CN115852767B - Structure and method for rapidly treating differential settlement of bridge head - Google Patents

Structure and method for rapidly treating differential settlement of bridge head Download PDF

Info

Publication number
CN115852767B
CN115852767B CN202211579373.XA CN202211579373A CN115852767B CN 115852767 B CN115852767 B CN 115852767B CN 202211579373 A CN202211579373 A CN 202211579373A CN 115852767 B CN115852767 B CN 115852767B
Authority
CN
China
Prior art keywords
grouting
roadbed
geogrid
bridge head
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202211579373.XA
Other languages
Chinese (zh)
Other versions
CN115852767A (en
Inventor
员康锋
孔繁盛
马冬云
周维锋
梁奇
王勇
田瑞芳
徐强
吕春春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Provincial Transportation Construction Center
Shanxi Transportation Technology Research and Development Co Ltd
Original Assignee
Shanxi Provincial Transportation Construction Center
Shanxi Transportation Technology Research and Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Provincial Transportation Construction Center, Shanxi Transportation Technology Research and Development Co Ltd filed Critical Shanxi Provincial Transportation Construction Center
Priority to CN202211579373.XA priority Critical patent/CN115852767B/en
Publication of CN115852767A publication Critical patent/CN115852767A/en
Application granted granted Critical
Publication of CN115852767B publication Critical patent/CN115852767B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention relates to a structure and a method for rapidly treating uneven settlement of a bridge head, which are characterized in that a geogrid, a frame, hollow steel pipes, copper rods, heating wires, copper rods, a humidity sensor and a data line are embedded in the bridge head during construction of the bridge head structure, when uneven settlement of a road surface occurs in the bridge head after operation, a grouting pipe is arranged at the hollow steel pipes on one side of a roadbed, a grouting machine is connected, the other side of the grouting pipe is connected with an electric wire and connected with a generator, the generator is started, the humidity change is monitored, the height of the existing roadbed is observed through a scale, the height to be lifted is estimated, the steel pipes are heated and expanded by the heating wires, the soil around the steel pipes is expanded when being heated, meanwhile, grouting is carried out to enable the soil in the roadbed to be integrally lifted, the humidity sensor is monitored to prevent leakage, a channel on the lower part of the geogrid enables slurry to flow horizontally, the roadbed is evenly filled, and the integral lifting is realized. The invention can improve the strength of the road bed at the bridge head, recover deformation to a certain extent, and rapidly solve the problem of uneven settlement at the bridge head under the condition of not influencing traffic.

Description

Structure and method for rapidly treating differential settlement of bridge head
Technical Field
The invention relates to the technical field of engineering foundations, in particular to a structure and a method for rapidly treating uneven settlement of bridge heads.
Background
The immediate cause of the uneven settlement phenomenon of the bridge head is caused by the obvious differential settlement of the rigid bridge abutment and the flexible embankment caused by the large difference of the rigidity under the action of load. The bridge head roadbed filler usually contains moisture and has pores, the compaction measures adopted in the construction process cannot completely eliminate the pores among filler particles under the action of the dead weight and the vehicle load, the filler gradually compacts, the porosity gradually decreases, the filler is compressed, and compression deformation is generated in a certain period.
The structure for rapidly treating uneven settlement of the bridge head is used for solving the problem of uneven settlement of the bridge head roadbed after construction. However, the current phenomenon of uneven settlement of bridge heads is common, and under severe conditions, the phenomenon is generally treated by jet grouting piles, so that traffic needs to be blocked, and the cost is high.
Disclosure of Invention
Aiming at the problems, the invention provides a structure and a method for rapidly treating uneven settlement of the bridge head, which can improve the roadbed strength of the bridge head, recover deformation to a certain extent and rapidly solve the problem of uneven settlement of the bridge head under the condition of not influencing traffic.
A structure for rapidly treating differential settlement of a bridgehead, comprising: bridge approach, pier, geogrid, frame, cavity steel pipe, bar copper, heating wire, wherein:
The frame is formed by crisscross combination of a cross rod and a vertical rod and is used for fixing the hollow steel pipe;
the surface of the hollow steel pipe is provided with a circular hole, a steel sheet is covered on the hole, one end of the steel sheet is fixed, the other end of the steel sheet can be opened and closed, the diameter of the steel sheet is larger than that of the hole, so that soil cannot enter the steel pipe when grouting is not performed, and the steel sheet is opened to inject soil under the action of pressure during grouting;
The electric wires are uniformly distributed on the inner side of the hollow steel pipe in a net-shaped manner, the middle of each electric wire is connected through a copper rod, one end of each copper rod is communicated with the electric wire, the electric wires are powered by a generator, the grouting pipe is communicated with one end of the hollow steel pipe, and grouting is performed by a grouting machine;
The geogrid is positioned in the roadbed, is horizontally arranged, and is concave in the lower part and communicated with the roadbed, and is used for dredging grouting bodies to realize uniform grouting.
Further, the humidity sensor is arranged on the upper portion of the geogrid, and the vertical humidity change condition is monitored at the top of the roadbed so as to prevent slurry from overflowing out of the road surface.
Further, the scale is arranged on one side of the roadbed and is perpendicular to the ground, and the scale is used for measuring the lifting deformation of the surface of the roadbed.
A method for rapidly treating differential settlement of bridge heads comprises the following steps:
the bridge head structure is buried into cavity steel pipe, the steel sheet, the heating wire, the bar copper, the electric wire, humidity transducer, data line and geogrid, when the uneven subsidence in road surface appears in the operation rear axle head, the slip casting pipe is installed in cavity steel pipe department on one side of the road bed, and connect the slip casting machine, the opposite side connecting wire meets with the generator, start simultaneously and gather the box, monitor humidity change, through the scale, observe current road bed height, estimate the height that needs the lifting, steel pipe heating expansion after the heating wire heating, the soil body meets thermal expansion around the steel pipe, slip casting makes the inside soil body whole lifting of road bed simultaneously, humidity transducer monitors and prevents the leakage thick liquid, geogrid lower part passageway makes thick liquid horizontal flow, evenly fill the road bed inside, realize whole lifting.
The invention has the following beneficial technical effects:
1) Circular holes are uniformly distributed on the surface of the hollow steel pipe, the diameters of the holes are smaller, steel sheets are covered on the holes, one section of the holes are welded, the other ends of the holes are freely placed, the diameters of the steel sheets are larger than those of the holes, and therefore the soil cannot enter the steel pipe when grouting is not performed, and the steel sheets are opened under the action of pressure to be injected into the soil when grouting is performed;
2) The geogrid is positioned in the roadbed, is horizontally arranged, and the lower parts of the geogrid are concave and communicated and are used for dredging grouting bodies to realize uniform grouting;
3) After the heating wire is heated, the steel pipe is heated and expanded, the soil body around the steel pipe is expanded when being heated, and meanwhile, the soil body inside the roadbed can be lifted integrally by grouting.
Drawings
FIG. 1 is a schematic view of a structure for rapidly treating differential settlement of a bridge head, in which:
The device comprises a bridge approach 1, a bridge pier 2, a geogrid 3, a 4-humidity sensor, a 5-frame, a 6-data line, a 7-hollow steel pipe, an 8-scale, a 9-copper bar, a 10-grouting machine, an 11-grouting pipe, a 12-external electric wire, a 13-electric heating wire, a 14-electric wire and a 15-generator.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
Examples
A structure for rapidly treating differential settlement of a bridgehead, comprising: bridge approach 1, bridge pier 2, geogrid 3, frame 5, hollow steel pipe 7, bar copper 9, heating wire 13.
The frame 5 is formed by crisscross combination of cross bars and vertical bars and is used for fixing the hollow steel pipes.
Circular holes are distributed on the surface of the hollow steel pipe 7, steel sheets are covered on the holes, one ends of the steel sheets are fixed, the other ends of the steel sheets are openable and closable, and the diameter of the steel sheets is larger than that of the holes, so that soil cannot enter the steel pipe when grouting is not performed, and the steel sheets are opened under the action of pressure to inject the soil during grouting.
The electric heating wires 13 are uniformly distributed on the inner side of the hollow steel tube 7 in a net-shaped manner, the middle of the electric heating wires 13 is connected through a copper rod 9, one end of the copper rod 9 is communicated with an electric wire, power is supplied through a generator 15, the grouting pipe 11 is communicated with one end of the hollow steel tube 7, and grouting is performed through a grouting machine 10.
The geogrid 3 is positioned in the roadbed, is horizontally arranged, and the lower parts of the geogrid are concave and communicated and are used for dredging grouting bodies so as to realize uniform grouting.
The humidity sensor 4 is arranged on the upper part of the geogrid, and monitors the vertical humidity change condition at the top of the roadbed so as to prevent slurry from overflowing out of the road surface.
The scale 8 is perpendicular to the ground and is arranged on one side of the roadbed and used for measuring the lifting deformation of the surface of the roadbed.
A method for rapidly treating differential settlement of bridge heads comprises the following steps:
The bridge head structure is buried into cavity steel pipe 7, the steel sheet, heating wire 13, bar copper 9, electric wire 14, scale 8, humidity transducer 4, data line 6 and geogrid 3, when the uneven subsidence of road surface appears in the operation rear axle head, the slip casting pipe 11 is installed in cavity steel pipe department in road bed one side, and connect grouting machine 10, the opposite side connecting wire 14 is connected with generator 15, start the generator, start simultaneously and gather the box, monitor humidity change, through the scale, survey current road bed height, estimate the height that needs the lifting, steel pipe heating expansion after heating wire 13 heats, the soil body is thermal expansion around the steel pipe, slip casting makes the inside soil body whole lifting of road bed simultaneously, humidity transducer 4 monitors and prevents the leakage thick liquid, geogrid 3 lower part passageway makes the thick liquid horizontal flow, evenly fill inside the road bed, realize whole lifting.
While the present invention has been described in detail with reference to the embodiments, the present invention is not limited to the above-described embodiments, and various changes can be made without departing from the spirit of the present invention within the knowledge of those skilled in the art, and the present invention shall also be considered as the scope of the present invention.

Claims (4)

1. A structure for rapidly treating differential settlement of a bridgehead, comprising: bridge approach, pier, geogrid, frame, cavity steel pipe, bar copper and heating wire, its characterized in that:
The frame is formed by crisscross combination of a cross rod and a vertical rod and is used for fixing the hollow steel pipe;
the surface of the hollow steel pipe is provided with a circular hole, a steel sheet is covered on the hole, one end of the steel sheet is fixed, the other end of the steel sheet can be opened and closed, the diameter of the steel sheet is larger than that of the hole, so that soil cannot enter the steel pipe when grouting is not performed, and the steel sheet is opened to inject soil under the action of pressure during grouting;
the electric heating wires are uniformly distributed on the inner side of the hollow steel pipe in a net shape, the middle of the electric heating wires are connected through copper bars, one ends of the copper bars are communicated with the electric wires, power is supplied through a generator, the grouting pipe is communicated with one end of the hollow steel pipe, and grouting is performed through a grouting machine;
The geogrid is positioned in the roadbed, is horizontally arranged, and is concave in the lower part and communicated with the roadbed, and is used for dredging grouting bodies to realize uniform grouting.
2. The structure for rapidly disposing of differential settlement of bridge heads according to claim 1, wherein: the humidity sensor is arranged on the upper part of the geogrid, and the vertical humidity change condition is monitored at the top of the roadbed so as to prevent slurry from overflowing out of the road surface.
3. The structure for rapidly disposing of uneven settlement of a bridgehead according to claim 2, wherein: the scale is arranged on one side of the roadbed and is perpendicular to the ground, and the scale is used for measuring the lifting deformation of the surface of the roadbed.
4. A method for rapidly treating uneven settlement of bridge heads is characterized by comprising the following steps: the structure in claim 2 is formed by embedding geogrid, frame, hollow steel tube, copper bar, heating wire, copper bar, humidity transducer, data line during construction of bridge head structure, when the uneven subsidence of road surface appears in the operation rear axle head, install the slip casting pipe in the hollow steel tube department of road bed one side, and connect the slip casting machine, the opposite side connecting wire meets with the generator, start humidity transducer simultaneously, monitor humidity variation, set up the scale in road bed one side, perpendicular to ground, through the scale, survey current road bed height, predict the height that needs the lifting, steel tube heating expansion after the heating wire heats, the soil body is met thermal expansion around the steel tube, slip casting makes the inside soil body whole lifting of road bed simultaneously, humidity transducer monitors and prevents the leakage thick liquid, geogrid lower part passageway makes thick liquid horizontal flow, evenly fill the inside the road bed, realize whole lifting.
CN202211579373.XA 2022-12-08 2022-12-08 Structure and method for rapidly treating differential settlement of bridge head Active CN115852767B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211579373.XA CN115852767B (en) 2022-12-08 2022-12-08 Structure and method for rapidly treating differential settlement of bridge head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211579373.XA CN115852767B (en) 2022-12-08 2022-12-08 Structure and method for rapidly treating differential settlement of bridge head

Publications (2)

Publication Number Publication Date
CN115852767A CN115852767A (en) 2023-03-28
CN115852767B true CN115852767B (en) 2024-08-23

Family

ID=85671519

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211579373.XA Active CN115852767B (en) 2022-12-08 2022-12-08 Structure and method for rapidly treating differential settlement of bridge head

Country Status (1)

Country Link
CN (1) CN115852767B (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110485230A (en) * 2019-09-17 2019-11-22 招商局重庆交通科研设计院有限公司 A kind for the treatment of structures and construction method of high water level weak soil Bridgehead by Blastig
CN110485316A (en) * 2019-08-27 2019-11-22 山东交通学院 A kind of method of multiple slip casting to administer bumping at bridge-head

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2906019C (en) * 2013-03-15 2021-07-13 William B. Coe Pavement repair system
JP7107665B2 (en) * 2017-11-17 2022-07-27 公益財団法人鉄道総合技術研究所 Roadbed improvement method
KR102106034B1 (en) * 2019-08-16 2020-04-29 주식회사 다올엔지니어링 Multistage steel pipe grouting method for tunnel construction
CN113136788B (en) * 2021-04-14 2022-08-19 殷绍斌 Bridgehead structure capable of reducing incidence of bridgehead bumping and construction and maintenance method
CN114134763A (en) * 2021-11-30 2022-03-04 中铁第四勘察设计院集团有限公司 Short-circuit foundation structure of embankment and construction method thereof

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110485316A (en) * 2019-08-27 2019-11-22 山东交通学院 A kind of method of multiple slip casting to administer bumping at bridge-head
CN110485230A (en) * 2019-09-17 2019-11-22 招商局重庆交通科研设计院有限公司 A kind for the treatment of structures and construction method of high water level weak soil Bridgehead by Blastig

Also Published As

Publication number Publication date
CN115852767A (en) 2023-03-28

Similar Documents

Publication Publication Date Title
CN111441374B (en) Quick plugging construction method for high-water-pressure deep foundation pit dewatering well
CN115852767B (en) Structure and method for rapidly treating differential settlement of bridge head
CN114086590B (en) Pre-reinforcing device for repairing pile foundation of transmission terminal tower and construction method thereof
CN105256790B (en) Prefabricated skirt type pipe pile used for drainage and added with pile body inclined support and construction method thereof
CN106320121A (en) Subgrade repair structure and subgrade repair method
CN116608323A (en) Quick construction equipment and construction method for fully assembled concrete drainage pipeline
CN111593725A (en) Vibroflotation gravel pile and construction method thereof
JP2000319865A (en) Soil reinforcing complex method
CN108385651A (en) A kind of design and construction method carrying out reinforcing soft foundation using composite geotextile
CN210529683U (en) A tubular pile for soft soil foundation
CN113373948A (en) Protective structure for repairing unstable expansive soil slope and construction method thereof
CN106759411A (en) Dry construction well point pipe's dmbeding method and special well point tube assembly
CN110241830A (en) A kind of backfilling apparatus and earth-filling method
CN111549818A (en) Fabricated vegetation retaining wall with controllable prestress in construction period and construction equipment and method
CN206667275U (en) The special well point tube assembly of dry construction well point pipe's dmbeding method
CN107059948B (en) Reset processing method and system for floating open cut tunnel structure
CN220079602U (en) Anti-sedimentation structure based on soft soil roadbed
CN115387325B (en) Construction method for trapped cutting box body of pile machine in TRD construction method
CN216474978U (en) End-bearing pile body defect repairing device
CN109898541A (en) Steel tower column foot construction technology and piling machine applied to the construction technology
CN214143747U (en) H formula combination cling compound structure with prestressed anchorage cable
CN114658045B (en) Active retaining wall repairing construction method
CN216948203U (en) Ground treatment structure for deep earth filling field
CN214992766U (en) Roadbed basement gravel pile composite foundation structure
CN108914987A (en) Pile crown construction method for high strain monitoring

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant