierarchical management method; acquiring real-time site position information and current time information of the sub-account, and managing and inquiring attendance conditions of the sub-account; according to different retrieval types, retrieval keywords and different operation authorities and operation types, retrieving related item information and files or uploading item files, and previewing the retrieved related item information and files on line; the project site picture information is collected and uploaded in real time, so that the project site conditions are managed, the project site safety wind control information is issued, and the condition of the project site is monitored and inspected remotely; according to different flows Cheng Moban, different flows are issued, the work execution steps of the project are remotely arranged, and various administrative flow information and notification information are issued at the same time, so that the efficiency and the instantaneity of project field management are improved.
Drawings
In order to more clearly illustrate the technical solutions of embodiments or examples of the present invention, the drawings that are required to be used in the embodiments or examples of the present invention will be briefly described below, and it is apparent that the drawings in the following description are only some embodiments of the present invention, and other drawings may be obtained according to the drawings without inventive efforts for those skilled in the art.
FIG. 1 is a flowchart of a method for project field management based on a mobile terminal program according to an embodiment of the present invention;
FIG. 2 is a flow chart of publishing and auditing project site information provided by an embodiment of the present invention;
FIG. 3 is a block diagram of a system for project field management based on a mobile terminal program according to an embodiment of the present invention;
the achievement of the objects, functional features and advantages of the present invention will be further described with reference to the accompanying drawings, in conjunction with the embodiments.
Detailed Description
In order that the above-recited objects, features and advantages of the present invention will be more clearly understood, a more particular description of the invention will be rendered by reference to the appended drawings and appended detailed description. It should be noted that, in the case of no conflict, the embodiments of the present application and the features in the embodiments may be combined with each other.
In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention, however, the present invention may be practiced in other ways than those described herein, and therefore the scope of the present invention is not limited to the specific embodiments disclosed below.
FIG. 1 is a flowchart of a method for project field management based on a mobile terminal program according to an embodiment of the present invention;
as shown in fig. 1, the present invention provides a method for performing project field management based on a mobile terminal program, which includes:
s102, setting three operation authorities of a decision layer, a management layer and an implementation layer by adopting a hierarchical management method, and carrying out project field management through different operation authorities;
the implementation layer authority comprises the use authority of the basic function, the management layer authority comprises the daily information of the management platform, the basic function and the authority for inputting various information, and the decision layer authority comprises the use authority and the approval flow of the basic function, the auditing risk correction progress and the authority for checking attendance information;
the field information of the hierarchical and layered management project is formed by reporting the field information of the project through an implementation layer, managing the input of daily information and the maintenance of basic functions through a management layer, approving and checking various information through a decision layer
Further, three different usage rights are set to correspond to three different usage functions, and the common sub-account has implementation layer rights as follows: attendance checking, card punching, file searching and checking, file transmission, flow publishing, project site information reporting personal information editing and account password modification;
furthermore, the decision layer authority also has important file retrieval and viewing authority, file encryption authority, flow auditing authority, attendance information viewing authority, project risk correction bill release and auditing authority on the basis of the implementation layer authority;
furthermore, the authority of the management layer has all the authorities of the implementation layer and the decision layer, and further has the authority of the attendance information file export, the authority of the sub-account high-level authority and the account information cancellation authority on the basis;
s104, acquiring real-time field position information and current time information of the sub-account, and managing and inquiring attendance conditions of the sub-account according to the acquired spatial distance between the real-time field position information and preset position information;
an attendance model is built, and the attendance condition of a user is judged through the obtained real-time on-site position information and the current time information of the sub-account;
calculating according to the spatial distance between the acquired real-time position information and the preset position information and the distance between the preset attendance range to obtain the attendance condition of the user;
comparing the obtained current time information with preset attendance time to judge whether the attendance of the user is delayed or not;
classifying all attendance data of different sub-accounts by adopting a clustering algorithm to obtain attendance information summary tables of the different sub-accounts, wherein the attendance information summary tables are used for managing and inquiring attendance conditions of users;
further, the attendance information is divided into two categories of on-time attendance and attendance delay by adopting a clustering algorithm, and the attendance information of each sub-account is summarized to obtain an attendance information table of each sub-account, so that the attendance information of a user can be managed and inquired conveniently;
s106, searching related item information and files or uploading item files according to different search types, search keywords and different operation authorities and operation types, and previewing the searched related item information and files on line;
establishing a data storage library, and storing various project file information, project progress information, project flow information, account information, attendance information, facial image characteristic information of a prisoner, facial characteristic information of a labor worker and project risk management and control information;
according to the input different inquiry keywords, matching and searching the project files containing the corresponding keywords, and automatically transmitting the uploaded project files to the corresponding category folders according to the category information of the uploaded project files;
furthermore, the files which can be checked or retrieved by different authorities are different, the operation authorities of uploading project files by different authorities are also different, the authority of an implementation layer can only retrieve and check common files which are not encrypted, the project files can not be selected for encryption transmission while being uploaded, the authority of a decision layer can check and retrieve all files including the encrypted files, and meanwhile, important files can be selected for encryption transmission when the files are transmitted, so that the checking and retrieving can be selectively limited to prevent the files from being leaked;
furthermore, the authority of the management layer comprises all the authorities of the decision layer and the implementation layer, can also create file classification, can distinguish more file types, can also transmit files in a mode of encrypting the files during transmitting the files, and can also manage the clearing of file information.
S108, managing project site conditions and issuing project site safety wind control information through real-time acquisition and uploading of project site picture information, and remotely monitoring and inspecting the condition of the project site;
acquiring project site picture information through a mobile terminal, and publishing or reporting project site conditions;
according to the risk information of the project site, issuing a safety wind control early warning modification, combining picture information, risk level information, position information of risks, risk concrete description information and limiting modification period information of the project site to issue a risk modification list, and early warning the risk of the project site;
performing risk modification on the project site according to the issued risk modification list, issuing modification execution information, checking and accepting the modified risk area, issuing checking and accepting result information, and checking the risk modification progress and result through the checking and accepting result information by a decision layer;
further, the method comprises the steps of performing risk modification on a project site according to the issued risk modification list, issuing modification execution information, checking and accepting the modified risk area, issuing checking and accepting result information, and checking the risk modification progress and result through the checking and accepting result information by a decision layer, wherein the method further comprises the steps of establishing a face recognition model for starting the authority of a sub-account decision layer, so that a supervisor can conveniently record and check the risk condition or modification condition of the project site in real time; auditing and supervising the project site risk area by adopting a remote monitoring or site monitoring mode; and extracting characteristic information of the collected face image information of the on-site supervision personnel through the collected face image information of the on-site supervision personnel, comparing the characteristic information with the face image characteristic information of the supervision personnel which is pre-recorded in a storage database, and judging whether to open decision layer authority to the current sub-account.
Further, acquiring video stream data of the project site to obtain project site object accumulation information, project site potential threat information and project site accident information; building an early warning model, and identifying the item stacking information, the item site potential threat information and the item site accident information to obtain item stacking duration early warning information, potential threat early warning information and accident early warning information; the real-time position information and the real-time face image information of the labor staff are acquired, the labor staff positioned near the early warning area are identified and calculated, and the early warning information is sent in real time to the labor staff positioned near the early warning area; and calculating and evaluating the severity of the potential threat event or the scene accident through the potential threat early warning information or the accident early warning information, calculating the labor staff positioned closest to the early warning area or in the early warning area according to the acquired real-time position information and the real-time face image information of the labor staff, and sending a real-time refuge message or an emergency rescue message.
S110, issuing different flows according to different flows Cheng Moban, remotely arranging work execution steps of projects, and issuing various administrative flow information and notification information;
remotely arranging the work execution steps of the project by issuing a flow of the work step of the project on site;
the various administrative flow information published include: holiday application, tune-away application, and emergency instruction application;
by issuing a notification flow, a person responsible for project site supervision or enforcing a project of personnel is notified of the event or workflow step flow.
It should be noted that, by giving different usage rights to the sub-account, real-time publishing project site information according to different functions, and implementing to view related files on the project site at any time through a file retrieval function, so as to be convenient for knowing basic information of the project in real time, and when transmitting related files, encryption transmission is optionally adopted to avoid leakage of important files of the project, and for quality problems or security risk problems found on the project site, related departments are notified to carry out rectification through real-time publishing risk rectification units, and quality problems or security risk problems of the project are examined and approved according to the result of rectification and acceptance; through timely project site information transmission, various conditions of a project site can be rapidly known, remote monitoring is realized, and efficiency and convenience of project management are improved.
The method is characterized in that labor staff is pre-warned through obtained project site object stacking time pre-warning information, so that the phenomenon that transportation roads and material losses are blocked due to overlong stacking time is avoided; early warning is carried out on labor staff through the obtained project site potential threat information, so that economic loss and safety accidents caused by the occurrence of potential threats are avoided; the accident early warning information is used for early warning staff around the accident, the accident occurrence place and the severity of the accident are notified at the first time, the serious accident is convenient to deal with at the first time, and meanwhile, the follow-up accident is prevented from affecting the life safety of the staff around the accident.
FIG. 2 is a flow chart of publishing and auditing project site information provided by an embodiment of the present invention;
as shown in FIG. 2, the present invention provides a flow chart for publishing and auditing project site information, comprising:
s202, selecting an operation type;
further, the optional operation types include flow release and audit, and risk modification order release and audit.
S204, performing face recognition to judge whether the person is a supervisor;
further, acquiring real-time face image information, preprocessing the face information, extracting the acquired real-time face image feature information, carrying out phase velocity calculation on the extracted real-time face image feature information in the facial image feature information of the supervision personnel stored in the storage database, and judging whether the acquired real-time face image information is the supervision personnel or not to obtain judging result information.
S206, giving corresponding permission according to the judging result information;
s208, publishing or auditing project site information;
it should be noted that, through face identification of the user identity using the account, misinformation release and project important information leakage caused by misuse authority are avoided, meanwhile, whether the user has authority is confirmed through identity identification, the phenomenon that approval passes without acceptance modification is avoided, the strictness of the approval process is ensured, project important information leakage is avoided, and the safety of project field management is greatly improved.
FIG. 3 is a block diagram of a system for project field management based on a mobile terminal program according to an embodiment of the present invention;
as shown in fig. 3, the present invention provides a structure diagram of a project field management system based on a mobile terminal program, including:
the login and attendance module is divided into a login unit and an attendance unit, wherein the login unit inputs an account number and a password to login, directly enters a home page interface, inputs a mobile phone number to login and jumps to the attendance unit, and performs attendance card punching;
furthermore, the attendance checking unit is used for providing the work personnel related to the project with the card punching on the work and the work, the card punching of the unit is divided into three time periods, namely, the morning, the afternoon and the evening, and each time period is provided with two buttons which respectively correspond to the card punching on the work and the card punching on the work. In each time period, if the working card is not punched, the working card cannot be punched, after the working staff successfully punched in a certain time period, the working staff can display that the working staff has punched the card, if the current time exceeds the card punching time, and the working staff does not punch the card yet, the working staff can display that the working staff cannot punch the card any more in the card punching time. After the card is punched, the user jumps to a card punching result page to display whether the card punching is successful or not, and if the person does not enter the job temporarily, the user can display the card punching failure and prompt the card punching person to enter the job temporarily.
The flow distribution module: according to different flows Cheng Moban, different administrative flow information, project work execution step information and notification information are published;
further, the work execution step of the project is remotely arranged through the flow of the work step of the project on-site execution; the various administrative flow information published include: holiday application, tune-away application, and emergency instruction application; by issuing a notification flow, emergency matters or work step flows responsible for project site supervisors or enforcer projects are notified.
A document management module: the method is used for viewing and uploading project related files in real time, and previewing the related files on line through keyword retrieval or category retrieval;
further, searching the files or file categories containing the search keywords in the storage database through the input search keywords, extracting the files containing the search keywords, transmitting file data information to the mobile terminal, and performing online previewing; and searching files containing the search labels of the category search operation in a storage database through the category search operation, extracting all files containing the search labels of the category search operation, transmitting file data information to a mobile terminal, and performing online previewing.
Quality and safety module: the method is used for issuing risk early warning of project sites, issuing a risk modification list and managing quality and safety problems of projects according to three flow steps of modification, acceptance and approval;
further, the supervision personnel collect relevant information on site for the safety risk and engineering quality problems occurring on the project site, and issue a risk modification list through the quality and safety module according to the collected risk information or engineering quality information, notify modification and update modification state in real time; after the correction is completed, the acceptance personnel carry out acceptance in the risk area, and release acceptance result information according to the acceptance result; and the decision layer remotely approves and monitors the progress of the rectification through rectification and acceptance result information.
The notification announcement module: and displaying project progress information, flow progress information, risk early warning correction progress information and published information related to the project.
The method is characterized in that a using platform is built based on B/S and C/S technologies, and the using platform comprises a mobile terminal using platform and a webpage terminal using platform; the mobile terminal using platform is used for remotely managing the project and reporting the working progress on site, and has an attendance function and a project related file searching and transmitting function; the webpage end platform is used for managing the authority of each sub account number, maintaining the stability of the platform, inputting, exporting and viewing various information; and meanwhile, the mobile terminal and the webpage terminal display the summary and the progress of each function entry, the latest project and the collection project by using the home page interface of the platform.
It should be noted that, the mobile terminal platform may be built by integrating the system program into a WeChat applet or a mobile device application program.
In the several embodiments provided in this application, it should be understood that the disclosed apparatus and method may be implemented in other ways. The above described device embodiments are only illustrative, e.g. the division of the units is only one logical function division, and there may be other divisions in practice, such as: multiple units or components may be combined or may be integrated into another system, or some features may be omitted, or not performed. In addition, the various components shown or discussed may be coupled or directly coupled or communicatively coupled to each other via some interface, whether indirectly coupled or communicatively coupled to devices or units, whether electrically, mechanically, or otherwise.
The units described above as separate components may or may not be physically separate, and components shown as units may or may not be physical units; can be located in one place or distributed to a plurality of network units; some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
In addition, each functional unit in each embodiment of the present invention may be integrated in one processing unit, or each unit may be separately used as one unit, or two or more units may be integrated in one unit; the integrated units may be implemented in hardware or in hardware plus software functional units.
Those of ordinary skill in the art will appreciate that: all or part of the steps for implementing the above method embodiments may be implemented by hardware related to program instructions, and the foregoing program may be stored in a computer readable storage medium, where the program, when executed, performs steps including the above method embodiments; and the aforementioned storage medium includes: a mobile storage device, a Read-Only Memory (ROM), a random access Memory (RAM, random Access Memory), a magnetic disk or an optical disk, or the like, which can store program codes.
Alternatively, the above-described integrated units of the present invention may be stored in a computer-readable storage medium if implemented in the form of software functional modules and sold or used as separate products. Based on such understanding, the technical solutions of the embodiments of the present invention may be embodied in essence or a part contributing to the prior art in the form of a software product stored in a storage medium, including several instructions for causing a computer device (which may be a personal computer, a server, or a network device, etc.) to execute all or part of the methods described in the embodiments of the present invention. And the aforementioned storage medium includes: a removable storage device, ROM, RAM, magnetic or optical disk, or other medium capable of storing program code.
The foregoing is merely illustrative of the present invention, and the present invention is not limited thereto, and any person skilled in the art will readily recognize that variations or substitutions are within the scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (10)

1. A method for project site management based on a mobile terminal program, comprising:
setting three operation authorities of a decision layer, a management layer and an implementation layer by adopting a hierarchical management method, and carrying out project field management through different operation authorities;
acquiring real-time field position information and current time information of a sub-account, and managing and inquiring attendance conditions of the sub-account according to the acquired space distance between the real-time field position information and preset position information;
according to different retrieval types, retrieval keywords and different operation authorities and operation types, retrieving related item information and files or uploading item files, and previewing the retrieved related item information and files on line;
the project site picture information is collected and uploaded in real time, so that the project site conditions are managed, the project site safety wind control information is issued, and the condition of the project site is monitored and inspected remotely;
the work execution step of the project is remotely arranged according to different flows Cheng Moban, and various administrative flow information and notification information are simultaneously issued.
2. The method for project field management based on mobile terminal program according to claim 1, wherein the method for project field management based on mobile terminal program is characterized by adopting a hierarchical management method, setting three operation authorities of a decision layer, a management layer and an implementation layer, and performing project field management through different operation authorities, and specifically comprises the following steps:
giving authority to each sub-account implementation layer, having operation authority to use all basic functions, and giving higher operation authority to each sub-account through a management platform webpage end;
the implementation layer authority comprises the use authority of the basic function, the management layer authority comprises the daily information of the management platform, the basic function and the authority for inputting various information, and the decision layer authority comprises the use authority and the approval flow of the basic function, the auditing risk correction progress and the authority for checking attendance information;
the hierarchical and layered management project field information is formed by reporting project field information by an implementation layer, managing daily information input by a management layer, maintaining basic functions, approving and checking various information by a decision layer.
3. The method for performing project field management based on a mobile terminal program according to claim 1, wherein the acquiring the real-time field location information and the current time information of the sub-account number, and managing and querying the attendance status of the user according to the acquired spatial distance between the real-time field location information and the preset location information, specifically comprises:
an attendance model is built, and the attendance condition of a user is judged through the obtained real-time on-site position information and the current time information of the sub-account;
calculating according to the spatial distance between the acquired real-time position information and the preset position information and the distance between the preset attendance range to obtain the attendance condition of the user;
comparing the obtained current time information with preset attendance time to judge whether the attendance of the user is delayed or not;
and classifying all attendance data of different sub-accounts by adopting a clustering algorithm to obtain an attendance information summary table of the different sub-accounts, wherein the attendance information summary table is used for managing and inquiring attendance conditions of users.
4. The method for performing project field management based on a mobile terminal program according to claim 1, wherein the steps of searching related project information and files or uploading project files according to different search types, search keywords and different operation authorities and operation types, and previewing the searched related project information and files on line specifically include:
establishing a data storage library, and storing various project file information, project progress information, project flow information, account information, attendance information, facial image characteristic information of a prisoner, facial characteristic information of a labor worker and project risk management and control information;
and matching and searching the project files containing the corresponding keywords according to the input different query keywords, and automatically transmitting the uploaded project files to the corresponding category folders according to the category information of the uploaded project files.
5. The method for project site management based on mobile terminal program according to claim 1, wherein the project site condition management and project site safety wind control information release are performed by collecting and uploading project site picture information in real time, and the project site condition remote monitoring and examination are performed specifically comprises:
acquiring project site picture information through a mobile terminal, and publishing or reporting project site conditions;
according to the risk information of the project site, issuing a safety wind control early warning modification, combining picture information, risk level information, position information of risks, risk concrete description information and limiting modification period information of the project site to issue a risk modification list, and early warning the risk of the project site;
and carrying out risk modification on the project site according to the issued risk modification list, issuing modification execution information, checking and accepting the modified risk area, issuing checking and accepting result information, and checking the risk modification progress and result through the checking and accepting result information by a decision layer.
6. The method for project field management based on a mobile terminal program according to claim 5, wherein the method comprises performing risk modification on the project field according to the issued risk modification list, issuing modification execution information, checking and accepting the modified risk area, issuing checking and accepting result information, and checking the progress and result of the risk modification by the decision layer through the checking and accepting result information, and further comprising:
the face recognition model is established and used for opening the authority of the sub-account decision-making layer, so that the supervision personnel can conveniently record and audit the risk situation or the correction situation of the project site in real time;
auditing and supervising the project site risk area by adopting a remote monitoring or site monitoring mode;
and extracting characteristic information of the collected face image information of the on-site supervision personnel through the collected face image information of the on-site supervision personnel, comparing the characteristic information with the face image characteristic information of the supervision personnel which is pre-recorded in a storage database, and judging whether to open decision layer authority to the current sub-account.
7. The method for project field management based on mobile terminal program according to claim 1, wherein said issuing different flows according to different flows Cheng Moban remotely schedules the project work execution step, and simultaneously issues various administrative flow information and notification information, specifically comprising:
remotely arranging the work execution steps of the project by issuing a flow of the work step of the project on site;
the various administrative flow information published include: holiday application, tune-away application, and emergency instruction application;
by issuing a notification flow, a person responsible for project site supervision or enforcing a project of personnel is notified of the event or workflow step flow.
8. A mobile-side-program-based project site management system, comprising:
the login and attendance module is divided into a login unit and an attendance unit, wherein the login unit inputs an account number and a password to login, directly enters a home page interface, inputs a mobile phone number to login and jumps to the attendance unit, and performs attendance card punching;
the flow distribution module: according to different flows Cheng Moban, different administrative flow information, project work execution step information and notification information are published;
a document management module: the method is used for viewing and uploading project related files in real time, and previewing the related files on line through keyword retrieval or category retrieval;
quality and safety module: the method is used for issuing risk early warning of project sites, issuing a risk modification list and managing quality and safety problems of projects according to three flow steps of modification, acceptance and approval;
the notification announcement module: and displaying project progress information, flow progress information, risk early warning correction progress information and published information related to the project.
9. The mobile-side-program-based project site management system of claim 8, further comprising a document management module:
searching the files or file categories containing the search keywords in the storage database through the input search keywords, extracting the files containing the search keywords, transmitting file data information to a mobile terminal, and performing online previewing;
and searching files containing the search labels of the category search operation in a storage database through the category search operation, extracting all files containing the search labels of the category search operation, transmitting file data information to a mobile terminal, and performing online previewing.
10. The mobile-side-program-based project site management system of claim 8, further comprising a quality and security module:
the supervision personnel collect relevant information on the spot of the safety risk and engineering quality problems occurring on the project site, issue a risk correction bill through the quality and safety module according to the collected risk information or engineering quality information, notify correction and update the correction state in real time;
after the correction is completed, the acceptance personnel carry out acceptance in the risk area, and release acceptance result information according to the acceptance result;
and the decision layer remotely approves and monitors the progress of the rectification through rectification and acceptance result information.
CN202310632007.4A 2023-05-31 2023-05-31 Method and system for project field management based on mobile terminal program Pending CN116384946A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310632007.4A CN116384946A (en) 2023-05-31 2023-05-31 Method and system for project field management based on mobile terminal program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310632007.4A CN116384946A (en) 2023-05-31 2023-05-31 Method and system for project field management based on mobile terminal program

Publications (1)

Publication Number Publication Date
CN116384946A true CN116384946A (en) 2023-07-04

Family

ID=86979073

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310632007.4A Pending CN116384946A (en) 2023-05-31 2023-05-31 Method and system for project field management based on mobile terminal program

Country Status (1)

Country Link
CN (1) CN116384946A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109636312A (en) * 2018-11-15 2019-04-16 武汉市国土资源和规划信息中心 Land control engineering online monitoring and management system
CN112184186A (en) * 2020-10-28 2021-01-05 湖北省水利水电规划勘测设计院 Hydraulic engineering general contract project field information management system and method
CN112508417A (en) * 2020-12-11 2021-03-16 民航中南机场设计研究院(广州)有限公司 Civil aviation professional engineering general contract project management system based on BIM technology
CN113780841A (en) * 2021-09-15 2021-12-10 铁科院(北京)工程咨询有限公司 Railway engineering multi-terminal collaborative interactive supervision system based on multi-information set
CN114493131A (en) * 2021-12-28 2022-05-13 广东宏茂建设管理有限公司 Supervision cloud system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109636312A (en) * 2018-11-15 2019-04-16 武汉市国土资源和规划信息中心 Land control engineering online monitoring and management system
CN112184186A (en) * 2020-10-28 2021-01-05 湖北省水利水电规划勘测设计院 Hydraulic engineering general contract project field information management system and method
CN112508417A (en) * 2020-12-11 2021-03-16 民航中南机场设计研究院(广州)有限公司 Civil aviation professional engineering general contract project management system based on BIM technology
CN113780841A (en) * 2021-09-15 2021-12-10 铁科院(北京)工程咨询有限公司 Railway engineering multi-terminal collaborative interactive supervision system based on multi-information set
CN114493131A (en) * 2021-12-28 2022-05-13 广东宏茂建设管理有限公司 Supervision cloud system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
邵成成 等: "《社交大数据挖掘 社交机器账户作用分析》", 华中科学技术大学出版社, pages: 296 - 298 *

Similar Documents

Publication Publication Date Title
CN106022649B (en) Project supervision, cost, bid, the total management system of consulting
CN113450065B (en) Production operation management system and method for wind power plant
CN109271938A (en) A kind of gas station's emptying Safety Monitoring Control method based on intelligent video analysis technology
CN111738568A (en) Artificial intelligence risk management and control system based on scene recognition drive
CN106530169A (en) City event processing method and device
CN103274272A (en) Elevator integrated management system and elevator integrated management method
CN101587576A (en) Public inquiring and supervising system of public security cases
CN103617360A (en) Early-warning event processing method and device
CN106331633A (en) Method and system for displaying and quickly accessing a variety of monitoring resources
CN114548656B (en) Safe emergency management commanding and dispatching system
CN113191730B (en) Dangerous chemical full life cycle information supervision system based on big data
CN115130807A (en) Intelligent supervision method for pharmaceutical production safety
CN108734201B (en) Classification method and system for experience feedback events of nuclear power plant based on hierarchical reason analysis method
CN107693997B (en) Fire fighting equipment detection and maintenance management system and management method
CN116957341A (en) Intelligent safety risk management and control system based on steel mill
CN112633695A (en) Intelligent safety management system
CN115239144A (en) Dual prevention mechanism information system based on regional risk management
CN114299686A (en) Chemical enterprise safety management method, device, equipment and storage medium
CN207070219U (en) Projects supervision system based on video monitoring
CN116384946A (en) Method and system for project field management based on mobile terminal program
KR20060058186A (en) Information technology risk management system and method the same
CN113487146A (en) Mine safety operation control method and device, electronic equipment and storage medium
CN109377183A (en) Coalmine Safety Supervision intelligence enforcement system
CN113869758A (en) Intelligent two-ticket management and operation site risk early warning system
CN114529438A (en) Rescue site risk assessment and resource management system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination