CN115542867B - Live-line work flow management method and system - Google Patents

Live-line work flow management method and system Download PDF

Info

Publication number
CN115542867B
CN115542867B CN202211513223.9A CN202211513223A CN115542867B CN 115542867 B CN115542867 B CN 115542867B CN 202211513223 A CN202211513223 A CN 202211513223A CN 115542867 B CN115542867 B CN 115542867B
Authority
CN
China
Prior art keywords
equipment
operated
item
rule
live
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202211513223.9A
Other languages
Chinese (zh)
Other versions
CN115542867A (en
Inventor
白一鸣
彭镇华
史小靖
梁少明
李宾
彭石丰
余俊杰
张炳盛
阮大兵
王淞平
刘鑫胜
崔承勋
尹雁和
阮志杰
江清楷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongshan Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Zhongshan Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongshan Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Zhongshan Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority to CN202211513223.9A priority Critical patent/CN115542867B/en
Publication of CN115542867A publication Critical patent/CN115542867A/en
Application granted granted Critical
Publication of CN115542867B publication Critical patent/CN115542867B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32252Scheduling production, machining, job shop
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention provides a flow management method and a flow management system for live working, which comprise the steps of determining equipment needing to be operated in the current live working and generating operation tasks corresponding to the equipment; matching the operation rules of each device to be operated by using the device operation rule base; carrying out charged analysis on each device to be operated according to the current network topology state to obtain the initial state of the device and determine the target state of the device, and generating operation items of each device to be operated based on the initial state and the target state; and translating the operation items into operation terms, taking each device to be operated as an operation object, and generating an operation ticket based on the operation task, the operation rule and the operation terms corresponding to each operation object. According to the method, the operation rule base of the distribution network equipment is established in advance, the corresponding operation tickets can be sequentially generated by matching the operation objects, the method can meet the operation ticket requirements of live working under different operation modes of the power grid, and the method is more efficient compared with a manual compiling mode.

Description

Live-line work flow management method and system
Technical Field
The invention belongs to the technical field of power grid live-line work management, and particularly relates to a live-line work flow management method and system.
Background
Live working refers to an operation method for overhauling and testing high-voltage electrical equipment without power failure, and the live working is an effective measure for avoiding overhauling and power failure and ensuring normal power supply. However, in the working process of live working, the working personnel need to enter the running interval of the live equipment to work, and the personnel risk of electric shock casualty exists.
In order to ensure the safety and the standardization of the live working, in the actual working process, a paper or electronic form is required to be adopted to fill in a live working operation ticket, and the operation ticket is the written basis of the electrical operation. Due to the complex change of the operation mode of the power grid, the filling of the operation order becomes very complicated. The traditional method of filling in the operation order by manual writing is time-consuming and labor-consuming, and has low accuracy. More importantly, the method cannot adapt to the change of the operation mode of the power grid, and the operation order of the corresponding equipment is difficult to generate timely and efficiently.
Disclosure of Invention
In view of this, the invention aims to solve the problem that in the existing live working process management, the manual operation order compiling mode is difficult to adapt to the change of the power grid operation mode, so that the operation order of the corresponding equipment is difficult to generate timely and efficiently.
In order to solve the technical problems, the invention provides the following technical scheme:
in a first aspect, the present invention provides a method for managing a flow of live-line work, including the steps of:
determining equipment needing to be operated in the current live working and generating operation tasks corresponding to the equipment;
matching the operation rules of each device to be operated by using the device operation rule base, wherein all the operation rules of each device during live working are stored in the device operation rule base;
carrying out charged analysis on each device to be operated according to the current network topology state to obtain an initial state of the device, determining a target state of the device through operation reasoning based on an operation task of the device, and generating an operation item of each device to be operated based on the initial state and the target state;
and translating the operation items into operation terms, taking each device to be operated as an operation object, and generating an operation ticket based on the operation task, the operation rule and the operation terms corresponding to each operation object.
Further, all operation rules of each device during live working are stored in the device operation rule base, and the method specifically includes:
the equipment operation rule base comprises an operation equipment part and an equipment operation rule part;
the operation equipment part comprises all electrical equipment, the equipment operation rule part comprises equipment categories and operation rules corresponding to the equipment categories, and the electrical equipment of the operation equipment part is mapped to the operation rules of the equipment operation rule part according to the equipment categories.
Further, the operation rule specifically includes:
an operation task item, a wiring form item, a related equipment item, an initial state item, a target state item and an operation term item.
Further, generating an operation item of each device to be operated based on the initial state and the target state specifically includes:
comparing the initial state with the target state to obtain the operation interval of each device to be operated;
determining an operation sequence based on an operation rule of the equipment, and searching the distribution network equipment in an operation interval according to the operation sequence;
placing the found distribution network equipment into an operation queue, and deleting the distribution network equipment from the operation interval until the operation interval is empty;
and obtaining the operation items of the devices to be operated based on the generated operation queue.
Further, determining the operation sequence based on the operation rule of the device further includes:
and performing error-proof check on the operation sequence so that the operation sequence meets the requirements of safety operation regulations.
In a second aspect, the present invention provides a flow management system for live-wire work, including:
the operation object determining unit is used for determining the equipment needing to be operated in the current live working and generating operation tasks corresponding to the equipment;
the operation rule matching unit is used for matching the operation rules of the equipment to be operated by utilizing an equipment operation rule base, and all the operation rules of the equipment during live working are stored in the equipment operation rule base;
the operation item determining unit is used for carrying out charged analysis on each device to be operated according to the current network topology state to obtain an initial state of the device, determining a target state of the device through operation reasoning based on an operation task of the device, and generating an operation item of each device to be operated based on the initial state and the target state;
and the operation ticket generating unit is used for translating the operation items into operation terms, taking each device to be operated as an operation object, and generating the operation ticket based on the operation task, the operation rule and the operation terms corresponding to each operation object.
Further, in the operation rule matching unit, all operation rules of each device during live working are stored in the device operation rule base, and the operation rule matching unit specifically includes:
the equipment operation rule base comprises an operation equipment part and an equipment operation rule part;
the operation equipment part comprises all electrical equipment, the equipment operation rule part comprises equipment categories and operation rules corresponding to the equipment categories, and the electrical equipment of the operation equipment part is mapped to the operation rules of the equipment operation rule part according to the equipment categories.
Further, in the operation rule matching unit, the operation rule specifically includes:
an operation task item, a wiring form item, a related equipment item, an initial state item, a target state item and an operation term item.
Further, in the operation item determination unit, based on the initial state and the target state, generating an operation item of each device to be operated specifically includes:
comparing the initial state with the target state to obtain the operation interval of each device to be operated;
determining an operation sequence based on an operation rule of the equipment, and searching the distribution network equipment in an operation interval according to the operation sequence;
placing the found distribution network equipment into an operation queue, and deleting the distribution network equipment from the operation interval until the operation interval is empty;
and obtaining the operation items of the devices to be operated based on the generated operation queue.
Further, in the operation item determination unit, the determining an operation order based on the operation rule of the device further includes:
and performing error-proof check on the operation sequence so that the operation sequence meets the requirements of safety operation regulations.
In summary, the present invention provides a method and a system for managing a flow of live-line work, including determining devices that need to be operated in the current live-line work and generating operation tasks corresponding to the devices; matching the operation rules of each device to be operated by using the device operation rule base; carrying out charged analysis on each device to be operated according to the current network topology state to obtain an initial state of the device, determining a target state of the device through operation reasoning based on an operation task of the device, and generating an operation item of each device to be operated based on the initial state and the target state; and translating the operation items into operation terms, taking each device to be operated as an operation object, and generating an operation ticket based on the operation task, the operation rule and the operation terms corresponding to each operation object. According to the method, the operation rule base of the distribution network equipment is established in advance, the corresponding operation tickets can be sequentially generated by matching the operation objects, the method can meet the operation ticket requirements of live working under different operation modes of the power grid, and the method is more efficient compared with a manual compiling mode.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the embodiments or the prior art descriptions will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and other drawings can be obtained by those skilled in the art without creative efforts.
Fig. 1 is a flowchart illustrating a flow management method for live-line work according to an embodiment of the present invention.
Detailed Description
In order to make the objects, features and advantages of the present invention more obvious and understandable, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is apparent that the embodiments described below are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be obtained by a person skilled in the art without making any creative effort based on the embodiments in the present invention, belong to the protection scope of the present invention.
Live working refers to an operation method for overhauling and testing high-voltage electrical equipment without power failure, and the live working is an effective measure for avoiding overhauling and power failure and ensuring normal power supply. However, in the working process of live working, the working personnel need to enter the running interval of the live equipment to work, and the personnel risk of electric shock casualty exists.
In order to ensure the safety and the normalization of the live working, in the actual working process, a live working operation ticket needs to be filled in a paper or electronic form, and the operation ticket is the written basis of the electrical operation. Due to the complex change of the operation mode of the power grid, the filling of the operation order becomes very complicated. The traditional method of filling in the operation order by manual writing is time-consuming and labor-consuming, and has low accuracy. More importantly, the method cannot adapt to the change of the operation mode of the power grid, and the operation order of the corresponding equipment is difficult to generate timely and efficiently.
Based on the above, the invention provides a flow management method and system for live-wire work.
The following describes an embodiment of a method for managing a flow of a live-wire job according to the present invention in detail.
Referring to fig. 1, the present embodiment provides a method for managing a flow of a live-line job, including the following steps:
s100: and determining the equipment which needs to be operated in the current live working and generating an operation task corresponding to each equipment.
It should be noted that the operation device for performing live working includes all primary and secondary devices governed by the scheduling, such as a bus, a communication line, a switch, protection, and the like. The operation tasks include all operation maintenance operations for ensuring safe operation of the power grid, for example, the operation of the X line is changed from operation to maintenance, and the operation tasks of different operation devices are different.
S200: and matching the operation rules of the equipment to be operated by using the equipment operation rule base, wherein all the operation rules of the equipment during live working are stored in the equipment operation rule base.
It should be noted that the operation rule is a basic strategy for ensuring safe operation of the power grid, and the formulation of the guidance operation sequence needs to be closely matched with the real-time operation condition of the electrical equipment, the connection mode of the power grid and the protection.
Because the number of distribution network equipment is large, it is inconvenient to compile an operation order for each equipment individually. Therefore, in this embodiment, by establishing the device operation rule base, for any distribution network device, the corresponding operation rule may be generated through matching with the device operation rule base.
Specifically, the device operation rule base includes two parts. The first is an operation device part, and the second is a device type and an operation rule corresponding to each type. The operation equipment part comprises all distribution network equipment which can be classified into 6 types of buses, switches, transformers, lines, protection and reclosure according to types. In the device type and operation rule section, the contents of the corresponding specific operation rule are described according to the 6 types of device. For each type of equipment, items such as total operation tasks, wiring forms, sub operation tasks, related equipment, initial states, target states and the like should be included. Taking a bus as an example, the total tasks of the bus comprise changing from operation to maintenance, changing from operation to cold standby, changing from maintenance to operation and the like; the wiring forms comprise single bus wiring, double bus belt bypass wiring and the like; the subtasks comprise the running of a bus coupler switch, the hot standby of all switches, the hot standby of a bypass switch and the like; the related equipment comprises a bus coupler switch, a bypass switch and the like; the initial state and the target state are determined by the specific electrification state of the distribution network equipment.
Each distribution network device of the operation device part is associated to a corresponding operation rule part according to the type of the device to which the distribution network device belongs, and for any device needing hot-line work, a corresponding specific operation content part can be obtained by matching through the device operation rule base.
S300: the method comprises the steps of carrying out charged analysis on each device to be operated according to the current network topology state to obtain the initial state of the device, determining the target state of the device through operation reasoning based on the operation task of the device, and generating the operation item of each device to be operated based on the initial state and the target state.
After the operation task of the current live-wire work is determined, the operation contents of the respective operation targets are analyzed. The current network topology state can perform charged analysis on each operation object to obtain the initial state of each device, and the target state of the operation object can be obtained through reasoning according to the initial state, the operation content and the network topology state. And generating an operation item based on the conversion from the initial state to the target state of the operation object. The inference operation can be completed by adopting an inference engine, and the inference engine can complete the operation of the equipment during state transition by adopting an inference algorithm, which is a part of the prior art and is not described again here.
Specifically, the generation process of the operation item is as follows:
s301: comparing the initial state with the target state to obtain the operation interval of each device to be operated;
s302: determining an operation sequence based on an operation rule of the equipment, and searching the distribution network equipment in an operation interval according to the operation sequence;
s303: placing the found distribution network equipment into an operation queue, and deleting the distribution network equipment from the operation interval until the operation interval is empty;
s304: and obtaining the operation items of the devices to be operated based on the generated operation queue.
The operation sequence of the distribution network equipment is related to the operation safety of the power grid, so that the operation sequence needs to be checked by mistake so as to meet the regulation requirement of the safety operation of the power grid.
S400: and translating the operation items into operation terms, taking each device to be operated as an operation object, and generating an operation ticket based on the operation task, the operation rule and the operation terms corresponding to each operation object.
It should be noted that the operation terminology is a rule for ensuring the accuracy and specification of the scheduling operation, and the scheduling terminology specification is correspondingly made in various places, and the operation terminology is a description of the specification and is inconsistent in various places.
The operation order is an operation instruction set which aims at specific equipment and specific operation tasks and switches the operation state of the related equipment according to the safe operation regulation of the power grid and the description sequence of the specified operation terms. And generating an operation ticket through the determined operation object, operation rule, operation task and operation term.
The embodiment provides a flow management method for live working, which comprises the steps of determining equipment needing to be operated in the current live working and generating operation tasks corresponding to the equipment; matching the operation rules of each device to be operated by using the device operation rule base; performing charged analysis on each device to be operated according to the current network topology state to obtain an initial state of the device, determining a target state of the device through operation reasoning based on an operation task of the device, and generating an operation item of each device to be operated based on the initial state and the target state; and translating the operation items into operation terms, taking each device to be operated as an operation object, and generating an operation ticket based on the operation task, the operation rule and the operation terms corresponding to each operation object. According to the method, the operation rule base of the distribution network equipment is established in advance, the corresponding operation tickets can be sequentially generated by matching the operation objects, the method can meet the operation ticket requirements of live working under different operation modes of the power grid, and the method is more efficient compared with a manual compiling mode.
The above is a detailed description of an embodiment of a flow management method of a live-wire work according to the present invention, and the following is a detailed description of an embodiment of a flow management system of a live-wire work according to the present invention.
The embodiment provides a flow management system of live working, including: an operation object determining unit, an operation rule matching unit, an operation item determining unit and an operation ticket generating unit.
In this embodiment, the operation object determining unit is configured to determine devices that need to be operated in current live-wire work and generate operation tasks corresponding to the devices;
in this embodiment, the operation rule matching unit is configured to match the operation rule of each device to be operated by using a device operation rule base, where all the operation rules of each device during live working are stored in the device operation rule base.
It should be noted that, in the operation rule matching unit, all operation rules of each device during live working are stored in the device operation rule base, and the operation rule matching unit specifically includes:
the equipment operation rule base comprises an operation equipment part and an equipment operation rule part;
the operation equipment part comprises all electrical equipment, the equipment operation rule part comprises equipment categories and operation rules corresponding to the equipment categories, and the electrical equipment of the operation equipment part is mapped to the operation rules of the equipment operation rule part according to the equipment categories.
Further, in the operation rule matching unit, the operation rule specifically includes:
an operation task item, a wiring form item, a related equipment item, an initial state item, a target state item and an operation term item.
In this embodiment, the operation item determining unit is configured to perform live analysis on each device to be operated according to a current network topology state to obtain an initial state of the device, determine a target state of the device through operation inference based on an operation task of the device, and generate an operation item of each device to be operated based on the initial state and the target state.
It should be noted that, in the operation item determination unit, based on the initial state and the target state, generating an operation item of each device to be operated specifically includes:
comparing the initial state with the target state to obtain the operation interval of each device to be operated;
determining an operation sequence based on an operation rule of the equipment, and searching the distribution network equipment in an operation interval according to the operation sequence;
placing the found distribution network equipment into an operation queue, and deleting the distribution network equipment from the operation interval until the operation interval is empty;
and obtaining the operation items of the devices to be operated based on the generated operation queue.
Further, in the operation item determination unit, the determining an operation order based on the operation rule of the device further includes:
and performing error-proof checking on the operation sequence so that the operation sequence meets the requirement of a safe operation regulation.
In this embodiment, the operation ticket generating unit is configured to translate the operation items into operation terms, take each device to be operated as an operation object, and generate an operation ticket based on the operation task, the operation rule, and the operation terms corresponding to each operation object.
It should be noted that, the process management system provided in this embodiment is used to implement the process management method provided in the foregoing embodiment, and the specific settings of each unit are subject to complete implementation of the method, which is not described herein again.
The above examples are only intended to illustrate the technical solution of the present invention, but not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions of the embodiments of the present invention.

Claims (8)

1. A flow management method of live-wire work is characterized by comprising the following steps:
determining equipment needing to be operated in the current live working and generating operation tasks corresponding to the equipment;
matching the operation rules of each device to be operated by using a device operation rule base, wherein all the operation rules of each device during live working are stored in the device operation rule base;
carrying out charged analysis on each device to be operated according to the current network topology state to obtain the initial state of the device, determining the target state of the device through operation reasoning based on the operation task of the device, and generating the operation item of each device to be operated based on the initial state and the target state;
translating the operation items into operation terms, taking each device to be operated as an operation object, and generating an operation ticket based on the operation tasks, the operation rules and the operation terms corresponding to the operation objects;
generating operation items of each device to be operated based on the initial state and the target state, specifically comprising:
comparing the initial state with the target state to obtain the operation interval of each device to be operated;
determining an operation sequence based on an operation rule of the equipment, and searching the distribution network equipment in the operation interval according to the operation sequence;
placing the found distribution network equipment into an operation queue, and deleting the distribution network equipment from the operation interval until the operation interval is empty;
and obtaining the operation items of the devices to be operated based on the generated operation queue.
2. The method for managing a flow of a live-wire work according to claim 1, wherein the device operation rule base stores all operation rules of each device during the live-wire work, and specifically includes:
the equipment operation rule base comprises an operation equipment part and an equipment operation rule part;
the operation equipment part comprises all electrical equipment, the equipment operation rule part comprises equipment categories and operation rules corresponding to the equipment categories, and the electrical equipment of the operation equipment part is mapped to the operation rules of the equipment operation rule part according to the equipment categories.
3. The method for managing the flow of live-wire work according to claim 2, wherein the operation rule specifically includes:
an operation task item, a wiring form item, a related equipment item, an initial state item, a target state item and an operation term item.
4. The method for flow management of live-wire work according to claim 1, wherein the operation order is determined based on an operation rule of the device, further comprising:
and performing error-proof check on the operation sequence so that the operation sequence meets the requirements of safety operation regulations.
5. A flow management system for live-wire work, comprising:
the operation object determining unit is used for determining the equipment needing to be operated in the current live working and generating operation tasks corresponding to the equipment;
the operation rule matching unit is used for matching the operation rules of the equipment to be operated by utilizing an equipment operation rule base, and all the operation rules of the equipment during live working are stored in the equipment operation rule base;
the operation item determining unit is used for carrying out charged analysis on each device to be operated according to the current network topology state to obtain the initial state of the device, determining the target state of the device through operation reasoning based on the operation task of the device, and generating the operation item of each device to be operated based on the initial state and the target state;
the operation ticket generating unit is used for translating the operation items into operation terms, taking each device to be operated as an operation object, and generating an operation ticket based on the operation task, the operation rule and the operation terms corresponding to each operation object;
in the operation item determination unit, generating an operation item of each device to be operated based on the initial state and the target state, specifically including:
comparing the initial state with the target state to obtain the operation interval of each device to be operated;
determining an operation sequence based on an operation rule of the equipment, and searching the distribution network equipment in the operation interval according to the operation sequence;
placing the found distribution network equipment into an operation queue, and deleting the distribution network equipment from the operation interval until the operation interval is empty;
and obtaining the operation items of the devices to be operated based on the generated operation queue.
6. The system for managing a flow of a live-wire work according to claim 5, wherein in the operation rule matching unit, all operation rules of each device during the live-wire work are stored in the device operation rule base, and specifically includes:
the equipment operation rule base comprises an operation equipment part and an equipment operation rule part;
the operation equipment part comprises all electrical equipment, the equipment operation rule part comprises equipment categories and operation rules corresponding to the equipment categories, and the electrical equipment of the operation equipment part is mapped to the operation rules of the equipment operation rule part according to the equipment categories.
7. The process management system according to claim 6, wherein in the operation rule matching unit, the operation rule specifically includes:
an operation task item, a wiring form item, a related equipment item, an initial state item, a target state item and an operation term item.
8. The system according to claim 5, wherein the operation item determination unit determines the operation order based on an operation rule of the device, and further includes:
and performing error-proof check on the operation sequence so that the operation sequence meets the requirements of safety operation regulations.
CN202211513223.9A 2022-11-30 2022-11-30 Live-line work flow management method and system Active CN115542867B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211513223.9A CN115542867B (en) 2022-11-30 2022-11-30 Live-line work flow management method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211513223.9A CN115542867B (en) 2022-11-30 2022-11-30 Live-line work flow management method and system

Publications (2)

Publication Number Publication Date
CN115542867A CN115542867A (en) 2022-12-30
CN115542867B true CN115542867B (en) 2023-03-10

Family

ID=84722676

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211513223.9A Active CN115542867B (en) 2022-11-30 2022-11-30 Live-line work flow management method and system

Country Status (1)

Country Link
CN (1) CN115542867B (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6011830A (en) * 1996-12-10 2000-01-04 Telefonaktiebolaget Lm Ericsson Operational test device and method of performing an operational test for a system under test
CN102169570A (en) * 2011-05-12 2011-08-31 东北电力大学 Two tickets combined inference billing method of power grid based on work task analysis
CN102752136A (en) * 2012-06-29 2012-10-24 广东东研网络科技有限公司 Method for operating and scheduling communication equipment
CN103679350A (en) * 2013-11-28 2014-03-26 四川蓝讯宝迩电子科技有限公司 Power grid switching operation ticket automatic generating system and method
CN105809571A (en) * 2015-04-02 2016-07-27 国网山东省电力公司青岛供电公司 Intelligent monitoring method and system for outputting scheduling operation tickets
CN110166378A (en) * 2019-04-04 2019-08-23 珠海欧力配网自动化股份有限公司 A kind of communication system and method for distribution network terminal debugging maintenance
CN110322232A (en) * 2019-07-10 2019-10-11 国网江苏省电力有限公司无锡供电分公司 A kind of distribution scheduling task ticket automatic generation method, apparatus and system
CN110674282A (en) * 2019-09-16 2020-01-10 北京四方继保自动化股份有限公司 Expert knowledge rule base-based one-key sequential control operation order intelligent simulation method
CN111199285A (en) * 2020-02-25 2020-05-26 国网冀北电力有限公司唐山供电公司 Two-ticket expert system based on relational database
CN114925960A (en) * 2022-03-31 2022-08-19 国电南瑞科技股份有限公司 Method and device for evaluating whole operation process of transformer substation
CN114971583A (en) * 2022-06-22 2022-08-30 国网湖南省电力有限公司 Digital modeling system for complex regulation and control rule of power grid
CN114997741A (en) * 2022-07-18 2022-09-02 广东电网有限责任公司佛山供电局 Maintenance plan risk assessment method, system and equipment

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6011830A (en) * 1996-12-10 2000-01-04 Telefonaktiebolaget Lm Ericsson Operational test device and method of performing an operational test for a system under test
CN102169570A (en) * 2011-05-12 2011-08-31 东北电力大学 Two tickets combined inference billing method of power grid based on work task analysis
CN102752136A (en) * 2012-06-29 2012-10-24 广东东研网络科技有限公司 Method for operating and scheduling communication equipment
CN103679350A (en) * 2013-11-28 2014-03-26 四川蓝讯宝迩电子科技有限公司 Power grid switching operation ticket automatic generating system and method
CN105809571A (en) * 2015-04-02 2016-07-27 国网山东省电力公司青岛供电公司 Intelligent monitoring method and system for outputting scheduling operation tickets
CN110166378A (en) * 2019-04-04 2019-08-23 珠海欧力配网自动化股份有限公司 A kind of communication system and method for distribution network terminal debugging maintenance
CN110322232A (en) * 2019-07-10 2019-10-11 国网江苏省电力有限公司无锡供电分公司 A kind of distribution scheduling task ticket automatic generation method, apparatus and system
CN110674282A (en) * 2019-09-16 2020-01-10 北京四方继保自动化股份有限公司 Expert knowledge rule base-based one-key sequential control operation order intelligent simulation method
CN111199285A (en) * 2020-02-25 2020-05-26 国网冀北电力有限公司唐山供电公司 Two-ticket expert system based on relational database
CN114925960A (en) * 2022-03-31 2022-08-19 国电南瑞科技股份有限公司 Method and device for evaluating whole operation process of transformer substation
CN114971583A (en) * 2022-06-22 2022-08-30 国网湖南省电力有限公司 Digital modeling system for complex regulation and control rule of power grid
CN114997741A (en) * 2022-07-18 2022-09-02 广东电网有限责任公司佛山供电局 Maintenance plan risk assessment method, system and equipment

Also Published As

Publication number Publication date
CN115542867A (en) 2022-12-30

Similar Documents

Publication Publication Date Title
Roytelman et al. State estimation for electric power distribution systems in quasi real-time conditions
Wang et al. DG impact on investment deferral: Network planning and security of supply
CN101719690B (en) Dispatching method of electric network
McCalley et al. Security boundary visualization for systems operation
CN104133443A (en) Method for automatically generating power grid dispatching operation order through power grid overhaul application forms
CN101968864A (en) Electric power system operation reliability-centered equipment importance evaluation method
CN104091243A (en) Intelligent switching operation ticket mechanism designing and achieving method
CN104851052A (en) Intelligent error preventing method and system used for outputting dispatching operation ticket
CN107611969A (en) Possess the regulation and control anti-error system and method for transfer order binding function
CN110826228B (en) Regional power grid operation quality limit evaluation method
CN103745276A (en) Distribution network operating state analysis method for grid
CN115542867B (en) Live-line work flow management method and system
CN103630781A (en) Composite energy supply non-contact on-line monitoring system for active electronic current transformer
CN113344509A (en) Operation ticket generation method, device, equipment and storage medium
WO2022150015A1 (en) A system for generating a mechanical and electrical service system design for a structure and a method thereof
CN106548284A (en) A kind of adaptive mode massing power grid security Alarm Assessment method towards operation regulation and control
CN108090626A (en) A kind of Meshing Method of distribution net gridding planning
Luo et al. Research and application of GIS‐based medium‐voltage distribution network comprehensive technical evaluation system
KR20150056494A (en) method for auto calculating for examination of block lifting safety
CN115564073A (en) Power grid power operation method and device, computer equipment and storage medium
Wruk et al. Automated planning of smart low voltage networks using an evolutionary algorithm
CN115224687A (en) Power failure overhaul safety checking method and system for power transmission and transformation equipment below 220KV
CN104376614A (en) One-key ticket outlet method for substation operation tickets
CN107317393A (en) Intelligent distribution network application management system
CN114969442A (en) Power dispatching task ticket generation method based on knowledge graph and deep reinforcement learning

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant