CN115387325B - Construction method for trapped cutting box body of pile machine in TRD construction method - Google Patents

Construction method for trapped cutting box body of pile machine in TRD construction method Download PDF

Info

Publication number
CN115387325B
CN115387325B CN202210644724.4A CN202210644724A CN115387325B CN 115387325 B CN115387325 B CN 115387325B CN 202210644724 A CN202210644724 A CN 202210644724A CN 115387325 B CN115387325 B CN 115387325B
Authority
CN
China
Prior art keywords
cutting box
wire rope
construction method
box
support bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210644724.4A
Other languages
Chinese (zh)
Other versions
CN115387325A (en
Inventor
丁继民
史绪鑫
艾丛阳
范恩菠
王长波
邓以亮
童涧清
史浩君
黄星迪
朱海娣
王涛
朱成林
李平
周方圆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongtong Geotechnical Science And Technology Inc
Original Assignee
Dongtong Geotechnical Science And Technology Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongtong Geotechnical Science And Technology Inc filed Critical Dongtong Geotechnical Science And Technology Inc
Priority to CN202210644724.4A priority Critical patent/CN115387325B/en
Publication of CN115387325A publication Critical patent/CN115387325A/en
Application granted granted Critical
Publication of CN115387325B publication Critical patent/CN115387325B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention discloses a construction method for pulling out a trapped cutting box body of a TRD construction method pile machine, and aims to provide a construction method capable of effectively improving the pulling out and getting rid of trapping capacity of the cutting box body of the TRD construction method pile machine and pulling out the trapped cutting box body of the TRD construction method pile machine. The construction method adopts a top support bracket and a pulling device for construction, and the construction method sequentially comprises the following steps that A, soil around a cutting box body is initially separated, and slurry doped with bentonite is sprayed to the soil around the cutting box body from bottom to top by adopting a high-pressure rotary jet grouting pile machine; b, installing a top support bracket, and fixing the top support bracket on the top of the cutting box body through bolts by using the top support bracket; the vibrating hammer is installed, and the vibrating hammer is fixedly installed on the top support bracket; installing a lifting device, paving a roadbed box on the ground surface, arranging a bottom frame on the roadbed box, enabling the upper end of a cutting box body to penetrate through the bottom frame and a top frame, and enabling a lifting oil cylinder to be positioned between the bottom frame and the top frame; and C, jacking the cutting box body.

Description

一种起拔TRD工法桩机被困切割箱体的施工方法A construction method for pulling out the trapped cutting box of the TRD construction method pile driver

技术领域Technical field

本发明涉及TRD工法桩机在埋钻时的施工方法,具体涉及一种起拔TRD工法桩机被困切割箱体的施工方法。The present invention relates to a construction method for a TRD pile driver when buried in a drill, and specifically relates to a construction method for pulling out a trapped cutting box of a TRD pile driver.

背景技术Background technique

TRD工法是一种能够在原地搅拌形成等厚地下水泥土连续墙的施工方法。施工过程中,切割箱体均处于地下,因槽壁土体坍塌、施工机械故障和施工操作不当等原因,切割箱体被倒塌的土体吸附、夹持、卡钻,导致设备自身的提升油缸无法达到起拔脱困的能力。目前常见的做法是,在切割箱体的一侧附加一台外置的液压油缸,但是顶推力依旧有限,且外置的液压油缸的顶推力位于切割箱体的一侧是偏心力,往往还是难以顶起被困的切割箱体,导致切割箱体“打捞”失败,造工程和设备的巨额经济损失。The TRD construction method is a construction method that can form a continuous wall of groundwater soil with equal thickness in situ. During the construction process, the cutting boxes were all underground. Due to the collapse of the trench wall soil, construction machinery failure, improper construction operations, etc., the cutting boxes were adsorbed, clamped, and stuck by the collapsed soil, causing the lifting cylinder of the equipment itself to collapse. Unable to achieve the ability to pull out of trouble. A common practice at present is to attach an external hydraulic cylinder to one side of the cutting box, but the pushing force is still limited, and the pushing force of the external hydraulic cylinder is located on one side of the cutting box because of the eccentric force, which is often still It is difficult to lift up the trapped cutting box, resulting in failure to "salvage" the cutting box and causing huge economic losses to the project and equipment.

发明内容Contents of the invention

本发明的目的是为了提供一种起拔TRD工法桩机被困切割箱体的施工方法,其能够有效提高TRD工法桩机的切割箱体的起拔脱困能力,将被困的TRD工法桩机的切割箱体拔起。The object of the present invention is to provide a construction method for pulling out the trapped cutting box of a TRD pile driver, which can effectively improve the pulling-out ability of the cutting box of a TRD pile driver and remove the trapped TRD pile driver. Pull up the cutting box.

本发明的技术方案是:The technical solution of the present invention is:

一种起拔TRD工法桩机被困切割箱体的施工方法,该施工方法采用顶撑支架和起拔装置施工,起拔装置包括底架、顶架及位于底架与顶架之间的顶升油缸,起拔TRD工法桩机被困切割箱体的施工方法依次包括以下步骤,A construction method for pulling out a trapped cutting box of a TRD construction method. The construction method uses a top support bracket and a lifting device. The lifting device includes a bottom frame, a top frame and a top frame located between the bottom frame and the top frame. The construction method of lifting the oil cylinder and pulling out the trapped cutting box of the pile driver using the TRD construction method includes the following steps in sequence:

A,初步分离切割箱体周围土体,采用高压旋喷桩机自下而上的对切割箱体周围的土体喷射掺有膨润土的泥浆,使切割箱体和切割箱体周围土体初步分离;A. Preliminarily separate the soil around the cutting box. Use a high-pressure jet spray pile machine to spray mud mixed with bentonite from bottom to top on the soil around the cutting box to initially separate the cutting box and the soil around the cutting box. ;

B,安装顶撑支架,将顶撑支架通过螺栓将顶撑支架固定在切割箱体的顶部;B. Install the top support bracket and fix the top support bracket to the top of the cutting box through bolts;

安装振动锤,在顶撑支架上固定安装振动锤;Install the vibrating hammer and fix the vibrating hammer on the top support bracket;

安装起拔装置,在地表铺设路基箱,底架置于路基箱上,顶架位于顶撑支架与底架之间,切割箱体上端穿过底架和顶架,顶升油缸位于底架与顶架之间;Install the lifting device, lay the subgrade box on the surface, place the bottom frame on the subgrade box, and the top frame is located between the top support bracket and the bottom frame. The upper end of the cutting box passes through the bottom frame and the top frame, and the lifting cylinder is located between the bottom frame and the bottom frame. between top shelves;

C,顶升切割箱体,(1)振动锤开启振动切割箱体;(2),顶升油缸顶升切割箱体,顶升油缸将顶架顶起并抵在顶撑支架上,然后顶升油缸通过顶架和顶撑支架顶起切割箱体。C. Lift the cutting box. (1) The vibration hammer opens the vibrating cutting box; (2) The lifting cylinder lifts the cutting box. The lifting cylinder lifts the top frame and presses it against the top support bracket, and then lifts the cutting box. The lifting cylinder lifts the cutting box through the top frame and the top support bracket.

本方案的施工方法中,先在A步骤中用高压旋喷桩机对切割箱体周围的土体喷射掺有膨润土的泥浆,使切割箱体和切割箱体周围土体初步分离,从而有效的减小被困的切割箱体受到的起拔阻力;如此,在相同的顶升力的情况下,能够有效提高TRD工法桩机的切割箱体的起拔脱困能力,将被困的TRD工法桩机的切割箱体拔起;接着,通过振动锤的振动进一步减小被困的切割箱体受到的起拔阻力,然后,在通过顶升油缸顶升切割箱体,从而有效的减小被困的切割箱体受到的起拔阻力,将被困的TRD工法桩机的切割箱体拔起。In the construction method of this plan, in step A, a high-pressure rotary jet pile driver is first used to spray mud mixed with bentonite on the soil around the cutting box, so that the cutting box and the soil around the cutting box are initially separated, thereby effectively Reduce the pulling-out resistance of the trapped cutting box; in this way, under the same jacking force, the pulling-out ability of the cutting box of the TRD pile driver can be effectively improved, and the trapped TRD pile driver can The cutting box is pulled up; then, the vibration of the vibrating hammer further reduces the pulling resistance of the trapped cutting box, and then the cutting box is lifted by the jacking cylinder, thereby effectively reducing the trapped cutting box. The cutting box of the trapped TRD pile driver was pulled up due to the pulling resistance.

作为优选,(2)步骤中,顶升油缸通过顶架和顶撑支架施加在切割箱体上的最大顶升力为N吨。Preferably, in step (2), the maximum lifting force exerted by the lifting cylinder on the cutting box through the top frame and the top support bracket is N tons.

作为优选,(2)步骤中,当顶升油缸通过顶架和顶撑支架施加在切割箱体上的顶升力达到N吨后,顶升油缸保持N吨的顶升力t分钟,若在此期间顶升油缸没有将切割箱体顶起;则返回(1)步骤直至顶升油缸将切割箱体顶起。如此,通过(1)步骤的振动与(2)步骤的顶升循环配合,一方面有利于将被困的TRD工法桩机的切割箱体拔起,另一方面,避免长期过大的顶升力施加在切割箱体上,而导致切割箱体的连接螺栓断裂。As a preference, in step (2), when the lifting force exerted by the lifting cylinder on the cutting box through the top frame and the top support bracket reaches N tons, the lifting cylinder maintains the lifting force of N tons for t minutes. If during this period The lifting cylinder does not lift the cutting box; return to step (1) until the lifting cylinder lifts the cutting box. In this way, the vibration of step (1) and the jacking cycle of step (2) are combined, on the one hand, it is beneficial to pull out the cutting box of the trapped TRD pile driver, and on the other hand, it avoids excessive jacking force in the long term. applied to the cutting box, causing the connecting bolts of the cutting box to break.

作为优选,A步骤还包括,泥浆液置换,在切割箱体内部输液通道内注入泥浆液,以稀释或清空切割箱体内部及其四周水泥土浆液,防止水泥浆与切割箱体凝固成为一体。如此,可以在起拔切割箱体之前,进一步的减小被困的切割箱体受到的起拔阻力,从而提高TRD工法桩机的切割箱体的起拔脱困能力。Preferably, step A also includes mud liquid replacement, injecting mud liquid into the infusion channel inside the cutting box to dilute or empty the cement and soil slurry inside and around the cutting box to prevent the cement slurry from solidifying into one with the cutting box. In this way, before the cutting box is pulled out, the pulling resistance of the trapped cutting box can be further reduced, thereby improving the pulling out ability of the cutting box of the TRD pile driver.

作为优选,泥浆液为掺有不低于5%膨润土含量的泥浆液。膨润土浆液具有润滑切割箱与土体的接触界面的作用,有利于使切割箱内部及其四周水泥土浆液清空,防止水泥浆与切割箱凝固成为一体。Preferably, the mud liquid is a mud liquid mixed with a bentonite content of not less than 5%. Bentonite slurry has the function of lubricating the contact interface between the cutting box and the soil, which is beneficial to clearing out the cement and soil slurry inside and around the cutting box, preventing the cement slurry and the cutting box from solidifying into one.

作为优选,顶升油缸至少为两个,且顶升油缸分布在切割箱体的相对两侧。Preferably, there are at least two lifting cylinders, and the lifting cylinders are distributed on opposite sides of the cutting box.

作为优选,A步骤与B步骤之间还包括A1步骤,A1步骤的具体施工如下,采用钢丝绳布设装置在地下布设钢丝绳,所述钢丝绳布设装置包括钢丝绳、限位钢管及两根导向钢管,限位钢管的下端设有钢丝绳限位槽,钢丝绳依次穿过两根导向钢管,钢丝绳的两端均设有吊环;采用钢丝绳布设装置在地下布设钢丝绳的具体步骤包括,Preferably, step A1 is also included between step A and step B. The specific construction of step A1 is as follows. A wire rope laying device is used to lay the wire rope underground. The wire rope laying device includes a steel wire rope, a limit steel pipe and two guide steel pipes. The lower end of the steel pipe is equipped with a wire rope limit groove, and the steel wire rope passes through the two guide steel pipes in sequence. Both ends of the steel wire rope are equipped with lifting rings; the specific steps of using a wire rope laying device to lay the wire rope underground include:

第一,将限位钢管和两根导向钢管立起呈竖直分布,两根导向钢管分布在切割箱体的前后两侧,限位钢管分布在切割箱体的左侧或右侧,钢丝绳穿过钢丝绳限位槽;First, stand the limiting steel pipe and the two guide steel pipes vertically. The two guide steel pipes are distributed on the front and rear sides of the cutting box. The limiting steel pipes are distributed on the left or right side of the cutting box. The wire rope is passed through Pass through the wire rope limit groove;

第二,将两根导向钢管和限位钢管往下插入土层中,直至两根导向钢管的下端和限位钢管的下端均位于TRD工法桩机的切割箱体下方的设定距离;这个过程中钢丝绳始终保持穿过两根导向钢管,钢丝绳穿过钢丝绳限位槽,且钢丝绳的两端位于地表上方;Second, insert the two guide steel pipes and the limit steel pipe downward into the soil layer until the lower ends of the two guide steel pipes and the limit steel pipe are located at the set distance below the cutting box of the TRD pile driver; this process The middle steel wire rope always passes through the two guide steel pipes, the steel wire rope passes through the steel wire rope limit groove, and both ends of the steel wire rope are above the ground surface;

接着,将位于地表上方的钢丝绳的两端往上拉,直至整根钢丝绳处于绷直状态;然后将限位钢管往上拉,使钢丝绳与钢丝绳限位槽分离;Then, pull up both ends of the steel wire rope located above the ground until the entire steel wire rope is in a straight state; then pull the limiting steel pipe upward to separate the steel wire rope from the steel wire rope limiting groove;

再接着,继续将位于地表上方的钢丝绳的两端往上拉,直至整根钢丝绳处于绷直状态,此时,两根导向钢管下端之间的钢丝绳将位于TRD工法桩机的切割箱体下方;Then, continue to pull up both ends of the steel wire rope located above the ground until the entire steel wire rope is in a straight state. At this time, the steel wire rope between the lower ends of the two guide steel pipes will be located under the cutting box of the TRD pile driver;

(2)步骤还包括,吊车和钢丝绳起拔切割箱体,且吊车和钢丝绳起拔切割箱体和顶升油缸顶升切割箱体同步进行,吊车和钢丝绳起拔切割箱体的具体步骤包括,钢丝绳两端的吊环挂在吊车的吊钩上,吊车通过钢丝绳将切割箱体的下端往上起拔。(2) The step also includes the crane and the wire rope lifting and cutting the box, and the crane and the wire rope lifting and cutting the box and the jacking cylinder lifting and cutting the box simultaneously. The specific steps of the crane and the wire rope lifting and cutting the box include: The lifting rings at both ends of the wire rope are hung on the hooks of the crane, and the crane lifts up the lower end of the cutting box through the wire rope.

在切割箱体被埋的工况中,会出现因埋钻夹持力过大,超过切割箱体中用于连接相邻两个切割箱单体的螺栓所能承受的最大拉力,致使用于连接某两个切割箱单体间的螺栓断裂,而导致部分或大部分的切割箱体无法起拔,造工程和设备的巨额经济损失。本方案的起拔方法就是为了解决这一问题,具体参见下文具体实施例。In the working condition where the cutting box is buried, the clamping force of the buried drill may be too large, exceeding the maximum tensile force that the bolts used to connect two adjacent cutting box units in the cutting box can withstand, resulting in the The bolts connecting two cutting box units are broken, causing part or most of the cutting box to be unable to be pulled out, resulting in huge economic losses to the construction project and equipment. The pulling method of this solution is to solve this problem. For details, please refer to the specific embodiments below.

作为优选,起拔装置还包括竖向分布的伸缩柱,伸缩柱的下端与底架相连接,伸缩柱的上端与顶架相连接。Preferably, the lifting device further includes vertically distributed telescopic columns, the lower end of the telescopic column is connected to the bottom frame, and the upper end of the telescopic column is connected to the top frame.

作为优选,顶撑支架为呈十字分布的十字梁。Preferably, the top support bracket is a cross beam distributed in a cross shape.

作为优选,振动锤为高频振动锤,振动锤通过螺栓固定安装在顶撑支架上。Preferably, the vibrating hammer is a high-frequency vibrating hammer, and the vibrating hammer is fixedly installed on the top support bracket through bolts.

本发明的有益效果是:能够有效提高TRD工法桩机的切割箱体的起拔脱困能力,将被困的TRD工法桩机的切割箱体拔起。The beneficial effects of the present invention are: it can effectively improve the pulling-out and escape capability of the cutting box of the TRD pile driver, and pull out the trapped cutting box of the TRD pile driver.

附图说明Description of the drawings

图1是本发明的具体实施例一的一种起拔TRD工法桩机被困切割箱体的施工方法在施工过程中的一种局部结构示意图。Figure 1 is a partial structural schematic diagram of a construction method for pulling out a TRD construction method in which a pile driver is trapped in a cutting box according to the first specific embodiment of the present invention.

图2是本发明的起拔装置的主视图。Figure 2 is a front view of the pulling device of the present invention.

图3是本发明的起拔装置的三维结构示意图。Figure 3 is a schematic three-dimensional structural diagram of the pulling device of the present invention.

图4是本发明的具体实施例二的一种起拔TRD工法桩机被困切割箱体的施工方法在施工过程中的一种局部结构示意图。Figure 4 is a schematic diagram of a partial structure during the construction process of a TRD construction method in which a pile driver is trapped in a cutting box according to the second specific embodiment of the present invention.

图5是图4中a-a处的一种局部剖面结构示意图。Figure 5 is a partial cross-sectional structural schematic diagram at a-a in Figure 4.

图中:In the picture:

起拔装置1,底架1.1,顶架1.2,顶升油缸1.3,伸缩柱1.4;Lifting device 1, bottom frame 1.1, top frame 1.2, lifting cylinder 1.3, telescopic column 1.4;

顶撑支架2;Top support bracket 2;

振动锤3;Vibrating hammer 3;

路基箱4;Road bed box 4;

切割箱体5;Cut box 5;

导向钢管6.1,限位钢管6.2,钢丝绳6.3。Guide steel pipe 6.1, limit steel pipe 6.2, wire rope 6.3.

具体实施方式Detailed ways

下面结合附图与具体实施方式对本发明作进一步详细描述:The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments:

具体实施例一:如图1 、图2、图3所示,一种起拔TRD工法桩机被困切割箱体的施工方法,该施工方法采用顶撑支架2和起拔装置1施工,起拔装置包括底架1.1、顶架1.2及位于底架与顶架之间的顶升油缸1.3。顶升油缸至少为两个,例如,顶升油缸为两个或四个或六个。本实施例中顶升油缸为四个。Specific Embodiment 1: As shown in Figure 1, Figure 2, and Figure 3, a construction method for pulling out a TRD construction method pile driver trapped in a cutting box is constructed using a jacking support bracket 2 and a lifting device 1. The pulling device includes a bottom frame 1.1, a top frame 1.2 and a lifting cylinder 1.3 located between the bottom frame and the top frame. There are at least two lifting cylinders, for example, two or four or six lifting cylinders. In this embodiment, there are four lifting cylinders.

起拔TRD工法桩机被困切割箱体的施工方法依次包括以下步骤,The construction method of pulling out the trapped cutting box of the TRD construction method includes the following steps:

A,初步分离切割箱体周围土体,采用高压旋喷桩机自下而上的对切割箱体5周围的土体喷射掺有膨润土的泥浆,使切割箱体和切割箱体周围土体初步分离。A. Preliminarily separate the soil around the cutting box. Use a high-pressure rotary jet pile machine to spray mud mixed with bentonite on the soil around the cutting box 5 from bottom to top, so that the cutting box and the soil around the cutting box are initially separation.

B,安装顶撑支架,将顶撑支架通过螺栓将顶撑支架固定在切割箱体的顶部。B. Install the top support bracket and fix the top support bracket to the top of the cutting box through bolts.

安装振动锤,在顶撑支架上固定安装振动锤3。Install the vibrating hammer and fix the vibrating hammer 3 on the top support bracket.

安装起拔装置,在地表铺设路基箱4,底架置于路基箱上,顶架位于顶撑支架与底架之间,切割箱体上端穿过底架和顶架,顶升油缸位于底架与顶架之间。四个顶升油缸对称分布在切割箱体的相对两侧。Install the lifting device and lay the subgrade box 4 on the ground. The bottom frame is placed on the subgrade box. The top frame is located between the top support bracket and the bottom frame. The upper end of the cutting box passes through the bottom frame and the top frame. The lifting cylinder is located on the bottom frame. between the top shelf. Four lifting cylinders are symmetrically distributed on opposite sides of the cutting box.

C,顶升切割箱体,(1)振动锤开启振动切割箱体,振动时间为1-3分钟;(2),顶升油缸顶升切割箱体,顶升油缸将顶架顶起并抵在顶撑支架上,然后顶升油缸通过顶架和顶撑支架顶起切割箱体(顶升油缸顶升切割箱体的过程中振动锤停止振动)。C. Lift the cutting box. (1) The vibrating hammer opens the vibrating cutting box. The vibration time is 1-3 minutes. (2) The lifting cylinder lifts the cutting box. The lifting cylinder lifts the top frame and resists it. On the top support bracket, the lifting cylinder then lifts up the cutting box through the top frame and the top support bracket (the vibrating hammer stops vibrating when the lifting cylinder lifts the cutting box).

本实施例的施工方法中,先在A步骤中用高压旋喷桩机对切割箱体周围的土体喷射掺有膨润土的泥浆,使切割箱体和切割箱体周围土体初步分离,从而有效的减小被困的切割箱体受到的起拔阻力;如此,在相同的顶升力的情况下,能够有效提高TRD工法桩机的切割箱体的起拔脱困能力,将被困的TRD工法桩机的切割箱体拔起;接着,通过振动锤的振动进一步减小被困的切割箱体受到的起拔阻力,然后,在通过顶升油缸顶升切割箱体,从而有效的减小被困的切割箱体受到的起拔阻力,将被困的TRD工法桩机的切割箱体拔起。In the construction method of this embodiment, in step A, a high-pressure rotary jet pile machine is first used to spray mud mixed with bentonite on the soil around the cutting box, so that the cutting box and the soil around the cutting box are initially separated, thereby effectively It can effectively reduce the pulling-out resistance of the trapped cutting box; in this way, under the same jacking force, the pulling-out ability of the cutting box of the TRD construction method pile machine can be effectively improved, and the trapped TRD construction method pile can be lifted out. The cutting box of the machine is pulled up; then, the vibration of the vibrating hammer further reduces the pulling resistance of the trapped cutting box, and then the cutting box is lifted by the jacking cylinder, thereby effectively reducing the trapped cutting box. The cutting box of the trapped TRD pile driver was pulled up due to the pulling resistance.

具体的,如图2、图3所示,起拔装置1还包括竖向分布的伸缩柱1.4,伸缩柱的下端与底架相连接,伸缩柱的上端与顶架相连接。顶升油缸的下端支撑在底架上。顶撑支架2为呈十字分布的十字梁。振动锤为高频振动锤,振动锤通过螺栓固定安装在顶撑支架上。Specifically, as shown in Figures 2 and 3, the lifting device 1 also includes vertically distributed telescopic columns 1.4, the lower end of the telescopic column is connected to the bottom frame, and the upper end of the telescopic column is connected to the top frame. The lower end of the jacking cylinder is supported on the bottom frame. The top support bracket 2 is a cross beam distributed in a cross shape. The vibrating hammer is a high-frequency vibrating hammer, which is fixedly installed on the top support bracket through bolts.

进一步的,A步骤还包括,泥浆液置换,在切割箱体内部输液通道内注入泥浆液,以稀释或清空切割箱体内部及其四周水泥土浆液,防止水泥浆与切割箱体凝固成为一体。如此,可以在起拔切割箱体之前,进一步的减小被困的切割箱体受到的起拔阻力,从而提高TRD工法桩机的切割箱体的起拔脱困能力。Further, step A also includes replacing the mud liquid and injecting mud liquid into the infusion channel inside the cutting box to dilute or empty the cement and soil slurry inside and around the cutting box to prevent the cement slurry from solidifying into one with the cutting box. In this way, before the cutting box is pulled out, the pulling resistance of the trapped cutting box can be further reduced, thereby improving the pulling out ability of the cutting box of the TRD pile driver.

泥浆液为掺有不低于5%膨润土含量的泥浆液。膨润土浆液具有润滑切割箱与土体的接触界面的作用,有利于使切割箱内部及其四周水泥土浆液清空,防止水泥浆与切割箱凝固成为一体。The mud liquid is a mud liquid mixed with a bentonite content of not less than 5%. Bentonite slurry has the function of lubricating the contact interface between the cutting box and the soil, which is beneficial to clearing out the cement and soil slurry inside and around the cutting box, preventing the cement slurry and the cutting box from solidifying into one.

进一步的,(2)步骤中,顶升油缸通过顶架和顶撑支架施加在切割箱体上的最大顶升力为N吨,N取值为560吨。Further, in step (2), the maximum lifting force exerted by the lifting cylinder on the cutting box through the top frame and the top support bracket is N tons, and the value of N is 560 tons.

(2)步骤中,当顶升油缸通过顶架和顶撑支架施加在切割箱体上的顶升力达到N吨后,顶升油缸保持N吨的顶升力t分钟,t取值为5-15分钟;若在此期间顶升油缸没有将切割箱体顶起;则返回(1)步骤直至顶升油缸将切割箱体顶起。如此,通过(1)步骤的振动与(2)步骤的顶升循环配合,一方面有利于将被困的TRD工法桩机的切割箱体拔起,另一方面,避免长期过大的顶升力施加在切割箱体上,而导致切割箱体的连接螺栓断裂。(2) In the step (2), when the lifting force exerted by the jacking cylinder on the cutting box through the top frame and jacking bracket reaches N tons, the jacking cylinder maintains the lifting force of N tons for t minutes, and the value of t is 5-15 minutes; if the lifting cylinder does not lift the cutting box during this period, return to step (1) until the lifting cylinder lifts the cutting box. In this way, the vibration of step (1) and the jacking cycle of step (2) are combined, on the one hand, it is beneficial to pull out the cutting box of the trapped TRD pile driver, and on the other hand, it avoids excessive jacking force in the long term. applied to the cutting box, causing the connecting bolts of the cutting box to break.

具体实施例二,本实施例的其余施工方法参照具体实施例一,其不同之处在于,Specific Embodiment 2. The remaining construction methods of this embodiment refer to Specific Embodiment 1. The difference is that,

A步骤与B步骤之间还包括A1步骤。Step A1 is also included between step A and step B.

A1步骤的具体施工如下,如图4、图5所示,采用钢丝绳布设装置在地下布设钢丝绳。钢丝绳布设装置包括钢丝绳6.3、限位钢管6.2及两根导向钢管6.1,限位钢管的下端设有开口朝向的钢丝绳限位槽,钢丝绳依次穿过两根导向钢管,钢丝绳的两端均设有吊环。采用钢丝绳布设装置在地下布设钢丝绳的具体步骤包括,The specific construction of step A1 is as follows, as shown in Figure 4 and Figure 5. A wire rope laying device is used to lay the wire rope underground. The wire rope laying device includes a steel wire rope 6.3, a limit steel pipe 6.2 and two guide steel pipes 6.1. The lower end of the limit steel pipe is equipped with an open-facing wire rope limit groove. The wire rope passes through the two guide steel pipes in turn. Both ends of the steel wire rope are equipped with lifting rings. . The specific steps for laying wire rope underground using a wire rope laying device include:

第一,将限位钢管和两根导向钢管立起呈竖直分布,两根导向钢管分布在切割箱体的前后两侧,限位钢管分布在切割箱体的左侧或右侧,钢丝绳穿过钢丝绳限位槽;本实施例中,限位钢管也为两根,其中一限位钢管靠近切割箱体的前侧面,另一限位钢管靠近切割箱体的后侧面。First, stand the limiting steel pipe and the two guide steel pipes vertically. The two guide steel pipes are distributed on the front and rear sides of the cutting box. The limiting steel pipes are distributed on the left or right side of the cutting box. The wire rope is passed through through the wire rope limiting groove; in this embodiment, there are also two limiting steel pipes, one of which is close to the front side of the cutting box, and the other limiting steel pipe is close to the rear side of the cutting box.

第二,将两根导向钢管和限位钢管往下插入土层中,直至两根导向钢管的下端和限位钢管的下端均位于TRD工法桩机的切割箱体下方的设定距离;这个过程中钢丝绳始终保持穿过两根导向钢管,钢丝绳穿过钢丝绳限位槽,且钢丝绳的两端位于地表上方;Second, insert the two guide steel pipes and the limit steel pipe downward into the soil layer until the lower ends of the two guide steel pipes and the limit steel pipe are located at the set distance below the cutting box of the TRD pile driver; this process The middle steel wire rope always passes through the two guide steel pipes, the steel wire rope passes through the steel wire rope limit groove, and both ends of the steel wire rope are above the ground surface;

接着,将位于地表上方的钢丝绳的两端往上拉,直至整根钢丝绳处于绷直状态;然后将限位钢管往上拉,使钢丝绳与钢丝绳限位槽分离;Then, pull up both ends of the steel wire rope located above the ground until the entire steel wire rope is in a straight state; then pull the limiting steel pipe upward to separate the steel wire rope from the steel wire rope limiting groove;

再接着,继续将位于地表上方的钢丝绳的两端往上拉,直至整根钢丝绳处于绷直状态,此时,两根导向钢管下端之间的钢丝绳将位于TRD工法桩机的切割箱体下方。Then, continue to pull up both ends of the steel wire rope above the ground until the entire steel wire rope is in a straightened state. At this time, the steel wire rope between the lower ends of the two guide steel pipes will be located under the cutting box of the TRD pile driver.

本实施例中,导向钢管和限位钢管均分布在TRD工法桩机施工形成的地下水泥土连续墙内,且采用钢丝绳布设装置在地下布设钢丝绳的施工步骤均在地下水泥土连续墙在固化之前施工完成。由于地下水泥土连续墙为水泥土搅拌形成,地下水泥土连续墙在固化之前较为松软,且经过高压旋喷桩机对切割箱体周围的土体喷射掺有膨润土的泥浆,从而使导向钢管、限位钢管和钢丝绳能够布设到位。In this embodiment, the guide steel pipes and the limiting steel pipes are distributed in the groundwater soil continuous wall formed by the pile driver construction of the TRD construction method, and the construction steps of using the wire rope laying device to lay the wire rope underground are completed before the groundwater soil continuous wall is solidified. . Since the groundwater soil continuous wall is formed by mixing cement and soil, the groundwater soil continuous wall is relatively soft before solidification, and the soil around the cutting box is sprayed with mud mixed with bentonite through a high-pressure rotary jet pile machine, thereby making the guide steel pipe and limiter Steel pipes and wire ropes can be laid in place.

(2)步骤还包括,吊车和钢丝绳起拔切割箱体,且吊车和钢丝绳起拔切割箱体和顶升油缸顶升切割箱体同步进行。吊车和钢丝绳起拔切割箱体的具体步骤包括,钢丝绳两端的吊环挂在吊车的吊钩上,吊车通过钢丝绳将切割箱体的下端往上起拔。(2) The step also includes the crane and the wire rope lifting and cutting the box, and the crane and the wire rope lifting and cutting the box and the jacking cylinder lifting the cutting box simultaneously. The specific steps of lifting up and pulling out the cutting box by a crane and a steel wire rope include hanging the lifting rings at both ends of the steel wire rope on the hooks of the crane, and the crane lifts up the lower end of the cutting box through the steel wire rope.

在切割箱体被埋的工况中,会出现因埋钻夹持力过大,超过切割箱体中用于连接相邻两个切割箱单体的螺栓所能承受的最大拉力,致使用于连接某两个切割箱单体间的螺栓断裂,而导致部分或大部分的切割箱体无法起拔,造工程和设备的巨额经济损失。本实施例的起拔方法就是为了解决这一问题,具体的,In the working condition where the cutting box is buried, the clamping force of the buried drill may be too large, exceeding the maximum tensile force that the bolts used to connect two adjacent cutting box units in the cutting box can withstand, resulting in the The bolts connecting two cutting box units are broken, causing part or most of the cutting box to be unable to be pulled out, resulting in huge economic losses to the construction project and equipment. The pulling method of this embodiment is to solve this problem. Specifically,

由于本实施例的A1骤中,采用钢丝绳布设装置在地下布设钢丝绳,通过钢丝绳绕过切割箱体的底部,如此,在吊车通过钢丝绳将切割箱体的下端往上起拔的过程中,切割箱体上用于连接相邻两个切割箱单体的螺栓不受力,因而这辆吊车通过钢丝绳作用在切割箱体上的起拔力不会破坏用于连接相邻两个切割箱单体的螺栓;如此,配合顶升油缸来顶升切割箱体,能够在不破坏切割箱体上用于连接相邻两个切割箱单体的螺栓的情况下,极大的提高对切割箱体提升起拔力,从而将切割箱体 “打捞”上来。In step A1 of this embodiment, a wire rope laying device is used to lay the wire rope underground, and the wire rope is used to bypass the bottom of the cutting box. In this way, when the crane lifts up the lower end of the cutting box through the wire rope, the cutting box The bolts used to connect two adjacent cutting box units are not stressed, so the pulling force of the crane on the cutting box body through the wire rope will not damage the bolts used to connect the two adjacent cutting box units. Bolts; in this way, using the jacking cylinder to lift the cutting box can greatly improve the lifting efficiency of the cutting box without damaging the bolts on the cutting box used to connect two adjacent cutting box units. Pull force to "salvage" the cutting box.

以上所述,仅是本发明的较佳实施例,并非对本发明作任何限制,凡是根据本发明技术实质对以上实施例所作的任何简单修改、变更以及等效变换,均仍属于本发明技术方案的保护范围。The above are only preferred embodiments of the present invention and do not limit the present invention in any way. Any simple modifications, changes and equivalent transformations made to the above embodiments based on the technical essence of the present invention still belong to the technical solution of the present invention. scope of protection.

Claims (9)

1.一种起拔TRD工法桩机被困切割箱体的施工方法,其特征是,该施工方法采用顶撑支架和起拔装置施工,起拔装置包括底架、顶架及位于底架与顶架之间的顶升油缸,起拔TRD工法桩机被困切割箱体的施工方法依次包括以下步骤,1. A construction method for pulling out the trapped cutting box of the TRD construction method. The construction method is characterized in that the construction method uses a top support bracket and a lifting device. The lifting device includes a bottom frame, a top frame and a top frame located between the bottom frame and the bottom frame. The construction method of lifting the cylinder between the top frames and pulling out the trapped cutting box of the TRD construction method includes the following steps in sequence: A,初步分离切割箱体周围土体,采用高压旋喷桩机自下而上的对切割箱体周围的土体喷射掺有膨润土的泥浆,使切割箱体和切割箱体周围土体初步分离;A. Preliminarily separate the soil around the cutting box. Use a high-pressure jet spray pile machine to spray mud mixed with bentonite from bottom to top on the soil around the cutting box to initially separate the cutting box and the soil around the cutting box. ; A1步骤的具体施工如下,采用钢丝绳布设装置在地下布设钢丝绳,所述钢丝绳布设装置包括钢丝绳、限位钢管及两根导向钢管,限位钢管的下端设有钢丝绳限位槽,钢丝绳依次穿过两根导向钢管,钢丝绳的两端均设有吊环;采用钢丝绳布设装置在地下布设钢丝绳的具体步骤包括,The specific construction of step A1 is as follows. A wire rope laying device is used to lay the wire rope underground. The wire rope laying device includes a steel wire rope, a limit steel pipe and two guide steel pipes. The lower end of the limit steel pipe is equipped with a wire rope limit groove, and the steel wire rope passes through the two steel pipes in sequence. A guide steel pipe is provided with lifting rings at both ends of the wire rope; the specific steps of using a wire rope laying device to lay the wire rope underground include: 第一,将限位钢管和两根导向钢管立起呈竖直分布,两根导向钢管分布在切割箱体的前后两侧,限位钢管分布在切割箱体的左侧或右侧,钢丝绳穿过钢丝绳限位槽;First, stand the limiting steel pipe and the two guide steel pipes vertically. The two guide steel pipes are distributed on the front and rear sides of the cutting box. The limiting steel pipes are distributed on the left or right side of the cutting box. The wire rope is passed through Pass through the wire rope limit groove; 第二,将两根导向钢管和限位钢管往下插入土层中,直至两根导向钢管的下端和限位钢管的下端均位于TRD工法桩机的切割箱体下方的设定距离;这个过程中钢丝绳始终保持穿过两根导向钢管,钢丝绳穿过钢丝绳限位槽,且钢丝绳的两端位于地表上方;Second, insert the two guide steel pipes and the limit steel pipe downward into the soil layer until the lower ends of the two guide steel pipes and the limit steel pipe are located at the set distance below the cutting box of the TRD pile driver; this process The middle steel wire rope always passes through the two guide steel pipes, the steel wire rope passes through the steel wire rope limit groove, and both ends of the steel wire rope are above the ground surface; 接着,将位于地表上方的钢丝绳的两端往上拉,直至整根钢丝绳处于绷直状态;然后将限位钢管往上拉,使钢丝绳与钢丝绳限位槽分离;Then, pull up both ends of the steel wire rope located above the ground until the entire steel wire rope is in a straight state; then pull the limiting steel pipe upward to separate the steel wire rope from the steel wire rope limiting groove; 再接着,继续将位于地表上方的钢丝绳的两端往上拉,直至整根钢丝绳处于绷直状态,此时,两根导向钢管下端之间的钢丝绳将位于TRD工法桩机的切割箱体下方;Then, continue to pull up both ends of the steel wire rope located above the ground until the entire steel wire rope is in a straight state. At this time, the steel wire rope between the lower ends of the two guide steel pipes will be located under the cutting box of the TRD pile driver; B,安装顶撑支架,将顶撑支架通过螺栓将顶撑支架固定在切割箱体的顶部;B. Install the top support bracket and fix the top support bracket to the top of the cutting box through bolts; 安装振动锤,在顶撑支架上固定安装振动锤;Install the vibrating hammer and fix the vibrating hammer on the top support bracket; 安装起拔装置,在地表铺设路基箱,底架置于路基箱上,顶架位于顶撑支架与底架之间,切割箱体上端穿过底架和顶架,顶升油缸位于底架与顶架之间;Install the lifting device, lay the subgrade box on the surface, place the bottom frame on the subgrade box, and the top frame is located between the top support bracket and the bottom frame. The upper end of the cutting box passes through the bottom frame and the top frame, and the lifting cylinder is located between the bottom frame and the bottom frame. between top shelves; C,顶升切割箱体,(1)振动锤开启振动切割箱体;C. Lift the cutting box, (1) vibrating hammer opens the vibrating cutting box; (2),顶升油缸顶升切割箱体,顶升油缸将顶架顶起并抵在顶撑支架上,然后顶升油缸通过顶架和顶撑支架顶起切割箱体;(2) The lifting cylinder lifts the cutting box. The lifting cylinder lifts the top frame and presses it against the top support bracket. Then the lifting cylinder lifts the cutting box through the top frame and top support bracket; 吊车和钢丝绳起拔切割箱体,且吊车和钢丝绳起拔切割箱体和顶升油缸顶升切割箱体同步进行,吊车和钢丝绳起拔切割箱体的具体步骤包括,钢丝绳两端的吊环挂在吊车的吊钩上,吊车通过钢丝绳将切割箱体的下端往上起拔。The crane and the wire rope lift and cut the box, and the crane and the wire rope lift and cut the box and the jacking cylinder lifts and cuts the box simultaneously. The specific steps of the crane and the wire rope for lifting and cutting the box include hanging the rings at both ends of the wire rope on the crane. On the hook, the crane lifts up the lower end of the cutting box through the wire rope. 2.根据权利要求1所述的一种起拔TRD工法桩机被困切割箱体的施工方法,其特征是,(2)步骤中,顶升油缸通过顶架和顶撑支架施加在切割箱体上的最大顶升力为N吨。2. A construction method for pulling out the trapped cutting box of the TRD construction method pile driver according to claim 1, characterized in that, in step (2), the lifting cylinder is applied to the cutting box through the top frame and the top support bracket. The maximum lifting force on the body is N tons. 3.根据权利要求2所述的一种起拔TRD工法桩机被困切割箱体的施工方法,其特征是,(2)步骤中,当顶升油缸通过顶架和顶撑支架施加在切割箱体上的顶升力达到N吨后,顶升油缸保持N吨的顶升力t分钟,若在此期间顶升油缸没有将切割箱体顶起;则返回(1)步骤直至顶升油缸将切割箱体顶起。3. A construction method for pulling out a trapped cutting box of a TRD construction method pile driver according to claim 2, characterized in that, in step (2), when the lifting cylinder is applied to the cutting box through the top frame and the top support bracket After the lifting force on the box reaches N tons, the lifting cylinder maintains the lifting force of N tons for t minutes. If the lifting cylinder does not lift the cutting box during this period, return to step (1) until the lifting cylinder will cut. The box is jacked up. 4. 根据权利要求1或2或3所述的一种起拔TRD工法桩机被困切割箱体的施工方法 ,其特征是,A步骤还包括,泥浆液置换,在切割箱体内部输液通道内注入泥浆液,以稀释或清空切割箱体内部及其四周水泥土浆液,防止水泥浆与切割箱体凝固成为一体。4. A construction method for pulling out the TRD construction method pile driver trapped in the cutting box according to claim 1 or 2 or 3, characterized in that step A also includes, mud liquid replacement, infusion channel inside the cutting box Inject mud liquid into the cutting box to dilute or empty the cement and soil slurry inside and around the cutting box to prevent the cement slurry and the cutting box from solidifying into one. 5. 根据权利要求4所述的一种起拔TRD工法桩机被困切割箱体的施工方法 ,其特征是,所述泥浆液为掺有不低于5%膨润土含量的泥浆液。5. A construction method for pulling out a trapped cutting box of a TRD construction method pile driver according to claim 4, characterized in that the mud liquid is a mud liquid mixed with a bentonite content of not less than 5%. 6. 根据权利要求1或2或3所述的一种起拔TRD工法桩机被困切割箱体的施工方法 ,其特征是,所述顶升油缸至少为两个,且顶升油缸分布在切割箱体的相对两侧。6. A construction method for pulling out a TRD construction method pile machine trapped in a cutting box according to claim 1 or 2 or 3, characterized in that there are at least two lifting cylinders, and the lifting cylinders are distributed in Cut opposite sides of the box. 7. 根据权利要求1或2或3所述的一种起拔TRD工法桩机被困切割箱体的施工方法 ,其特征是,所述起拔装置还包括竖向分布的伸缩柱,伸缩柱的下端与底架相连接,伸缩柱的上端与顶架相连接。7. A construction method for pulling out a TRD construction method pile driver trapped in a cutting box according to claim 1 or 2 or 3, characterized in that the pulling out device also includes vertically distributed telescopic columns, and the telescopic columns The lower end of the telescopic column is connected to the bottom frame, and the upper end of the telescopic column is connected to the top frame. 8. 根据权利要求1或2或3所述的一种起拔TRD工法桩机被困切割箱体的施工方法 ,其特征是,所述顶撑支架为呈十字分布的十字梁。8. A construction method for pulling out a trapped cutting box of a TRD construction method pile driver according to claim 1 or 2 or 3, characterized in that the top support bracket is a cross beam distributed in a cross. 9. 根据权利要求1或2或3所述的一种起拔TRD工法桩机被困切割箱体的施工方法 ,其特征是,所述振动锤为高频振动锤,振动锤通过螺栓固定安装在顶撑支架上。9. A construction method for pulling out a TRD construction method pile driver trapped in a cutting box according to claim 1 or 2 or 3, characterized in that the vibrating hammer is a high-frequency vibrating hammer, and the vibrating hammer is fixed and installed by bolts On the top support bracket.
CN202210644724.4A 2022-06-08 2022-06-08 Construction method for trapped cutting box body of pile machine in TRD construction method Active CN115387325B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210644724.4A CN115387325B (en) 2022-06-08 2022-06-08 Construction method for trapped cutting box body of pile machine in TRD construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210644724.4A CN115387325B (en) 2022-06-08 2022-06-08 Construction method for trapped cutting box body of pile machine in TRD construction method

Publications (2)

Publication Number Publication Date
CN115387325A CN115387325A (en) 2022-11-25
CN115387325B true CN115387325B (en) 2024-01-30

Family

ID=84117432

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210644724.4A Active CN115387325B (en) 2022-06-08 2022-06-08 Construction method for trapped cutting box body of pile machine in TRD construction method

Country Status (1)

Country Link
CN (1) CN115387325B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116752599B (en) * 2023-06-09 2025-09-12 江苏鸿基节能新技术股份有限公司 A device for removing embedded cards of TRD equipment knife row

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101705684A (en) * 2009-11-13 2010-05-12 中铁大桥局集团第四工程有限公司 Method for sinking steel protecting canister for drilled pile construction
CN108277836A (en) * 2017-12-25 2018-07-13 浙江吉通地空建筑科技有限公司 Canal formula cuts the fracture chain saw Refloatation method of cement soil continuous wall cutting equipment
CN207812527U (en) * 2017-12-13 2018-09-04 中冶天工集团有限公司 Cement mixing wall cutting box buries and bores pull-out device
CN111456007A (en) * 2020-04-22 2020-07-28 中交第二航务工程局有限公司 Steel casing pulling-out method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6417291B2 (en) * 2015-07-13 2018-11-07 鹿島建設株式会社 Placing device and placing method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101705684A (en) * 2009-11-13 2010-05-12 中铁大桥局集团第四工程有限公司 Method for sinking steel protecting canister for drilled pile construction
CN207812527U (en) * 2017-12-13 2018-09-04 中冶天工集团有限公司 Cement mixing wall cutting box buries and bores pull-out device
CN108277836A (en) * 2017-12-25 2018-07-13 浙江吉通地空建筑科技有限公司 Canal formula cuts the fracture chain saw Refloatation method of cement soil continuous wall cutting equipment
CN111456007A (en) * 2020-04-22 2020-07-28 中交第二航务工程局有限公司 Steel casing pulling-out method

Also Published As

Publication number Publication date
CN115387325A (en) 2022-11-25

Similar Documents

Publication Publication Date Title
CN110158632B (en) Anti-settling foundation structure of soft soil foundation and method thereof
CN109184261B (en) Slippage construction method for building with raft
CN115387325B (en) Construction method for trapped cutting box body of pile machine in TRD construction method
CN107524141A (en) A kind of construction method of piece of stone soil base cast-in-situ bored pile
CN105862862B (en) A kind of large diameter pile buries hammer Refloatation method
CN212026256U (en) Guide platform for building
CN106948347B (en) Pile pulling method and pile pulling system
CN106968252B (en) Pile pulling recharging method and pile pulling recharging system
CN204982894U (en) High pressure is washed by water and is pulled out device of old engineering stake in underground
CN103334433B (en) A kind of construction method of pile pulling
CN203834481U (en) Sleeve type combined pile driver
CN203022001U (en) Pile-pulling device with vibrating sleeve ring
CN2244572Y (en) Hydraulic rocking full-sleeve machine for pouring pile
CN108221955B (en) A prefabricated underground diaphragm wall, spreader and construction method that can be recycled as a whole
CN206902712U (en) Pile pulling recharge system
CN217629891U (en) A device for preventing pile driver from moving sideways
CN215889958U (en) Vibration type constant force unfreezing device for underground drilling
CN103953042B (en) A sleeve type combined pile driver and pile driving method thereof
CN115404931B (en) Cutting box body lifting auxiliary device and lifting method suitable for TRD construction machine
CN214656037U (en) Escape device of operation equipment
CN104895058B (en) The all-hydraulic two-tube compound club-footed pile machine of static pressure and its construction method
WO2013149471A1 (en) Piling method based on hole-forming by sinking double pipes and pulling inner pipe, and application thereof
CN108457273B (en) Piling recovery method for steel pipe slope protection piles
CN103046550B (en) A kind of vibrations collar pile pulling device and using method thereof
CN107059872A (en) Oblique cord pile extracting method and oblique cord pile pulling system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20221125

Assignee: Zhejiang Zhefeng Engineering Consulting Co.,Ltd.

Assignor: Dongtong Geotechnical Science and Technology Inc.

Contract record no.: X2025980000660

Denomination of invention: A Construction Method for Trapped Cutting Box of TRD Pile Machine

Granted publication date: 20240130

License type: Common License

Record date: 20250109

Application publication date: 20221125

Assignee: Hangzhou Dongtong Construction Engineering Co.,Ltd.

Assignor: Dongtong Geotechnical Science and Technology Inc.

Contract record no.: X2025980000658

Denomination of invention: A Construction Method for Trapped Cutting Box of TRD Pile Machine

Granted publication date: 20240130

License type: Common License