CN206801597U - A kind of flood mine chamber waterproof construction - Google Patents

A kind of flood mine chamber waterproof construction Download PDF

Info

Publication number
CN206801597U
CN206801597U CN201720609087.1U CN201720609087U CN206801597U CN 206801597 U CN206801597 U CN 206801597U CN 201720609087 U CN201720609087 U CN 201720609087U CN 206801597 U CN206801597 U CN 206801597U
Authority
CN
China
Prior art keywords
chamber
concrete
anchor pole
wire netting
splash guard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720609087.1U
Other languages
Chinese (zh)
Inventor
李万涛
杨卫民
王文才
王磊
刘辉
何瑞峰
袁远
张立鹏
胡振鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Iron and Steel Group Mining Co Ltd
HBIS Co Ltd
Original Assignee
HBIS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HBIS Co Ltd filed Critical HBIS Co Ltd
Priority to CN201720609087.1U priority Critical patent/CN206801597U/en
Application granted granted Critical
Publication of CN206801597U publication Critical patent/CN206801597U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of flood mine chamber waterproof construction is the utility model is related to, belongs to underground mine engineering construction equipment technical field.Technical scheme is:Include wire netting(1), gunite concrete(2), impervious concrete(3), anchor pole(4), splash guard(5)And chamber(6), anchor pole(4)It is anchored at chamber(6)Wall on, wire netting(1)Pass through anchor pole(4)It is fixed on chamber(6)Wall on, gunite concrete(2)It is injected in chamber(6)Wire netting on wall(1)On, splash guard(5)It is fixed on gunite concrete(2)Surface on, splash guard(5)Outside cast impervious concrete(3).The beneficial effects of the utility model are:It can apply in the chamber support of flood mine, effectively solve the problems, such as that chamber can not be checked and accepted because water burst is not up to standard, compared to the pattern for carrying out the measures such as grouting behind shaft or drift lining after conventional supporting again, more save cost and duration.

Description

A kind of flood mine chamber waterproof construction
Technical field
A kind of flood mine chamber waterproof construction is the utility model is related to, belongs to underground mine engineering construction equipment and technology neck Domain.
Background technology
According to existing metallurgical mine underground chamber acceptance criteria, the water protection standards of chamber are generally divided into four grades, The water yield round the clock of chamber is clearly required, does not allow chamber larger water burst, especially distribution chamber occur, almost It is not allow for any water burst.
In the underground mine that the aqueous abundant or underground Bedrock Crevice Water of some ground table soil sections is abundant, water burst is engineering construction The biggest problem, under the conditions of this kind construct underground chamber, only with routine concrete spraying support or plain concrete branch Shield, is not reach acceptance specification much to require, after the completion of causing Chamber Construction, because water yield is not up to standard, can not carry out an acceptance inspection Come into operation.The methods such as grouting behind shaft or drift lining, the U-shaped anti-water barrier frame of erection must be used to be handled, not only construction technology is difficult, and work Journey cost is higher.Therefore, it is necessary to a kind of chamber support structure is studied, to solve the problems, such as that chamber waterproof is not up to standard.
Utility model content
The utility model purpose is to provide a kind of flood mine chamber waterproof construction, disclosure satisfy that underground chamber checks and accepts mark Standard, construction technology is simple, saves cost, solves problem present in background technology.
The technical solution of the utility model is:
A kind of flood mine chamber waterproof construction, includes wire netting, gunite concrete, impervious concrete, anchor pole, splash guard And chamber, anchor rod anchored wire netting is fixed on the wall of chamber by anchor pole on the wall of chamber, and gunite concrete is injected in cave On wire netting on locular wall, splash guard is fixed on the surface of gunite concrete, the outside cast impervious concrete of splash guard.
The wire netting is fixed on the end of anchor pole.
Cast impervious concrete on the outside of the splash guard, which is provided with to pour, connects stubble seam, it is described pour to connect in stubble seam be provided with sealing Band.
Using the utility model, after the completion of chamber driving, anchor rod anchored rock is installed first, then consolidated in anchor pole end Determine metal mesh sheet, then to chamber wall gunite concrete, the part as conventional chamber support.Then on gunite concrete surface Splash guard is arranged, then sets up template, impervious concrete is injected into template.
The beneficial effects of the utility model are:It can apply in the chamber support of flood mine, using splash guard, anti-infiltration The water control measures such as solidifying soil, construction joint waterstop, it is combined with the chamber anchor pole, wire netting, concrete spraying support of routine, shape Into a kind of new chamber support structure.Can effectively solve the problems, such as that chamber can not be checked and accepted because water burst is not up to standard, compared to conventional Supporting after carry out the patterns of the measures such as grouting behind shaft or drift lining again, more save cost and duration.
Brief description of the drawings
Fig. 1 is the utility model section view;
Fig. 2 is the utility model top view;
Fig. 3 is the utility model waterstop schematic diagram;
In figure:Wire netting 1, gunite concrete 2, impervious concrete 3, anchor pole 4, splash guard 5, chamber 6, pour connect stubble seam 7, Waterstop 8.
Embodiment
Below in conjunction with accompanying drawing, by example, the utility model is described in further detail.
Referring to the drawings 1, a kind of flood mine chamber waterproof construction, wire netting 1, gunite concrete 2, impervious concrete are included 3rd, anchor pole 4, splash guard 5 and chamber 6, anchor pole 4 are anchored on the wall of chamber 6, and wire netting 1 is fixed on the wall of chamber 6 by anchor pole 4 On, gunite concrete 2 is injected on the wire netting 1 on the wall of chamber 6, and splash guard 5 is fixed on the surface of gunite concrete 2, is prevented The outside cast impervious concrete 3 of water plate 5.
In the present embodiment, after the completion of chamber driving, anchor pole 4 of constructing first, anchor pole 4 is anchored on the wall of chamber, Then wire netting 1 is fixed on to the end of anchor pole 4, to chamber wall gunite concrete 2, as a part for chamber permanent support, And the method that conventional chamber support is conventional, but do not have waterproof effect.
After gunite concrete 2 reaches intensity, splash guard 5 is installed on the surface of gunite concrete 2, then will according to design Erection template is sought, impervious concrete 3 is injected into template.
When impervious concrete is poured, pouring between pouring every time connects in stubble seam 7 and uses construction joint waterstop, really Protect pour connect stubble seam 7 position occur without water burst.

Claims (3)

1. a kind of flood mine chamber waterproof construction, it is characterised in that include wire netting(1), gunite concrete(2), antiseepage coagulation Soil(3), anchor pole(4), splash guard(5)And chamber(6), anchor pole(4)It is anchored at chamber(6)Wall on, wire netting(1)Pass through anchor pole (4)It is fixed on chamber(6)Wall on, gunite concrete(2)It is injected in chamber(6)Wire netting on wall(1)On, splash guard(5) It is fixed on gunite concrete(2)Surface on, splash guard(5)Outside cast impervious concrete(3).
A kind of 2. flood mine chamber waterproof construction according to claim 1, it is characterised in that the wire netting(1)It is fixed In anchor pole(4)End.
A kind of 3. flood mine chamber waterproof construction according to claim 1 or 2, it is characterised in that the splash guard(5) The cast impervious concrete in outside(3)Stubble seam is connect provided with pouring(7), it is described pour connect stubble seam(7)It is interior to be provided with waterstop(8).
CN201720609087.1U 2017-05-27 2017-05-27 A kind of flood mine chamber waterproof construction Active CN206801597U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720609087.1U CN206801597U (en) 2017-05-27 2017-05-27 A kind of flood mine chamber waterproof construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720609087.1U CN206801597U (en) 2017-05-27 2017-05-27 A kind of flood mine chamber waterproof construction

Publications (1)

Publication Number Publication Date
CN206801597U true CN206801597U (en) 2017-12-26

Family

ID=60743475

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720609087.1U Active CN206801597U (en) 2017-05-27 2017-05-27 A kind of flood mine chamber waterproof construction

Country Status (1)

Country Link
CN (1) CN206801597U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113982684A (en) * 2021-11-02 2022-01-28 中煤科工集团西安研究院有限公司 Combined auxiliary roof connecting device and method for rapid closure of water passing roadway

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113982684A (en) * 2021-11-02 2022-01-28 中煤科工集团西安研究院有限公司 Combined auxiliary roof connecting device and method for rapid closure of water passing roadway
CN113982684B (en) * 2021-11-02 2023-10-27 中煤科工集团西安研究院有限公司 Combined auxiliary roof connecting device and method for rapid closure of water passing tunnel

Similar Documents

Publication Publication Date Title
CN204266220U (en) A kind of plugging device of precipitation well in foundation pit
CN105041349B (en) A kind of excavating construction method that station is digged on the basis of Subway Tunnel shield tunnel
CN104806267B (en) The shield end reinforcement system and its construction method of land pebble stratum super-front large pipe shed
CN106801417B (en) Tunnel Passing structures steel pipe isolation pile stratum consolidation system and its construction method
CN105089670B (en) Construction method for enlarging and excavating subway station on basis of parallel interval shield tunnel
CN204126653U (en) A kind of integrated ground shield lining circular ring structure
CN103114595A (en) Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch
CN106759843A (en) A kind of outer wall of basement waterproof construction and its construction method
CN206408655U (en) The top plate sidewall structure of covered back-digging construction
CN106245654B (en) Deposited reinforced concrete pile exempts from inter-pile soil excavation construction method
CN106065628B (en) Based on the major diameter running water pipe security protection construction method faced forever with reference to theory
CN107575237A (en) A kind of subsurface excavation method is combined the construction method of construction subway station with shield method
CN103114575B (en) Steel reinforcement cage for filling pile and filling pile construction method using steel reinforcement cage
CN206801597U (en) A kind of flood mine chamber waterproof construction
CN207525758U (en) A kind of reinforced Structure About Soldier Pile
CN109024609A (en) A kind of foundation pit supporting construction and its construction method based on old campshed
CN204959781U (en) Dewatering well plugging device
CN204199296U (en) Based on the foundation pit supporting construction of old outer wall of basement structure
CN204326080U (en) A kind of next-door neighbour's existing building pit maintenance soil structure
CN205421303U (en) High water level silt ground water treatment facilities falls
CN103132531A (en) Foundation pit supporting system construction method
CN104047273B (en) Power station dissipation and scouring wall and construction method thereof
CN206189458U (en) Multi -deck formula piping lane
CN205421276U (en) Strut heterotypic double row pile of foundation ditch lateral wall
CN209324383U (en) A kind of joint structure of Shield-bored tunnels and station

Legal Events

Date Code Title Description
GR01 Patent grant