CN116290834A - Building insulation board auxiliary installation device - Google Patents

Building insulation board auxiliary installation device Download PDF

Info

Publication number
CN116290834A
CN116290834A CN202310593295.7A CN202310593295A CN116290834A CN 116290834 A CN116290834 A CN 116290834A CN 202310593295 A CN202310593295 A CN 202310593295A CN 116290834 A CN116290834 A CN 116290834A
Authority
CN
China
Prior art keywords
board
fixed
insulation board
supporting
building insulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202310593295.7A
Other languages
Chinese (zh)
Other versions
CN116290834B (en
Inventor
陈波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Genjiu Technology Development Co ltd
Original Assignee
Jiangsu Genjiu Technology Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Genjiu Technology Development Co ltd filed Critical Jiangsu Genjiu Technology Development Co ltd
Priority to CN202310593295.7A priority Critical patent/CN116290834B/en
Publication of CN116290834A publication Critical patent/CN116290834A/en
Application granted granted Critical
Publication of CN116290834B publication Critical patent/CN116290834B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/167Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B80/00Architectural or constructional elements improving the thermal performance of buildings
    • Y02B80/10Insulation, e.g. vacuum or aerogel insulation

Abstract

The invention relates to the technical field of building auxiliary, in particular to an auxiliary installation device for a building insulation board. The invention provides an auxiliary installation device for a building insulation board, which can reduce gaps and bubbles between the insulation board and a wall body in the process of installing the insulation board, and can position and calibrate the insulation board so that the installation effect is better. An auxiliary installation device for a building insulation board comprises a base, travelling wheels, a hollow supporting cylinder and the like; the base is rotatably connected with four travelling wheels, and the hollow supporting cylinder is arranged at the center of the top of the base. According to the invention, the support plate drives the building insulation board to move, the lower part of the building insulation board is contacted with the wall surface firstly, the support plate swings upwards to enable the building insulation board to be attached to the wall surface from bottom to top, air bubbles between the building insulation board and the wall surface are extruded, and gaps between the building insulation board and the wall surface are reduced, so that the building insulation board is quickly installed.

Description

Building insulation board auxiliary installation device
Technical Field
The invention relates to the technical field of building auxiliary, in particular to an auxiliary installation device for a building insulation board.
Background
The heat insulating board is made of polystyrene resin as material, other supplementary material and polymer, and through heating, mixing, catalyst injection, extrusion to form, and features moisture-proof and waterproof performance, and can reduce the thickness of building outer protecting structure and increase indoor area.
At present, when the thermal insulation board is installed, the working personnel generally coat mortar on the thermal insulation board, then attach a surface thermal insulation board coated with the mortar on the wall surface, and then the thermal insulation board can be installed, but the efficiency of manually installing the thermal insulation board is lower, and the thermal insulation board is not easy to install and position, so that larger errors are easy to occur. At present, some equipment for assisting workers in installing the heat-insulating plate is arranged, most of the auxiliary equipment is used for vertically installing the heat-insulating plate, gaps or bubbles are easily generated between the heat-insulating plate and a wall body by the aid of the installation mode, the installation effect is poor, and most of the equipment does not have the function of installing and calibrating the heat-insulating plate, so that the heat-insulating plate is easy to install and incline.
Disclosure of Invention
In view of the above, the present invention provides an auxiliary installation device for building insulation boards, which can solve the above problems, reduce the gap and air bubbles between the insulation boards and the wall during the installation process of the insulation boards, and perform positioning calibration on the insulation boards, so that the installation effect is better.
The technical scheme of the invention is as follows: the utility model provides a building heated board auxiliary installation device, includes base, walking wheel, hollow support section of thick bamboo, fixed bolster, lifting adjustment mechanism and tilting mechanism, four walking wheels of rotation type connection on the base, hollow support section of thick bamboo fixed connection is in the central point of base top put, fixed bolster fixed connection is in hollow support section of thick bamboo upper portion, lifting adjustment mechanism establishes on fixed bolster, tilting mechanism establishes on lifting adjustment mechanism.
Further, the lifting adjusting mechanism comprises a threaded knob, a lifting threaded rod, a fixed support plate, an electric push rod and a screwing seat, wherein the threaded knob is rotatably connected to the fixed support frame, the lifting threaded rod is connected to the threaded knob through threads, the lifting threaded rod penetrates through the hollow support cylinder, the fixed support plate is fixedly connected to the top of the lifting threaded rod, the electric push rod is rotatably connected to the lower portion of the fixed support plate, and the screwing seat is fixedly connected to the electric push rod.
Furthermore, a plurality of friction grooves are formed in the outer walls of the threaded knob and the screwing seat.
Further, tilting mechanism is including fixing base, arc round bar, extrusion spring, backup pad and electric sucking disc, fixing base fixed connection is on electric putter's telescopic link, sliding connection has two arc round bars on the fixing base, two the arc round bar is the symmetry setting, two fixedly connected with backup pad between the arc round bar, two be connected with extrusion spring between arc round bar and the fixing base respectively, four fixedly connected with electric sucking disc in the backup pad, four adsorb a building heated board between the electric sucking disc, building heated board and backup pad contact.
Further, the supporting plate is obliquely arranged.
Further, tilting mechanism is still including auxiliary stay mechanism, auxiliary stay mechanism establishes on fixed extension board and is connected with the backup pad, auxiliary stay mechanism is including movable rod, reset spring, fixed arc, sliding strip, fixed stopper, movable support strip, transverse connection board and movable connecting rod, movable rod slidingtype connection is on fixed extension board, be connected with reset spring between movable rod and the fixed extension board, fixed arc fixed connection is being close to the one end of backup pad at the movable rod, the sliding strip slidingtype connection is on fixed arc, one side fixedly connected with two fixed stoppers that the backup pad is close to fixed extension board, two fixed stopper is the symmetry setting, one side slidingtype that the backup pad is close to fixed extension board is connected with two movable support strips, movable support strip and fixed stopper slidingtype connection, two movable support strip all contact with the building insulation board, two fixedly connected with transverse connection board between the movable connection board, the one end rotation formula of movable connecting rod is connected at the middle part of transverse connection board, the other end and the sliding strip rotation type of movable connecting rod are connected.
Further, the tilting mechanism is still including vertical board, rotatory adjusting screw and calibration board, vertical board fixed connection is at the fixing base top, a calibration groove has been seted up on fixed extension board upper portion, rotatory adjusting screw passes through threaded connection on vertical board upper portion, the calibration board swivelling joint is on rotatory adjusting screw, the calibration board passes the calibration groove.
Further, the tilting mechanism further comprises a closing switch, the closing switch is fixedly connected to one side, far away from the supporting plate, of the fixing support plate, and the closing switch is electrically connected with the four electric sucking discs.
The beneficial effects are that: 1. according to the invention, the fixing seat is driven to move towards the direction close to the wall surface by the electric push rod, so that the supporting plate drives the building insulation board to move towards the direction close to the wall surface, the lower part of the building insulation board is contacted with the wall surface first, the fixing seat continues to move, the supporting plate swings upwards, the building insulation board is further attached to the wall surface from bottom to top, the building insulation board is pressed, air bubbles between the building insulation board and the wall surface are extruded, the building insulation board is completely attached to the wall surface, the generation of the air bubbles is reduced, and gaps between the building insulation board and the wall surface are also reduced, so that the building insulation board is quickly installed.
2. According to the invention, the building insulation board is supported and positioned through the two movable support bars, so that inaccurate positioning during subsequent installation of the building insulation board is avoided, the building insulation board can be more accurately installed on a wall surface, the two movable support bars can not clamp the building insulation board any more during the movement of the support plates, and the building insulation board can be more accurately installed on the wall surface.
3. According to the invention, the fixing seat moves to drive the vertical plate to move, so that the calibration plate moves and passes through the calibration groove, if the vertical plate is not in a vertical state, the calibration groove can calibrate and position the calibration plate, and further the supporting plate is pushed to swing, so that the supporting plate ensures the vertical state, and the building insulation plate is vertically attached to a wall surface, thereby calibrating the building insulation plate and preventing the building insulation plate from inclining.
Drawings
Fig. 1 is a schematic perspective view of a first embodiment of the present invention.
Fig. 2 is a schematic perspective view of a second embodiment of the present invention.
Fig. 3 is a schematic cross-sectional perspective view of the present invention.
Fig. 4 is a schematic view of a partial perspective structure of the present invention.
Fig. 5 is a schematic view of a partial perspective view of the elevation adjustment mechanism and the tilting mechanism of the present invention.
Fig. 6 is a schematic view of a partial perspective structure of the lifting adjusting mechanism and the auxiliary supporting mechanism of the present invention.
Fig. 7 is a schematic perspective view of the fixing support plate and the alignment groove according to the present invention.
Fig. 8 is a schematic view of a partial perspective structure of the auxiliary supporting mechanism of the present invention.
Fig. 9 is a partially disassembled perspective view of the auxiliary supporting mechanism of the present invention.
In the reference numerals: the device comprises a base, 2-travelling wheels, 3-hollow supporting cylinders, 4-fixed supporting frames, 51-threaded knobs, 52-lifting threaded rods, 53-fixed supporting plates, 54-electric push rods, 55-screwing bases, 61-fixed seats, 62-arc-shaped round rods, 63-extrusion springs, 64-supporting plates, 65-electric sucking discs, 66-building heat-insulating plates, 71-moving rods, 72-reset springs, 721-fixed arc-shaped plates, 722-sliding strips, 73-fixed limiting blocks, 74-moving supporting strips, 75-transverse connecting plates, 76-movable connecting rods, 81-vertical plates, 811-calibration grooves, 82-rotary adjusting screws, 83-calibration plates and 9-closed switches.
Detailed Description
Embodiments of the present invention are described in further detail below with reference to the accompanying drawings and examples. The following examples are illustrative of the invention but are not intended to limit the scope of the invention.
Example 1: the utility model provides a building heated board auxiliary installation device, is shown as fig. 1-5, including base 1, walking wheel 2, hollow support section of thick bamboo 3, fixed support frame 4, lifting adjustment mechanism and tilting mechanism, the last rotation type of base 1 is connected with four walking wheels 2, hollow support section of thick bamboo 3 passes through bolted connection in the central point of base 1 top, hollow support section of thick bamboo 3 is hollow structure, fixed support frame 4 passes through bolted connection on hollow support section of thick bamboo 3 upper portion, lifting adjustment mechanism establishes on fixed support frame 4, tilting mechanism establishes on lifting adjustment mechanism.
The lifting adjusting mechanism comprises a threaded knob 51, a lifting threaded rod 52, a fixed support plate 53, an electric push rod 54 and a screwing seat 55, wherein the threaded knob 51 is rotatably connected to the fixed support frame 4, the lifting threaded rod 52 is connected to the threaded knob 51 through threads, the lifting threaded rod 52 is arranged vertically, the lifting threaded rod 52 penetrates through the hollow support cylinder 3, the fixed support plate 53 is welded and connected to the top of the lifting threaded rod 52, the electric push rod 54 is rotatably connected to the lower portion of the fixed support plate 53, and the screwing seat 55 is fixedly connected to the electric push rod 54.
The outer walls of the screw knob 51 and the screwing seat 55 are provided with a plurality of friction grooves.
The tilting mechanism is including fixing base 61, arc round bar 62, extrusion spring 63, backup pad 64 and electric sucking disc 65, fixing base 61 passes through bolted connection on the telescopic link of electric putter 54, sliding connection has two arc round bars 62 on the fixing base 61, two arc round bars 62 are the symmetry setting, two welding has backup pad 64 between the arc round bar 62, two be connected with extrusion spring 63 between arc round bar 62 and the fixing base 61 respectively, extrusion spring 63 cover is on arc round bar 62, there are four electric sucking discs 65 through bolted connection on the backup pad 64, four adsorb and have a building heated board 66 between the electric sucking disc 65, building heated board 66 and backup pad 64 contact.
The support plate 64 is disposed obliquely.
In actual operation, the worker pushes the hollow supporting cylinder 3 to move towards the direction close to the wall surface, the supporting plate 64 faces the wall body, the base 1 is contacted with the wall body, the supporting plate 64 is kept at a certain distance from the wall body, the installation of the subsequent building insulation board 66 is facilitated, then the threaded knob 51 is rotated, the lifting threaded rod 52 and the fixed supporting plate 53 move upwards or downwards together, the fixed supporting plate 53 moves upwards or downwards to drive the electric push rod 54 and the fixed seat 61 to move upwards or downwards together, the fixed seat 61 moves upwards or downwards to drive the arc-shaped round rod 62 and the supporting plate 64 to move upwards or downwards together, the height of the supporting plate 64 is adjusted, the building insulation board 66 is installed for different heights of the wall surface, then four electric sucking discs 65 are started, the building insulation board 66 coated with mortar is placed on the supporting plate 64, the four electric sucking discs 65 can suck the building insulation board 66, so that the building heat insulation plate 66 can not fall off, the electric push rod 54 is started by a worker, the telescopic rod of the electric push rod 54 stretches to drive the fixing seat 61 to move towards the direction close to the wall surface, the fixing seat 61 moves to drive the arc-shaped round rod 62, the supporting plate 64 and the electric sucking disc 65 to move together, further the building heat insulation plate 66 moves towards the direction close to the wall surface, the lower part of the building heat insulation plate 66 is contacted with the wall surface firstly, the building heat insulation plate 66 and the supporting plate 64 are blocked by the wall surface, the supporting plate 64 does not move any more, at the moment, the fixing seat 61 continues to move to enable the arc-shaped round rod 62 and the supporting plate 64 to swing towards the direction close to the wall surface, the extrusion spring 63 is compressed, the supporting plate 64 swings upwards to enable the building heat insulation plate 66 to be attached to the wall surface from bottom to top, and the building heat insulation plate 66 is pressed, so that bubbles between the building heat insulation plate 66 and the wall surface can be extruded, the building insulation board 66 is fully attached to the wall surface, the generation of bubbles is reduced, the gap between the building insulation board 66 and the wall surface is also reduced, the building insulation board 66 is installed, after the building insulation board 66 is fully attached to the wall surface, a worker pauses the electric push rod 54, the support board 64 keeps pressing the building insulation board 66, after mortar on the building insulation board 66 is dry, the worker closes the four electric suction cups 65, adjusts the telescopic rod shrinkage of the electric push rod 54, the telescopic rod shrinkage of the electric push rod 54 drives the fixing seat 61, the arc round rod 62, the support board 64 and the electric suction cups 65 to reset together, the support board 64 and the electric suction cups 65 are separated from contact with the building insulation board 66, and at the moment, the extrusion spring 63 is reset to drive the arc round rod 62 and the support board 64 to reversely swing together; then, the staff pushes the hollow supporting cylinder 3 to move, adjusts the position of the supporting plate 64, and continuously installs the building insulation board 66 on the wall surface; the staff can also rotate and twist seat 55 for electric putter 54 rotates, and electric putter 54 rotates and can drive fixing base 61 and arc round bar 62 and rotate together, and arc round bar 62 rotates and can drive backup pad 64 and rotate, and then adjusts building heated board 66 vertical state or incline the installation form of state.
Example 2: on the basis of embodiment 1, as shown in fig. 4-9, the tilting mechanism further comprises an auxiliary supporting mechanism, the auxiliary supporting mechanism is arranged on the fixed supporting plate 53 and is connected with the supporting plate 64, the auxiliary supporting mechanism comprises a moving rod 71, a return spring 72, a fixed arc 721, a sliding strip 722, a fixed limiting block 73, a moving supporting strip 74, a transverse connecting plate 75 and a movable connecting rod 76, the moving rod 71 is slidably connected on the fixed supporting plate 53, the moving rod 71 is horizontally arranged, the return spring 72 is connected between the moving rod 71 and the fixed supporting plate 53 through a hook, the return spring 72 is sleeved on the moving rod 71, the fixed arc 721 is connected at one end of the moving rod 71 close to the supporting plate 64 through a bolt, the sliding strip 722 is slidably connected on the fixed arc 721, one side of the supporting plate 64 close to the fixed supporting plate 53 is symmetrically provided with two fixed limiting blocks 73, one side of the supporting plate 64 close to the fixed supporting plate 53 is slidably connected with two moving supporting strips 74, the moving limiting blocks 74 are slidably connected with the two supporting strips 74 through bolts, the other ends of the two supporting strips are slidably connected with the movable connecting plate 75 through the movable connecting plate 76, and the other ends of the movable connecting plate 76 are rotatably connected with the movable connecting plate 75 through the movable connecting plate 75.
Initially, a worker clamps the building insulation board 66 coated with mortar between two movable support strips 74, the two movable support strips 74 support and position the building insulation board 66, inaccurate positioning during subsequent installation of the building insulation board 66 is avoided, the building insulation board 66 can be more accurately installed on a wall surface, the movable support strips 64 move to drive the fixed limiting blocks 73 to move, under the elastic force of the reset springs 72, the movable rods 71 pull the fixed arc-shaped plates 721 and the sliding strips 722, so that the movable connecting rods 76, the movable support strips 74 and the transverse connecting plates 75 do not move first, at the moment, the two movable support strips 74 are not clamped on the building insulation board 66 any more, at the moment, the four electric suckers 65 absorb the building insulation board 66, the fixed limiting blocks 73 continue to block the movable support strips 74 and push the movable support strips 74 to move, the movable support strips 74 move to drive the transverse connecting plates 75 to move together with the movable connecting rods 76, and the movable connecting rods 76 move to pull the movable rods 71, the fixed arc-shaped plates 721 and the sliding strips 722 move together, and the reset springs 72 are compressed; when the support plate 64 resets, the fixed limiting block 73 is driven to reset, the movable supporting bar 74 is not blocked any more by the reset limiting block 73, the reset spring 72 resets to drive the movable rod 71 to reset, the movable rod 71 resets to drive the fixed arc 721, the sliding bar 722 and the movable connecting rod 76 to reset together, and the movable connecting rod 76 resets to drive the movable supporting bar 74 and the transverse connecting plate 75 to reset together.
Example 3: on the basis of embodiment 2, as shown in fig. 2-7, the tilting mechanism further comprises a vertical plate 81, a rotary adjusting screw 82 and a calibration plate 83, wherein the vertical plate 81 is connected to the top of the fixed seat 61 through a bolt, a calibration groove 811 is formed in the upper portion of the fixed support plate 53, the rotary adjusting screw 82 is connected to the upper portion of the vertical plate 81 through threads, the rotary adjusting screw 82 is horizontally arranged, the calibration plate 83 is rotatably connected to the rotary adjusting screw 82, and the calibration plate 83 passes through the calibration groove 811.
When the fixing seat 61 moves, the vertical plate 81 is driven to move, the vertical plate 81 moves to drive the rotary adjusting screw 82 and the calibration plate 83 to move together, in the process of moving the calibration plate 83, if the vertical plate 81 is not in a vertical state, the calibration groove 811 calibrates and positions the calibration plate 83, the fixed support plate 53 can push the calibration plate 83 to swing, the calibration plate 83 swings to drive the vertical plate 81 and the rotary adjusting screw 82 to swing together, the vertical plate 81 swings to drive the fixing seat 61 and the electric push rod 54 to swing together, and then the support plate 64 swings, so that the support plate 64 ensures a vertical state, the building heat-insulating plate 66 is vertically attached to a wall surface, and therefore the building heat-insulating plate 66 is calibrated, and the building heat-insulating plate 66 is prevented from inclining; if a worker needs to install the building insulation board 66 obliquely, the rotary adjusting screw 82 is rotated, so that the rotary adjusting screw 82 is separated from the vertical board 81, the vertical board 81 does not drive the rotary adjusting screw 82 to move when moving, and the calibration board 83 does not calibrate the building insulation board 66.
Example 4: on the basis of embodiment 3, as shown in fig. 4, the tilting mechanism further includes a closing switch 9, the closing switch 9 is fixedly connected to a side of the fixing support plate 53 away from the support plate 64, and the closing switch 9 is electrically connected to the four electric sucking discs 65.
The movable rod 71 contacts with the closing switch 9 when moving towards the direction close to the wall surface, and presses the closing switch 9 to close the four electric sucking discs 65, so that the four electric sucking discs 65 do not adsorb the building insulation board 66 any more, and the building insulation board 66 is prevented from being pulled by the electric sucking discs 65, and the building insulation board 66 is pulled loose.
In the description of the present invention, unless otherwise indicated, the meaning of "plurality" is two or more, and the terms "upper", "lower", "left", "right", "inner", "outer", "front", "rear", "head", "tail", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are merely for convenience in describing the present invention and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be configured and operated in a specific orientation, and thus are not to be construed as limiting the present invention. Furthermore, the terms "first," "second," "third," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.

Claims (6)

1. The auxiliary installation device for the building insulation board is characterized by comprising a base (1), travelling wheels (2), a hollow supporting cylinder (3), a fixed supporting frame (4), a lifting adjusting mechanism and an inclining mechanism, wherein the four travelling wheels (2) are rotationally connected to the base (1), the hollow supporting cylinder (3) is fixedly connected to the central position of the top of the base (1), the fixed supporting frame (4) is fixedly connected to the upper part of the hollow supporting cylinder (3), the lifting adjusting mechanism is arranged on the fixed supporting frame (4), and the inclining mechanism is arranged on the lifting adjusting mechanism;
the lifting adjusting mechanism comprises a threaded knob (51), a lifting threaded rod (52), a fixed support plate (53), an electric push rod (54) and a screwing seat (55), wherein the threaded knob (51) is rotationally connected to the fixed support frame (4), the lifting threaded rod (52) is connected to the threaded knob (51) through threads, the lifting threaded rod (52) penetrates through the hollow support cylinder (3), the fixed support plate (53) is fixedly connected to the top of the lifting threaded rod (52), the electric push rod (54) is rotationally connected to the lower portion of the fixed support plate (53), and the screwing seat (55) is fixedly connected to the electric push rod (54);
the tilting mechanism is including fixing base (61), arc round bar (62), extrusion spring (63), backup pad (64) and electric sucking disc (65), fixing base (61) fixed connection is on the telescopic link of electric putter (54), sliding connection has two arc round bars (62) on fixing base (61), two arc round bars (62) are the symmetry setting, two fixedly connected with backup pad (64) between arc round bar (62), two be connected with extrusion spring (63) between arc round bar (62) and fixing base (61) respectively, fixedly connected with four electric sucking disc (65) on backup pad (64), four adsorb one building heated board (66) between electric sucking disc (65), building heated board (66) contact with backup pad (64).
2. The auxiliary installation device for the building insulation board according to claim 1, wherein a plurality of friction grooves are formed on the outer walls of the threaded knob (51) and the screwing seat (55).
3. An auxiliary installation device for building insulation boards according to claim 1, characterized in that the support plate (64) is arranged obliquely.
4. The auxiliary installation device for the building insulation board according to claim 1, wherein the tilting mechanism further comprises an auxiliary supporting mechanism, the auxiliary supporting mechanism is arranged on the fixed supporting board (53) and is connected with the supporting board (64), the auxiliary supporting mechanism comprises a movable rod (71), a return spring (72), a fixed arc board (721), a sliding bar (722), a fixed limiting block (73), a movable supporting bar (74), a transverse connecting board (75) and a movable connecting rod (76), the movable rod (71) is slidably connected on the fixed supporting board (53), a return spring (72) is connected between the movable rod (71) and the fixed supporting board (53), the fixed arc board (721) is fixedly connected at one end of the movable rod (71) close to the supporting board (64), the sliding bar (722) is slidably connected on the fixed arc board (721), two fixed limiting blocks (73) are fixedly connected at one side of the supporting board (64) close to the fixed supporting board (53), the two fixed limiting blocks (73) are symmetrically arranged, the two fixed limiting blocks (74) are fixedly connected at one side of the supporting board (64) close to the fixed supporting board (53), two movable support bars (74) are in contact with a building insulation board (66), a transverse connecting plate (75) is fixedly connected between the two movable support bars (74), one end of a movable connecting rod (76) is rotatably connected to the middle of the transverse connecting plate (75), and the other end of the movable connecting rod (76) is rotatably connected with a sliding bar (722).
5. The building insulation board auxiliary installation device according to claim 4, wherein the tilting mechanism further comprises a vertical board (81), a rotary adjusting screw (82) and a calibration board (83), the vertical board (81) is fixedly connected to the top of the fixing base (61), a calibration groove (811) is formed in the upper portion of the fixing support board (53), the rotary adjusting screw (82) is connected to the upper portion of the vertical board (81) through threads, the calibration board (83) is rotatably connected to the rotary adjusting screw (82), and the calibration board (83) penetrates through the calibration groove (811).
6. The auxiliary installation device for the building insulation board according to claim 5, wherein the tilting mechanism further comprises a closing switch (9), the closing switch (9) is fixedly connected to one side, far away from the supporting plate (64), of the fixing support plate (53), and the closing switch (9) is electrically connected with the four electric sucking discs (65).
CN202310593295.7A 2023-05-24 2023-05-24 Building insulation board auxiliary installation device Active CN116290834B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310593295.7A CN116290834B (en) 2023-05-24 2023-05-24 Building insulation board auxiliary installation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310593295.7A CN116290834B (en) 2023-05-24 2023-05-24 Building insulation board auxiliary installation device

Publications (2)

Publication Number Publication Date
CN116290834A true CN116290834A (en) 2023-06-23
CN116290834B CN116290834B (en) 2023-08-04

Family

ID=86785544

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310593295.7A Active CN116290834B (en) 2023-05-24 2023-05-24 Building insulation board auxiliary installation device

Country Status (1)

Country Link
CN (1) CN116290834B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101643551B1 (en) * 2015-05-07 2016-11-23 송우석 The wall auto spread machine and method for spreading wall using this same
CN109629808A (en) * 2018-12-18 2019-04-16 合肥巍华钢结构有限公司 A kind of positioning installation frame of steel construction insulation board
WO2020155535A1 (en) * 2019-01-30 2020-08-06 北新集团建材股份有限公司 Mechanical auxiliary device for fabricated wall
CN112282320A (en) * 2020-10-30 2021-01-29 毛爱芬 Energy-conserving building's outer hanging external wall insulation board erection equipment
CN112523477A (en) * 2020-12-09 2021-03-19 浙江广厦建设职业技术大学 Laying device for building external wall insulation board
CN214144301U (en) * 2020-12-01 2021-09-07 中维建设工程(深圳)有限公司 Building glass curtain wall support frame
CN113802817A (en) * 2021-08-18 2021-12-17 徐州安联木业有限公司 Quick installation device of veneer for house ornamentation
CN215331582U (en) * 2021-05-19 2021-12-28 广东烽烨建设工程有限公司 Auxiliary installation device for insulation board for building external wall
CN114809661A (en) * 2022-05-20 2022-07-29 河南省建筑科学研究院有限公司 Support system for installing fabricated building
CN218028798U (en) * 2022-04-09 2022-12-13 中建五局(山东)投资建设有限公司 Auxiliary clamp for installation of insulation board

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101643551B1 (en) * 2015-05-07 2016-11-23 송우석 The wall auto spread machine and method for spreading wall using this same
CN109629808A (en) * 2018-12-18 2019-04-16 合肥巍华钢结构有限公司 A kind of positioning installation frame of steel construction insulation board
WO2020155535A1 (en) * 2019-01-30 2020-08-06 北新集团建材股份有限公司 Mechanical auxiliary device for fabricated wall
CN112282320A (en) * 2020-10-30 2021-01-29 毛爱芬 Energy-conserving building's outer hanging external wall insulation board erection equipment
CN214144301U (en) * 2020-12-01 2021-09-07 中维建设工程(深圳)有限公司 Building glass curtain wall support frame
CN112523477A (en) * 2020-12-09 2021-03-19 浙江广厦建设职业技术大学 Laying device for building external wall insulation board
CN215331582U (en) * 2021-05-19 2021-12-28 广东烽烨建设工程有限公司 Auxiliary installation device for insulation board for building external wall
CN113802817A (en) * 2021-08-18 2021-12-17 徐州安联木业有限公司 Quick installation device of veneer for house ornamentation
CN218028798U (en) * 2022-04-09 2022-12-13 中建五局(山东)投资建设有限公司 Auxiliary clamp for installation of insulation board
CN114809661A (en) * 2022-05-20 2022-07-29 河南省建筑科学研究院有限公司 Support system for installing fabricated building

Also Published As

Publication number Publication date
CN116290834B (en) 2023-08-04

Similar Documents

Publication Publication Date Title
CN116290834B (en) Building insulation board auxiliary installation device
CN210476878U (en) Fixing device for plate processing
CN114856159A (en) Temporary attachment device for attached lifting scaffold
CN211485455U (en) Electric medical bed for department of stomatology
CN218908867U (en) Limiting device for instrument panel lifting tool
CN113021291A (en) Scribing marking device for aerospace composite material wall plate processing
CN216789059U (en) Position locking device
JPS5851789Y2 (en) drafting table
CN216552478U (en) Quick mounting structure of heated board
CN219378543U (en) Thermal insulation aluminum skin forming device
CN219083241U (en) Warmer with adjustable warming angle
CN219290507U (en) Fire water monitor mounting frame for air film type coal shed
CN219238443U (en) Open and press from both sides base
CN220052944U (en) Environment-friendly pipe connection positioning device for building
CN220555340U (en) Positioning transfer trolley for light partition board
CN216608943U (en) Model making, forming and positioning device
CN114828475B (en) Industrial control cabinet fixing device
CN220681231U (en) Edge sealing structure of paper-surface gypsum board
CN209762625U (en) Environmental protection equipment alignment jig
CN216350835U (en) Integrated conductance feedback device
CN212085708U (en) Cable bridge with good stability
CN215442562U (en) Multi-specification unit curtain wall combined structure
CN115816528B (en) Cutting device of heat insulation plate
CN219854154U (en) Clamping structure for foam board processing
CN219261833U (en) Reinforced structure of concrete frame beam column

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant