CN115769159A - 作业计划确定程序、作业计划确定方法以及信息处理装置 - Google Patents
作业计划确定程序、作业计划确定方法以及信息处理装置 Download PDFInfo
- Publication number
- CN115769159A CN115769159A CN202080102042.XA CN202080102042A CN115769159A CN 115769159 A CN115769159 A CN 115769159A CN 202080102042 A CN202080102042 A CN 202080102042A CN 115769159 A CN115769159 A CN 115769159A
- Authority
- CN
- China
- Prior art keywords
- cutting device
- raw material
- objects
- switching
- conversions
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/18—Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of programme data in numerical form
- G05B19/182—Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of programme data in numerical form characterised by the machine tool function, e.g. thread cutting, cam making, tool direction control
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
- G06Q10/043—Optimisation of two dimensional placement, e.g. cutting of clothes or wood
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
- G05B19/41865—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/04—Manufacturing
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32016—Minimize setup time of machines
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32253—As a function of, change of machine operation
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32257—Tool replacement minimization
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32264—Setup time
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32301—Simulate production, process stages, determine optimum scheduling rules
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/36—Nc in input of data, input key till input tape
- G05B2219/36289—Cutting, machining conditions by optimisation of time, cost, accuracy
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Physics & Mathematics (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Manufacturing & Machinery (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Game Theory and Decision Science (AREA)
- Automation & Control Theory (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Human Computer Interaction (AREA)
- General Engineering & Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Factory Administration (AREA)
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/JP2020/027259 WO2022013921A1 (ja) | 2020-07-13 | 2020-07-13 | 作業計画特定プログラム、作業計画特定方法、および情報処理装置 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN115769159A true CN115769159A (zh) | 2023-03-07 |
Family
ID=79555294
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202080102042.XA Pending CN115769159A (zh) | 2020-07-13 | 2020-07-13 | 作业计划确定程序、作业计划确定方法以及信息处理装置 |
Country Status (5)
| Country | Link |
|---|---|
| US (1) | US20230147377A1 (enExample) |
| EP (1) | EP4180887A4 (enExample) |
| JP (1) | JPWO2022013921A1 (enExample) |
| CN (1) | CN115769159A (enExample) |
| WO (1) | WO2022013921A1 (enExample) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2023140807A (ja) * | 2022-03-23 | 2023-10-05 | 株式会社東芝 | 作成システム、作成方法、プログラム、及び記憶媒体 |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2011028539A (ja) * | 2009-07-27 | 2011-02-10 | Amada Co Ltd | 板材加工システム及び板材加工システムの加工スケジュール設定方法 |
| JP2019049837A (ja) * | 2017-09-08 | 2019-03-28 | フルサト工業株式会社 | 生産指示装置、生産指示方法及びプログラム |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH07314297A (ja) * | 1994-05-25 | 1995-12-05 | Toyota Motor Corp | 素材加工システム |
| JP4369189B2 (ja) * | 2003-09-22 | 2009-11-18 | 三菱電機株式会社 | スケジューリングシステムおよびスケジューリングをコンピュータに実行させるためのプログラム |
| US7277768B2 (en) * | 2004-11-05 | 2007-10-02 | International Business Machines Corporation | Method for production design and operations scheduling for plate design in the steel industry |
| US20110258087A1 (en) * | 2010-04-14 | 2011-10-20 | International Business Machines Corporation | Analytics for setting up strategic inventory systems to handle small lot orders in the steel industry |
| JP6096772B2 (ja) | 2011-07-22 | 2017-03-15 | パックサイズ,エルエルシー | 包装材料のタイリング生産 |
| JP5872101B1 (ja) * | 2015-06-01 | 2016-03-01 | 株式会社Jls | 面材切断加工指示装置と面材切断加工機と面材 |
-
2020
- 2020-07-13 EP EP20944889.3A patent/EP4180887A4/en not_active Withdrawn
- 2020-07-13 WO PCT/JP2020/027259 patent/WO2022013921A1/ja not_active Ceased
- 2020-07-13 JP JP2022536001A patent/JPWO2022013921A1/ja not_active Ceased
- 2020-07-13 CN CN202080102042.XA patent/CN115769159A/zh active Pending
-
2022
- 2022-11-30 US US18/060,020 patent/US20230147377A1/en not_active Abandoned
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2011028539A (ja) * | 2009-07-27 | 2011-02-10 | Amada Co Ltd | 板材加工システム及び板材加工システムの加工スケジュール設定方法 |
| JP2019049837A (ja) * | 2017-09-08 | 2019-03-28 | フルサト工業株式会社 | 生産指示装置、生産指示方法及びプログラム |
Also Published As
| Publication number | Publication date |
|---|---|
| JPWO2022013921A1 (enExample) | 2022-01-20 |
| EP4180887A1 (en) | 2023-05-17 |
| WO2022013921A1 (ja) | 2022-01-20 |
| US20230147377A1 (en) | 2023-05-11 |
| EP4180887A4 (en) | 2023-08-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Wong et al. | A comparison of hybrid genetic algorithm and hybrid particle swarm optimization to minimize makespan for assembly job shop | |
| Abbasi et al. | Production planning and performance optimization of reconfigurable manufacturing systems using genetic algorithm | |
| CN115700639B (zh) | 智能生产排程方法、装置、设备及存储介质 | |
| Hyun et al. | Multiobjective optimization for modular unit production lines focusing on crew allocation and production performance | |
| JP2012194712A (ja) | 生産計画作成方法 | |
| JP7031502B2 (ja) | 制御システム、制御方法、学習装置、制御装置、学習方法及び学習プログラム | |
| CN116414094A (zh) | 一种焊接装配智能调度方法及系统 | |
| CN113052376B (zh) | 生产排程方法及装置,存储介质和电子设备 | |
| JP7729691B2 (ja) | 生産計画立案装置及び方法 | |
| CN115769159A (zh) | 作业计划确定程序、作业计划确定方法以及信息处理装置 | |
| Gan et al. | Optimal control-limit maintenance policy for a production system with multiple process states | |
| Joseph et al. | Analysis of dynamic due-date assignment models in a flexible manufacturing system | |
| JP5318651B2 (ja) | スケジューリング方法及びスケジューリングプログラム、並びにスケジューリングシステム | |
| Quiza et al. | Sustainability-focused optimization of fused-deposition component design and manufacturing | |
| CN116739269A (zh) | 基于调度优化模型的排程方法、装置、计算机设备及存储介质 | |
| Dolgui et al. | MIP-based GRASP and genetic algorithm for balancing transfer lines | |
| JP2009258863A (ja) | 多品目多段工程動的ロットサイズスケジューリング方法 | |
| JP2006031360A (ja) | 生産ライン計画支援装置および生産ライン計画支援方法 | |
| CN120387655A (zh) | 一种基于数字孪生技术的智能制造管理方法、设备及介质 | |
| CN114442578A (zh) | 复杂型面智能生产单元任务的刀具联合动态调度方法 | |
| Chen et al. | A fuzzy set approach for evaluating and enhancing the mid-term competitiveness of a semiconductor factory | |
| JP4913882B2 (ja) | 切断加工スケジューリング方法及び自動切断加工スケジューリング機能を組み込んだ立体型切断ネットワークシステム | |
| CN117649079A (zh) | 一种机械手搬运的柔性作业车间调度方法及设备 | |
| JP2000237937A (ja) | 生産システムの設計支援方法 | |
| Hirvikorpi et al. | Job scheduling and management of wearing tools with stochastic tool lifetimes |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination |