CN104376614A CN201410651210.7A CN201410651210A CN104376614A CN 104376614 A CN104376614 A CN 104376614A CN 201410651210 A CN201410651210 A CN 201410651210A CN 104376614 A CN104376614 A CN 104376614A
Authority
CN
China
Prior art keywords
information
substation
platform
maintenance
bus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410651210.7A
Other languages
Chinese (zh)
Inventor
刘晓辉
石云松
李俊华
许星浩
王予疆
何贺
马琳
程煜
周琦
吕文
黄晓飞
张慧
唐翠莲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENGZHOU ZHONGCHUANG HUIDA ELECTRIC Co Ltd
State Grid Corp of China SGCC
Zhengzhou Power Supply Co of Henan Electric Power Co
Original Assignee
ZHENGZHOU ZHONGCHUANG HUIDA ELECTRIC Co Ltd
State Grid Corp of China SGCC
Zhengzhou Power Supply Co of Henan Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU ZHONGCHUANG HUIDA ELECTRIC Co Ltd, State Grid Corp of China SGCC, Zhengzhou Power Supply Co of Henan Electric Power Co filed Critical ZHENGZHOU ZHONGCHUANG HUIDA ELECTRIC Co Ltd
Priority to CN201410651210.7A priority Critical patent/CN104376614A/en
Publication of CN104376614A publication Critical patent/CN104376614A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a one-key ticket outlet method for substation operation tickets. The one-key ticket outlet method comprises the following steps: a. establishing a substation information database by a sqlserver data management system and building a substation framework model based on the voltage grade and wiring way of a substation; b. establishing primary information and secondary information of the substation; c. establishing primary state data information and secondary state data information of the substation; d. establishing operation task information of the substation and building a one-key ticket outlet platform for substation operation tickets; generating a word document in a standard operation ticket format by visual basic (VB) to support export and online printing functions; importing the generated operating sequence text into the word document in a standard operation ticket format by combining primary five-prevention locking of the substation and the secondary information of the substation. According to the method, a operation ticket is generated by the rule base reasoning mechanism combining intelligent and typical modes; the method is safe in billing, is capable of realizing the whole process management such as planning the ticket, supervising, checking and the like of the operation ticket, and is also used for realizing simulation demonstration and training for the operation ticket.

Description

Substation switching one key ticket drawing method
  
technical field:
The present invention relates to a kind of method for making of Substation switching, particularly relate to a kind of Substation switching one key ticket drawing method.
background technology:
The safe operation of electric system is directly connected to the development of national economy, and write operation ticket is an important groundwork in power transformation operation, and correct compilation operation ticket is a kind of important means ensureing safe operation of power system.All the time, substation switching operation ticket is by operator's hand filling, and along with developing of electrical network, increasing of the administrative equipment of transformer station, hand filling grid switching operation bill has more and more been not suitable with the requirement of operation of power networks.First, switch operation is increasingly various, and this has increased the weight of the heavy routine work of operator; Secondly, if there is the whole back brake ticket of some minor errors just must rewrite during hand filling; Moreover fill out ticket by hand, statistical query is also inconvenient.Especially the current high speed development along with each electric company bulk power grid, electric pressure is more and more complete, and bus arrangement mode is more and more various, and the method for operation is more and more flexible, and the process of making out an invoice of its Substation switching becomes increasingly complex and flexibly.Tool originally has been not suitable for the requirement of making out an invoice of each electric company in the expert system of the pure typical ticket mode of conventional individual version of tradition non-vector graphics mode.
For a long time, people make a lot of effort in the microcomputer generation of operation order, and these systems can be divided into two types: typical operation bill system and graphical operation bill system.Typical operation bill system: the grid switching operation of transformer station is organized into typical operation ticket (tens to up to a hundred not etc.), classifying input data storehouse, during the new operation order of each formulation, retrieves similar typical operation ticket from database, after doing suitably amendment, obtain the operation order of actual use.This method improves the formation speed of operation order really, but lacks logic analysis function, in modification process, the accuracy of operation order cannot be ensured, also cannot meet the needs of simulation operations and training, and when wiring relation changes, relevant typical ticket all must be revised, and adds workload.Graphical operation bill system: personnel operate on wiring diagram by power transformation operation, progressively generating run ticket.This Method compare is directly perceived, and process of drawing a bill and training process organically combine, just progressively by professional is accepted.The power supply department of some developed regions has brought into use such product, total effect is fairly good, but some system is desirable not enough, show several aspect: first, model is too simple, by enumerating the output character of mouse on element during keystroke, generate corresponding action statement, cause the text event detection amount in configuration stage too large, and the operation (as checked balancing the load etc. between two switches) relating to multiple element cannot be defined, also be difficult to the operation (as car switch) defining multimode equipment, finally rely on input through keyboard; Secondly, also do not have a set of operation ticket system can realize complete latching relation, difficulty is to process once, secondary device and latching relation each other, this latching relation depends on different operation tasks.
summary of the invention:
Technical matters to be solved by this invention is: overcome the deficiencies in the prior art, provides a kind of safety of making out an invoice, correct quick and easy directly perceived and have the Substation switching one key ticket drawing method of analog demenstration and training function.
Technical scheme of the present invention is:
A kind of Substation switching one key ticket drawing method, comprises the following steps:
A, utilize sqlserver data management system to set up substation information database, described substation information database comprise substation information tables of data, bus once with secondary information tables of data, transformer once with secondary information tables of data, circuit once with secondary information tables of data;
B, build transformer station's frame model based on the electric pressure of transformer station and the mode of connection, the described mode of connection comprises in conjunction with transforming plant primary five-defence block and substation secondary information, imports in the word document of standard operation ticket form by the sequence of operation text generated;
C, set up transforming plant primary information and secondary information, described transforming plant primary information platform comprises bus primary information, transformer primary information, circuit primary information; Described substation secondary information platform comprises bus secondary information, transformer secondary information, circuit secondary information;
D, set up transforming plant primary and second state data message, described transforming plant primary and second state data message comprise bus once with second state data message, transformer once with second state data message, circuit once with second state data message;
E, set up Substation Operating mission bit stream, described Substation Operating task comprises that bus stops power transmission, Bus PT electricity, bus protection has work, transformer stops power transmission, tranformer protection has work, circuit stops power transmission, line segregation routine test, route protection have work;
F, set up Substation switching one key and to draw a bill platform, VB is utilized to generate the word document of standard operation ticket form, support to derive and online printing function, and in conjunction with transforming plant primary five-defence block and substation secondary information, import in the word document of standard operation ticket form by the sequence of operation text generated, final generation meets standard, qualified operation order.
In stepb, the mode of connection comprises double bus scheme mode, double-bus three section wiring mode, double-bus four section wiring mode, single female three section wiring modes, single female four section wiring modes, unit connection mode, internal bridge connection, outer bridging line mode.
Set up substation information maintenance platform, for uploading and downloading transformer station's framework spanned file.Described substation information maintenance platform comprises bus maintenance of information platform, transformer maintenance of information platform, line information maintenance platform, capacitor maintenance of information platform, bus observing and controlling screen maintenance of information platform, bus convergence control cabinet maintenance of information platform, bus protection screen maintenance of information platform, transformer measure control screen maintenance of information platform, transformer convergence control cabinet maintenance of information platform, tranformer protection screen maintenance of information platform, circuit observing and controlling screen maintenance of information platform, circuit convergence control cabinet maintenance of information platform, route protection screen maintenance of information platform, capacitor secondary information maintenance platform, arc suppression coil secondary information maintenance platform.
The data generated are connected in series with host computer by cable network or wireless network, realize remote monitoring and manipulation, can also be connected in series with personal telecommunication terminal, realize real-time Transmission and manipulation.
The invention has the beneficial effects as follows:
1, the present invention can realize complete latching relation, correct process once, secondary device and latching relation each other.Using riverfront transformer station as experiment centre, first secondary pressure plate, air switch in station are integrated in operation order ticket system, not only can meet the requirement of making out an invoice in real time of each transformer station, the management expectancy in power transformation work area, safety supervision portion, production technology portion can be met again simultaneously, and electrical network mode can also be adapted to change and the various operations such as automatic safety device adjustment, have again simultaneously and hold safe operation and close, prevent artificial habituation from breaking rules and regulations, electric grid operating work is of great immediate significance.
2, " " the rule base inference mechanism generating run ticket be combined with each other, the basis of conventional procedures ticket is integrated with secondary pressure plate and air switch to intellectuality+typical way to the present invention's employing, operation order is made out an invoice safe, correct, quick and easy, directly perceived.And realize the Whole Course Management such as plan ticket, supervision, execution, examination of operation order, realize analog demenstration and the training function of operation order.
3, the present invention adopts sqlserver database to be the memory function that relational data and structural data provide safety and reliability, supports Windows graphically managing instrument, supports local and remote system management and configuration.Have powerful issued transaction function, and adopt various method to ensure the integrality of data, reliability is high.
4, the present invention adopts VB software can compile the program of visualization interface, is convenient to show intuitively the manufacturing process of operation order and makes the page, and supports to derive and online printing function, convenient and swift.
5, the present invention is integrated with the available for different connection modes such as single female mode of connection line, two female mode of connection, unit connection mode, bridge connection, contain the various different mode of connection of electric system, and take into account transforming plant primary and secondary information, practical operation application is strong, possesses wide popularization space, be easy to promotion and implementation, there is good economic benefit.
embodiment:
A kind of Substation switching one key ticket drawing method, comprises the following steps:
A, utilize sqlserver data management system to set up substation information database, substation information database comprise substation information tables of data, bus once with secondary information tables of data, transformer once with secondary information tables of data, circuit once with secondary information tables of data;
B, build transformer station's frame model based on the electric pressure of transformer station and the mode of connection, the mode of connection comprises in conjunction with transforming plant primary five-defence block and substation secondary information, imports in the word document of standard operation ticket form by the sequence of operation text generated;
C, set up transforming plant primary information and secondary information, transforming plant primary information platform comprises bus primary information, transformer primary information, circuit primary information; Substation secondary information platform comprises bus secondary information, transformer secondary information, circuit secondary information;
D, set up transforming plant primary and second state data message, transforming plant primary and second state data message comprise bus once with second state data message, transformer once with second state data message, circuit once with second state data message;
E, set up Substation Operating mission bit stream, Substation Operating task comprises that bus stops power transmission, Bus PT electricity, bus protection has work, transformer stops power transmission, tranformer protection has work, circuit stops power transmission, line segregation routine test, route protection have work;
F, set up Substation switching one key and to draw a bill platform, VB is utilized to generate the word document of standard operation ticket form, support to derive and online printing function, and in conjunction with transforming plant primary five-defence block and substation secondary information, import in the word document of standard operation ticket form by the sequence of operation text generated, final generation meets standard, qualified operation order.
In stepb, the mode of connection comprises double bus scheme mode, double-bus three section wiring mode, double-bus four section wiring mode, single female three section wiring modes, single female four section wiring modes, unit connection mode, internal bridge connection, outer bridging line mode.
Set up substation information maintenance platform, for uploading and downloading transformer station's framework spanned file.Substation information maintenance platform comprises bus maintenance of information platform, transformer maintenance of information platform, line information maintenance platform, capacitor maintenance of information platform, bus observing and controlling screen maintenance of information platform, bus convergence control cabinet maintenance of information platform, bus protection screen maintenance of information platform, transformer measure control screen maintenance of information platform, transformer convergence control cabinet maintenance of information platform, tranformer protection screen maintenance of information platform, circuit observing and controlling screen maintenance of information platform, circuit convergence control cabinet maintenance of information platform, route protection screen maintenance of information platform, capacitor secondary information maintenance platform, arc suppression coil secondary information maintenance platform.
The data generated are connected in series with host computer by cable network or wireless network, realize remote monitoring and manipulation, can also be connected in series with personal telecommunication terminal, realize real-time Transmission and manipulation.
During work, first metering-in control system, then operates according to following step:
1) in " substation information database ", the essential information of required transformer station is imported;
2) electric pressure (such as 220kV) of this transformer station is selected, and the mode of connection of transformer station 220kV bus, the mode of connection of 110kV bus, the mode of connection of 10kV bus, the main transformer number of units of each electric pressure, the number of lines of each electric pressure and line name;
3) system generates this transformer station's frame model " * .txt " file, and the characteristic according to this transformer station revises the model file generated, and is reloaded by " * .txt " file of modification and perfection;
4) generate this substation secondary information model " * .txt " file, the characteristic according to this transformer station revises the model file generated, and is reloaded by " * .txt " file of modification and perfection;
5) this transforming plant primary maintenance of information platform is browsed, with this substation secondary maintenance of information platform;
6) in transformer station's status data information platform, initialization is carried out to transforming plant primary and secondary information, normal operating condition is set;
7) operation task of this transformer station is selected, generating run ticket;
8) operation order of generation can be printed as required online, also can realize the Whole Course Management such as plan ticket, supervision, execution, examination of operation order, analog demenstration and the training of operation order can also be realized.
The above, it is only preferred embodiment of the present invention, not any pro forma restriction is done to the present invention, every above embodiment is done according to technical spirit of the present invention any simple modification, equivalent variations and modification, all still belong in the scope of technical solution of the present invention.
  

Claims (5)

1. a Substation switching one key ticket drawing method, comprises the following steps:
A, utilize sqlserver data management system to set up substation information database, described substation information database comprise substation information tables of data, bus once with secondary information tables of data, transformer once with secondary information tables of data, circuit once with secondary information tables of data;
B, build transformer station's frame model based on the electric pressure of transformer station and the mode of connection, the described mode of connection comprises in conjunction with transforming plant primary five-defence block and substation secondary information, imports in the word document of standard operation ticket form by the sequence of operation text generated;
C, set up transforming plant primary information and secondary information, described transforming plant primary information platform comprises bus primary information, transformer primary information, circuit primary information; Described substation secondary information platform comprises bus secondary information, transformer secondary information, circuit secondary information;
D, set up transforming plant primary and second state data message, described transforming plant primary and second state data message comprise bus once with second state data message, transformer once with second state data message, circuit once with second state data message;
E, set up Substation Operating mission bit stream, described Substation Operating task comprises that bus stops power transmission, Bus PT electricity, bus protection has work, transformer stops power transmission, tranformer protection has work, circuit stops power transmission, line segregation routine test, route protection have work;
F, set up Substation switching one key and to draw a bill platform, VB is utilized to generate the word document of standard operation ticket form, support to derive and online printing function, and in conjunction with transforming plant primary five-defence block and substation secondary information, import in the word document of standard operation ticket form by the sequence of operation text generated, final generation meets standard, qualified operation order.
2. Substation switching one key ticket drawing method according to claim 1, it is characterized in that: in stepb, the mode of connection comprises double bus scheme mode, double-bus three section wiring mode, double-bus four section wiring mode, single female three section wiring modes, single female four section wiring modes, unit connection mode, internal bridge connection, outer bridging line mode.
3. Substation switching one key ticket drawing method according to claim 1, is characterized in that: set up substation information maintenance platform, for uploading and downloading transformer station's framework spanned file.
4. Substation switching one key ticket drawing method according to claim 3, it is characterized in that: described substation information maintenance platform comprises bus maintenance of information platform, transformer maintenance of information platform, line information maintenance platform, capacitor maintenance of information platform, bus observing and controlling screen maintenance of information platform, bus convergence control cabinet maintenance of information platform, bus protection screen maintenance of information platform, transformer measure control screen maintenance of information platform, transformer convergence control cabinet maintenance of information platform, tranformer protection screen maintenance of information platform, circuit observing and controlling screen maintenance of information platform, circuit convergence control cabinet maintenance of information platform, route protection screen maintenance of information platform, capacitor secondary information maintenance platform, arc suppression coil secondary information maintenance platform.
5. Substation switching one key ticket drawing method according to claim 1, is characterized in that: the data of generation are connected in series with host computer by cable network or wireless network, realize remote monitoring and manipulation.
CN201410651210.7A 2014-11-17 2014-11-17 One-key ticket outlet method for substation operation tickets Pending CN104376614A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410651210.7A CN104376614A (en) 2014-11-17 2014-11-17 One-key ticket outlet method for substation operation tickets

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410651210.7A CN104376614A (en) 2014-11-17 2014-11-17 One-key ticket outlet method for substation operation tickets

Publications (1)

Publication Number Publication Date
CN104376614A true CN104376614A (en) 2015-02-25

Family

ID=52555503

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410651210.7A Pending CN104376614A (en) 2014-11-17 2014-11-17 One-key ticket outlet method for substation operation tickets

Country Status (1)

Country Link
CN (1) CN104376614A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107608295A (en) * 2017-10-18 2018-01-19 国家电网公司 A kind of optimization method of electricity grid substation O&M operation order
CN107632766A (en) * 2017-09-28 2018-01-26 中国南方电网有限责任公司超高压输电公司曲靖局 The anti-error embankment method of Substation maintenance
CN113780121A (en) * 2021-08-30 2021-12-10 国网上海市电力公司 Power system operation instruction ticket automatic identification application method based on artificial intelligence

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100082464A1 (en) * 2008-10-01 2010-04-01 Keefe Robert A System and Method for Managing the Consumption and Discharging of Power of Electric Vehicles
CN102023853A (en) * 2009-09-17 2011-04-20 上海市电力公司超高压输变电公司 Modeling method of transformer station equipments used for synchronously giving order for primary and secondary equipment
CN102426444A (en) * 2011-10-20 2012-04-25 湖南省电力公司科学研究院 Modularized distribution network remote operation ticket automatic generating module
CN103679350A (en) * 2013-11-28 2014-03-26 四川蓝讯宝迩电子科技有限公司 Power grid switching operation ticket automatic generating system and method
CN104091225A (en) * 2014-06-11 2014-10-08 国网山东省电力公司日照供电公司 Object-oriented electric power system scheduling operation ticket system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100082464A1 (en) * 2008-10-01 2010-04-01 Keefe Robert A System and Method for Managing the Consumption and Discharging of Power of Electric Vehicles
CN102023853A (en) * 2009-09-17 2011-04-20 上海市电力公司超高压输变电公司 Modeling method of transformer station equipments used for synchronously giving order for primary and secondary equipment
CN102426444A (en) * 2011-10-20 2012-04-25 湖南省电力公司科学研究院 Modularized distribution network remote operation ticket automatic generating module
CN103679350A (en) * 2013-11-28 2014-03-26 四川蓝讯宝迩电子科技有限公司 Power grid switching operation ticket automatic generating system and method
CN104091225A (en) * 2014-06-11 2014-10-08 国网山东省电力公司日照供电公司 Object-oriented electric power system scheduling operation ticket system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
闫庆华: "变电站典型操作培训系统开发", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107632766A (en) * 2017-09-28 2018-01-26 中国南方电网有限责任公司超高压输电公司曲靖局 The anti-error embankment method of Substation maintenance
CN107608295A (en) * 2017-10-18 2018-01-19 国家电网公司 A kind of optimization method of electricity grid substation O&M operation order
CN107608295B (en) * 2017-10-18 2019-10-08 国家电网公司 A kind of optimization method of electricity grid substation O&M operation order
CN113780121A (en) * 2021-08-30 2021-12-10 国网上海市电力公司 Power system operation instruction ticket automatic identification application method based on artificial intelligence

Similar Documents

Publication Publication Date Title
CN102663912B (en) Computer simulation systems for integrated dispatching and monitoring of regional power network
CN103970887B (en) A kind of information flow display system and method based on GIS power distribution network figures
CN107346917A (en) Secondary device based on virtual machine integrates joint debugging method
CN104504485A (en) Integrative power system relay protection setting calculation method
CN103761624A (en) Implementing method of integrated power grid dispatching operation intelligent mistaken-early-warning preventing system
CN108345739B (en) Method for identifying CIME and SVG model file information to realize protection fixed value on-line check function and obtain model
CN105807749A (en) Test platform and test method for power dispatching automatic master station system
CN103903496A (en) 10kV digital power distribution room simulation training system
CN110852023B (en) Automatic generation method and device for primary main wiring diagram of intelligent substation
CN104360835A (en) Automatic sequential control operation ticket generation method based on topologic mode
CN106886950A (en) A kind of method that dispatching of power netwoks instruction is automatically generated
CN203013082U (en) 10kV digital power distribution room simulation training system
CN105045991B (en) The checking method of intelligent substation intelligent apparatus allocation plan and empty terminal
CN113553486A (en) Power transmission line running state visualization method, device, equipment and storage medium
CN114548800A (en) Future-state power grid maintenance risk identification method and device based on power grid knowledge graph
CN104376614A (en) One-key ticket outlet method for substation operation tickets
CN103647279B (en) A kind of forecast failure set creation method based on plant stand wiring information
CN112256872B (en) Intelligent billing method for overhaul work ticket of transformer substation
CN109543156A (en) A kind of Substation switching automatic invoice issuance system based on IEC61850
CN109447466A (en) A kind of overall process visualization managing and control system based on Distribution Network Communication network construction
Luo et al. Research and application of GIS‐based medium‐voltage distribution network comprehensive technical evaluation system
CN202840679U (en) Intelligent analyzing and decision-making system for transformation operating accidents and abnormity
CN205899894U (en) Use emulation intelligent ammeter's trouble analogue means
CN107292524A (en) Intelligent substation secondary safety measure automatic generation method and device
Li et al. Power system reliability analysis system based on PSASP and fault enumeration method and applications

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150225

RJ01 Rejection of invention patent application after publication