CN106759411A - Dry construction well point pipe's dmbeding method and special well point tube assembly - Google Patents

Dry construction well point pipe's dmbeding method and special well point tube assembly Download PDF

Info

Publication number
CN106759411A
CN106759411A CN201710149752.8A CN201710149752A CN106759411A CN 106759411 A CN106759411 A CN 106759411A CN 201710149752 A CN201710149752 A CN 201710149752A CN 106759411 A CN106759411 A CN 106759411A
Authority
CN
China
Prior art keywords
well
pore
point pipe
pipe
point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710149752.8A
Other languages
Chinese (zh)
Inventor
张绍虎
杨新开
赵长海
朱鹏
李让春
史学武
宋在权
徐辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Water Resources Development Co Ltd
Original Assignee
Anhui Water Resources Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Water Resources Development Co Ltd filed Critical Anhui Water Resources Development Co Ltd
Priority to CN201710149752.8A priority Critical patent/CN106759411A/en
Publication of CN106759411A publication Critical patent/CN106759411A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The present invention gives a kind of dry construction well point pipe's dmbeding method, comprise the following steps:Pore-forming pillar is rammed vertically and is pounded into underground;The soil in pore-forming pillar is taken out, wellhole is formed;Well-point pipe is put into pore-forming pillar, the locating support of well-point pipe is resisted against on pore-forming pillar inwall;Casing pack filtrate is protected to pore-forming;Pore-forming pillar is taken out from underground;Wellhole is sealed with clay.The wellhole of this method construction is absolutely available, does not result in invalid hole, improves well-points dewatering efficiency of construction.The present invention gives a kind of special well point tube assembly for realizing above-mentioned method for embedding, including well-point pipe, pore-forming pillar and some locating supports, and well-point pipe lower sides are provided with some filtering permeable holes;Some locating supports are sequentially fixed at outside the tube side wall of well point along the axial direction of well-point pipe.This well point tube assembly can more be applicable the requirement of dry construction well point pipe's dmbeding method, it is ensured that well-point pipe will not be inclined in follow-up work, and the thickness of filtrate is uniform.

Description

Dry construction well point pipe's dmbeding method and special well point tube assembly
Technical field
The present invention relates to a kind of dry construction well point pipe's dmbeding method.
The invention further relates to a kind of special well point tube assembly suitable for dry construction well point pipe's dmbeding method.
Background technology
It is earth work, ground and foundation engineering during well-points dewatering is constructed for level of ground water construction environment higher An important technique measure in construction, moisture that can be in drainage base soil, promotes soil solidifying, foundation strength is improved, while can To reduce the lateral displacement of the slight slope soil body and sedimentation, stable side slope eliminates quicksand, reduces the protuberance of substrate soil, makes to be located at natively Ground below lower water is avoided that the influence of underground water with basic engineering construction, there is provided relatively more dry execution conditions, can also subtract Few earth volume, shortening duration, raising construction quality and guarantee construction safety.
Well-points dewatering construction equipment mainly includes that (bottom can be provided with filtering permeable hole or directly still further install well-point pipe Chimney filter), water header and pumping equipment etc..Discharge manifold, then embedded well point first, effective bent union connects well-point pipe and house steward It is logical, then pumping equipment is installed.
The embedded use water jetting of well-point pipe in common well-points dewatering construction, water jetting is divided into punching and two mistakes of pipe laying , first using high-pressure rubber pipe be connected high-pressure hydraulic pump with hole during punching by journey, and punching pipe is sling with crane gear, and is inserted in well point On position, using water under high pressure, and through the water spray aperture of main punching tube head, soil is washed with jet erosion rapidly, while making punching Hole pipe is rotated up and down, and it is heavy to wash down, so as to gradually form hole in soil, after wellhole is formed, extracts punching pipe, immediately Insertion well-point pipe.
But constructed using water jetting and had the disadvantages that:1st, water under high pressure washes away the soil of metapore wall built on the sand, easily makes Into the soil that collapses, wellhole is set to be changed into useless hole;2nd, water under high pressure is changed into slime water and deposits to soil layer after injection punching, subsequent affect precipitation effect Really;3rd, the hole wall of wellhole is unstable, and easily soil is mingled with filter material layer during follow-up filling filtrate, easily blocks filtering permeable hole, Influence dewatering effect.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of good dry construction well-point pipe of rational in infrastructure, using effect Method for embedding.
The technical problems to be solved by the invention are also to provide a kind of suitable for the special of dry construction well point pipe's dmbeding method Use well point tube assembly.
In order to solve the above technical problems, the invention provides a kind of dry construction well point pipe's dmbeding method, including following step Suddenly:
A) pore-forming pillar is rammed vertically in predetermined stringing position and is pounded into underground;
B) soil in pore-forming pillar is taken out, wellhole is formed;
C) well-point pipe is put into pore-forming pillar, is fixed with some locating supports in the pipe outer wall of well point, locating support against On pore-forming pillar inwall;
D) casing pack filtrate is protected to pore-forming, the packed height of filtrate exceedes the permeable hole site of filtering of well-point pipe bottom;
E) pore-forming pillar is taken out from underground, well-point pipe is still stayed in wellhole;
F) scope of 1 meter of wellhole upper end is sealed with clay, well-point pipe upper end is stretched out outside wellhole.
Preferably, pore-forming pillar is rammed using hydraulic vibration driver in step a) and is pounded into underground.
Preferably, the soil fetched earth in machine taking-up pore-forming pillar using spiral is made in step b).
After such method, the installation of well-point pipe and the filling of filtrate are without the soil that collapses for worrying wellhole, and well Point pipe accurate positioning, does not result in well-point pipe periphery filtrate and fills uneven problem, reduces because filtering supplement causes soil to block up The problem of real filtering permeable hole;Compared to existing technology, the wellhole of this method construction is absolutely available, and it is invalid not result in Hole, improves well-points dewatering efficiency of construction.
Even if after follow-up pore-forming pillar is extracted out, borehole wall is collapsed, and because filtrate and well-point pipe have been arranged in place, also will not The normal of influence well-point pipe is used.
In order to solve the above technical problems, realizing above-mentioned dry construction well point pipe's dmbeding method present invention also offers a kind of Special well point tube assembly, at least including well-point pipe, well-point pipe lower sides are provided with some filtering permeable holes;
Also include pore-forming pillar and some locating supports, some locating supports are sequentially fixed at along the axial direction of well-point pipe Outside the tube side wall of well point, the external diameter of the internal diameter more than circle where locating support outline of pore-forming pillar, locating support outer wall is resisted against On pore-forming pillar inwall.
After such structure, this well point tube assembly can more be applicable the requirement of dry construction well point pipe's dmbeding method, side Just burial and construction;The effect of locating support may insure that well-point pipe is in the center of wellhole, it is ensured that well-point pipe is in follow-up work Will not be inclined in work, the thickness of filtrate is uniform.
The locating support of this well point tube assembly is the frame structure of annular, is provided with locating support some through its upper and lower side The through hole in face;After such structure, the frame structure of annular can be such that locating support is more preferably adapted to pore-forming pillar endoporus, And locating support is provided with through hole can not influence the filling of follow-up filtrate.
The pore-forming pillar side wall upper part of this well point tube assembly is provided with two lifting eyes, and lifting rope is arranged in lifting eye;Using After such structure, facilitate the taking-up of follow-up pore-forming pillar.
The pore-forming pillar sidewall upper of this well point tube assembly is provided with the annular boss coordinated with hydraulic vibration driver;Using so Structure after, it is convenient to coordinate with hydraulic vibration driver, and can subsequently coordinate the taking-up of pore-forming pillar.
Brief description of the drawings
Fig. 1 is one structural representation of well-point pipe Assemblies Example of embodiment.
Fig. 2 is one top view of well-point pipe Assemblies Example locating support of embodiment.
Fig. 3 is one of one state diagram of dry construction well point pipe's dmbeding method of embodiment.
Fig. 4 is embodiment one the two of the state diagram of dry construction well point pipe's dmbeding method.
Fig. 5 is two structural representations of well-point pipe Assemblies Example of embodiment.
Specific embodiment
As shown in Fig. 1 to 2
For this well point tube assembly includes well-point pipe 2, pore-forming pillar 1 and some locating supports 3.
Pore-forming pillar 1 is one section of straight tube long, and the upper and lower opening of pore-forming pillar 1, the side wall upper part of pore-forming pillar 1 is provided with two and rises Lifting hole(eyelet) 11, lifting rope 12 is arranged in lifting eye 11;Well-point pipe 2 is also one section of straight tube long, the chimney filter part of the bottom of well-point pipe 2, The lower sides of well-point pipe 2 are provided with multiple filtering permeable holes 21, and outside will also wrap geotechnological filter cloth, and the percent opening of chimney filter is usually 25%-30%, before bag filter cloth, the pad muscle of the outer general also issued at intervals 4mm diameters of pipe plays overhead, distribution spacing Usually 100mm-150mm (bottom of well-point pipe 2 can also set single filter pipe).
Well-point pipe 2 is welded with three locating supports 3 successively along its axial direction, and locating support 3 is the frame structure of annular, Locating support 3 includes the first locating ring 31, the second locating ring 32 and five support bars 33, and the endoporus of the first locating ring 31 agrees with well point The outer wall of pipe 2, and the first locating ring 31 and the welding of the outer wall of well-point pipe 2, the second locating ring 32 with diameter greater than the first locating ring 31, Second locating ring 32 is enclosed within the outside of the first locating ring 31, is welded by support bar 33 between the second locating ring 32 and the first locating ring 31 Fixation is connect, be there is gap between the inside of locating support 3 of frame structure and constituted five through the upper and lower end face of locating support 3 Through hole 34, the external diameter of the internal diameter more than circle where the outline of locating support 3 of pore-forming pillar 1.
This dry construction well point pipe's dmbeding method is specifically introduced below in conjunction with above-mentioned well point tube assembly, is comprised the following steps:
A) determine predetermined stringing position, pore-forming pillar 1 is rammed vertically using hydraulic vibration driver is pounded into underground, pore-forming pillar 1 The exposed side on the ground of lifting eye 11 of side wall upper part;
B) soil in pore-forming pillar 1 is taken out using the spiral machine that fetches earth, wellhole is formed, because the soil in outside is protected by pore-forming Pipe 1 is intercepted, the soil so wellhole will not collapse;
C) well-point pipe 2 is put into pore-forming pillar 1, the locating support 3 on the outer wall of well-point pipe 2 is born against in pore-forming pillar On 1 inwall, locating support 3 may insure to stretch into the not run-off the straight of well-point pipe 2 in pore-forming pillar 1;
D) to filtrate 4 is filled in pore-forming pillar 1, the packed height of filtrate 4 exceedes the filtering permeable hole 21 of the bottom of well-point pipe 2 Position, in the presence of locating support 3, well-point pipe 2 is in the center of wellhole, when filtrate 4 is filled, does not result in well-point pipe 2 periphery filtrates 4 fill uneven problem, and reducing causes the problem of the stifled real filtering permeable hole 21 of soil, such as Fig. 3 because of filtering supplement It is shown;
E) pore-forming pillar 1 is taken out from underground using the lifting rope 12 on the lifting eye 11 of pore-forming pillar 1, well-point pipe 2 is still stayed In wellhole, due to pore-forming pillar 1 filtrate 4 can be caused to produce vibration while detaching, and then it is more close to fill filtrate 4 Real, the position of well-point pipe 2 is not influenceed by pore-forming pillar 1, and filtrate 4 has been filled with finishing, after pore-forming pillar 1 is extracted out, i.e., Just wellhole is collapsed soil, is not also interfered with the normal of well-point pipe 2 and is used;
F) wellhole upper end is sealed with 1 meter of scope clay 5 or other materials, well-point pipe 2 is stretched out outside wellhole, completes well point The burial and construction of pipe 2, as shown in Figure 4.
Embodiment two
As shown in Figure 5
The present embodiment is differed only in embodiment one:The upper end of pore-forming pillar 1 ', is not required to open lifting hole(eyelet), and is provided with Bulge loop 13 ' is engaged with the equipment of tube drawing, engaging bulge loop 13 ' can be hammered into shape with hydraulic hammer, electric vibrating etc., and equipment coordinates, and completes The tube drawing operation of pore-forming pillar 1 '.
Above-described is only two kinds of implementation methods of the invention, it is noted that for one of ordinary skill in the art For, under the premise without departing from the principles of the invention, some variations and modifications can also be made, these also should be regarded as belonging to this hair Bright protection domain.

Claims (7)

1. a kind of dry construction well point pipe's dmbeding method, comprises the following steps:
A) pore-forming pillar is rammed vertically in predetermined stringing position and is pounded into underground;
B) soil in pore-forming pillar is taken out, wellhole is formed;
C) well-point pipe is put into pore-forming pillar, some locating supports is fixed with the pipe outer wall of well point, locating support is resisted against into On the pillar inwall of hole;
D) casing pack filtrate is protected to pore-forming, the packed height of filtrate exceedes the permeable hole site of filtering of well-point pipe bottom;
E) pore-forming pillar is taken out from underground, well-point pipe is still stayed in wellhole;
F) scope of 1 meter of wellhole upper end is sealed with clay, well-point pipe upper end is stretched out outside wellhole.
2. dry construction well point pipe's dmbeding method according to claim 1, it is characterized in that:
Pore-forming pillar is rammed using hydraulic vibration driver in step a) and is pounded into underground.
3. dry construction well point pipe's dmbeding method according to claim 1, it is characterized in that:
Make the soil fetched earth in machine taking-up pore-forming pillar using spiral in step b).
4. a kind of special well point tube assembly for realizing dry construction well point pipe's dmbeding method as claimed in claim 1, at least includes Well-point pipe, well-point pipe lower sides are provided with some filtering permeable holes;
It is characterized in that:
Also include pore-forming pillar and some locating supports, some locating supports are sequentially fixed at well point along the axial direction of well-point pipe Outside tube side wall, the external diameter of the internal diameter more than circle where locating support outline of pore-forming pillar, locating support outer wall is resisted against pore-forming On pillar inwall.
5. the special well point tube assembly of dry construction well point pipe's dmbeding method according to claim 4, it is characterized in that:
Locating support is the frame structure of annular, and some through holes through its upper and lower end face are provided with locating support.
6. the special well point tube assembly of dry construction well point pipe's dmbeding method according to claim 4, it is characterized in that:
The pore-forming pillar side wall upper part is provided with two lifting eyes, and lifting rope is arranged in lifting eye.
7. the special well point tube assembly of dry construction well point pipe's dmbeding method according to claim 4, it is characterized in that:
The pore-forming pillar sidewall upper is provided with the engaging bulge loop coordinated with hydraulic vibration driver.
CN201710149752.8A 2017-03-14 2017-03-14 Dry construction well point pipe's dmbeding method and special well point tube assembly Pending CN106759411A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710149752.8A CN106759411A (en) 2017-03-14 2017-03-14 Dry construction well point pipe's dmbeding method and special well point tube assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710149752.8A CN106759411A (en) 2017-03-14 2017-03-14 Dry construction well point pipe's dmbeding method and special well point tube assembly

Publications (1)

Publication Number Publication Date
CN106759411A true CN106759411A (en) 2017-05-31

Family

ID=58962118

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710149752.8A Pending CN106759411A (en) 2017-03-14 2017-03-14 Dry construction well point pipe's dmbeding method and special well point tube assembly

Country Status (1)

Country Link
CN (1) CN106759411A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109098198A (en) * 2018-08-31 2018-12-28 中国二十冶集团有限公司 The localization method of non-fine concrete downcast well pipe
CN111926839A (en) * 2020-07-13 2020-11-13 福建和盛达建筑工程有限公司 Well point pipe structure and well point construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001115458A (en) * 1999-10-15 2001-04-24 Geo-Research Institute Deep well construction method using earth retaining wall
CN101070704A (en) * 2007-06-04 2007-11-14 上海地矿工程勘察有限公司 Controllable one-well lamina precipitation construction method
CN201224887Y (en) * 2008-07-14 2009-04-22 河北建设勘察研究院有限公司 Well point tube for flexible soil foundation water drain consolidation
CN105649098A (en) * 2016-01-21 2016-06-08 中国能源建设集团安徽电力建设第工程有限公司 Multi-stage casing tube sand getting and boring method suitable for light well point precipitation of medium-coarse sand geology
CN205369282U (en) * 2016-02-08 2016-07-06 王继龙 Well point dewatering of sluice construction usefulness
CN206667275U (en) * 2017-03-14 2017-11-24 安徽水利开发股份有限公司 The special well point tube assembly of dry construction well point pipe's dmbeding method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001115458A (en) * 1999-10-15 2001-04-24 Geo-Research Institute Deep well construction method using earth retaining wall
CN101070704A (en) * 2007-06-04 2007-11-14 上海地矿工程勘察有限公司 Controllable one-well lamina precipitation construction method
CN201224887Y (en) * 2008-07-14 2009-04-22 河北建设勘察研究院有限公司 Well point tube for flexible soil foundation water drain consolidation
CN105649098A (en) * 2016-01-21 2016-06-08 中国能源建设集团安徽电力建设第工程有限公司 Multi-stage casing tube sand getting and boring method suitable for light well point precipitation of medium-coarse sand geology
CN205369282U (en) * 2016-02-08 2016-07-06 王继龙 Well point dewatering of sluice construction usefulness
CN206667275U (en) * 2017-03-14 2017-11-24 安徽水利开发股份有限公司 The special well point tube assembly of dry construction well point pipe's dmbeding method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109098198A (en) * 2018-08-31 2018-12-28 中国二十冶集团有限公司 The localization method of non-fine concrete downcast well pipe
CN111926839A (en) * 2020-07-13 2020-11-13 福建和盛达建筑工程有限公司 Well point pipe structure and well point construction method
CN111926839B (en) * 2020-07-13 2021-08-24 福建和盛达建筑工程有限公司 Well point pipe structure and well point construction method

Similar Documents

Publication Publication Date Title
CN105951826A (en) Suction ground anchor device in tubular pile and water pressure injection method thereof
CN101550697A (en) Pulling-out method of underground piles by sleeving, vibrating and punching
CN106192981B (en) A kind of Dewatering dynamic compaction integrated device and its application method
CN207003424U (en) The rotary digging drilling hole bored concrete pile that steel reinforcement cage band covers in a kind of Soft Soil Layer
CN207073140U (en) A kind of well casing dewatering well dewatering device
CN106499412A (en) A kind of anti-rock burst method for protecting support in the tunnel with active support as theory and support system
CN105625420B (en) A kind of extension type support with manually dug piles construction and its construction method
CN106759411A (en) Dry construction well point pipe's dmbeding method and special well point tube assembly
CN104047280B (en) Soft foundation sharp separation compacting method
CN105672309B (en) The recyclable overlength steel pile casting wall protecting method of karst area embedded rock pile pore-forming
CN215629929U (en) Novel site operation structure of anti-floating anchor rod
CN110513045A (en) A kind of NEW TYPE OF COMPOSITE sand control Reduction by Drainage kill-job soil compaction hole-forming device and method
CN206667275U (en) The special well point tube assembly of dry construction well point pipe's dmbeding method
CN201296932Y (en) Segmentation prefabricating sunken outer wall and guide wall thereof
CN206246133U (en) A kind of anti-rock burst support system in tunnel and tunnel structure
CN205653825U (en) A deviational survey pipe mounting structure is irritated to simple and easy pressure
CN108018859B (en) Emergency treatment method and structure for sudden surge of foundation pit
CN211922599U (en) CFG pile end post-grouting device
CN106958248A (en) The construction method of pattern foundation pit supporting structure
CN104060636B (en) Pressure release anti-float method during high water level regional architecture foundation construction and device
CN206157748U (en) Release of stress type stirrup cage sand well foundation pit dewatering device
CN206801597U (en) A kind of flood mine chamber waterproof construction
CN106567397A (en) Method and device for controlling underground water of deep foundation pit
CN207847694U (en) A kind of tunnel drainage device and tunnel solid concrete roabed
CN110700243A (en) Method for treating pile bottom sediment of concrete cast-in-place pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190620

Address after: 233010 No. 5183 Donghai Avenue, Bengbu City, Anhui Province

Applicant after: Anhui Water Resources Development Co., Ltd.

Address before: 233010 South of Zhanggongshan Road, Donghai Avenue, Bengbu City, Anhui Province

Applicant before: Anhui Water Resources Development Co., Ltd.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531