CN115749380A - Single-layer prefabricated wall plate bearing farm house and manufacturing method thereof - Google Patents
Single-layer prefabricated wall plate bearing farm house and manufacturing method thereof Download PDFInfo
- Publication number
- CN115749380A CN115749380A CN202211173241.7A CN202211173241A CN115749380A CN 115749380 A CN115749380 A CN 115749380A CN 202211173241 A CN202211173241 A CN 202211173241A CN 115749380 A CN115749380 A CN 115749380A
- Authority
- CN
- China
- Prior art keywords
- roof
- prefabricated
- panels
- lightweight
- wall panel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Roof Covering Using Slabs Or Stiff Sheets (AREA)
Abstract
Description
技术领域technical field
本发明涉及承重农房领域,特别是涉及一种单层预制墙板承重农房及其制造方法。The invention relates to the field of load-bearing farm houses, in particular to a single-layer prefabricated wallboard load-bearing farm house and a manufacturing method thereof.
背景技术Background technique
当前,我国农村的自建用房从舒适性和劳作习惯来讲,多为一层、二层的砖混结构,墙体一般为砖砌体、混凝土砌块砌体,墙体的综合容重16KN/m3,自重较大,这对于抗震设防是极为不利的。At present, in terms of comfort and working habits, most of the self-built houses in rural areas in my country are brick-concrete structures with one or two floors. The walls are generally brick masonry and concrete block masonry. The comprehensive bulk density of the wall is 16KN. /m3, the self-weight is relatively large, which is extremely unfavorable for seismic fortification.
发明内容Contents of the invention
本发明主要解决的技术问题是提供一种单层预制墙板承重农房及其制造方法。The technical problem mainly solved by the present invention is to provide a single-layer prefabricated wallboard load-bearing farm house and its manufacturing method.
为解决上述技术问题,本发明采用的一个技术方案是:一种单层预制墙板承重农房,通过基础预埋件与地面固定连接,包括:In order to solve the above technical problems, a technical solution adopted by the present invention is: a single-layer prefabricated wallboard load-bearing farm house, which is fixedly connected to the ground through foundation embedded parts, including:
轻质预制墙板以及墙板构造方管,所述轻质预制墙板通过墙板构造方管相互连接形成墙体框架;Lightweight prefabricated wall panels and wall panel construction square tubes, the lightweight prefabricated wall panels are connected to each other through wall panel construction square tubes to form a wall frame;
轻钢屋架以及屋面檩条,轻钢屋架与屋面檩条连接后形成屋顶框架,所述轻钢屋架整体设置成三角屋架,并通过屋面檩条对轻钢屋架进行支撑,且屋顶框架固设于墙体框架的正上方。Light steel roof trusses and roof purlins, light steel roof trusses and roof purlins are connected to form a roof frame, the light steel roof trusses are set as a triangular roof truss as a whole, and the light steel roof trusses are supported by roof purlins, and the roof frame is fixed on the wall frame directly above the .
优选的,轻质屋架上表面设有一复合保温屋面,复合保温屋面由欧松板、保温板、沥青防水瓦、龙骨、和屋面瓦组合而成;Preferably, a composite thermal insulation roof is provided on the upper surface of the lightweight roof truss, and the composite thermal insulation roof is composed of an Ozon board, a thermal insulation board, asphalt waterproof tiles, keels, and roof tiles;
其中,欧松板通过自攻钉固定连接在屋面檩条上,保温板以及沥青防水瓦钉在欧松板上,同时龙骨通过连接件与保温板以及沥青防水瓦通过连接件固定连接,屋面瓦通过螺钉与龙骨固定连接。Among them, the Ozon board is fixedly connected to the roof purlins by self-tapping nails, the insulation board and the asphalt waterproof tile are nailed to the Ozon board, and at the same time, the keel is fixedly connected to the insulation board and the asphalt waterproof tile through the connector, and the roof tile is passed through Screws are fixedly connected with the keel.
优选的,轻质预制墙板包括标准条形板以及浇筑于标准条形板内的轻质混凝土。Preferably, the lightweight prefabricated wall panels include standard strip panels and lightweight concrete poured into the standard strip panels.
优选的,轻质预制墙板底部设有第一U型槽钢,第一U型槽钢通过构件与基础预埋件固定连接,预制墙板插接于第一U型槽钢内,且通过自攻钉从第一U型槽钢侧面与轻质预制墙板固定连接。Preferably, the bottom of the lightweight prefabricated wallboard is provided with a first U-shaped channel steel, the first U-shaped channel steel is fixedly connected with the foundation embedded parts through components, the prefabricated wallboard is inserted into the first U-shaped channel steel, and passed The self-tapping nail is fixedly connected with the light prefabricated wallboard from the side of the first U-shaped channel steel.
优选的,轻质预制墙板顶部插接有一第二U型槽钢,第二U型槽钢通过自攻钉与预制墙板固定连接,第二U型槽钢顶部与屋顶框架固定连接。Preferably, the top of the lightweight prefabricated wall panel is plugged with a second U-shaped channel steel, the second U-shaped channel steel is fixedly connected to the prefabricated wall panel by self-tapping screws, and the top of the second U-shaped channel steel is fixedly connected to the roof frame.
优选的,墙体框架设有多个门窗洞口,所述门窗洞口的侧边均固设有一冷弯U型槽钢。Preferably, the wall frame is provided with a plurality of door and window openings, and a cold-formed U-shaped channel steel is fixed on the sides of the door and window openings.
优选的,轻钢屋架包括:多个矩形管焊接而成的三角屋架,其中部分三角屋架两两之间连接有一柔性水平圆钢,轻钢屋架底部一刚性方管系杆,刚性方管系杆贯穿多个三角屋架设置。Preferably, the light steel roof truss includes: a triangular roof truss welded by a plurality of rectangular tubes, in which a flexible horizontal round steel is connected between two parts of the triangular roof truss, a rigid square tube tie bar at the bottom of the light steel roof truss, and a rigid square tube tie bar Through multiple triangular roof truss settings.
优选的,材料加工包括:Preferably, material processing includes:
S101:对轻质预制墙板进行加工;S101: Processing lightweight prefabricated wall panels;
其中,将轻质预制墙板预制成标准的条形板,条形板采用水泥基轻质材料,一般为蒸压加气混凝土板或蒸压陶粒板,标准宽度为600mm,外墙抗压强度不小于5Mpa,容重为6~8KN/m3;Among them, the lightweight prefabricated wall panels are prefabricated into standard strip panels. The strip panels are made of cement-based lightweight materials, usually autoclaved aerated concrete panels or autoclaved ceramsite panels. The standard width is 600mm. The compressive strength is not less than 5Mpa, and the bulk density is 6-8KN/m3;
S102:对墙板构造方管进行加工;S102: processing the square tube of the wall panel structure;
其中,墙板构造方管的空腔内填充聚苯颗粒混凝土,容重不大于3kN/m3并通过专用粘结砂浆填充所带来的孔隙。Among them, the cavity of the square tube of the wall panel structure is filled with polystyrene granular concrete, the bulk density is not greater than 3kN/m3, and the resulting pores are filled with special bonding mortar.
优选的,复合保温屋面铺设包括:Preferably, the composite thermal insulation roof laying includes:
S601:首先进行五秒欧松板的安装铺设;S601: First, install and lay the five-second Ozon board;
S602:并根据欧松板的排版图进行下料切割,按照排版图进行安装;S602: Carry out blanking and cutting according to the layout drawing of the Ozon board, and install according to the layout drawing;
S603:欧松板安装完成后进行挂瓦条的安装,结合屋面瓦的尺寸进行定位;S603: After the installation of the Ozon board is completed, install the hanging tiles, and position according to the size of the roof tiles;
S604:挂瓦条安装完成后进行屋面保温板铺贴,保温板嵌在挂瓦条分割的空间内;S604: After the installation of the tiles is completed, the roof insulation board is laid, and the insulation board is embedded in the space divided by the tiles;
S605:保温板铺贴完成进行防水透气膜的铺贴,然后挂屋面瓦,最后进行屋面细部处理工作;S605: After laying the thermal insulation board, lay the waterproof and breathable membrane, then hang the roof tiles, and finally carry out the roof detail treatment;
其中,屋面细部处理工作包括:屋面脊瓦、三通、堵头、屋面瓦紧固件防水帽、檐口包边安装。Among them, the roof detail processing work includes: roof ridge tiles, tees, plugs, roof tile fastener waterproof caps, cornice edge wrapping installation.
本发明有益效果:Beneficial effects of the present invention:
通过轻质预制墙板和轻钢屋架复合保温屋面有机结合,扩大了轻质预制墙板应用范围,整个房屋的轻量化,提高了建筑的抗震性能、安全性,轻钢屋架复合保温屋面,既减小了屋面的质量,又增加了整个房屋的安全性、保温性,本发明所有构件均为工厂加工预制,现场组装、吊装,大大减少了现场的装修时间,与传统建筑相比,施工快捷方便,施工质量高。Through the organic combination of lightweight prefabricated wall panels and light steel roof truss composite thermal insulation roofs, the application range of lightweight prefabricated wall panels has been expanded, and the light weight of the entire house has improved the seismic performance and safety of the building. Light steel roof truss composite thermal insulation roofs, both The quality of the roof is reduced, and the safety and heat preservation of the whole house are increased. All the components of the present invention are prefabricated in the factory, assembled and hoisted on site, which greatly reduces the decoration time on site. Compared with traditional buildings, the construction is quick Convenience and high quality construction.
附图说明Description of drawings
图1是本发明一种单层预制墙板承重农房的整体结构示意图;Fig. 1 is the overall structure schematic diagram of a kind of single-layer prefabricated wallboard load-bearing farm house of the present invention;
图2是本发明一种单层预制墙板承重农房制造方法的工艺流程图。Fig. 2 is a process flow diagram of a method for manufacturing a single-layer prefabricated wallboard load-bearing farm house according to the present invention.
附图中各部件的标记如下:1、轻质预制墙板2、墙板构造方管3、轻钢屋架4、屋面檩条5、门窗洞口。The marks of the components in the drawings are as follows: 1. Lightweight prefabricated
具体实施方式Detailed ways
下面结合附图对本发明的较佳实施例进行详细阐述,以使本发明的优点和特征能更易于被本领域技术人员理解,从而对本发明的保护范围做出更为清楚明确的界定。The preferred embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings, so that the advantages and features of the present invention can be more easily understood by those skilled in the art, so as to define the protection scope of the present invention more clearly.
实施例1:Example 1:
如图1所示,一种单层预制墙板承重农房,通过基础预埋件与地面固定连接,包括:As shown in Figure 1, a single-layer prefabricated wallboard load-bearing farm house is fixedly connected to the ground through foundation embedded parts, including:
轻质预制墙板1以及墙板构造方管2,轻质预制墙板1通过墙板构造方管2相互连接形成墙体框架。Lightweight prefabricated
其中,轻质预制墙板1包括标准条形板以及浇筑于标准条形板内的轻质混凝土。Wherein, the lightweight prefabricated
其中,将轻质预制墙板1预制成标准的条形板,条形板采用水泥基轻质材料,一般为蒸压加气混凝土板,标准宽度为600mm,外墙抗压强度不小于5Mpa,容重为6KN/m3。Among them, the lightweight
其中,构造方管置于墙板转角处、T型对接处的预制板缝之间,方管的空腔内填充聚苯颗粒混凝土,容重不大于3KN/m3,提高保温性能,通过粘结砂浆填充所带来的孔隙,方管根部与预埋件铁件连接,且顶部、底部U型槽在对应的位置与之焊接连接。Among them, the structural square tube is placed between the corner of the wall panel and the prefabricated slab joint at the T-shaped joint. The cavity of the square tube is filled with polystyrene granular concrete, and the bulk density is not greater than 3KN/m3 to improve the thermal insulation performance. To fill the voids, the root of the square pipe is connected to the iron parts of the embedded parts, and the top and bottom U-shaped grooves are welded to it at the corresponding positions.
其中,墙板构造方管2是嵌于转角部位薄壁方管。Wherein, the wall panel structure
墙体框架的正上方固定设有一屋顶框架,屋顶框架包括:轻钢屋架3与屋面檩条4连接,轻钢屋架3与屋面檩条4连接后形成屋顶框架,轻钢屋架3整体设置成三角屋架,并通过屋面檩条4对轻钢屋架3进行支撑,其中,两轻钢屋架3之间通过多个腹杆支撑,进一步提高支撑效果。A roof frame is fixed directly above the wall frame, and the roof frame includes: the light steel roof truss 3 is connected to the
其中,轻钢屋架3包括:多个矩形管焊接而成的三角屋架,其中部分三角屋架两两之间连接有一柔性水平圆钢,三角屋架两两之间是否设置柔性水平圆钢主要看底部墙体框架两侧壁之间的距离,轻钢屋架3底部一刚性方管系杆,刚性方管系杆贯穿多个三角屋架设置。Among them, the light steel roof truss 3 includes: a triangular roof truss welded by a plurality of rectangular tubes, and a flexible horizontal round steel is connected between two triangle roof trusses. The distance between the two side walls of the body frame, a rigid square tube tie bar at the bottom of the light steel roof truss 3, and the rigid square tube tie bar runs through multiple triangular roof trusses.
轻质预制墙板1底部设有第一U型槽钢,第一U型槽钢通过构件与基础预埋件固定连接,预制墙板插接于第一U型槽钢内,且通过自攻钉从第一U型槽钢侧面与轻质预制墙板1固定连接。The bottom of the lightweight prefabricated
轻质预制墙板1顶部插接有一第二U型槽钢,第二U型槽钢通过自攻钉与预制墙板固定连接,第二U型槽钢顶部与屋顶框架固定连接。The top of the lightweight prefabricated
其中第一U型槽钢采用普通的冷弯U型槽钢,冷弯U型槽钢是由镀锌钢板冷加工压型而成。Wherein the first U-shaped channel steel adopts common cold-formed U-shaped channel steel, and the cold-formed U-shaped channel steel is formed by cold processing and pressing of galvanized steel sheets.
墙体框架设有多个门窗洞口5,门窗洞口5的侧边均固设有一冷弯U型槽钢。The wall frame is provided with a plurality of door and
其中,门窗洞口5处的冷弯U型采用加强冷弯U型槽钢,冷弯U型槽钢是由镀锌钢板冷加工压型而成。Among them, the cold-formed U-shaped at the 5 openings of doors and windows adopts reinforced cold-formed U-shaped channel steel, and the cold-formed U-shaped channel steel is formed by cold processing and pressing of galvanized steel sheets.
轻质屋架上表面设有一复合保温屋面,复合保温屋面由欧松板、保温板、沥青防水瓦、龙骨、和屋面瓦组合而成;The upper surface of the light-weight roof truss is equipped with a composite thermal insulation roof, which is composed of Ozon board, thermal insulation board, asphalt waterproof tile, keel, and roof tile;
其中,欧松板通过自攻钉固定连接在屋面檩条4上,保温板以及沥青防水瓦钉在欧松板上,同时龙骨通过连接件与保温板以及沥青防水瓦通过连接件固定连接,屋面瓦通过螺钉与龙骨固定连接。Among them, the Ozon board is fixedly connected to the
如图1、图2所示,一种单层预制墙板承重农房的制造方法,包括:As shown in Figures 1 and 2, a method for manufacturing a single-layer prefabricated wallboard load-bearing farm house includes:
S1:对材料进行预加工;S1: Preprocessing the material;
其中,材料加工包括:Among them, material processing includes:
S101:对轻质预制墙板1进行加工;S101: Processing the lightweight
其中,将轻质预制墙板1预制成标准的条形板,条形板采用水泥基轻质材料,一般为蒸压加气混凝土板,标准宽度为600mm,外墙抗压强度不小于5Mpa,容重为6KN/m3;Among them, the lightweight
S102:对墙板构造方管2进行加工;S102: Process the wall panel structure
其中,墙板构造方管2的空腔内填充聚苯颗粒混凝土,容重不大于3kN/m3并通过专用粘结砂浆填充所带来的孔隙。Among them, the cavity of the
S2:带动加工材料运送至施工现场,并进行安装前测试;S2: Drive the processed materials to be transported to the construction site, and conduct pre-installation tests;
其中,安装前应进行建筑轴线的测量放线工作,并应弹出门窗洞口位置。Among them, the measurement and setting out of the building axis should be carried out before installation, and the openings of doors and windows should be popped up.
S3:安装过程中对轻质预制墙板1进行临时支撑形成稳定的墙板单元;S3: During the installation process, the lightweight
S4:对于无法及时形成稳定的墙板单元除应加设临时支撑外,还应保证在纵横墙交界处提前安装起步墙板;S4: In addition to adding temporary support to the wall panel units that cannot be formed in time, it is also necessary to ensure that the starting wall panels are installed in advance at the junction of the vertical and horizontal walls;
S5:预制墙板组装完成后带动屋顶框架固设于墙体单元的正上方;S5: After the prefabricated wall panel is assembled, the roof frame is driven to be fixed directly above the wall unit;
S6:带动复合保温屋面整体铺设安装在屋顶框架上。S6: Drive the overall laying of the composite thermal insulation roof and install it on the roof frame.
其中,复合保温屋面铺设包括:Among them, the laying of composite thermal insulation roof includes:
S601:首先进行五秒欧松板的安装铺设;S601: First, install and lay the five-second Ozon board;
S602:并根据欧松板的排版图进行下料切割,按照排版图进行安装;S602: Carry out blanking and cutting according to the layout drawing of the Ozon board, and install according to the layout drawing;
S603:欧松板安装完成后进行挂瓦条的安装,结合屋面瓦的尺寸进行定位;S603: After the installation of the Ozon board is completed, install the hanging tiles, and position according to the size of the roof tiles;
S604:挂瓦条安装完成后进行屋面保温板铺贴,保温板嵌在挂瓦条分割的空间内;S604: After the installation of the tiles is completed, the roof insulation board is laid, and the insulation board is embedded in the space divided by the tiles;
S605:保温板铺贴完成进行防水透气膜的铺贴,然后挂屋面瓦,最后进行屋面细部处理工作;S605: After laying the thermal insulation board, lay the waterproof and breathable membrane, then hang the roof tiles, and finally carry out the roof detail treatment;
其中,屋面细部处理工作包括:屋面脊瓦、三通、堵头、屋面瓦紧固件防水帽、檐口包边安装。Among them, the roof detail processing work includes: roof ridge tiles, tees, plugs, roof tile fastener waterproof caps, cornice edge wrapping installation.
实施例2:Example 2:
如图1所示,一种单层预制墙板承重农房,通过基础预埋件与地面固定连接,包括:As shown in Figure 1, a single-layer prefabricated wallboard load-bearing farm house is fixedly connected to the ground through foundation embedded parts, including:
轻质预制墙板1以及墙板构造方管2,轻质预制墙板1通过墙板构造方管2相互连接形成墙体框架。Lightweight
其中,轻质预制墙板1包括标准条形板以及浇筑于标准条形板内的轻质混凝土。Wherein, the lightweight
其中,将轻质预制墙板1预制成标准的条形板,条形板采用水泥基轻质材料,一般为蒸压陶粒板,标准宽度为600mm,外墙抗压强度不小于5Mpa,容重为8KN/m3。Among them, the lightweight
其中,构造方管置于墙板转角处、T型对接处的预制板缝之间,方管的空腔内填充聚苯颗粒混凝土,容重不大于3KN/m3,提高保温性能,通过粘结砂浆填充所带来的孔隙,方管根部与预埋件铁件连接,且顶部、底部U型槽在对应的位置与之焊接连接。Among them, the structural square tube is placed between the corner of the wall panel and the prefabricated slab joint at the T-shaped joint. The cavity of the square tube is filled with polystyrene granular concrete, and the bulk density is not greater than 3KN/m3 to improve the thermal insulation performance. To fill the voids, the root of the square pipe is connected to the iron parts of the embedded parts, and the top and bottom U-shaped grooves are welded to it at the corresponding positions.
其中,墙板构造方管2是嵌于转角部位薄壁方管。Wherein, the wall panel structure
墙体框架的正上方固定设有一屋顶框架,屋顶框架包括:轻钢屋架3与屋面檩条4连接,轻钢屋架3与屋面檩条4连接后形成屋顶框架,轻钢屋架3整体设置成三角屋架,并通过屋面檩条4对轻钢屋架3进行支撑,其中,两轻钢屋架3之间通过多个腹杆支撑,进一步提高支撑效果。A roof frame is fixed directly above the wall frame, and the roof frame includes: the light steel roof truss 3 is connected to the
其中,轻钢屋架3包括:多个矩形管焊接而成的三角屋架,其中部分三角屋架两两之间连接有一柔性水平圆钢,三角屋架两两之间是否设置柔性水平圆钢主要看底部墙体框架两侧壁之间的距离,轻钢屋架3底部一刚性方管系杆,刚性方管系杆贯穿多个三角屋架设置。Among them, the light steel roof truss 3 includes: a triangular roof truss welded by a plurality of rectangular tubes, and a flexible horizontal round steel is connected between two triangle roof trusses. The distance between the two side walls of the body frame, a rigid square tube tie bar at the bottom of the light steel roof truss 3, and the rigid square tube tie bar runs through multiple triangular roof trusses.
轻质预制墙板1底部设有第一U型槽钢,第一U型槽钢通过构件与基础预埋件固定连接,预制墙板插接于第一U型槽钢内,且通过自攻钉从第一U型槽钢侧面与轻质预制墙板1固定连接。The bottom of the lightweight
轻质预制墙板1顶部插接有一第二U型槽钢,第二U型槽钢通过自攻钉与预制墙板固定连接,第二U型槽钢顶部与屋顶框架固定连接。The top of the lightweight
其中第一U型槽钢采用普通的冷弯U型槽钢,冷弯U型槽钢是由镀锌钢板冷加工压型而成。Wherein the first U-shaped channel steel adopts common cold-formed U-shaped channel steel, and the cold-formed U-shaped channel steel is formed by cold processing and pressing of galvanized steel sheets.
墙体框架设有多个门窗洞口5,门窗洞口5的侧边均固设有一冷弯U型槽钢。The wall frame is provided with a plurality of door and
其中,门窗洞口5处的冷弯U型采用加强冷弯U型槽钢,冷弯U型槽钢是由镀锌钢板冷加工压型而成。Among them, the cold-formed U-shaped at the 5 openings of doors and windows adopts reinforced cold-formed U-shaped channel steel, and the cold-formed U-shaped channel steel is formed by cold processing and pressing of galvanized steel sheets.
轻质屋架上表面设有一复合保温屋面,复合保温屋面由欧松板、保温板、沥青防水瓦、龙骨、和屋面瓦组合而成;The upper surface of the light-weight roof truss is equipped with a composite thermal insulation roof, which is composed of Ozon board, thermal insulation board, asphalt waterproof tile, keel, and roof tile;
其中,欧松板通过自攻钉固定连接在屋面檩条4上,保温板以及沥青防水瓦钉在欧松板上,同时龙骨通过连接件与保温板以及沥青防水瓦通过连接件固定连接,屋面瓦通过螺钉与龙骨固定连接。Among them, the Ozon board is fixedly connected to the
如图1、图2所示,一种单层预制墙板承重农房的制造方法,包括:As shown in Figures 1 and 2, a method for manufacturing a single-layer prefabricated wallboard load-bearing farm house includes:
S1:对材料进行预加工;S1: Preprocessing the material;
其中,材料加工包括:Among them, material processing includes:
S101:对轻质预制墙板1进行加工;S101: Processing the lightweight
其中,将轻质预制墙板1预制成标准的条形板,条形板采用水泥基轻质材料,一般为蒸压陶粒板,标准宽度为600mm,外墙抗压强度不小于5Mpa,容重为8KN/m3;Among them, the lightweight
S102:对墙板构造方管2进行加工;S102: Process the wall panel structure
其中,墙板构造方管2的空腔内填充聚苯颗粒混凝土,容重不大于3kN/m3并通过专用粘结砂浆填充所带来的孔隙。Among them, the cavity of the
S2:带动加工材料运送至施工现场,并进行安装前测试;S2: Drive the processed materials to be transported to the construction site, and conduct pre-installation tests;
其中,安装前应进行建筑轴线的测量放线工作,并应弹出门窗洞口位置。Among them, the measurement and setting out of the building axis should be carried out before installation, and the openings of doors and windows should be popped up.
S3:安装过程中对轻质预制墙板1进行临时支撑形成稳定的墙板单元;S3: During the installation process, the lightweight
S4:对于无法及时形成稳定的墙板单元除应加设临时支撑外,还应保证在纵横墙交界处提前安装起步墙板;S4: In addition to adding temporary support to the wall panel units that cannot be formed in time, it is also necessary to ensure that the starting wall panels are installed in advance at the junction of the vertical and horizontal walls;
S5:预制墙板组装完成后带动屋顶框架固设于墙体单元的正上方;S5: After the prefabricated wall panel is assembled, the roof frame is driven to be fixed directly above the wall unit;
S6:带动复合保温屋面整体铺设安装在屋顶框架上。S6: Drive the overall laying of the composite thermal insulation roof and install it on the roof frame.
其中,复合保温屋面铺设包括:Among them, the laying of composite thermal insulation roof includes:
S601:首先进行五秒欧松板的安装铺设;S601: First, install and lay the five-second Ozon board;
S602:并根据欧松板的排版图进行下料切割,按照排版图进行安装;S602: Carry out blanking and cutting according to the layout drawing of the Ozon board, and install according to the layout drawing;
S603:欧松板安装完成后进行挂瓦条的安装,结合屋面瓦的尺寸进行定位;S603: After the installation of the Ozon board is completed, install the hanging tiles, and position according to the size of the roof tiles;
S604:挂瓦条安装完成后进行屋面保温板铺贴,保温板嵌在挂瓦条分割的空间内;S604: After the installation of the tiles is completed, the roof insulation board is laid, and the insulation board is embedded in the space divided by the tiles;
S605:保温板铺贴完成进行防水透气膜的铺贴,然后挂屋面瓦,最后进行屋面细部处理工作;S605: After laying the thermal insulation board, lay the waterproof and breathable membrane, then hang the roof tiles, and finally carry out the roof detail treatment;
其中,屋面细部处理工作包括:屋面脊瓦、三通、堵头、屋面瓦紧固件防水帽、檐口包边安装。Among them, the roof detail processing work includes: roof ridge tiles, tees, plugs, roof tile fastener waterproof caps, cornice edge wrapping installation.
以上所述仅为本发明的实施例,并非因此限制本发明的专利范围,凡是利用本发明说明书及附图内容所作的等效结构或等效流程变换,或直接或间接运用在其他相关的技术领域,均同理包括在本发明的专利保护范围内。The above is only an embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the description of the present invention and the contents of the accompanying drawings, or directly or indirectly used in other related technologies fields, all of which are equally included in the scope of patent protection of the present invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211173241.7A CN115749380A (en) | 2022-09-26 | 2022-09-26 | Single-layer prefabricated wall plate bearing farm house and manufacturing method thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211173241.7A CN115749380A (en) | 2022-09-26 | 2022-09-26 | Single-layer prefabricated wall plate bearing farm house and manufacturing method thereof |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN115749380A true CN115749380A (en) | 2023-03-07 |
Family
ID=85351973
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202211173241.7A Pending CN115749380A (en) | 2022-09-26 | 2022-09-26 | Single-layer prefabricated wall plate bearing farm house and manufacturing method thereof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN115749380A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117211438A (en) * | 2023-08-16 | 2023-12-12 | 中科绿筑(北京)科技有限公司 | Prefabricated light steel composite wall panel house system and production and assembly method |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN208950069U (en) * | 2018-09-17 | 2019-06-07 | 辽宁科技大学 | A kind of light-duty prefabricated buildings |
| CN211200704U (en) * | 2019-11-27 | 2020-08-07 | 山东莱钢建设有限公司 | A L C wallboard bearing house |
| CN213539443U (en) * | 2020-07-07 | 2021-06-25 | 杭州众业科技有限公司 | Light steel roof |
-
2022
- 2022-09-26 CN CN202211173241.7A patent/CN115749380A/en active Pending
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN208950069U (en) * | 2018-09-17 | 2019-06-07 | 辽宁科技大学 | A kind of light-duty prefabricated buildings |
| CN211200704U (en) * | 2019-11-27 | 2020-08-07 | 山东莱钢建设有限公司 | A L C wallboard bearing house |
| CN213539443U (en) * | 2020-07-07 | 2021-06-25 | 杭州众业科技有限公司 | Light steel roof |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117211438A (en) * | 2023-08-16 | 2023-12-12 | 中科绿筑(北京)科技有限公司 | Prefabricated light steel composite wall panel house system and production and assembly method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101265723B (en) | Architecture structure system assembled by composite building board and building method | |
| CN105421818B (en) | Built-in steel Standard house | |
| CN109322392B (en) | Light steel house and construction method thereof | |
| WO2017041517A1 (en) | Movable aluminum alloy house | |
| CN206174206U (en) | Embedded outer wall suitable for steel house room | |
| CN206655314U (en) | The board-like assembling building systems of DGC | |
| CN205296893U (en) | Embedded steel construction assembly house | |
| CN208950069U (en) | A kind of light-duty prefabricated buildings | |
| CN211622098U (en) | A semi-embedded external waterproof and internal thermal insulation external wall panel | |
| CN110778016B (en) | A kind of outer protection system of prefabricated steel structure house suitable for severe cold area | |
| CN204959963U (en) | Compound lightweight wall housing construction of assembled steel frame | |
| CN111101594A (en) | Cold-formed thin-wall light steel structure building | |
| CN115749380A (en) | Single-layer prefabricated wall plate bearing farm house and manufacturing method thereof | |
| CN211973951U (en) | Outer wall system | |
| CN205444514U (en) | Bearing light insulation intergral template | |
| CN220469185U (en) | Prefabricated modularized building outer wall system | |
| CN115928909B (en) | Short-limb shear wall assembled light steel combined truss supported steel wire net rack mortar-perlite-polyphenyl composite enclosure wall and manufacturing method thereof | |
| CN206034713U (en) | Precast concrete is small -size from waterproof insulation roofing system | |
| CN1632252B (en) | Light steel sealed column framework construction system | |
| CN116044053B (en) | Concrete frame prefabricated light steel composite truss supporting steel wire mesh mortar-perlite-polystyrene composite enclosure wall and its construction method | |
| CN216276396U (en) | Waterproof roofing structure keeps warm based on rack | |
| CN111287311A (en) | Construction method of cold-formed thin-wall light steel structure building | |
| CN205776780U (en) | Integrated assembled type dwelling house system | |
| RU158881U1 (en) | BUILDING CONSTRUCTION FROM MULTILAYER PANELS | |
| CN111411690B (en) | Structure system capable of being assembled rapidly and construction method thereof |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination |