CN207003424U - The rotary digging drilling hole bored concrete pile that steel reinforcement cage band covers in a kind of Soft Soil Layer - Google Patents

The rotary digging drilling hole bored concrete pile that steel reinforcement cage band covers in a kind of Soft Soil Layer Download PDF

Info

Publication number
CN207003424U
CN207003424U CN201720245498.7U CN201720245498U CN207003424U CN 207003424 U CN207003424 U CN 207003424U CN 201720245498 U CN201720245498 U CN 201720245498U CN 207003424 U CN207003424 U CN 207003424U
Authority
CN
China
Prior art keywords
steel reinforcement
reinforcement cage
drilling hole
rotary digging
hole bored
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720245498.7U
Other languages
Chinese (zh)
Inventor
胡锦伟
王咸东
刘兵
王勇
席有青
姜秋红
王传礼
盛光祺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KUNMING JUNLONG GEOTECHNICAL ENGINEERING Co Ltd
Original Assignee
KUNMING JUNLONG GEOTECHNICAL ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KUNMING JUNLONG GEOTECHNICAL ENGINEERING Co Ltd filed Critical KUNMING JUNLONG GEOTECHNICAL ENGINEERING Co Ltd
Priority to CN201720245498.7U priority Critical patent/CN207003424U/en
Application granted granted Critical
Publication of CN207003424U publication Critical patent/CN207003424U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The rotary digging drilling hole bored concrete pile that steel reinforcement cage band covers in a kind of Soft Soil Layer, pile foundation engineering field, including steel reinforcement cage are the utility model is related to, wraps up geotextiles on the outside of steel reinforcement cage, geotextiles are fixed on steel reinforcement cage by horizontal location muscle and circular orientation muscle.The utility model solve conventional rotary digging drilling hole bored concrete pile technique in cumulosol, strawberry is native, when being constructed in soft creeping modeling shape silt soil strata, concrete spreads to the periphery soil body and causes pile quality to be difficult to the technical barrier excessive with fullness coefficient that be guaranteed.And can saves a large amount of concrete while pile quality is guaranteed.

Description

The rotary digging drilling hole bored concrete pile that steel reinforcement cage band covers in a kind of Soft Soil Layer
Technical field
It the utility model is related to rotary digging drilling hole bored concrete pile, the rotary digging drilling hole that steel reinforcement cage band covers in especially a kind of Soft Soil Layer fills Stake is noted, belongs to pile foundation engineering field.
Background technology
Such as in the gyittja soil layer of Kunming, Yunnan Dian Chi section, thicker strawberry soil, peat are distributed with duricrust clay layer Matter is native and soft modeling~current-formed silt matter soil, these soil layers have the characteristics that moisture content is high, void ratio is big, natural density is low. Problems be present when applying construction technology using conventional rotary digging drilling hole bored concrete pile in the section:(1) stream modeling shape cumulosol and high hole Gap using common rotary digging drilling hole bored concrete pile technique than in strawberry soil (unit weight is up to more than 2.5 slightly larger than water, void ratio), being applied Man-hour, institute's placing concrete easily to the periphery soil body spread and cause fullness coefficient excessive, corresponding fullness coefficient up to 3.0 with On.(2) concrete to the periphery soil body spread when, stake top concrete liquid level constantly declines, can be new if now teeming concrete Old concrete intersection is mingled with mud and causes broken pile.(3) after concrete spreads to the periphery soil body, periphery Spiral digging machine pore-forming is caused Difficulty even can not pore-forming.
The content of the invention
The utility model provides the rotary digging drilling hole bored concrete pile that steel reinforcement cage band covers in a kind of Soft Soil Layer, and concrete scheme is as follows:
The rotary digging drilling hole bored concrete pile that steel reinforcement cage band covers in a kind of Soft Soil Layer, including steel reinforcement cage, it is characterised in that:Also include soil Work cloth, geotextiles are wrapped on the outside of steel reinforcement cage, and geotextiles are fixed on steel reinforcement cage by horizontal location muscle and circular orientation muscle.
Further, horizontal location muscle is symmetrically welded in the cage bar of steel reinforcement cage.
Further, horizontal location muscle width is equal to filling pile cage of reinforcement thickness of concrete cover.
Further, circular orientation muscle is welded on the outside of horizontal location muscle.
Further, geotextiles are fixed on circular orientation muscle by tied silk or cord.
Compared with prior art, the beneficial effects of the utility model are:
Geotextiles are wrapped on the outside of steel reinforcement cage by circular orientation muscle and horizontal location muscle, institute's placing concrete is installed in In geotextiles.Solve conventional rotary digging drilling hole bored concrete pile technique in cumulosol, strawberry is native, soft modeling~current-formed silt matter soil layer During middle construction, concrete spreads to the periphery soil body and causes pile quality to be difficult to the technology hardly possible for being guaranteed excessive with fullness coefficient Topic.And can saves a large amount of concrete while pile quality is guaranteed.
Brief description of the drawings
Fig. 1 shows structural representation of the present utility model;
Fig. 2 shows profile of the present utility model;
Fig. 3 shows the construction flow chart of one specific implementation of the utility model
Wherein, steel reinforcement cage 01, circular orientation muscle 02, horizontal location muscle 03, geotextiles 04.
Embodiment
Below in conjunction with the accompanying drawings and specific embodiment, the utility model is described in further detail.
As shown in Figure 1 and Figure 2, the rotary digging drilling hole bored concrete pile that steel reinforcement cage band covers in the Soft Soil Layer of the present embodiment, including steel reinforcement cage 01, in addition to geotextiles 04, geotextiles 04 are wrapped in the outside of steel reinforcement cage 01, and geotextiles 04 pass through horizontal location muscle 03 and annular Positioning bar 02 is fixed on steel reinforcement cage 01.Horizontal location muscle 03 is symmetrically welded in the cage bar of steel reinforcement cage 01.Horizontal location muscle 03 Width is equal to filling pile cage of reinforcement thickness of concrete cover.Circular orientation muscle 02 is welded on the outside of horizontal location muscle 03.Soil Work cloth 04 is fixed on circular orientation muscle 02 by tied silk or cord.
Horizontal location muscle 03 and spacing of the circular orientation muscle 02 along the length direction of steel reinforcement cage 01 be 1000mm~2000mm it Between.As shown in figure 3, the construction technology process 10 of the present embodiment starts from step S11, wherein prepare before carrying out every construction, such as Construction machinery, material, personnel, confide a technological secret, levelling of the land, machine-walking road bedding compacting etc. preparation.
Step S12 be mechanical package, debugging, test running, mud pit excavate, surveying setting-out go out a site.
Enter step S13 after the completion of step S12, prepare mud, mud match ratio determines according to field test.
After the completion of step S13, technique enters step S14, and measurement, unwrapping wire orient stake position, stake position made with albarium Mark.
Step S14 enters step S15 immediately when completing, steel reinforcement cage processing, during steel reinforcement cage processing in cage bar weld horizontal Positioning bar 03, horizontal location muscle 03 should be carried out symmetrically when welding, and horizontal location muscle 03 is remote in horizontal location muscle after the completion of welding Annular positioning bar 02 is welded in one end of steel reinforcement cage, and horizontal location muscle 03 and circular orientation muscle 02 are along between the length direction of steel reinforcement cage 01 Away between 1500mm~2000mm.Circular orientation muscle 02 is consolidated after the completion of constructing on circular orientation muscle 02 using tied silk or cord Determine the overcoat of geotextiles 04.
When step S15 is carried out, step S16 is carried out simultaneously, and using rotary drilling rig pore-forming, pore-forming is qualified up to verifying.Step After the completion of S16, into step S17, telephone-moving to next position is constructed after pore-forming and acceptance(check).When step S17 is completed, enter Enter step S18, hung in the band processed set steel reinforcement cage in hole and up to acceptance(check) using crane or other Special cranes.Step After the completion of rapid S18, into step S19, placing concrete.
After the completion of step S19, into step S20, construction is completed, and is entered next position in the same way and is constructed.
After the completion of step S20, method 10 terminates.
Above-described utility model is only that the preferred embodiments of the invention are described, and not the present invention is entered Row limitation, is not departing from outside the utility model in essence content, the various improvement made to the utility model, all should belong to this reality With new right.

Claims (5)

1. the rotary digging drilling hole bored concrete pile that steel reinforcement cage band covers in a kind of Soft Soil Layer, including steel reinforcement cage(01), it is characterised in that:Also include Geotextiles(04), geotextiles(04)It is wrapped in steel reinforcement cage(01)Outside, geotextiles(04)Pass through horizontal location muscle(03)And annular Positioning bar(02)It is fixed on steel reinforcement cage(01)On.
2. the rotary digging drilling hole bored concrete pile that steel reinforcement cage band covers in Soft Soil Layer according to claim 1, it is characterised in that:Level is fixed Position muscle(03)It is symmetrically welded at steel reinforcement cage(01)Cage bar on.
3. the rotary digging drilling hole bored concrete pile that steel reinforcement cage band covers in Soft Soil Layer according to claim 1, it is characterised in that:Level is fixed Position muscle(03)Width is equal to filling pile cage of reinforcement thickness of concrete cover.
4. the rotary digging drilling hole bored concrete pile that steel reinforcement cage band covers in Soft Soil Layer according to claim 1, it is characterised in that:Annular is fixed Position muscle(02)It is welded on horizontal location muscle(03)Outside.
5. the rotary digging drilling hole bored concrete pile that steel reinforcement cage band covers in Soft Soil Layer according to claim 1, it is characterised in that:Geotextiles (04)Circular orientation muscle is fixed on by tied silk or cord(02)On.
CN201720245498.7U 2017-03-14 2017-03-14 The rotary digging drilling hole bored concrete pile that steel reinforcement cage band covers in a kind of Soft Soil Layer Active CN207003424U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720245498.7U CN207003424U (en) 2017-03-14 2017-03-14 The rotary digging drilling hole bored concrete pile that steel reinforcement cage band covers in a kind of Soft Soil Layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720245498.7U CN207003424U (en) 2017-03-14 2017-03-14 The rotary digging drilling hole bored concrete pile that steel reinforcement cage band covers in a kind of Soft Soil Layer

Publications (1)

Publication Number Publication Date
CN207003424U true CN207003424U (en) 2018-02-13

Family

ID=61427701

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720245498.7U Active CN207003424U (en) 2017-03-14 2017-03-14 The rotary digging drilling hole bored concrete pile that steel reinforcement cage band covers in a kind of Soft Soil Layer

Country Status (1)

Country Link
CN (1) CN207003424U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108517862A (en) * 2018-03-26 2018-09-11 中冶天工集团有限公司 A kind of construction method of side felting
CN108978638A (en) * 2018-07-30 2018-12-11 中国二十二冶集团有限公司 Control the construction method of bored concrete pile thickness of protection tier
CN110670584A (en) * 2019-09-05 2020-01-10 中冶交通建设集团有限公司 Cast-in-situ bored pile and construction method thereof
CN110700245A (en) * 2019-11-26 2020-01-17 江西思绮建筑劳务有限公司 Construction method of cast-in-place pile
CN111663715A (en) * 2019-03-05 2020-09-15 石家庄通天管业有限公司 Double-rubber-ring steel bell and spigot steel bar cage assembling method
CN112900423A (en) * 2021-01-25 2021-06-04 中国十九冶集团有限公司 Method for reducing filling coefficient of cast-in-place pile in ultra-deep silt geology

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108517862A (en) * 2018-03-26 2018-09-11 中冶天工集团有限公司 A kind of construction method of side felting
CN108978638A (en) * 2018-07-30 2018-12-11 中国二十二冶集团有限公司 Control the construction method of bored concrete pile thickness of protection tier
CN111663715A (en) * 2019-03-05 2020-09-15 石家庄通天管业有限公司 Double-rubber-ring steel bell and spigot steel bar cage assembling method
CN110670584A (en) * 2019-09-05 2020-01-10 中冶交通建设集团有限公司 Cast-in-situ bored pile and construction method thereof
CN110700245A (en) * 2019-11-26 2020-01-17 江西思绮建筑劳务有限公司 Construction method of cast-in-place pile
CN112900423A (en) * 2021-01-25 2021-06-04 中国十九冶集团有限公司 Method for reducing filling coefficient of cast-in-place pile in ultra-deep silt geology

Similar Documents

Publication Publication Date Title
CN207003424U (en) The rotary digging drilling hole bored concrete pile that steel reinforcement cage band covers in a kind of Soft Soil Layer
CN103469789B (en) Karst-area underwater bridge pier drilled pile construction method
CN102505695B (en) Construction method for deep foundation pit of three-dimensional garage
CN109208637A (en) Increase the construction method of open-cut station newly on the basis of existing tunnel
CN106759297A (en) A kind of construction method of support pile and three pipe high-pressure rotary jet grouting pile deep basal pits
CN108316339A (en) A kind of construction method of water penetration geology large size arch bridge base
CN105002927B (en) A kind of construction method of execavated rockmass barricade loaded filter
CN106968690A (en) The method for tunnel construction for soil property of caving in
CN107513995A (en) A kind of bridge struction pile post grouting construction method
CN107724383A (en) Rotary digging cast-in-place pile construction method
CN106968139A (en) The construction method of railway bed supporting in undercrossing tunnel jacking framed bridge jack-in process
CN102535490A (en) Method for dewatering foundation pit by using bored cast-in-place pile
CN106869151A (en) A kind of bridge construction method of deep foundation ditch
CN110453699B (en) Drainage slide-resistant pile structure of 'rice' -shaped pile core and construction method thereof
CN206721870U (en) A kind of long auger guncreting pile steel reinforcement cage
CN110685272B (en) Method for treating soft foundation settlement overrun by utilizing inclined-hole cloth bag pile
CN108086308A (en) Reclaimation area locally secretly buries the construction method that mud wraps Punching Borehole Cast-in-place Concrete Pile
CN111365005A (en) Reinforcing structure and method for shield tunnel lower-penetrating elevated bridge foundation
CN107514266A (en) Shield export & import bolt anchorage soil body construction method
CN107100164A (en) A kind of long auger guncreting pile construction method
CN104727295B (en) Preexisting hole filler displacement hammer flattener heavy-tamping method
CN108914911A (en) A kind of stratum prestress advanced excavation stability control method
CN107100137A (en) The integrated antiseepage processing method of hamburger type dyke
CN110565452A (en) Railway roadbed body steel flower tube grouting reinforcement method and railway roadbed
CN110512667A (en) It is a kind of to handle because water damage leads to the new method of pile foundation settlement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant