CN110241830A CN201910654624.8A CN201910654624A CN110241830A CN 110241830 A CN110241830 A CN 110241830A CN 201910654624 A CN201910654624 A CN 201910654624A CN 110241830 A CN110241830 A CN 110241830A
Authority
CN
China
Prior art keywords
stress
backfilling
conehead
backfill
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910654624.8A
Other languages
Chinese (zh)
Inventor
高建伟
李国栋
孙艳杰
孙华斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910654624.8A priority Critical patent/CN110241830A/en
Publication of CN110241830A publication Critical patent/CN110241830A/en
Pending legal-status Critical Current

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00—Excavations; Bordering of excavations; Making embankments
    • E02D17/18—Making embankments, e.g. dikes, dams
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02—Improving by compacting
    • E02D3/046—Improving by compacting by tamping or vibrating, e.g. with auxiliary watering of the soil
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02F—DREDGING; SOIL-SHIFTING
    • E02F3/00—Dredgers; Soil-shifting machines
    • E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/96—Dredgers; Soil-shifting machines mechanically-driven with arrangements for alternate or simultaneous use of different digging elements
    • E02F3/967—Dredgers; Soil-shifting machines mechanically-driven with arrangements for alternate or simultaneous use of different digging elements of compacting-type tools

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Soil Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Mechanical Engineering (AREA)
  • Foundations (AREA)

Abstract

本发明涉及一种回填装置,包括固定连接在挖掘机中破碎锤锥头上的应力传递锥头,所述应力传递锥头的底部固定连接有应力板,且该应力板与所述应力传递锥头保持垂直,所述的应力传递锥头与应力板之间设有应力弹簧;该回填装置能够安装在挖掘机的破碎锤锥头上,通过挖掘机带动该回填装置的应力板发生振动对回填料进行夯实,能够有效的保证回填洞的回填效果,同时在回填的过程中,可以通过该回填装置将回填料推入到回填洞中,夯实和推入为一体,节省了回填的时间和回填的使用设备,节约了回填的人力和财力。

The invention relates to a backfilling device, comprising a stress transfer cone fixedly connected to the cone of a breaker in an excavator, a stress plate fixedly connected to the bottom of the stress transfer cone, and the stress plate is connected to the stress transfer cone The head is kept vertical, and a stress spring is set between the stress transfer cone and the stress plate; the backfill device can be installed on the cone of the excavator's breaker, and the stress plate of the backfill device is driven by the excavator to vibrate to the backfill. The filling is compacted, which can effectively ensure the backfilling effect of the backfilling hole. At the same time, during the backfilling process, the backfilling device can be used to push the backfilling into the backfilling hole. The tamping and pushing are integrated, which saves the time and cost of backfilling. The efficient use of equipment saves manpower and financial resources for backfilling.

Description

一种回填装置及回填方法Backfilling device and backfilling method

技术领域technical field

本发明涉及回填洞回填技术领域,尤其涉及一种回填装置及回填方法。The invention relates to the technical field of backfill holes, in particular to a backfill device and a backfill method.

背景技术Background technique

在以黄土地质为代表的青海、甘肃、陕西、山西等省,受地表径流冲刷大,受地下水的淘空影响深远,以及人为矿产作业的采空区范围,均有落水洞的形成。In Qinghai, Gansu, Shaanxi, Shanxi and other provinces represented by loess geology, there are large surface runoff erosion, far-reaching impacts from groundwater scouring, and the formation of sinkholes in the goafs of human-made mining operations.

落水洞形式多种多样,内部结构复杂多变,在传统处理作业过程中,主要采用浅表切割开挖后,以水稳结合料碾压成型回填。或对空洞区域采取注浆处理,达到固结后,具有一定的支撑能力。为提供荷载传递,起到承载性作用。Sinkholes come in a variety of forms, and their internal structures are complex and changeable. In the traditional treatment process, shallow cutting and excavation are mainly used, and then water-stabilized binders are rolled and formed to backfill. Or take grouting treatment to the hollow area to achieve a certain supporting capacity after consolidation. In order to provide load transfer, play a bearing role.

传统方法无机结合料回填:在距离地表3m范围内,根据处理面积,进行预先切槽,然后选用无机结合料,通过机械拌和,形成石灰土、水泥土、碎石土等填筑材料。确定松铺系数后,进行分层碾压;Traditional method of backfilling with inorganic binder: within 3m from the ground surface, according to the treatment area, pre-cut grooves, then select inorganic binders, and mix them mechanically to form filling materials such as lime soil, cement soil, and gravel soil. After determining the loose laying coefficient, carry out layered rolling;

特点:处理深度不足,对周边扰动大,无机结合材料单价高。压实机具无法有效作业。Features: Insufficient processing depth, large disturbance to the surrounding area, high unit price of inorganic bonding materials. The compactor is not working effectively.

传统方法注浆回填:Traditional grouting backfill:

根据回填范围,大批量拌制水泥浆液,采用高压注浆和混凝土,补充落水洞的空洞部位;According to the scope of backfilling, cement slurry is mixed in large quantities, and high-pressure grouting and concrete are used to supplement the hollow parts of the sinkhole;

特点:作为回填方式,采用界面区域回填,两种介质,无法有效粘结成为一体,回填材料成本高,代价大,回填质量很难达到要求。作为隐蔽性工程,无法进行有效控制;Features: As a backfilling method, the interface area is used for backfilling. The two media cannot be effectively bonded into one body. The cost of backfilling materials is high, and the cost is high, and the quality of backfilling is difficult to meet the requirements. As a hidden project, effective control cannot be carried out;

传统处理方法,存在处理不彻底,填筑处理材料造价高,注浆收缩变形大,处置代价大,深层地段无法填筑,大型机械无法操作控制,压实度无法保证,隐患风险性持续增加等问题。The traditional treatment method has the disadvantages of incomplete treatment, high cost of filling treatment materials, large shrinkage and deformation of grouting, high disposal cost, inability to fill deep sections, inability to operate and control large-scale machinery, unguaranteed degree of compaction, and continuous increase in hidden dangers and risks, etc. question.

发明内容Contents of the invention

为了克服上述现有技术的缺点,本发明的目的是提供一种能够安装在挖掘机上,通过应力传递至应力锤板,通过分层振动,密实挤压扩充空洞点的回填装置及回填方法。In order to overcome the above-mentioned shortcoming of the prior art, the object of the present invention is to provide a kind of backfilling device and backfilling method that can be installed on the excavator, transmit the stress to the stress hammer plate, and expand the hollow point through layered vibration and dense extrusion.

为达到上述目的,本发明采用以下技术方案,一种回填装置,包括固定连接在挖掘机中破碎锤锥头上的应力传递锥头,所述应力传递锥头的底部固定连接有应力板,且该应力板与所述应力传递锥头保持垂直,所述的应力传递锥头与应力板之间设有应力弹簧。In order to achieve the above object, the present invention adopts the following technical solution, a backfill device, including a stress transfer cone fixedly connected to the cone of the breaker in the excavator, the bottom of the stress transfer cone is fixedly connected with a stress plate, and The stress plate is kept perpendicular to the stress transfer cone, and a stress spring is arranged between the stress transfer cone and the stress plate.

所述应力板的中部焊接有锥形筒,所述的应力传递锥头插入到锥形筒并延伸到锥形筒内的应力弹簧中,且该应力弹簧与应力板固定连接,所述锥形筒的上端与挖掘机通过钢丝绳固定连接。The middle part of the stress plate is welded with a conical cylinder, the stress transfer conical head is inserted into the conical cylinder and extends into the stress spring inside the conical cylinder, and the stress spring is fixedly connected with the stress plate, the conical The upper end of the barrel is fixedly connected with the excavator through a wire rope.

所述破碎锤锥头与应力传递锥头通过连接抱箍固定连接。The cone head of the breaking hammer is fixedly connected with the stress transfer cone head through a connecting hoop.

所述应力板上设有多个透气孔,且该多个透气孔均匀分布在锥形筒的四周。A plurality of ventilation holes are provided on the stress plate, and the plurality of ventilation holes are evenly distributed around the conical cylinder.

所述应力传递锥头的锤头插入到应力弹簧中,且该应力弹簧的上端卡在应力传递锥头的上端。The hammer head of the stress transfer cone is inserted into the stress spring, and the upper end of the stress spring is locked on the upper end of the stress transfer cone.

所述应力板的下端固定设有与应力板垂直的柱状体。The lower end of the stress plate is fixed with a column perpendicular to the stress plate.

所述应力板的下端固定连接有三角形锥头。The lower end of the stress plate is fixedly connected with a triangular cone head.

所述应力板的下端面固定连接有弧形锥头。The lower end surface of the stress plate is fixedly connected with an arc-shaped cone head.

一种回填方法,按照以下步骤进行:A method of backfilling, performed in the following steps:

步骤一:自卸车将用于填落水洞的回填料倾倒到施工现场;Step 1: The dump truck dumps the backfill used to fill the sinkhole to the construction site;

步骤二:通过挖掘机端头的应力传递锥头将土体推移到回填部位,然后通过应力传递锥头连接的应力板对回填洞中的回填料进行分层击实,上下差位夯实;使回填洞中的回填料的压实度达到95%;Step 2: Push the soil body to the backfill position through the stress transfer cone at the end of the excavator, and then carry out layered compaction of the backfill in the backfill hole through the stress plate connected with the stress transfer cone, and compact the upper and lower positions; The compaction of the backfill in the backfill hole reaches 95%;

步骤三:在后期经过汛期和降雨量较大情况下对路面回填点位进行调查,如有发生下沉的情况,继续进行回填夯实,直到回填表面无积水且路面强度几乎不发生变化为止。Step 3: After the flood season and heavy rainfall in the later stage, investigate the backfill points of the pavement. If subsidence occurs, continue to backfill and tamp until there is no water on the backfill surface and the road strength hardly changes.

所述步骤二中在对回填料进行夯实时,按照上下线位运动做功,左右搭接,搭接点间距呈梅花型并做运动进行夯实。In the second step, when the backfill is tamped, work is done according to the movement of the upper and lower lines, and the left and right overlap, and the distance between the overlapping points is quincunx and the movement is performed for tamping.

本发明的有益效果是:利用挖掘机发动机功率,带动破碎锤锥头,通过抱箍,将高能应力锤连接。高强应力锤采用整体焊接,在向下接触介质后,通过帯簧锥头,将应力传递至应力锤板,通过分层振动,密实挤压扩充空洞点,并行发出的液压应力,向下挤压,使松散土体达到密实状态;The beneficial effect of the invention is that: the engine power of the excavator is used to drive the cone head of the breaking hammer, and the high-energy stress hammer is connected through the hoop. The high-strength stress hammer is welded as a whole. After contacting the medium downward, the stress is transmitted to the stress hammer plate through the spring cone head. Through layered vibration, dense extrusion expands the hollow point, and the parallel hydraulic stress is extruded downward. , so that the loose soil reaches a compact state;

应力传递钢板与连接锥头,采用2cm钢板无间隙焊接,在与破碎锤锥头连接部位,设置防震断弹簧。为防止高能应力传递过程中,发生滑脱以外,在应力钢板与锥头处,对称焊接保险环,通过保险绳外挂至破碎锤端头的挂点,预防脱落情况发生。The stress transmission steel plate and the connecting cone head are welded with 2cm steel plate without gaps, and an anti-shock breaking spring is set at the connection part with the cone head of the breaking hammer. In order to prevent slipping during high-energy stress transmission, safety rings are symmetrically welded between the stress steel plate and the cone head, and are hung to the hanging point at the end of the breaker through the safety rope to prevent slipping.

附图说明Description of drawings

图1是本发明是回填装置的结构示意图;Fig. 1 is that the present invention is the structural representation of backfill device;

图2是本发明中应力板连接结构示意图;Fig. 2 is a schematic diagram of a stress plate connection structure in the present invention;

图3是本发明中图破碎锤锥头与应力传递锥头的结构示意图;Fig. 3 is a schematic diagram of the structure of the breaker cone and the stress transfer cone in the present invention;

图4是本发明中应力板的结构示意图;Fig. 4 is the structural representation of stress plate among the present invention;

图5是本发明中应力板的俯视结构示意图;Fig. 5 is a top view structural representation of a stress plate in the present invention;

图6是本发明中具有柱状体的结构示意图;Fig. 6 is a schematic structural view of a columnar body in the present invention;

图7是本发明中具有三角形锥头的结构示意图;Fig. 7 is a schematic structural view with a triangular conical head in the present invention;

图8是本发明中具有弧形锥头的结构示意图。Fig. 8 is a schematic structural view of an arc-shaped conical head in the present invention.

具体实施方式Detailed ways

下面结合附图和实施例对本发明进行详细的描述。The present invention will be described in detail below in conjunction with the accompanying drawings and embodiments.

在本发明的描述中,需要理解的是,术语“中心”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。In describing the present invention, it is to be understood that the terms "center", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", The orientations or positional relationships indicated by "top", "bottom", "inner", "outer", etc. are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying References to devices or elements must have a particular orientation, be constructed, and operate in a particular orientation and therefore should not be construed as limiting the invention.

术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括一个或者更多个该特征;在本发明的描述中,除非另有说明,“多个”的含义是两个或两个以上。The terms "first" and "second" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance or implicitly specifying the quantity of indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of these features; in the description of the present invention, unless otherwise specified, the meaning of "plurality" is two or more.

实施例1Example 1

如图1和图2所示一种回填装置,包括固定连接在挖掘机6中破碎锤锥头7上的应力传递锥头3,所述应力传递锥头3的底部固定连接有应力板4,且该应力板4与所述应力传递锥头3保持垂直,所述的应力传递锥头3与应力板4之间设有应力弹簧5。该装置在使用时安装在所述的挖掘机的破碎锤锥头上,通过该挖掘机提供驱动动力,在进行回填时,所述的挖掘机带动应力传递锥头3推动堆放到回填料推入到回填洞中,然后驱动应力传递头=锥头进行振动,该应力传递锥头在振动的过程中带动引力板发生相应的振动,对进入到回填洞中的回填料进行夯实,保证了回填洞能够进行有效的回填,并且保证了回填洞不会发生下沉的情况,所述压力弹簧5能够保证在应力传递锥头带动压力板进行振动时,能够有效的起到缓冲的作用,进而避免了应力板与回填料发生碰撞时,造成应力板发生损坏的情况。As shown in Figures 1 and 2, a backfilling device includes a stress transfer cone 3 fixedly connected to a breaker cone 7 in an excavator 6, and a stress plate 4 is fixedly connected to the bottom of the stress transfer cone 3, And the stress plate 4 is kept perpendicular to the stress transfer cone 3 , and a stress spring 5 is arranged between the stress transfer cone 3 and the stress plate 4 . The device is installed on the breaker cone of the excavator when in use, and the driving power is provided by the excavator. When backfilling, the excavator drives the stress transfer cone 3 to push the backfill into the pile. Into the backfill hole, and then drive the stress transfer head = cone to vibrate, the stress transfer cone will drive the gravity plate to vibrate correspondingly during the vibration process, and compact the backfill that enters the backfill hole, ensuring the backfill hole Effective backfilling can be carried out, and it is guaranteed that the backfilling hole will not sink. The pressure spring 5 can ensure that when the stress transmission cone drives the pressure plate to vibrate, it can effectively play a buffering role, thereby avoiding When the stress plate collides with the backfill material, the stress plate is damaged.

进一步的,为了方便应力板4与应力传递锥头3之间的连接,如图4所述应力板4的中部焊接有锥形筒401,所述的应力传递锥头3插入到锥形筒401并延伸到锥形筒401内的应力弹簧5中,且该应力弹簧5与应力板4固定连接,所述锥形筒401的上端与挖掘机6通过钢丝绳1固定连接。在安装时,将压力弹簧装入到焊接为一体的锥形筒与应力板的筒中,然后将所述应力传递锥头插入到该锥形筒中,并使应力传递锥头3的锤头插入到应力弹簧5中,并使应力弹簧5的上端卡在应力传递锥头3的上端。然后将锥形筒401的上端与挖掘机通过钢丝绳固定连接起来,具体的是在所述的锥形筒401的上部固定设有圆形筒,该圆形筒的半径与锥形筒上端的半径相同,在使用时,所述的挖掘机带动应力传递锥头3进行转动,该应力传递锥头带动压缩弹簧进行转动,此时应力板在其带动下进行振动,对回填料进行夯实振动。Further, in order to facilitate the connection between the stress plate 4 and the stress transfer cone 3, as shown in FIG. And extend to the stress spring 5 in the conical cylinder 401 , and the stress spring 5 is fixedly connected with the stress plate 4 , and the upper end of the conical cylinder 401 is fixedly connected with the excavator 6 through the wire rope 1 . When installing, the pressure spring is packed into the barrel of the welded one-piece cone and stress plate, then the stress transfer cone is inserted into the cone, and the hammer of the stress transfer cone 3 is inserted into the Stress spring 5, and the upper end of stress spring 5 is stuck on the upper end of stress transfer cone 3. Then the upper end of the conical cylinder 401 is fixedly connected with the excavator by a wire rope, specifically, a circular cylinder is fixedly arranged on the top of the conical cylinder 401, and the radius of the circular cylinder is the same as the radius of the conical cylinder upper end. Similarly, when in use, the excavator drives the stress transmission cone 3 to rotate, and the stress transmission cone drives the compression spring to rotate. At this time, the stress plate vibrates under its drive to tamp and vibrate the backfill.

进一步的,为了方便破碎锤锥头与应力传递锤头3之间的连接,如图3所述破碎锤锥头7与应力传递锥头3通过连接抱箍8固定连接。在连接时,将所述破碎锤锥头7的下端与应力传递锥头3的上端对齐,然后将连接抱箍箍在所述的破碎锤锥头7与应力传递锥头3之间,然后拉动连接抱箍的拉条,将所述破碎锤锥头7与应力传递锥头3固定连接起来。Further, in order to facilitate the connection between the breaker cone and the stress transmission hammer 3, the breaker cone 7 and the stress transmission cone 3 are fixedly connected by a connecting hoop 8 as shown in FIG. 3 . When connecting, align the lower end of the breaker cone 7 with the upper end of the stress transfer cone 3, then place the connecting hoop between the breaker cone 7 and the stress transfer cone 3, and then pull The tie bars connected with the hoop fixedly connect the breaker cone 7 with the stress transfer cone 3 .

进一步的,在通过应力板对回填洞进行夯实时,由于回填料中具有空气或水,在应力板进行夯实时,回填料中的空气或水被挤出,会对应力板产生一定的反作用力,导致应力板对回填料的夯实力,为解决此目的如图5所述应力板4上设有多个透气孔402,且该多个透气孔402均匀分布在锥形筒401的四周。该透气孔能够有效的保证在应力板下压时,空气能够有效的穿过透气孔,减少应力板使用的应力。同时在所述在应力钢板与锥头处,对称焊接保险环,通过保险绳外挂至破碎锤端头的挂点,预防脱落情况发生。Further, when the backfill hole is tamped through the stress plate, since there is air or water in the backfill, when the stress plate is tamped, the air or water in the backfill is squeezed out, which will produce a certain reaction force on the stress plate , leading to the tamping force of the stress plate on the backfill, in order to solve this purpose, a plurality of air holes 402 are provided on the stress plate 4 as shown in FIG. The vent hole can effectively ensure that when the stress plate is pressed down, the air can pass through the vent hole effectively, reducing the stress of the stress plate. At the same time, safety rings are symmetrically welded at the stress steel plate and the cone head, and are hung to the hanging point at the end of the breaker through the safety rope to prevent falling off.

实施例2Example 2

根据不同的土质,更换处置方式,更换应力传递方式。According to different soil properties, change the disposal method and change the stress transmission method.

如在松软地质和土质均一的段,如图1所示直接采用应力板的冲击方式进行夯实。For example, in the section with soft ground and uniform soil quality, as shown in Figure 1, the impact method of the stress plate is directly used for compaction.

实施例3Example 3

在实施例1的基础上,在在夹石不均匀地层中,可以采用如图7所示的应力板4的下端面固定连接有弧形锥头11对夹石不均匀地层进行夯实,保证夯实的实度。On the basis of Example 1, in the uneven formation with rocks, the lower end surface of the stress plate 4 as shown in Figure 7 can be fixedly connected with the arc-shaped cone head 11 to tamp the uneven formation with rocks to ensure compaction solidity.

实施例4Example 4

在实施例1的基础上,在粘性土质抛填介质挤淤时,如图8所示应力板4的下端固定连接有三角形锥头10,通过三角形锥头10能够有效的对淤泥土质时进行有效的挤压,保证淤泥土质的夯实。On the basis of Example 1, when the cohesive soil throwing filling medium is squeezed out, as shown in Figure 8, the lower end of the stress plate 4 is fixedly connected with a triangular cone head 10, and the triangular cone head 10 can be used to effectively treat the silt soil. Extrusion to ensure the compaction of silt soil.

实施例5Example 5

在实施例1的基础上,对于深层洞体处置时,如图6应力板4的下端固定设有与应力板4垂直的柱状体,该柱状体进行应力传递,向深层处置松软地质;保证深层洞内的填料能够完全的被夯实。On the basis of Embodiment 1, when dealing with deep caverns, as shown in Figure 6, the lower end of the stress plate 4 is fixedly provided with a columnar body perpendicular to the stress plate 4, and the columnar body carries out stress transmission to deal with soft geology in the deep layer; to ensure that the deep layer The filling in the hole can be completely compacted.

工作过程为,利用挖掘机发动机额定功率,带动破碎锤锥头,通过抱箍,连接整体焊接的应力传递锥头,将应力传递至介质接触的钢板,通过分层振动,密实挤压扩充空洞点,使松散土体达到密实状态。The working process is to use the rated power of the excavator engine to drive the cone head of the breaker, connect the integrally welded stress transfer cone head through the hoop, transfer the stress to the steel plate in contact with the medium, and expand the cavity point through layered vibration and compact extrusion , so that the loose soil reaches a compact state.

应力传递钢板与连接锥头,采用2cm钢板无间隙焊接,在与破碎锤锥头连接部位,设置防震断弹簧。The stress transmission steel plate and the connecting cone head are welded with 2cm steel plate without gaps, and an anti-shock breaking spring is set at the connection part with the cone head of the breaking hammer.

为防止高能应力传递过程中,发生滑脱以外,在应力钢板与锥头处,对称焊接保险环,通过保险绳外挂至破碎锤端头的挂点,预防脱落情况发生。In order to prevent slipping during high-energy stress transmission, safety rings are symmetrically welded between the stress steel plate and the cone head, and are hung to the hanging point at the end of the breaker through the safety rope to prevent slipping.

一种回填方法,按照以下步骤进行:A method of backfilling, performed in the following steps:

步骤一:自卸车将用于填落水洞的回填料倾倒到施工现场;Step 1: The dump truck dumps the backfill used to fill the sinkhole to the construction site;

步骤二:通过挖掘机端头的应力传递锥头3将土体推移到回填部位,然后通过应力传递锥头3连接的应力板对回填洞中的回填料进行分层击实,上下差位夯实;使回填洞中的回填料的压实度达到95%;Step 2: Push the soil body to the backfill position through the stress transfer cone 3 at the end of the excavator, and then carry out layered compaction of the backfill in the backfill hole through the stress plate connected to the stress transfer cone 3, and compact the upper and lower positions ; Make the compaction of the backfill in the backfill hole reach 95%;

步骤三:在后期经过汛期和降雨量较大情况下对路面回填点位进行调查,如有发生下沉的情况,继续进行回填夯实,直到回填表面无积水且路面强度几乎不发生变化为止。Step 3: After the flood season and heavy rainfall in the later stage, investigate the backfill points of the pavement. If subsidence occurs, continue to backfill and tamp until there is no water on the backfill surface and the road strength hardly changes.

所述步骤二中在对回填料进行夯实时,按照上下线位运动做功,左右搭接,搭接点间距呈梅花型并做运动进行夯实。In the second step, when the backfill is tamped, work is done according to the movement of the upper and lower lines, and the left and right overlap, and the distance between the overlapping points is quincunx and the movement is performed for tamping.

地表起始至30m垂直处理深度的落水洞,包括浅层采空区、2m以上条形基础回填、市政管网既有结构体附近回填,而不受地形变化限制。Sinkholes from the ground surface to a vertical treatment depth of 30m, including shallow mined-out areas, backfilling of strip foundations above 2m, and backfilling near the existing structures of the municipal pipe network, without being restricted by terrain changes.

均一地质段,采用板式锤头进行处理。不均匀地质段采用,球形锥头进行处理。碎石土及砾石土体,采用锥式锤头进行处理。对墓穴或斜巷扩充回填,采用调节震动杆,进行处理。Homogeneous geological sections are treated with plate hammers. The uneven geological section is treated with a spherical cone head. Crushed stone soil and gravel soil are treated with cone hammers. To expand and backfill the tomb or inclined alley, adjust the vibrating rod to deal with it.

利用原状土体,机械操作手将锥头放置于回填介质上,推动土体至空洞内,达到50cm左右,将做功端头放在回填土体顶部,进行做功击实。待沉降量与变形量达到预控指标时,即可进行下一层回填作业。Using the undisturbed soil, the mechanical operator places the cone head on the backfill medium, pushes the soil into the cavity to about 50cm, and puts the working end on the top of the backfill soil to perform work compaction. When the settlement and deformation reach the pre-control indicators, the next layer of backfilling can be carried out.

特点:颠覆传统的处理方法,不受地域影响,回填段落位置处理过程中,利用原状土体,节约成本的同时,可以采用压实度和形变量,双向指标进行压实控制。Features: It subverts the traditional processing method and is not affected by the region. In the process of processing the position of the backfill section, the undisturbed soil is used to save costs. At the same time, the compaction degree, deformation, and two-way indicators can be used for compaction control.

以上实施例仅仅是对本发明的举例说明,并不构成对本发明的保护范围的限制,凡是与本发明相同或相似的设计均属于本发明的保护范围之内。The above embodiment is only an illustration of the present invention, and does not constitute a limitation to the protection scope of the present invention. Any design that is the same as or similar to the present invention belongs to the protection scope of the present invention.

Claims (10)

1. a kind of backfilling apparatus, which is characterized in that including the stress being fixedly connected in excavator (6) on quartering hammer conehead (7) Transmit conehead (3), the bottom of the stress transfer conehead (3) is fixedly connected with stress plate (4), and the stress plate (4) with it is described Stress transfer conehead (3) keeps vertical, is equipped with stress spring (5) between the stress transfer conehead (3) and stress plate (4).
2. a kind of backfilling apparatus according to claim 1, which is characterized in that be welded with taper in the middle part of the stress plate (4) Cylinder (401), the stress transfer conehead (3) are inserted into conically shaped (401) and extend to the stress spring in conically shaped (401) (5) in, and the stress spring (5) is fixedly connected with stress plate (4), and upper end and the excavator (6) of the conically shaped (401) pass through Wirerope (1) is fixedly connected.
3. a kind of backfilling apparatus according to claim 1 or claim 2, which is characterized in that the quartering hammer conehead (7) and stress transfer Conehead (3) is fixedly connected by connecting anchor ear (8).
4. a kind of backfilling apparatus according to claim 2, which is characterized in that the stress plate (4) is equipped with multiple air holes (402), and multiple air hole (402) is evenly distributed on the surroundings of conically shaped (401).
5. a kind of backfilling apparatus according to claim 1, which is characterized in that the tup of the stress transfer conehead (3) is inserted into To in stress spring (5), and the upper end of the stress spring (5) is stuck in the upper end of stress transfer conehead (3).
6. a kind of backfilling apparatus according to claim 1 or claim 2, which is characterized in that the lower end of the stress plate (4) is fixed with The column (9) vertical with stress plate (4).
7. a kind of backfilling apparatus according to claim 1 or claim 2, which is characterized in that the lower end of the stress plate (4) is fixedly connected There are triangle conehead (10).
8. a kind of backfilling apparatus according to claim 1 or claim 2, which is characterized in that the lower end surface of the stress plate (4) is fixed to be connected It is connected to arc conehead (11).
9. a kind of earth-filling method, which is characterized in that follow the steps below:
Step 1: the backfill material for being used to fill out sinkhole is poured into construction site by dumper;
Step 2: the soil body is elapsed to backfill position by the stress transfer conehead (3) of excavator end, is then passed by stress The stress plate for passing conehead (3) connection carries out layering to the backfill material in backfill hole and hits reality, up and down poor position compacting;Make to backfill in hole The compactness of backfill material reaches 95%;
Step 3: in the case where the later period is by flood season and rainfall larger situation, road pavement backfill point is investigated, if any under generation Heavy situation continues to be backfilling and compacted, until backfilling surface without ponding and pavement strength hardly happens variation.
10. a kind of earth-filling method according to claim 9, which is characterized in that carried out in the step 2 to backfill material When compacting, according to upper offline position movement acting, left and right overlap joint, overlapped points spacing is tamped in blossom type and taking exercises.
CN201910654624.8A 2019-07-19 2019-07-19 Backfilling device and backfilling method Pending CN110241830A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910654624.8A CN110241830A (en) 2019-07-19 2019-07-19 Backfilling device and backfilling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910654624.8A CN110241830A (en) 2019-07-19 2019-07-19 Backfilling device and backfilling method

Publications (1)

Publication Number Publication Date
CN110241830A true CN110241830A (en) 2019-09-17

Family

ID=67892901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910654624.8A Pending CN110241830A (en) 2019-07-19 2019-07-19 Backfilling device and backfilling method

Country Status (1)

Country Link
CN (1) CN110241830A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111778959A (en) * 2020-05-28 2020-10-16 榆林市天元路业有限公司 Construction method for treating loess collapse in tunnel site area by adopting cement stabilized soil

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030095366A (en) * 2003-07-18 2003-12-18 남인근 Apparatus for tramping road
KR20040053943A (en) * 2002-12-16 2004-06-25 박광업 Breaker tool for an excavator and ground hardening process using the same
CN101906774A (en) * 2010-08-06 2010-12-08 左天德 Hammerblow tamper of excavator
CN103603334A (en) * 2013-06-03 2014-02-26 罗朝钦 Foundation soil punning method
CN106522195A (en) * 2016-12-07 2017-03-22 国家电网公司 Tamping hammer
CN109826263A (en) * 2019-01-24 2019-05-31 中建新疆建工(集团)有限公司 An excavator compaction device for trenches
CN210238473U (en) * 2019-07-19 2020-04-03 高建伟 Backfill device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040053943A (en) * 2002-12-16 2004-06-25 박광업 Breaker tool for an excavator and ground hardening process using the same
KR20030095366A (en) * 2003-07-18 2003-12-18 남인근 Apparatus for tramping road
CN101906774A (en) * 2010-08-06 2010-12-08 左天德 Hammerblow tamper of excavator
CN103603334A (en) * 2013-06-03 2014-02-26 罗朝钦 Foundation soil punning method
CN106522195A (en) * 2016-12-07 2017-03-22 国家电网公司 Tamping hammer
CN109826263A (en) * 2019-01-24 2019-05-31 中建新疆建工(集团)有限公司 An excavator compaction device for trenches
CN210238473U (en) * 2019-07-19 2020-04-03 高建伟 Backfill device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘本学;郝飞;张志峰;冯忠绪;: "高速液压夯实机动力学模型试验", 长安大学学报(自然科学版), no. 01, pages 99 - 102 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111778959A (en) * 2020-05-28 2020-10-16 榆林市天元路业有限公司 Construction method for treating loess collapse in tunnel site area by adopting cement stabilized soil
CN111778959B (en) * 2020-05-28 2021-11-30 榆林市天元路业有限公司 Construction method for treating loess collapse in tunnel site area by adopting cement stabilized soil

Similar Documents

Publication Publication Date Title
CN109208625B (en) A construction method for strengthening and strengthening karst caves of underground pile foundations
CN103821139B (en) A kind of rammer expands carrier strength core multiple elements design stake and reinforced soft soil ground construction method
CN103741670B (en) A kind of method for processing foundation eliminating negative friction
CN106884433A (en) Control vibrations pile pulling causes the structure of underground structure depression and control depression method
CN103074882A (en) Construction method for reinforcing island-type perennial frozen-soil foundation by adopting gravel piles
CN110055948A (en) A kind of big Treatment Methods of Karst Foundation of depth and device
CN101311418A (en) Exchange filling method for deep-foundation pit and large area equipment foundation
CN105714773A (en) Foundation treatment method
CN104746505A (en) Method for treating miscellaneous fill foundation combing dynamic consolidation and compaction grouting
CN102400462A (en) Secondary grouting small pile construction process in foundation anti-seismic reinforcement treatment
KR100927324B1 (en) Construction method and device for compacting ground using hydraulic hammer for pile driving on crane
CN108049395A (en) A kind of anti-collapse impact holing construction method in complex karst place
CN109680671A (en) A kind of liquefaction foundation treatment method based on building waste
CN103758109B (en) For setting and the processing method of the draining rotary churning pile ground of underconsolidated soil
CN115125782A (en) A kind of red sandstone high fill road subgrade structure and construction method
CN104947648A (en) Deep replacement dynamic compaction gravel pile foundation reinforcement method
CN109137872B (en) A reinforced structural bag and a method for processing a soft foundation using the reinforced structural bag
CN102839683B (en) Granular pile-permeable concrete stake dual compound foundation and processing method
CN210238473U (en) Backfill device
CN102312439A (en) Device and method for treating liquefied foundation with vibrating hammer tube
CN103806434B (en) A kind of level joins the method building the slag soil engineering bag front saturated over-wet soil ground of engineering of process brill
CN103603334A (en) Foundation soil punning method
CN208604589U (en) A kind of novel rammer compacter for three back backfills
CN203741824U (en) Rammed carrier strong core multi-component composite pile
CN116537158A (en) Collapsible loess curing construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Gao Jianwei

Inventor after: Yan Zhichang

Inventor after: Li Guodong

Inventor after: Sun Yanjie

Inventor after: Sun Huabin

Inventor after: Wei Fangxiao

Inventor after: Li Jun

Inventor after: Niu Hongwu

Inventor after: Bian Yongning

Inventor after: Liang Yumao

Inventor before: Gao Jianwei

Inventor before: Li Guodong

Inventor before: Sun Yanjie

Inventor before: Sun Huabin

CB03 Change of inventor or designer information
RJ01 Rejection of invention patent application after publication

Application publication date: 20190917