CN106320121A CN201510178580.8A CN201510178580A CN106320121A CN 106320121 A CN106320121 A CN 106320121A CN 201510178580 A CN201510178580 A CN 201510178580A CN 106320121 A CN106320121 A CN 106320121A
Authority
CN
China
Prior art keywords
roadbed
pile
subgrade
prefabricated pile
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510178580.8A
Other languages
Chinese (zh)
Other versions
CN106320121B (en
Inventor
陈远川
李佳坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University of Arts and Sciences
Original Assignee
Chongqing University of Arts and Sciences
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University of Arts and Sciences filed Critical Chongqing University of Arts and Sciences
Priority to CN201510178580.8A priority Critical patent/CN106320121B/en
Publication of CN106320121A publication Critical patent/CN106320121A/en
Application granted granted Critical
Publication of CN106320121B publication Critical patent/CN106320121B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The invention discloses a subgrade repair structure, which comprises a pavement layer on the upper portion and a subgrade on the lower portion, wherein a pavement settlement area is positioned on the upper portion of the pavement layer and the subgrade, a plurality of prefabricated piles are arranged inside the subgrade, are perpendicular to the length direction of the subgrade, and are vertically arranged, the prefabricated pile is cylindrical, the front end is provided with a conical pile head, a plurality of holes are uniformly distributed on the surface of the prefabricated pile, and the prefabricated pile is filled with a chemical slurry. The present invention provides the subgrade repair structure and the subgrade repair method, wherein the squeezing effect of the horizontal-lateral piling and the grouting reinforcement are effectively combined, and the subgrade filler is compacted through the lateral piling near the horizontal direction, such that the subgrade is subjected to compacting rising in the vertical direction so as to restore the settlement deformation; and the pressure grouting channel and the hole are reserved in the prefabricated pile, such that the grouting reinforcement is convenient and effective.

Description

A kind of roadbed repairs structure and method
Technical field
The present invention relates to road construction, be specifically related to a kind of roadbed and repair structure and method.
Background technology
Roadbed be according to highway or rail route position and certain technology require to build as road surface or rail The banded structure thing on basis, road, is the basis of highway and railway, and roadbed is to build with soil or building stones to form Linear structure thing.Roadbed should be built under the conditions of good geology, the hydrology and weather.From material Point, roadbed can be divided into soil subgrade, rock subgrade, soil-stone embankment three kinds.
Road foundation owing to filler is uneven, filler is bad, filling compaction is insufficient, water content is too high, , there is sedimentation and deformation in the effect of the factors such as earthquake, Construction Vibration, vehicular load, penetration, deadweight It it is the FAQs of road foundation.Subgrade settlement necessarily causes the destruction of railroad track and highway pavement, Endanger safe traffic.Therefore, the settlement issues of effective Subgrade, for ensureing traffic safety Have important practical significance.
At present, Some Domestic scholar has carried out and Roadbed Soil has been improved by grouting the aspects such as its intensity Research, although have certain effect, but owing to the compactness of Roadbed Soil body is once more than 80%, fill Slurry dyschezia, effectively to carry out, is easily formed leakage irrigated area, local.At present, reinforce Rock And Soil by the means of piling, It is mainly used in the punishment of structure foundation, and mainly vertical direction is driven piles.At road foundation deformation Controlling aspect, the method that less use piling is repaired, the level that has no laterally is driven piles the engineering method repaired.
Summary of the invention
The technical problem to be solved is that existing road roadbed repairing effect is bad, is easily formed office The problem in leakage irrigated area, portion.
In order to solve above-mentioned technical problem, the technical solution adopted in the present invention is to provide a kind of roadbed and repaiies Complex structure, including supercrust and the roadbed of bottom on top, roadbed subsidence region is positioned at supercrust and road The top of base, is provided with many prefabricated piles in described roadbed, described prefabricated pile hangs down with the length direction of roadbed Straight and be horizontally disposed with, described prefabricated pile be cylindrical shape, and front end is provided with cone shape pile crown, described prefabricated Surface is uniform has multiple hole in stake, is perfused with chemistry slurry in described prefabricated pile.
Further technical scheme, described prefabricated pile is steel-pipe pile or reinforced concrete pile.
Further technical scheme, described prefabricated pile is horizontal through roadbed, and squeezes into the one of prefabricated pile End leaves the opening of perfusion slurry.
Further technical scheme, in the vertical section of roadbed, described prefabricated pile is formed horizontally arranged Multirow, is crisscross arranged between adjacent upper and lower two row, forms multiple triangular structure.
Present invention also offers a kind of roadbed restorative procedure, comprise the following steps: S1, prefabricated band slip casting Passage and the steel-pipe pile of hole or reinforced concrete pile;S2, squeeze into the prefabricated pile of level in roadbed side, The filler of compacted and crowded high sedimentation roadbed, repairs sedimentation and deformation;S3, pressure inject chemistry slurry, change Slurry solidifies, and reinforces the filler of sedimentation roadbed further;S4, roadbed is carried out maintenance, form height The road structure of intensity
Further technical scheme, in step s 2, squeezes into the mode of prefabricated pile for the most line by line Dislocation is squeezed into, and forms multiple triangular structure.
The invention provides a kind of roadbed and repair structure and method, soil compaction effect level laterally driven piles Effectively combine with grouting and reinforcing, by the compacted roadbed filling of piling of lateral nearly horizontal direction, make Roadbed in the vertical direction squeezes height, recovers sedimentation and deformation.Logical by the grouting of pre-reservation pressure in prefabricated pile Road and hole, make grouting and reinforcing more convenient and effective.
Accompanying drawing explanation
Fig. 1 repairs the overall schematic of structure for the roadbed that the present invention provides;
Fig. 2 repairs the elevational schematic of structure for the roadbed that the present invention provides;
The prefabricated pile structural representation that Fig. 3 provides for the present invention.
In figure: 1. roadbed, 2. supercrust, 3. prefabricated pile, 4. roadbed subsidence region, 5. hole, 6. Pile crown.
Detailed description of the invention
Subgrade settlement refer to the basis of road (highway, railway etc.) due to by extraneous power (earthquake, Construction Vibration, vehicular load, penetration etc.) or the action of gravity of self and the phenomenon sunk.Road Gene compactness is inadequate, and the immersion of water softens, and after pavement usage a period of time, roadbed also can sink Falling into (sedimentation), settling amount Observable is out.
Roadbed reparation is to recover the intensity of roadbed, rigidity and stability by engineering, recovers roadbed Designed elevation, the physical dimension such as width.Make to deteriorate by recovery technique, the roadbed of pathological changes extensive Multiple health status, reaches to maintain the purpose having a good transport and communication network and ensureing road geological security.The present invention provides Roadbed restorative procedure be soil compaction effect level laterally driven piles and grouting and reinforcing effectively combines, By the compacted roadbed filling of piling of lateral nearly horizontal direction, roadbed in the vertical direction is made to squeeze height, extensive Multiple sedimentation and deformation.By pre-reservation pressure grouting channel and hole in prefabricated pile, make grouting and reinforcing more Convenient and effective.
Below in conjunction with the accompanying drawings the present invention is described in detail.
As it is shown in figure 1, the present invention provide a kind of roadbed repair structure include top supercrust and under The roadbed in portion, roadbed subsidence region is positioned at the top of supercrust and roadbed, be provided with in roadbed many prefabricated Stake, in the present invention, prefabricated pile can be steel-pipe pile or reinforced concrete pile.Prefabricated pile and the length of roadbed Direction is vertical and is horizontally disposed with, more preferable than the effect of vertically piling.As it is shown on figure 3, prefabricated pile is circle Tubular, front end is provided with cone shape pile crown, makes to squeeze into prefabricated pile more quick, reduces resistance.Prefabricated Surface is uniform has multiple hole in stake, is perfused with chemistry slurry in prefabricated pile.
Prefabricated pile is horizontal through roadbed, and the opening of perfusion slurry is left in the one end squeezing into prefabricated pile. As in figure 2 it is shown, in the vertical section of roadbed, prefabricated pile forms horizontally arranged multirow, adjacent up and down Being crisscross arranged between two row, form multiple triangular structure, this frame mode makes grouting evenly, After slurry solidification, prefabricated pile is more firm to the support of whole roadbed.
The roadbed restorative procedure that the present invention provides comprises the following steps:
S1, prefabricated band slip casting passage and the steel-pipe pile of hole or reinforced concrete pile;
S2, squeeze into the prefabricated pile of level in roadbed side, the filler of compacted and crowded high sedimentation roadbed, repair Multiple sedimentation and deformation, the mode squeezing into prefabricated pile is squeezed into for dislocation the most line by line, forms multiple triangle Shape structure;
Lateral piling refers to, by the prefabricated pile laterally squeezing into nearly horizontal direction at Roadbed Soil body, beat Entering stake is equivalent to make the solid phase grogs volume of Roadbed Soil body and weight to increase, the lateral crowd in-out effects of stake Necessarily make the ratio relative reduction of gas phase air and liquid phase moisture in roadbed space or hole.Therefore, laterally Piling is clamp-oned roadbed and is equivalent to apply compacting load on Roadbed Soil surface, completely in terms of mechanics effect The basic goal of the strengthening roadbed of Effective Compaction Roadbed Soil body can be reached.
S3, pressure inject chemistry slurry, chemistry slurry solidification, reinforce the filler of sedimentation roadbed further.
S4, complete above-mentioned steps after roadbed carried out maintenance, form the road structure of high intensity.
The invention provides a kind of roadbed and repair structure and method, soil compaction of first driving piles, by roadbed side The prefabricated pile close to horizontal direction, compacted roadbed filling are squeezed in face, reduce air and moisture content in roadbed and account for According to space or hole, improve roadbed compaction rate.Hit the person prefabricated pile in side direction horizontal direction, permissible Squeeze elevated formation level filler at vertical direction, reach to recover the purpose of subgrade settlement, make road foundation height mark reach heavy Designed elevation before fall.By grouting pipe reserved in prefabricated pile and hole, provide for pressure grouting Passage.Comprehensive lateral piling soil compaction effect and the effect of slip casing by pressure, it is achieved sedimentation subgrade strength and change The reparation of shape, ensures the stability of roadbed.
The present invention is not limited to above-mentioned preferred forms, and anyone should learn the enlightenment in the present invention Under the structure change made, every have same or like technical scheme with the present invention, each falls within this Within the protection domain of invention.

Claims (6)

1. a structure repaired by roadbed, including supercrust and the roadbed of bottom, the roadbed subsidence on top Region is positioned at the top of supercrust and roadbed, it is characterised in that be provided with many prefabricated piles in described roadbed, Described prefabricated pile is vertical with the length direction of roadbed and is horizontally disposed with, and described prefabricated pile is cylindric, front End is provided with cone shape pile crown, and described prefabricated pile surface is uniform has multiple hole, in described prefabricated pile It is perfused with chemistry slurry.
Structure repaired by a kind of roadbed the most according to claim 1, it is characterised in that: described pre- Stake processed is steel-pipe pile or reinforced concrete pile.
Structure repaired by a kind of roadbed the most according to claim 1, it is characterised in that: described pre- Stake processed is horizontal through roadbed, and the opening of perfusion slurry is left in the one end squeezing into prefabricated pile.
Structure repaired by a kind of roadbed the most according to claim 1, it is characterised in that: at roadbed Vertical section in, described prefabricated pile forms horizontally arranged multirow, staggered between adjacent upper and lower two row sets Put, form multiple triangular structure.
5. a roadbed restorative procedure, it is characterised in that comprise the following steps:
S1, prefabricated band slip casting passage and the steel-pipe pile of hole or reinforced concrete pile;
S2, squeeze into the prefabricated pile of level in roadbed side, the filler of compacted and crowded high sedimentation roadbed, repair Multiple sedimentation and deformation;
S3, pressure inject chemistry slurry, chemistry slurry solidification, reinforce the filler of sedimentation roadbed further;
S4, roadbed is carried out maintenance, form the road structure of high intensity.
A kind of roadbed restorative procedure the most according to claim 5, it is characterised in that: in step In S2, the mode squeezing into prefabricated pile is squeezed into for dislocation the most line by line, forms multiple triangular structure.
CN201510178580.8A 2015-04-16 2015-04-16 A kind of roadbed repairs structure and method Expired - Fee Related CN106320121B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510178580.8A CN106320121B (en) 2015-04-16 2015-04-16 A kind of roadbed repairs structure and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510178580.8A CN106320121B (en) 2015-04-16 2015-04-16 A kind of roadbed repairs structure and method

Publications (2)

Publication Number Publication Date
CN106320121A true CN106320121A (en) 2017-01-11
CN106320121B CN106320121B (en) 2018-08-07

Family

ID=57731958

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510178580.8A Expired - Fee Related CN106320121B (en) 2015-04-16 2015-04-16 A kind of roadbed repairs structure and method

Country Status (1)

Country Link
CN (1) CN106320121B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107740408A (en) * 2017-09-30 2018-02-27 朱龙 A kind of Prefabricated concrete-filled steel tube stake
CN112411286A (en) * 2020-11-09 2021-02-26 安徽省新路建设工程集团有限责任公司 Active highway embankment grouting reinforcement structure and construction method
CN113622236A (en) * 2021-08-12 2021-11-09 温州市市政管理中心 Roadbed reinforcing device and construction method
CN114150543A (en) * 2021-11-26 2022-03-08 长沙理工大学 Pre-disintegration soft rock embankment grouting anti-seepage lifting structure and construction method thereof

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110485316A (en) * 2019-08-27 2019-11-22 山东交通学院 A kind of method of multiple slip casting to administer bumping at bridge-head

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
HK1038249A1 (en) * 1998-06-05 2002-03-08 Vladimir Ronin A method of stabilising the ground in road construction work.
US6409433B1 (en) * 2000-01-27 2002-06-25 David A. Hubbell Foundation piles or similar load carrying elements
CN2540445Y (en) * 2002-04-25 2003-03-19 李毓锦 Reinforced concrete prefibricated pile
CN102127890A (en) * 2011-03-31 2011-07-20 湖南恒盾岩土工程注浆科技有限公司 Reinforcing construction method of existing railway subgrade
CN102352582A (en) * 2011-08-15 2012-02-15 铁道第三勘察设计院集团有限公司 Reinforced soil-cement pile strengthening structure of railway roadbed
CN203238624U (en) * 2013-04-24 2013-10-16 昆山睿基新能源科技有限公司 Novel steel tube cement pile
CN204551161U (en) * 2015-04-16 2015-08-12 重庆文理学院 A kind of roadbed repair structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
HK1038249A1 (en) * 1998-06-05 2002-03-08 Vladimir Ronin A method of stabilising the ground in road construction work.
US6409433B1 (en) * 2000-01-27 2002-06-25 David A. Hubbell Foundation piles or similar load carrying elements
CN2540445Y (en) * 2002-04-25 2003-03-19 李毓锦 Reinforced concrete prefibricated pile
CN102127890A (en) * 2011-03-31 2011-07-20 湖南恒盾岩土工程注浆科技有限公司 Reinforcing construction method of existing railway subgrade
CN102352582A (en) * 2011-08-15 2012-02-15 铁道第三勘察设计院集团有限公司 Reinforced soil-cement pile strengthening structure of railway roadbed
CN203238624U (en) * 2013-04-24 2013-10-16 昆山睿基新能源科技有限公司 Novel steel tube cement pile
CN204551161U (en) * 2015-04-16 2015-08-12 重庆文理学院 A kind of roadbed repair structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107740408A (en) * 2017-09-30 2018-02-27 朱龙 A kind of Prefabricated concrete-filled steel tube stake
CN112411286A (en) * 2020-11-09 2021-02-26 安徽省新路建设工程集团有限责任公司 Active highway embankment grouting reinforcement structure and construction method
CN113622236A (en) * 2021-08-12 2021-11-09 温州市市政管理中心 Roadbed reinforcing device and construction method
CN113622236B (en) * 2021-08-12 2022-09-20 温州市市政管理中心 Roadbed reinforcing device
CN114150543A (en) * 2021-11-26 2022-03-08 长沙理工大学 Pre-disintegration soft rock embankment grouting anti-seepage lifting structure and construction method thereof

Also Published As

Publication number Publication date
CN106320121B (en) 2018-08-07

Similar Documents

Publication Publication Date Title
CN203960700U (en) The closed road structure of stake holder U-lag
CN106320121A (en) Subgrade repair structure and subgrade repair method
CN106522242A (en) Foundation pit supporting system for subsurface structure close to soft ground stratum and construction method of foundation pit supporting system
CN206956742U (en) High precipitous rock roadbed side slope repair system
CN106835880A (en) Highway lateral support type peg board formula is without earth roadbed
CN103452130B (en) The deformed bar net board-like barricade of reinforcement earth pillar
CN110700291A (en) Combined retaining structure and construction method thereof
CN111364486B (en) Remediation and reinforcement device and method for emergency rescue of slide-resistant pile side slope
CN204551161U (en) A kind of roadbed repair structure
CN205116204U (en) Roadbed structure of crowded native bored concrete pile stake board of two -way spiral
CN210194361U (en) Splicing structure for widening new and old roadbeds on road
CN203334154U (en) Embankment structure for preventing bearing platform of pile foundation from stretching in roadbed under viaduct
CN108487234B (en) Construction method of cast-in-situ pile plate type platform wall
CN104894935B (en) A kind of existing highway or railroad embankment lighting subsidence control method
CN102966109A (en) Method for constructing zonal deep foundation pit bottom sealing of soft soil foundation
CN219410355U (en) Flexible side-width structure of high-fill embankment of existing railway
CN105804101B (en) Reduce off-loading supporting and retaining system system and construction method and the application of retaining structure stress
CN111172833A (en) Construction method of steep slope high embankment structure
CN207552833U (en) A kind of elevated bridge basal perimeter ground road structure
CN203007761U (en) Grouting reinforcement structure for steel floral tube of existing railway roadbed under operation condition
CN207538068U (en) A kind of high slope framed revetment
CN206941324U (en) A kind of embankment of anti-settling formula
CN211006716U (en) Combined retaining structure
CN205420939U (en) Roadbed structure of crowded native bored concrete pile stake net of bidirectional screw
CN111400806B (en) Anti-bump wide roadbed structure next to ballastless railway, roadbed system and design method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180807

Termination date: 20190416