CN109629808A - A kind of positioning installation frame of steel construction insulation board - Google Patents
A kind of positioning installation frame of steel construction insulation board Download PDFInfo
- Publication number
- CN109629808A CN109629808A CN201811545619.5A CN201811545619A CN109629808A CN 109629808 A CN109629808 A CN 109629808A CN 201811545619 A CN201811545619 A CN 201811545619A CN 109629808 A CN109629808 A CN 109629808A
- Authority
- CN
- China
- Prior art keywords
- insulation board
- supporting plate
- plate
- clamping
- rolling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/18—Implements for finishing work on buildings for setting wall or ceiling slabs or plates
- E04F21/1894—Lever-type lifters gripping the bottom edge of wall panels
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention relates to a kind of positioning installation frames of steel construction insulation board, including support baseboard, regulating mechanism and mounting device, it is provided with sliding slot on the top of the support baseboard, regulating mechanism is installed on the top of support baseboard, is equipped on mounting device on the left end of regulating mechanism;The regulating mechanism includes adjusting motor, adjusting bull stick, swivel plate, telescopic column and lateral struts;The mounting device includes installation supporting plate, installation cylinder, flexible supporting plate, clamping supporting plate, grip block, flexible clamping plate, clamping plate push rod and rolling mechanism.The present invention when can solve the installation of existing insulation board it is existing need manually insulation board to be carried out being easy to happen safety accident, insulation board when holding attachment, insulation board mounting position are excessively high be bonded the problems such as gap is larger between the insulation board that effect is poor, insulation board installation is connected with metope, may be implemented close to mount to the function on exterior wall by the stable clamping of insulation board and by it.
Description
Technical field
The present invention relates to multimedia technology field, in particular to a kind of positioning installation frame of steel construction insulation board.
Background technique
In existing steel building after the Construction of Steel Structure of outer layer, need that thermal insulation material is installed to its wall face,
Existing most common thermal insulation material is eps foam insulation board, and eps foam insulation board is square structure, and insulation board needs during installation
Will its external coating one layer of glue now, it is this by manually mounting later by manually mounting insulation board onto wall face
Mode, which works, will cause low efficiency, large labor intensity.
It is installed for existing insulation board, existing patent also proposed some solutions, Patent No.
201710479349.1 Chinese invention patent provide a kind of environment-friendly type energy-saving insulation board and its installation method, the invention are main
The structure of insulation board is disclosed, makes insulating layer after coating parent plate by filling viscous middle A, B glue of viscous viscose, it can be in insulating layer
The filling arbon dioxide gas between parent plate greatly reduces the thermal coefficient of insulating layer, improves heat insulation effect, the invention
The structure of insulation board and the construction technology of the insulation board are mainly disclosed, insulation board is also to carry out by artificial mode to it
Installation;The Chinese utility model patent of Patent No. 201820312526.7 provides a kind of mounting bracket of curtain wall thermal insulation board,
The utility model realizes the flexible and convenient function in the installation and removal of curtain wall thermal insulation board, the cause installation branch solved
Frame complex steps, the problem of causing the set-up time to be delayed, influence working efficiency, which, which is mainly arranged on metope, is protected
The mounting bracket of warm plate, there is no in the how stable attachment to the bracket of open insulation board;Above patent has design to protect
Warm plate, but it is too simple in insulation board installation steps.
Existing to insulation board installation, constantly existing particular problem is as follows, needs manually to carry out holding attachment to insulation board,
It is larger to keep the temperature board size, needs more people's cooperations to carry out installation action to it, insulation board mounting position needs to set up foot hand when excessively high
Frame carries out installation action, is easy to happen safety accident, and insulation board is bonded the insulation board that effect is poor, and insulation board installation is connected with metope
Between gap it is larger.
Summary of the invention
To solve the above-mentioned problems, it the present invention provides a kind of positioning installation frame of steel construction insulation board, can solve existing
Have and existing when insulation board installation needs manually insulation board be easy to happen when holding attachment, insulation board mounting position are excessively high
Safety accident, insulation board are bonded the problems such as gap is larger between the insulation board that effect is poor, insulation board installation is connected with metope, can be with
It realizes the stable clamping of insulation board and closely attachment to the function on exterior wall there is mechanization to take to insulation board by it
Hold attachment, insulation board mounting position it is excessively high when safety accident will not occur, insulation board is bonded that effect is good, insulation board installation with metope
The advantages that gap is smaller between connected insulation board.
To achieve the goals above, the present invention use following technical scheme, a kind of positioning installation frame of steel construction insulation board,
Including support baseboard, regulating mechanism and mounting device, sliding slot, the top of support baseboard are provided on the top of the support baseboard
Regulating mechanism is installed in portion, mounting device is installed on the left end of regulating mechanism, is installed to the present invention by support baseboard
In external mobile mechanism.
The regulating mechanism includes adjusting motor, adjusting bull stick, swivel plate, telescopic column and lateral struts, adjusts electricity
Machine is mounted on the top of support baseboard by motor set, is adjusted and is equipped with swivel plate on the output shaft of motor, and bull stick pair is adjusted
Claim to be distributed in the outside for adjusting motor, adjusts and be mounted at the top of bull stick on the bottom of swivel plate, the bottom for adjusting bull stick passes through
The mode being slidably matched is connected with the sliding slot that support baseboard is arranged, and telescopic column is mounted on the top of swivel plate, telescopic vertical
Lateral struts are installed, when specific works, regulating mechanism can adjust the angle and height of mounting device, work as peace on the top of column
Insulation board is manually placed on mounting device by assembling device when being located at left end of the invention, is controlled mounting device later and is turned to this
The right end of invention, to carry out installation action to insulation board.
The mounting device includes installation supporting plate, installation cylinder, flexible supporting plate, clamping supporting plate, grip block, telescopic clamp
Plate, clamping plate push rod and rolling mechanism, installation supporting plate are mounted on the left side of lateral struts, install left side and the installation of supporting plate
The bottom of cylinder is connected, and installs and is equipped with flexible supporting plate on the top of cylinder, is provided with square groove in the middle part of flexible supporting plate, stretches
The left side rear and front end of supporting plate is provided with a sliding slot;
The left side that supporting plate is located at flexible supporting plate is clamped, clamps and is symmetrically arranged with slide bar on the right side of supporting plate, clamp supporting plate
The right end of upper slide bar is connected by way of being slidably matched with the sliding slot of flexible supporting plate setting;The clamping supporting plate right side
The bottom for each slide bar being arranged is connected at the top of a firm spring, and the bottom of firm spring is mounted on flexible supporting plate
Left side on, clamp and grip block be installed on the left side bottom of supporting plate, flexible clamping plate is mounted on clamping by clamping plate push rod
On the left side upper end of supporting plate;The left end of the grip block and flexible clamping plate is pointed structures, grip block and flexible clamping plate
Right end medial surface on be evenly arranged with anti-slop serrations;
It clamps and is provided with rolling groove on the middle part of supporting plate, the rear and front end of clamping supporting plate rolling groove is distributed with a rolling
Press mechanism, rolling mechanism is mounted on the right side of clamping supporting plate, and when specific works, mounting device can complete the folder of insulation board
It holds, and insulation board is closely mounted on wall face, the stretching motion of clamping plate push rod can adjust the position of flexible clamping plate, make
It obtains grip block to match and various sizes of insulation board can be installed with flexible clamping plate, grip block and flexible clamping plate medial surface
Anti-slop serrations can prevent mounting device there is a phenomenon where insulation boards to fall off in rotary course, install the stretching motion of cylinder with
Insulation board can be moved to suitable installation site by the adjusting that external mobile mechanism carries out position, control telescopic column later
Contractile motion is carried out, the insulation board upper end for enabling insulation board to be close to mount increases the compactness of insulation board attachment,
Slide bar when telescopic column carries out contractile motion on clamping supporting plate can slide on the sliding slot of flexible supporting plate setting, consolidate at this time
Spring can generate certain drawing force, so that the insulation board of installation can be close to pacify under the tensile force effect of firm spring
The insulation board upper end installed, this mode flexible that is adjacent to can increase insulation board in the case where not destroying and having installed insulation board
Installation effect.
As a preferred technical solution of the present invention, absorption branch is installed on the left side middle part of the installation supporting plate
Column, the middle part for drawing pillar pass through the square groove being arranged in the middle part of flexible supporting plate, draw and be equipped with Pneumatic suction cup on the left side of pillar,
Pneumatic suction cup is located in the rolling groove of Pneumatic suction cup setting, and when specific works, Pneumatic suction cup can be before insulation board be installed by it
It is drawn, increases the stability of insulation board, absorption of the Pneumatic suction cup releasing to insulation board is controlled after insulation board installs.
As a preferred technical solution of the present invention, the rolling mechanism includes rolling Multi-stage push rod, rolling frame linking
And rolling wheel, rolling wheel are located in the rolling groove of clamping supporting plate setting, rolling wheel is mounted on the inner end of rolling frame linking by shaft
On, it rolls and is connected on the right side of the outer end of frame linking at the top of rolling Multi-stage push rod, the bottom for rolling Multi-stage push rod is mounted on clamping
On the outer end right side of supporting plate;It is symmetrically distributed with square groove on the lateral surface of the rolling wheel, in each square groove of rolling wheel
One flexible briquetting is installed by briquetting spring, the outer end for the briquetting that stretches is arcuate structure, when specific works, rolling mechanism energy
It is enough to carry out rolling movement to it after insulation board mounts, increase the compaction rate of insulation board and metope, rolls Multi-stage push rod
Stretching motion enables to rolling wheel inward roll, and when inward roll of rolling wheel, flexible briquetting can squeeze insulation board
Movement, further increases the installation effect of insulation board.
As a preferred technical solution of the present invention, extrusion rack is installed on the bottom of the installation supporting plate, is squeezed
It presses and extruding telescopic rod is uniformly installed on the left side of bracket, an extruding rolling is mounted on each top for squeezing telescopic rod
Wheel, squeezes and is set with extruding spring on the outer end of telescopic rod, and when specific works, when insulation board is installed, squeezing roller can
Mounted insulation board upper end is pushed down, installing cylinder after the installation is completed when insulation board will do it contraction, and grip block has band at this time
Dynamic to have installed the hidden danger that the upper end of insulation board is displaced outwardly, squeezing roller can compress under the contractility effect for squeezing spring
Mounted insulation board, prevents it to be subjected to displacement.
When work, the present invention is installed in external mobile mechanism by support baseboard first, regulating mechanism can be adjusted
The angle and height for saving mounting device, are manually placed on mounting device for insulation board when mounting device is located at left end of the invention
On, mounting device is controlled later and turns to right end of the invention, to carry out installation action to insulation board.
Mounting device can complete the clamping of insulation board, and insulation board closely be mounted on wall face, clamping plate push rod
Stretching motion can adjust the position of flexible clamping plate so that match with flexible clamping plate can be to various sizes of guarantor for grip block
Warm plate is installed, and the anti-slop serrations of grip block and flexible clamping plate medial surface can prevent mounting device from protecting in rotary course
The phenomenon that warm plate falls off, the adjusting that the stretching motion for installing cylinder carries out position with external mobile mechanism can move insulation board
Suitable installation site is moved, telescopic column is controlled later and carries out contractile motion, insulation board is enabled to be close to mount
Insulation board upper end, increase insulation board attachment compactness, telescopic column carry out contractile motion when clamping supporting plate on slide bar energy
Enough to slide on the sliding slot of flexible supporting plate setting, certain drawing force can be generated by consolidating spring at this time, thus the insulation board of installation
It can be close to mounted insulation board upper end under the tensile force effect of firm spring, this mode flexible that is adjacent to is not
The installation effect that can increase insulation board in the case where having installed insulation board is destroyed, rolling mechanism can be after insulation board mounts
Rolling movement is carried out to it, increases the compaction rate of insulation board and metope, and the stretching motion for rolling Multi-stage push rod enables to roll
Pinch roller inward roll, flexible briquetting can carry out extruding movement to insulation board when the inward roll of rolling wheel, further increase guarantor
The installation effect of warm plate, when insulation board is installed, squeezing roller can push down mounted insulation board upper end, work as heat preservation
Plate installs cylinder after the installation is completed will do it contraction, and grip block, which has to drive, at this time has installed what the upper end of insulation board was displaced outwardly
Hidden danger, squeezing roller can compress mounted insulation board under the contractility effect for squeezing spring, it prevented to be subjected to displacement,
It may be implemented closely to mount by the stable clamping of insulation board and by it to the function on exterior wall.
The beneficial effects of the present invention are:
One, the present invention can solve existing insulation board installation when it is existing need manually to insulation board carry out holding attachment,
Insulation board mounting position is easy to happen safety accident when excessively high, insulation board is bonded that effect is poor, insulation board installation is connected with metope
The problems such as gap is larger between insulation board may be implemented closely to mount onto exterior wall by the stable clamping of insulation board and by it
There is function mechanization to carry out that safety accident, heat preservation will not occur when holding attachment, insulation board mounting position are excessively high to insulation board
Plate is bonded the advantages that gap is smaller between the insulation board that effect is good, insulation board installation is connected with metope;
Two, the present invention is provided with regulating mechanism, and regulating mechanism can adjust the angle and height of mounting device, when installation fills
Manually insulation board is placed on mounting device when setting in left end of the invention, mounting device is controlled later and turns to the present invention
Right end, so as to insulation board carry out installation action;
Three, be provided with rolling mechanism on mounting device of the present invention, rolling mechanism can after insulation board mounts to its into
Row rolling movement, increases the compaction rate of insulation board and metope;
Four, it is provided with squeezing roller on mounting device of the present invention, squeezing roller can be pushed down when insulation board is installed
Mounted insulation board upper end, when insulation board after the installation is completed, squeezing roller squeeze spring contractility effect under can
Mounted insulation board is compressed, it is prevented to be subjected to displacement;
Five, firm spring is provided on mounting device of the present invention, telescopic column carries out when contractile motion on clamping supporting plate
Slide bar can slide on the sliding slot of flexible supporting plate setting, and certain drawing force can be generated by consolidating spring at this time, thus installation
Insulation board can be close to mounted insulation board upper end, this side of being adjacent to flexible under the tensile force effect of firm spring
Formula can increase the installation effect of insulation board in the case where not destroying and having installed insulation board.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is structural schematic diagram of the invention;
Fig. 2 is the first structure diagram of mounting device of the present invention;
Fig. 3 is the second structural schematic diagram of mounting device of the present invention;
Fig. 4 is the structural schematic diagram between the flexible supporting plate of the present invention, clamping supporting plate and rolling mechanism;
Fig. 5 is the structural schematic diagram between rolling wheel of the present invention, briquetting spring and flexible briquetting.
Specific embodiment
In order to be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, tie below
Conjunction is specifically illustrating, and the present invention is further explained.It should be noted that in the absence of conflict, embodiment in the application and
Feature in embodiment can be combined with each other.
As shown in Figures 1 to 5, a kind of positioning installation frame of steel construction insulation board, including support baseboard 1,2 and of regulating mechanism
Mounting device 3 is provided with sliding slot on the top of the support baseboard 1, regulating mechanism 2 is equipped on the top of support baseboard 1,
Mounting device 3 is installed on the left end of regulating mechanism 2, the present invention is installed in external mobile mechanism by support baseboard 1.
The regulating mechanism 2 includes adjusting motor 21, adjusting bull stick 22, swivel plate 23, telescopic column 24 and laterally prop up
Column 25 adjusts motor 21 and is mounted on the top of support baseboard 1 by motor set, adjusts and be equipped on the output shaft of motor 21
Swivel plate 23 adjusts bull stick 22 and is symmetrically distributed in the outside for adjusting motor 21, and the top for adjusting bull stick 22 is mounted on swivel plate 23
Bottom on, adjust bull stick 22 bottom by way of being slidably matched with support baseboard 1 setting sliding slot be connected, telescopic vertical
Column 24 is mounted on the top of swivel plate 23, is equipped with lateral struts 25 on the top of telescopic column 24, when specific works, is adjusted
Mechanism 2 can adjust the angle and height of mounting device 3, when mounting device 3 is located at left end of the invention manually by insulation board
It is placed on mounting device 3, controls mounting device 3 later and turn to right end of the invention, it is dynamic to carry out installation to insulation board
Make.
The mounting device 3 includes installation supporting plate 31, installation cylinder 32, flexible supporting plate 33, clamping supporting plate 34, grip block
35, stretch clamping plate 36, clamping plate push rod 37 and rolling mechanism 38, and installation supporting plate 31 is mounted on the left side of lateral struts 25, pacifies
The left side for filling supporting plate 31 is connected with the bottom of installation cylinder 32, installs and is equipped with flexible supporting plate 33 on the top of cylinder 32,
The middle part of flexible supporting plate 33 is provided with square groove, and the left side rear and front end of flexible supporting plate 33 is provided with a sliding slot;
The left side that supporting plate 34 is located at flexible supporting plate 33 is clamped, clamps on the right side of supporting plate 34 and is symmetrically arranged with slide bar, press from both sides
The right end for holding 34 upper slide bar of supporting plate is connected by way of being slidably matched with the sliding slot of flexible supporting plate 33 setting;The clamping
The bottom of each slide bar of 34 right side of supporting plate setting is connected with the top of a firm spring 341, consolidates spring 341
Bottom is mounted on the left side of flexible supporting plate 33, is clamped and is equipped with grip block 35, telescopic clamp on the left side bottom of supporting plate 34
Plate 36 is mounted on the left side upper end of clamping supporting plate 34 by clamping plate push rod 37;The grip block 35 and flexible clamping plate 36
Left end is pointed structures, is evenly arranged with anti-slop serrations on grip block 35 and the right end medial surface of flexible clamping plate 36;
It clamps and is provided with rolling groove on the middle part of supporting plate 34, the rear and front end of clamping 34 rolling groove of supporting plate is distributed with one
A rolling mechanism 38, rolling mechanism 38 is mounted on the right side of clamping supporting plate 34, and when specific works, mounting device 3 can be complete
It is closely mounted on wall face at the clamping of insulation board, and by insulation board, the stretching motion of clamping plate push rod 37, which can be adjusted, to be stretched
The position of contracting clamping plate 36, so that grip block 35 is matched with flexible clamping plate 36 can install various sizes of insulation board,
It is de- that the anti-slop serrations of grip block 35 and flexible 36 medial surface of clamping plate can prevent mounting device 3 from insulation board occurring in rotary course
Insulation board can be moved to by the phenomenon that falling, the adjusting that the stretching motion for installing cylinder 32 carries out position with external mobile mechanism
Suitable installation site controls telescopic column 24 later and carries out contractile motion, insulation board is enabled to be close to have mounted
Insulation board upper end, increases the compactness of insulation board attachment, and telescopic column 24 carries out slide bar when contractile motion on clamping supporting plate 34
It can be slided on the sliding slot that flexible supporting plate 33 is arranged, certain drawing force can be generated by consolidating spring 341 at this time, thus installation
Insulation board can be close to mounted insulation board upper end, this patch flexible under the tensile force effect of firm spring 341
Tight mode can increase the installation effect of insulation board in the case where not destroying and having installed insulation board.
It is equipped in the middle part of the left side of the installation supporting plate 31 and draws pillar 311, the middle part for drawing pillar 311 passes through
The square groove being arranged in the middle part of flexible supporting plate 33 is drawn and is equipped with Pneumatic suction cup 312 on the left side of pillar 311, and Pneumatic suction cup 312
In in the rolling groove that Pneumatic suction cup 312 is arranged, when specific works, Pneumatic suction cup 312 can be carried out before insulation board is installed
It draws, increases the stability of insulation board, absorption of the releasing of Pneumatic suction cup 312 to insulation board is controlled after insulation board installs.
The rolling mechanism 38 includes rolling Multi-stage push rod 381, rolling frame linking 382 and rolling wheel 383, rolling wheel 383
In the rolling groove that clamping supporting plate 34 is arranged, rolling wheel 383 is mounted on the inner end of rolling frame linking 382 by shaft, rolling
It is connected on the right side of the outer end of frame linking 382 with the top of rolling Multi-stage push rod 381, the bottom of rolling Multi-stage push rod 381 is mounted on folder
It holds on the outer end right side of supporting plate 34;Be symmetrically distributed with square groove on the lateral surface of the rolling wheel 383, rolling wheel 383 it is every
A flexible briquetting 385 is equipped with by briquetting spring 384 in a square groove, the outer end for the briquetting 385 that stretches is arcuate structure, tool
When body running, rolling mechanism 38 can carry out rolling movement after insulation board mounts to it, increase the close of insulation board and metope
The stretching motion of real degree, rolling Multi-stage push rod 381 enables to 383 inward roll of rolling wheel, the inward roll of rolling wheel 383
When flexible briquetting 385 can carry out extruding movement to insulation board, further increase the installation effect of insulation board.
Extrusion rack 313 is installed on the bottom of the installation supporting plate 31, is uniformly pacified on the left side of extrusion rack 313
Equipped with telescopic rod 314 is squeezed, it is mounted on a squeezing roller 315 on each top for squeezing telescopic rod 314, squeezes telescopic rod
It is set on 314 outer end and squeezes spring 316, when specific works, squeezing roller 315 can be pressed when insulation board is installed
Firmly mounted insulation board upper end, installing cylinder 32 after the installation is completed when insulation board will do it contraction, and grip block 35 has at this time
Drive has installed the hidden danger that the upper end of insulation board is displaced outwardly, and squeezing roller 315 is in the case where squeezing the contractility effect of spring 316
Mounted insulation board can be compressed, it is prevented to be subjected to displacement.
When work, the present invention is installed in external mobile mechanism by support baseboard 1 first, regulating mechanism 2 can
The angle and height for adjusting mounting device 3, are manually placed on installation for insulation board when mounting device 3 is located at left end of the invention
On device 3, mounting device 3 is controlled later and turns to right end of the invention, to carry out installation action to insulation board.
Mounting device 3 can complete the clamping of insulation board, and insulation board closely be mounted on wall face, clamping plate push rod
37 stretching motion can adjust the position of flexible clamping plate 36, so that match with flexible clamping plate 36 can be to difference for grip block 35
The insulation board of size is installed, and grip block 35 and the anti-slop serrations of flexible 36 medial surface of clamping plate can prevent mounting device 3 from revolving
There is a phenomenon where insulation boards to fall off during turning, and the stretching motion and external mobile mechanism of installing cylinder 32 carry out the tune of position
Energy conservation is enough to be moved to suitable installation site for insulation board, controls telescopic column 24 later and carries out contractile motion, so that insulation board
It can be close to the insulation board upper end mounted, increase the compactness of insulation board attachment, telescopic column 24 carries out contractile motion
When clamping supporting plate 34 on slide bar can be slided on the sliding slot that flexible supporting plate 33 is arranged, one can be generated by consolidating spring 341 at this time
Fixed drawing force, so that the insulation board of installation can be close to mounted guarantor under the tensile force effect of firm spring 341
Warm plate upper end, this mode flexible that is adjacent to can increase the installation effect of insulation board in the case where not destroying and having installed insulation board
Fruit, rolling mechanism 38 can carry out rolling movement after insulation board mounts to it, increase the compaction rate of insulation board and metope,
The stretching motion of rolling Multi-stage push rod 381 enables to 383 inward roll of rolling wheel, and when inward roll of rolling wheel 383 is flexible
Briquetting 385 can carry out extruding movement to insulation board, the installation effect of insulation board be further increased, when insulation board is installed
Squeezing roller 315 can push down mounted insulation board upper end, and installing cylinder 32 after the installation is completed when insulation board will do it receipts
Contracting, grip block 35 has drive to install the hidden danger that the upper end of insulation board is displaced outwardly at this time, and squeezing roller 315 is squeezing bullet
Mounted insulation board can be compressed under the contractility effect of spring 316, prevents it to be subjected to displacement, realizes and stablize insulation board
Clamping and by it, closely attachment is existing when solving the installation of existing insulation board to need manually to guarantor to the function on exterior wall
Warm plate carries out being easy to happen safety accident when holding attachment, insulation board mounting position are excessively high, insulation board be bonded with metope effect it is poor,
The problems such as gap is larger between the connected insulation board of insulation board installation, has reached purpose.
The basic principles, main features and advantages of the invention have been shown and described above.The technical staff of the industry should
Understand, the present invention is not limited to the above embodiments, and only illustrating for the description in above embodiments and description is of the invention
Principle, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these change and change
Into all fall within the protetion scope of the claimed invention.The claimed scope of the invention is by appended claims and its equivalent
It defines.
Claims (7)
1. a kind of positioning installation frame of steel construction insulation board, including support baseboard (1), regulating mechanism (2) and mounting device (3),
It is characterized by: being provided with sliding slot on the top of the support baseboard (1), adjusting is installed on the top of support baseboard (1)
Mechanism (2) is equipped with mounting device (3) on the left end of regulating mechanism (2);Wherein:
The regulating mechanism (2) include adjust motor (21), adjust bull stick (22), swivel plate (23), telescopic column (24) and
Lateral struts (25) adjust motor (21) and are mounted on the top of support baseboard (1) by motor set, adjust the defeated of motor (21)
It is equipped on shaft swivel plate (23), adjusts bull stick (22) and be symmetrically distributed in the outside for adjusting motor (21), adjust bull stick (22)
Top be mounted on the bottom of swivel plate (23), adjust the bottom of bull stick (22) by way of being slidably matched and support baseboard
(1) sliding slot being arranged is connected, and telescopic column (24) is mounted on the top of swivel plate (23), on the top of telescopic column (24)
Lateral struts (25) are installed;
The mounting device (3) include installation supporting plate (31), installation cylinder (32), flexible supporting plate (33), clamping supporting plate (34),
Grip block (35), flexible clamping plate (36), clamping plate push rod (37) and rolling mechanism (38), installation supporting plate (31) are mounted on lateral struts
(25) on left side, the left side for installing supporting plate (31) is connected with the bottom of installation cylinder (32), installation cylinder (32)
Flexible supporting plate (33) are installed on top, are provided with square groove in the middle part of flexible supporting plate (33), before the left side of supporting plate (33) of stretching
Both ends are provided with a sliding slot afterwards;
The left side that supporting plate (34) are located at flexible supporting plate (33) is clamped, clamps and is symmetrically arranged with slide bar on the right side of supporting plate (34),
The right end for clamping supporting plate (34) upper slide bar is connected by way of being slidably matched with the sliding slot of flexible supporting plate (33) setting, is clamped
Grip block (35) are installed, flexible clamping plate (36) are mounted on clamping by clamping plate push rod (37) on the left side bottom of supporting plate (34)
On the left side upper end of supporting plate (34);
It clamps and is provided with rolling groove on the middle part of supporting plate (34), the rear and front end of clamping supporting plate (34) rolling groove is distributed with one
A rolling mechanism (38), rolling mechanism (38) are mounted on the right side of clamping supporting plate (34).
2. a kind of positioning installation frame of steel construction insulation board according to claim 1, it is characterised in that: the grip block
It (35) is pointed structures with the left end of flexible clamping plate (36), on the right end medial surface of grip block (35) and flexible clamping plate (36)
It is even to be provided with anti-slop serrations.
3. a kind of positioning installation frame of steel construction insulation board according to claim 1, it is characterised in that: the installation branch
It is equipped in the middle part of the left side of plate (31) and draws pillar (311), the middle part for drawing pillar (311) passes through in flexible supporting plate (33)
The square groove of portion's setting is drawn and is equipped with Pneumatic suction cup (312) on the left side of pillar (311), and Pneumatic suction cup (312) is located at pneumatic
In the rolling groove of sucker (312) setting.
4. a kind of positioning installation frame of steel construction insulation board according to claim 1, it is characterised in that: the clamping branch
The bottom of each slide bar of plate (34) right side setting is connected at the top of a firm spring (341), consolidates spring
(341) bottom is mounted on the left side of flexible supporting plate (33).
5. a kind of positioning installation frame of steel construction insulation board according to claim 1, it is characterised in that: the roller press
Structure (38) includes rolling Multi-stage push rod (381), rolling frame linking (382) and rolling wheel (383), and rolling wheel (383) is located at clamping branch
In the rolling groove of plate (34) setting, rolling wheel (383) is mounted on the inner end of rolling frame linking (382) by shaft, rolls frame linking
(382) it is connected on the right side of outer end at the top of rolling Multi-stage push rod (381), the bottom of rolling Multi-stage push rod (381) is mounted on
On the outer end right side for clamping supporting plate (34).
6. a kind of positioning installation frame of steel construction insulation board according to claim 5, it is characterised in that: the rolling wheel
(383) it is symmetrically distributed with square groove on lateral surface, is installed by briquetting spring (384) in each square groove of rolling wheel (383)
There is a flexible briquetting (385), the outer end of flexible briquetting (385) is arcuate structure.
7. a kind of positioning installation frame of steel construction insulation board according to claim 1, it is characterised in that: the installation branch
It is equipped on the bottom of plate (31) extrusion rack (313), extruding telescopic rod is uniformly installed on the left side of extrusion rack (313)
(314), it is mounted on a squeezing roller (315) on each top for squeezing telescopic rod (314), squeezes telescopic rod (314)
It is set on outer end and squeezes spring (316).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811545619.5A CN109629808A (en) | 2018-12-18 | 2018-12-18 | A kind of positioning installation frame of steel construction insulation board |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811545619.5A CN109629808A (en) | 2018-12-18 | 2018-12-18 | A kind of positioning installation frame of steel construction insulation board |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109629808A true CN109629808A (en) | 2019-04-16 |
Family
ID=66074893
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811545619.5A Pending CN109629808A (en) | 2018-12-18 | 2018-12-18 | A kind of positioning installation frame of steel construction insulation board |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109629808A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110453897A (en) * | 2019-05-14 | 2019-11-15 | 成都生活家网络科技有限公司 | A kind of fixed device of wall body brick |
CN110725519A (en) * | 2019-10-22 | 2020-01-24 | 广东博智林机器人有限公司 | Pushing and pressing mechanism and wood floor laying robot |
CN111648607A (en) * | 2020-05-06 | 2020-09-11 | 马鞍山市金韩防水保温工程有限责任公司 | Use convenient external wall insulation board mounting tool |
CN112095497A (en) * | 2020-10-26 | 2020-12-18 | 潘林妃 | Building bridge reinforcement construction method |
CN112392214A (en) * | 2020-11-20 | 2021-02-23 | 南京骆巍峨科技有限公司 | Installation method of heat-insulation decorative material for heat-insulation exterior wall construction |
CN112900894A (en) * | 2021-01-26 | 2021-06-04 | 杨淑媛 | Supporting upright post righting device for steel structure assembly construction |
CN113216576A (en) * | 2021-05-19 | 2021-08-06 | 山东海瑞林装饰工程有限公司 | Method for paving heat-insulating board for indoor decoration |
CN114250872A (en) * | 2021-12-28 | 2022-03-29 | 福建宏盛建设集团有限公司 | Construction method for energy-saving green building heat-insulating wall |
CN114278061A (en) * | 2022-01-10 | 2022-04-05 | 安徽理工大学 | Automatic wall tile sticking device capable of uniformly coating cement for building construction |
CN116290834A (en) * | 2023-05-24 | 2023-06-23 | 江苏亘久科技发展有限公司 | Building insulation board auxiliary installation device |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100728712B1 (en) * | 2006-01-31 | 2007-06-14 | (주)대동석재공업 | A fixing device for a out side panel |
CN106381990A (en) * | 2016-11-04 | 2017-02-08 | 浙江百施通网络科技有限公司 | Robot for wall and floor paving |
CN108086646A (en) * | 2017-12-18 | 2018-05-29 | 吴传江 | A kind of floor building decoration construction material fiber cement outer wall hanging plate automatic mounting machine |
CN108374548A (en) * | 2018-05-14 | 2018-08-07 | 王兰兰 | A kind of decorating building wall construction equipment |
CN108560886A (en) * | 2018-05-14 | 2018-09-21 | 王兰兰 | A kind of construction and decoration construction machine of automatic replacement furring tile |
CN108655261A (en) * | 2018-05-04 | 2018-10-16 | 潘岳燕 | A kind of automatic bending device of steel construction processing angle steel |
-
2018
- 2018-12-18 CN CN201811545619.5A patent/CN109629808A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100728712B1 (en) * | 2006-01-31 | 2007-06-14 | (주)대동석재공업 | A fixing device for a out side panel |
CN106381990A (en) * | 2016-11-04 | 2017-02-08 | 浙江百施通网络科技有限公司 | Robot for wall and floor paving |
CN108086646A (en) * | 2017-12-18 | 2018-05-29 | 吴传江 | A kind of floor building decoration construction material fiber cement outer wall hanging plate automatic mounting machine |
CN108655261A (en) * | 2018-05-04 | 2018-10-16 | 潘岳燕 | A kind of automatic bending device of steel construction processing angle steel |
CN108374548A (en) * | 2018-05-14 | 2018-08-07 | 王兰兰 | A kind of decorating building wall construction equipment |
CN108560886A (en) * | 2018-05-14 | 2018-09-21 | 王兰兰 | A kind of construction and decoration construction machine of automatic replacement furring tile |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110453897B (en) * | 2019-05-14 | 2024-04-09 | 成都生活家网络科技有限公司 | Wall brick fixing device |
CN110453897A (en) * | 2019-05-14 | 2019-11-15 | 成都生活家网络科技有限公司 | A kind of fixed device of wall body brick |
CN110725519A (en) * | 2019-10-22 | 2020-01-24 | 广东博智林机器人有限公司 | Pushing and pressing mechanism and wood floor laying robot |
CN110725519B (en) * | 2019-10-22 | 2020-12-22 | 广东博智林机器人有限公司 | Pushing and pressing mechanism and wood floor laying robot |
CN111648607A (en) * | 2020-05-06 | 2020-09-11 | 马鞍山市金韩防水保温工程有限责任公司 | Use convenient external wall insulation board mounting tool |
CN112095497A (en) * | 2020-10-26 | 2020-12-18 | 潘林妃 | Building bridge reinforcement construction method |
CN112392214A (en) * | 2020-11-20 | 2021-02-23 | 南京骆巍峨科技有限公司 | Installation method of heat-insulation decorative material for heat-insulation exterior wall construction |
CN112900894A (en) * | 2021-01-26 | 2021-06-04 | 杨淑媛 | Supporting upright post righting device for steel structure assembly construction |
CN113216576A (en) * | 2021-05-19 | 2021-08-06 | 山东海瑞林装饰工程有限公司 | Method for paving heat-insulating board for indoor decoration |
CN114250872A (en) * | 2021-12-28 | 2022-03-29 | 福建宏盛建设集团有限公司 | Construction method for energy-saving green building heat-insulating wall |
CN114250872B (en) * | 2021-12-28 | 2023-08-25 | 福建宏盛建设集团有限公司 | Construction method for energy-saving green building thermal insulation wall |
CN114278061A (en) * | 2022-01-10 | 2022-04-05 | 安徽理工大学 | Automatic wall tile sticking device capable of uniformly coating cement for building construction |
CN114278061B (en) * | 2022-01-10 | 2023-12-19 | 中交苏南(无锡)城市建设有限公司 | Automatic wall brick pasting device capable of uniformly coating cement for building construction |
CN116290834A (en) * | 2023-05-24 | 2023-06-23 | 江苏亘久科技发展有限公司 | Building insulation board auxiliary installation device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109629808A (en) | A kind of positioning installation frame of steel construction insulation board | |
CN204960311U (en) | Door and window entrance to a cave removable mold board bearing structure | |
CN108374548A (en) | A kind of decorating building wall construction equipment | |
CN106835509B (en) | A kind of clamping device of curtain taping machine | |
CN210890394U (en) | Electromechanical engineering is with a gallows of combatting earthquake | |
CN108390625B (en) | Portable solar photovoltaic support | |
CN109103497B (en) | Soft package lithium battery aluminum plastic film packaging equipment and automatic aluminum plastic film packaging process | |
CN107052092A (en) | A kind of silicon steel post corrects leveling apparatus | |
CN210999159U (en) | Automatic pressing device for wood frame production | |
CN209697242U (en) | A kind of container bottom board processing adhesive spray equipment of adjustable spray range | |
CN209109443U (en) | A kind of auxiliary overturning tooling for the processing of door industry | |
CN206759669U (en) | A kind of special wheat frame of Energy of Vocal Music | |
CN211694288U (en) | Six-axis adjusting mechanism based on liquid crystal display | |
CN205888653U (en) | Fixed establishment is placed to pipe | |
CN107356067A (en) | It is a kind of can multilayer assembling bacon dryer bacon frame | |
CN208392260U (en) | A kind of glue stations for wooden boards | |
CN109015477B (en) | Automatic installation robot for agricultural plastic film greenhouse | |
CN207373878U (en) | A kind of pressed film equipment of profiled sheeting | |
CN109216593B (en) | Aluminum plastic film packaging rolling machine and aluminum plastic film packaging rolling method for soft package lithium battery | |
CN210469972U (en) | Control panel convenient to height-adjusting | |
CN204225506U (en) | To build a wall spreading device | |
CN207594507U (en) | A kind of portable plank printing device | |
CN107297614B (en) | A kind of aluminum alloy push-pull doorframe special intelligent fitting machine | |
CN206976560U (en) | A kind of comprehensive adjustable embellished antenna mounting bracket | |
CN219926674U (en) | Film drying and dehumidifying device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190416 |
|
WD01 | Invention patent application deemed withdrawn after publication |