CN115111432A - Urban rainwater sewage pipe network construction is with placing structure - Google Patents

Urban rainwater sewage pipe network construction is with placing structure Download PDF

Info

Publication number
CN115111432A
CN115111432A CN202210783656.XA CN202210783656A CN115111432A CN 115111432 A CN115111432 A CN 115111432A CN 202210783656 A CN202210783656 A CN 202210783656A CN 115111432 A CN115111432 A CN 115111432A
Authority
CN
China
Prior art keywords
pipeline
plate
electric push
fixedly connected
push rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210783656.XA
Other languages
Chinese (zh)
Other versions
CN115111432B (en
Inventor
周海波
蔡伟
徐成志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Haibo Engineering Design Group Co ltd
Original Assignee
Hefei Haibo Engineering Design Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Haibo Engineering Design Group Co ltd filed Critical Hefei Haibo Engineering Design Group Co ltd
Priority to CN202210783656.XA priority Critical patent/CN115111432B/en
Publication of CN115111432A publication Critical patent/CN115111432A/en
Application granted granted Critical
Publication of CN115111432B publication Critical patent/CN115111432B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/028Laying or reclaiming pipes on land, e.g. above the ground in the ground
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G35/00Mechanical conveyors not otherwise provided for
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/42Gripping members engaging only the external or internal surfaces of the articles
    • B66C1/44Gripping members engaging only the external or internal surfaces of the articles and applying frictional forces
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/06Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for minimising or preventing longitudinal or transverse swinging of loads
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/08Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C19/00Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/06Accessories therefor, e.g. anchors

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Sewage (AREA)

Abstract

The invention discloses a placement structure for urban rainwater and sewage pipe network construction, which relates to the technical field of placement for pipe network construction and is used for solving the problems of low efficiency of a traditional device for placing a pipeline, inaccurate placement accuracy and poor butt joint effect; compared with the prior art, the invention can simultaneously place a plurality of pipelines and can realize high-efficiency and accurate butt joint of the pipelines.

Description

Urban rain sewage pipe network construction is with placing structure
Technical Field
The invention relates to the technical field of placement for pipe network construction, in particular to a placement structure for urban rainwater and sewage pipe network construction.
Background
The existing pipeline is placed by hoisting a rope, but the rope can drive the pipeline to shake together in the process of moving the pipeline, furthermore, the pipeline is difficult to be accurately and quickly placed in the foundation pit, and the placing direction and the placing position of the pipeline are generally adjusted by a person in cooperation with a pipeline pushing manner after the pipeline is placed in the foundation pit, so that the adjusting manner is time-consuming and labor-consuming, but also endanger the personal safety of operators pushing the pipelines by hands, the existing butt joint mode of the two pipelines generally adopts two machines to respectively lift the two butted pipelines, a plurality of operators jointly push the pipelines to enable the ports of the pipelines to be positioned on the same central line, in order to avoid the suspended pipelines from shaking to influence butt joint, furthermore, multiple operators are required to support the pipelines until the ports of the two pipelines are connected, so that the operation mode is time-consuming and labor-consuming, and the pipeline installation efficiency is seriously influenced;
therefore, the placing structure for the urban rainwater and sewage pipe network construction is provided.
Disclosure of Invention
The invention aims to provide a placing structure for urban rainwater and sewage pipe network construction, which is used for solving the following problems:
the first motor and the fourth electric push rod are matched with each other, and the pipeline hoisting device is free of ropes to hoist the pipeline, so that the pipeline can be accurately, quickly and stably placed at a specified position in a foundation pit, the problem that the pipeline shakes in the hoisting process is solved, the problems that time and labor are wasted when an operator needs to push the pipeline to adjust the direction of the pipeline by hand, the butt joint efficiency is low due to the fact that multiple operators need to cooperate with each other, and the personnel cost is high and time and labor are wasted due to the fact that multiple operators need to cooperate with each other are solved
The purpose of the invention can be realized by the following technical scheme:
a placement structure for urban rainwater and sewage pipe network construction comprises a frame, wherein a chassis is fixed to the bottom end of the frame through spot welding, a plurality of first rolling wheels are arranged at the bottom of the chassis, a cross frame is fixedly connected to the top of the frame, a hoisting assembly is installed at the bottom of the cross frame, a conveying butt joint assembly is installed on the outer side of the chassis, the hoisting assembly comprises a fourth electric push rod, a fourth electric push rod is fixedly connected to the inner portion of the cross frame, a first sliding groove is formed in the bottom of the cross frame, a sliding plate is connected to the bottom of the first sliding groove in a sliding mode, a first motor is fixed to the bottom of the sliding plate, a first rotating rod is movably connected to the bottom of the sliding plate through a bearing, a first gear is fixedly sleeved on the outer side of the first rotating rod, a second gear is fixed to the output end of the first motor through spot welding, the first gear is meshed with the second gear, a first transverse plate is fixedly connected to the bottom of the first rotating rod, the bottom of the transverse plate I is fixedly connected with an electric push rod V, the bottom of the electric push rod V is fixedly connected with a transverse plate II, and the bottom of the transverse plate II is fixedly connected with a connecting plate, a baffle plate, a sliding rod and a motor II;
the utility model discloses a connector, including the connecting plate, the connecting plate is connected with the baffle, has the threaded rod through bearing swing joint between connecting plate and the baffle, the one end and the two fixed connection of motor of threaded rod, the below of connecting plate is provided with moves board one and moves board two, move board one and move outside fixedly connected with sleeve one and sleeve two of board two, the sleeve is one set to be established in the outside of threaded rod, and sleeve one and threaded rod threaded connection, two sliding connection of sleeve are in the outside of slide bar, move board one and move the equal fixedly connected with a plurality of montants in bottom of board two, electric putter one and electric putter two, the bottom of montant is rotated and is connected with the gripper jaw.
Further, the outside cover of montant is equipped with a slide cartridge, the outside of slide cartridge is rotated and is connected with the connecting rod, the one end that the slide cartridge was kept away from to the connecting rod is rotated with the gripper jaw and is connected, and is adjacent fixedly connected with pull rod between the slide cartridge, the pull rod with correspond the electric putter one and the electric putter two fixed connection who sets up.
Furthermore, one side of each clamping jaw is fixedly connected with an additional jaw, the outer sides of the additional jaws are provided with inserting grooves at equal angles, the inner sides of the clamping jaws are connected with a buffer plate through compression springs, the inner sides of the buffer plates are provided with a plurality of slotted holes, and guide wheels are movably connected in the slotted holes through bearings.
Further, carry butt joint subassembly to include backup pad, electric putter three, equipment rack, conveyer belt, lug, buffering sucking disc, support arm, guide roll, arc backing plate and spout two, gyro wheel two is installed to the bottom of backup pad, the outside fixedly connected with electric putter three of backup pad, equipment rack is installed at the top of backup pad, a plurality of supports of fixedly connected with respectively in the outside of backup pad and equipment rack one and support two, support one and support two rotate to be connected, electric putter three's output rotates with equipment rack to be connected, install the conveyer belt in the equipment rack, the equidistant fixedly connected with lug in the outside of conveyer belt, the through-hole has been seted up in the outside of lug, and is connected with buffering sucking disc through compression spring two in the through-hole.
Further, the outside symmetry of equipment frame is fixed with the support arm, the adjacent one side of support arm has a plurality of guide rolls through bearing swing joint, a plurality of arc backing plates of outside fixedly connected with of guide roll, spout two has been seted up in the outside on chassis, sliding connection has the slider in the spout two, the backup pad rotates with the slider to be connected.
The invention also provides a working method of the placing structure for urban rainwater and sewage pipe network construction, which comprises the following steps:
the method comprises the following steps: firstly, placing the chassis arranged on the two sides of an excavated ditch, moving the supporting plate to a set position by moving the sliding block, rotating the supporting plate to deflect, starting the first motor, and driving the first transverse plate to rotate by the first motor until the pipeline clamping direction of the clamping claw is consistent with the pipeline conveying direction of the supporting plate;
step two: an operator places one end of a pipeline between two conveyor belts and starts the conveyor belts, the conveyor belts drive the buffer suckers to move, and then the pipeline is driven to move, until the pipeline passes between two clamping jaws and the central position of the pipeline is located at the position where the clamping jaws grab, a first electric push rod or a second electric push rod which is correspondingly arranged is started, and then the two clamping jaws deflect, and then the buffer plate stably clamps the pipeline, a first motor is started again, and then the clamping jaws drive the pipeline to deflect until the pipeline deflects to the angle that the ditch is placed to the pipeline.
Step three: and starting the electric push rod V, driving the transverse plate II and the pipeline at the bottom of the transverse plate II to descend by the electric push rod V until the pipeline descends to the bottom of the inner wall of the ditch, then starting the electric push rod I or the electric push rod II, further driving the sliding cylinder to move upwards and driving the clamping jaw to deflect through the connecting rod until the clamping jaw releases the clamping on the pipeline, and further realizing accurate placement of the pipeline.
Compared with the prior art, the invention has the beneficial effects that:
1. when the invention is used, the clamping claw clamps the pipeline through the buffer plate connected with the compression spring, the electric push rod five drives the transverse plate II and the pipeline below the transverse plate II to move downwards until the pipeline is close to the bottom of the foundation pit, then the motor I is started, the transverse plate drives the transverse plate II and the pipeline arranged at the bottom of the transverse plate II to deflect until the pipeline deflects to a position conforming to the installation angle, then the electric push rod IV drives the sliding plate to slide, further drives the pipeline clamped below the lifting device to further adjust the position of the pipeline in the foundation pit, realizes pipeline lifting by the mutual matching of the motor I and the electric push rod IV and by the invention without using a rope, thereby leading the pipeline to be accurately, quickly and stably placed to the appointed position in the foundation pit, avoiding the problem of shaking of the pipeline in the hoisting process, and the problem that the pipeline direction needs to be adjusted by pushing the pipeline by an operator in a hand, which wastes time and labor is solved.
2. When the device is used, the plurality of clamping claws are arranged at the bottoms of the first moving plate and the second moving plate, the correspondingly arranged clamping claws are respectively controlled by the correspondingly arranged electric push rods I or the correspondingly arranged electric push rods II, and if the electric push rods I and the electric push rods II are started simultaneously or sequentially, the device can simultaneously clamp four pipelines and carry out pairwise butt joint, so that the butt joint efficiency and the butt joint quantity of the device on the pipelines are further improved, and the problems of low butt joint efficiency and poor effect caused by the fact that only one pipeline can be hoisted once by the conventional device and the pipeline can be accurately butted by simultaneously using two machines and matching with a plurality of workers to further finely adjust the pipelines are solved;
3. rotating the supporting plate, driving the first transverse plate to deflect by the first motor, enabling the conveying direction of the conveying belt and the clamping direction of the clamping claws to be on the same axis, starting the conveying belt, lifting the pipeline by an operator, putting one end of the pipeline on the outer side of the guide roller in the supporting arm, pushing the pipeline again, enabling one end of the pipeline to be in contact with a buffer sucker arranged on the outer side of the conveying belt, driving the pipeline to move under the driving of the conveying belt after the buffer sucker is in contact with the pipeline, putting one end of the pipeline on the conveying belt on the other side after passing through the clamping claws, continuing to move, closing the conveying belt when the middle part of the pipeline is in the clamping position of the clamping claws, clamping the pipeline by the clamping claws, adjusting the pipeline direction and completing the lowering under the driving of the first motor, therefore, the pipeline can be quickly conveyed, and the problem that the existing device wastes time and labor when the pipelines are bound by using ropes one by one before being hoisted is solved;
4. according to the invention, the additional claws are fixedly connected to the other side of the clamping claw, the insertion grooves are formed in the outer sides of the additional claws, and the electric push rod I and the electric push rod II are started, so that the correspondingly arranged clamping claws deflect until the two adjacent additional claws approach to each other and are inserted into the corresponding insertion grooves, thereby further shortening the distance between the two adjacent additional claws and stably clamping a pipeline with a thinner caliber.
Drawings
In order to facilitate understanding for those skilled in the art, the present invention will be further described with reference to the accompanying drawings;
FIG. 1 is a side view of the overall structure of the present invention;
FIG. 2 is a bottom view of the second cross plate structure of the present invention;
FIG. 3 is a top view of a conveyor belt structure of the present invention;
FIG. 4 is a side view of a support plate structure of the present invention;
FIG. 5 is a schematic view of a gripper of the present invention;
FIG. 6 is a schematic view of an additional jaw configuration of the present invention;
FIG. 7 is an enlarged view of the area A of the present invention;
fig. 8 is a top view of the overall structure of the present invention.
Reference numerals: 1. a frame; 2. a chassis; 3. a first roller; 4. a cross frame; 5. hoisting the assembly; 500. an electric push rod IV; 501. a first motor; 502. a first rotating rod; 503. a first gear; 504. a second gear; 505. a transverse plate II; 506. a connection plate; 507. a slide bar; 508. a second motor; 509. a threaded rod; 510. moving the first plate; 511. moving a second plate; 512. a vertical rod; 513. an electric push rod I; 514. a second electric push rod; 515. a slide cylinder; 516. an additional claw; 517. inserting grooves; 518. a buffer plate; 519. a guide wheel; 520. a slide plate; 521. a gripper jaw; 522. a connecting rod; 523. a fifth electric push rod; 6. a delivery docking assembly; 601. a support plate; 602. an electric push rod III; 603. an equipment rack; 604. a conveyor belt; 605. a bump; 606. a buffer sucker; 607. a support arm; 608. a guide roller; 609. an arc-shaped base plate; 610. and a second sliding chute.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in fig. 1 to 8, the present invention provides a technical solution:
the first embodiment is as follows:
present pipeline need move it to the foundation ditch through the rope in, because the rope takes place to rock easily, can lead to the pipeline that is hoisted together to take place to rock along with the rope in removing the hoist and mount, and then be difficult to put into the foundation ditch with the pipeline accuracy is quick, and after the pipeline was put into the foundation ditch, operating personnel generally all was the hand push pipeline and adjusts the direction and the position that the pipeline was placed, such regulation mode is not only wasted time and energy, and can harm the operating personnel personal safety of hand push pipeline, for solving this problem, concrete operation is as follows:
firstly, the invention moves to a position near an excavated ditch through a first roller 3, two chassis 2 are respectively arranged at two sides of the ditch, a clamping claw 521 clamps a pipeline through a buffer plate 518 connected with a compression spring, an electric push rod five 523 is started, the electric push rod five 523 drives a transverse plate two 505 and the pipeline below the transverse plate two to move downwards until the pipeline is close to the bottom of a foundation pit, a first motor 501 is started, a conveying end of the first motor 501 drives a gear two 504 to rotate, the gear two 504 and the gear one 503 are meshed and rotate, and then a rotating rod one 502 is driven to rotate, the bottom end of the rotating rod one 502 is fixedly connected with the transverse plate one, the transverse plate two 505 is arranged below the transverse plate one, and the transverse plate two 505 and the pipeline arranged at the bottom of the rotating rod two are driven to deflect by rotating the transverse plate one until the pipeline deflects to a position according with an installation angle;
the top of the chassis 2 is fixedly connected with a frame 1, the top of the frame 1 is fixedly connected with a cross frame 4, the output end of an electric push rod IV 500 is fixedly connected with a sliding plate 520, the sliding plate 520 included in the hoisting assembly 5 slides in the cross frame 4, the bottom of the sliding plate 520 is movably connected with a rotating rod I502 through a bearing, the electric push rod IV 500 is started, the electric push rod IV 500 drives the sliding plate 520 to slide, further drives the pipeline clamped below the lifting device to further adjust the placing position in the foundation pit, realizes pipeline lifting through the mutual matching of the first motor 501 and the fourth electric push rod 500 and does not use a rope, thereby leading the pipeline to be accurately, quickly and stably placed to the appointed position in the foundation pit, avoiding the problem of shaking of the pipeline in the hoisting process, and the problem that the pipeline direction needs to be adjusted by pushing the pipeline by an operator with hands, which wastes time and labor is solved.
Example two:
present butt joint mode to two pipelines all generally uses the pipeline of two machines with two butt joints to hoist respectively, many operators jointly promote the pipeline and make its port be in same central line, and because current hoist and mount pipeline utilizes rope hoist and mount, the pipeline takes place to rock easily after unsettled, for avoiding rocking influence pipeline butt joint, and then need the pipeline of holding that many operators are not from at a glance, finish until the port connection of two pipelines, such operation mode is wasted time and energy, seriously influence pipeline installation efficiency, for solving this problem, concrete operation is as follows:
according to the invention, a first moving plate 510 and a second moving plate 511 are arranged below a second transverse plate 505, clamping claws 521 are symmetrically arranged below the first moving plate 510 and the second moving plate 511, the first moving plate 510 and the second moving plate 511 can independently move and are matched with the independently arranged clamping claws 521 to clamp a pipeline to be butted, the bottom of the second transverse plate 505 is fixedly connected with a connecting plate 506, a baffle plate, a sliding rod 507 and a second motor 508, a threaded rod 509 is movably connected between the connecting plate 506 and the baffle plate through a bearing, one end of the threaded rod 509 is fixedly connected with the second motor 508, a first moving plate 510 and a second moving plate 511 are arranged below the connecting plate 506, a first sleeve and a second sleeve are fixedly connected to the outer sides of the first moving plate 510 and the second moving plate 511, the first sleeve is sleeved on the outer sides of the threaded rod 509 and is in threaded connection with the threaded rod 509, the second sleeve is in sliding connection to the outer sides of the sliding rod 507, starting an electric push rod I513 or an electric push rod II 514, wherein the electric push rod I513 pushes a pull rod to further enable a sliding cylinder 515 to slide outside a vertical rod 512, the sliding cylinder 515 pushes a clamping claw 521 to deflect through a connecting rod 522 until a buffer plate 518 inside the clamping claw 521 clamps and clamps the outer wall of a pipeline, and similarly clamps and clamps another pipeline to be butted, a motor II 508 is started, the motor II 508 drives a threaded rod 509 to rotate, so that a moving plate I510, a moving plate II 511 and the clamped pipeline are driven to approach each other until the ports of the two pipelines are contacted with each other, an operator can hermetically connect the ports of the two pipelines, and the moving plate I510 and the moving plate II 511 can avoid the problem that the pipelines shake during butting under the matching of the threaded rod 509 and the sliding rod 507, so that the efficiency of pipeline butting is further improved;
as shown in fig. 2, a plurality of clamping claws 521 are arranged at the bottoms of a first moving plate 510 and a second moving plate 511 of the present invention, and the correspondingly arranged clamping claws 521 are respectively controlled by a first electric push rod 513 or a second electric push rod 514 which are correspondingly arranged, if the first electric push rod 513 and the second electric push rod 514 are simultaneously or sequentially started, the present invention can simultaneously clamp four pipelines and perform two-to-two butt joint, thereby further improving the butt joint efficiency and the butt joint quantity of the present invention to the pipelines, and solving the problems of low butt joint efficiency and poor effect caused by the fact that the present invention can only hoist one pipeline at a time, and when the pipelines are butted, two machines are simultaneously used and the pipelines are further finely adjusted by cooperating with a plurality of workers to realize accurate butt joint;
when a pipeline with a thin diameter is clamped, because the deflection angle of the clamping claw 521 is limited, and the pipeline with the thin diameter cannot be stably hoisted, the additional claw 516 is fixedly connected to the other side of the clamping claw 521, and the insertion groove 517 is formed in the outer side of the additional claw 516, the first electric push rod 513 and the second electric push rod 514 are started firstly, so that the correspondingly arranged clamping claws 521 deflect until the two adjacent additional claws 516 approach each other and are inserted into the corresponding insertion grooves 517, and thus the distance between the two adjacent additional claws 516 is further shortened, and the pipeline with the thin diameter can be stably clamped;
example three:
the existing device can only place a pipeline at a time, and for the convenience of hoisting and placing the pipeline, an operator needs to tie up the pipeline by using a rope one by one, and for solving the problem, the concrete operation is as follows:
the top of a chassis 2 is provided with a second sliding groove 610, a sliding block is connected in the second sliding groove 610 of a conveying butt joint assembly 6 in a sliding manner, a supporting plate 601 is connected with the sliding block in a rotating manner, when the conveying butt joint assembly is specifically arranged, the supporting plate 601 is rotated, a first transverse plate is driven by a first motor 501 to deflect, the conveying direction of a conveying belt 604 and the clamping direction of a clamping claw 521 are on the same axis, the conveying belt 604 is started again, an operator lifts a pipeline, a supporting arm 607 is fixedly connected to the outer side of the supporting plate 601, a plurality of guide rollers 608 are movably connected in the supporting arm 607 through bearings, a plurality of arc-shaped base plates 609 are fixedly connected to the outer side of the guide rollers 608, the operator puts one end of the pipeline on the outer side of the supporting arm 607, pushes the pipeline again, one end of the pipeline is in contact with a buffer sucker 606 arranged on the outer side of the conveying belt 604, the buffer sucker 606 is driven by the conveying belt 604 after being in contact with the pipeline, the pipeline is driven to move until one end of the pipeline passes through the clamping claw 521 and then is lapped on the conveyor belt 604 on the other side to continue moving until the middle of the pipeline is positioned at the position clamped by the clamping claw 521, the conveyor belt 604 is closed, the clamping claw 521 clamps the pipeline, the direction of the pipeline is regulated under the driving of the motor I501, and the pipeline is placed downwards, so that the pipeline is quickly conveyed, and the problem that the pipeline is time-consuming and labor-consuming to tie up one pipeline by one by using ropes before the pipeline is hoisted by the conventional device is solved;
example four:
as shown in fig. 4, an electric push rod three 602 is installed on the outer side of the supporting plate 601, the equipment rack 603 is rotatably connected with the electric push rod three 602 and the supporting plate 601, bumps 605 are fixedly connected to the outer sides of the conveyor belts 604 at equal intervals, buffer suckers 606 are installed in the bumps 605 through compression springs two, the buffer suckers 606 tightly support the conveyed pipelines to prevent the pipelines from shaking, the electric push rod three 602 is started, the symmetrically arranged electric push rods three 602 deflect the equipment rack 603, and then the conveyor belts 604 in the two equipment racks 603 are close to or far away from each other, so that the purpose of effectively conveying the pipelines with any caliber is achieved;
example five:
as shown in fig. 8, the moving distance and the rotation angle of the supporting plate 601 of the present invention can be adjusted at will, so that the conveyor belts 604 in the supporting plates 601 at both sides of the cross frame 4 can clamp and convey two pipes with different calibers successively or simultaneously, thereby further improving the assembly efficiency of the pipes, and the inner side of the buffer plate 518 is provided with a plurality of slotted holes, the slotted holes are movably connected with guide wheels 519 through bearings, when the pipes pass through the clamping claws 521, the guide wheels 519 are matched, thereby avoiding the pipes from scraping the inner wall of the buffer plate 518.
The preferred embodiments of the invention disclosed above are intended to be illustrative only. The preferred embodiments are not intended to be exhaustive or to limit the invention to the precise forms disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and the practical application, to thereby enable others skilled in the art to best utilize the invention. The invention is limited only by the claims and their full scope and equivalents.

Claims (6)

1. The placing structure for the urban rainwater and sewage pipe network construction comprises a frame (1) and is characterized in that a chassis (2) is fixed to the bottom end of the frame (1) through spot welding, a plurality of rollers I (3) are arranged at the bottom of the chassis (2), a cross frame (4) is fixedly connected to the top of the frame (1), a hoisting assembly (5) is installed at the bottom of the cross frame (4), a conveying butt joint assembly (6) is installed on the outer side of the chassis (2), the hoisting assembly (5) comprises an electric push rod IV (500), the electric push rod IV (500) is fixedly connected to the inside of the cross frame (4), a first sliding groove is formed in the bottom of the cross frame (4), a sliding plate (520) is connected to the first sliding groove in a sliding mode, a first motor (501) is fixed to the bottom of the sliding plate (520), a first rotating rod (502) is movably connected to the bottom of the sliding plate (520) through a bearing, a first gear (503) is fixedly sleeved on the outer side of the first rotating rod (502), a second gear (504) is fixedly arranged at the output end of the first motor (501) through spot welding, the first gear (503) is meshed with the second gear (504), a first transverse plate is fixedly connected to the bottom of the first rotating rod (502), a fifth electric push rod (523) is fixedly connected to the bottom of the first transverse plate, a second transverse plate (505) is fixedly connected to the bottom of the fifth electric push rod (523), and a connecting plate (506), a baffle, a sliding rod (507) and a second motor (508) are fixedly connected to the bottom of the second transverse plate (505);
there are threaded rod (509) through bearing swing joint between linkage plate (506) and the baffle, the one end and motor two (508) fixed connection of threaded rod (509), the below of linkage plate (506) is provided with moves board one (510) and moves board two (511), move board one (510) and move outside fixedly connected with sleeve one and sleeve two of board two (511), the sleeve is one set and is established in the outside of threaded rod (509), and sleeve one and threaded connection of threaded rod (509), two sliding connection in the outside of slide bar (507), move board one (510) and move the equal fixedly connected with in bottom of board two (511) a plurality of montants (512), electric putter one (513) and electric putter two (514), the bottom rotation of montant (512) is connected with clamping jaw (521).
2. The placing structure for the urban rainwater and sewage pipe network construction according to claim 1, wherein a sliding cylinder (515) is sleeved on the outer side of the vertical rod (512), a connecting rod (522) is rotatably connected to the outer side of the sliding cylinder (515), one end, far away from the sliding cylinder (515), of the connecting rod (522) is rotatably connected with a clamping claw (521), a pull rod is fixedly connected between the adjacent sliding cylinders (515), and the pull rod is fixedly connected with a first electric push rod (513) and a second electric push rod (514) which are correspondingly arranged.
3. The placing structure for the urban rainwater and sewage pipe network construction according to claim 1, wherein an additional claw (516) is fixedly connected to one side of the clamping claw (521), an inserting groove (517) is formed in the outer side of the additional claw (516) at an equal angle, a buffer plate (518) is connected to the inner side of the clamping claw (521) through a compression spring, a plurality of slotted holes are formed in the inner side of the buffer plate (518), and a guide wheel (519) is movably connected to the inside of each slotted hole through a bearing.
4. The placing structure for the urban rainwater and sewage pipe network construction according to claim 1, wherein the conveying and docking assembly (6) comprises a supporting plate (601), a third electric push rod (602), an equipment frame (603), a conveyor belt (604), a bump (605), a buffer suction cup (606), a supporting arm (607), a guide roller (608), an arc-shaped backing plate (609) and a second sliding groove (610), wherein a second roller is installed at the bottom of the supporting plate (601), the third electric push rod (602) is fixedly connected to the outer side of the supporting plate (601), the equipment frame (603) is installed at the top of the supporting plate (601), a plurality of first supports and second supports are respectively and fixedly connected to the outer sides of the supporting plate (601) and the equipment frame (603), the first supports and the second supports are rotatably connected, and the output end of the third electric push rod (602) is rotatably connected to the equipment frame (603), install conveyer belt (604) in equipment rack (603), the equidistance fixedly connected with lug (605) in the outside of conveyer belt (604), the through-hole has been seted up in the outside of lug (605), and is connected with buffer suction cup (606) through compression spring two in the through-hole.
5. The placing structure for the urban rainwater and sewage pipe network construction according to claim 4, wherein the outer sides of the equipment racks (603) are symmetrically fixed with supporting arms (607), one side of the supporting arms (607) adjacent is movably connected with a plurality of guide rollers (608) through bearings, the outer sides of the guide rollers (608) are fixedly connected with a plurality of arc-shaped backing plates (609), the outer side of the chassis (2) is provided with a second sliding groove (610), the second sliding groove (610) is connected with a sliding block in a sliding manner, and the supporting plate (601) is rotatably connected with the sliding block.
6. An operating method of a placing structure for urban storm sewage pipe network construction according to claims 1-5, characterized by comprising the following steps:
the method comprises the following steps: firstly, placing a chassis (2) arranged on two sides of an excavated ditch, moving a sliding block to enable a supporting plate (601) to move to a set position, rotating the supporting plate (601) to enable the supporting plate to deflect, starting a first motor (501), and driving a first transverse plate to rotate by the first motor (501) until the pipeline clamping direction of a clamping claw (521) is consistent with the pipeline conveying direction of the supporting plate (601);
step two: an operator places one end of a pipeline between two conveyer belts (604) and starts conveyer belt (604), conveyer belt (604) drive buffer suction cup (606) and move, and then drive the pipeline and move, the central point that makes the pipeline passes between two gripper jaws (521) and is located the position that gripper jaw (521) snatched until the pipeline, start corresponding electric putter one (513) or electric putter two (514) that set up, and then make two gripper jaws (521) take place to deflect, and then make buffer plate (518) stabilize the centre gripping to the pipeline, start motor one (501) once more, and then make gripper jaw (521) drive the pipeline and deflect until the angle that the ditch was transferred to the pipeline of being convenient for.
Step three: and starting the electric push rod five (523), wherein the electric push rod five (523) drives the transverse plate two (505) and the pipeline at the bottom of the transverse plate two (505) to descend until the pipeline descends to the bottom of the inner wall of the ditch, and then starting the electric push rod one (513) or the electric push rod two (514), so that the sliding cylinder (515) is driven to move upwards and drive the clamping claws (521) to deflect through the connecting rods (522) until the clamping claws (521) release the clamping on the pipeline, and the accurate placement of the pipeline is realized.
CN202210783656.XA 2022-07-05 2022-07-05 Urban rainwater sewage pipe network construction is with placing structure Active CN115111432B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210783656.XA CN115111432B (en) 2022-07-05 2022-07-05 Urban rainwater sewage pipe network construction is with placing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210783656.XA CN115111432B (en) 2022-07-05 2022-07-05 Urban rainwater sewage pipe network construction is with placing structure

Publications (2)

Publication Number Publication Date
CN115111432A true CN115111432A (en) 2022-09-27
CN115111432B CN115111432B (en) 2023-08-08

Family

ID=83333069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210783656.XA Active CN115111432B (en) 2022-07-05 2022-07-05 Urban rainwater sewage pipe network construction is with placing structure

Country Status (1)

Country Link
CN (1) CN115111432B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117091006A (en) * 2023-10-18 2023-11-21 冠诚建设集团有限公司 Industrial pipeline installation connecting device

Citations (33)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB189612139A (en) * 1896-06-03 1897-05-15 Adolf Bleichert Improvements in and connected with Gripping Devices for Suspended Cable or Rope Railways.
US3747357A (en) * 1972-03-20 1973-07-24 R Erickson Vehicle for underground installation of flexible utility lines and the like
US4039087A (en) * 1976-11-17 1977-08-02 Sandvick Robert M Sen Pipe laying apparatus
RU2018760C1 (en) * 1991-06-28 1994-08-30 Институт проблем транспорта энергоресурсов Device for withdrawal of pipe line from ground
NO20002065D0 (en) * 2000-04-18 2000-04-18 Kongsberg Offshore As Connection tools and methods for connecting pipelines
KR100954499B1 (en) * 2009-03-27 2010-04-22 나남열 The device connection of smart hock to transfer concrete-pipe
GB201222992D0 (en) * 2012-12-20 2013-01-30 Balfour Beatty Plc Method and apparatus for the installation of cables or pipes in tunnels
WO2016037214A1 (en) * 2014-09-12 2016-03-17 Parry Russell John Improved pipe joining device
CN110421332A (en) * 2019-08-08 2019-11-08 简辽 Steel pipe butt-jointing device of the jacking construction with safeguard structure
CN210286436U (en) * 2019-06-03 2020-04-10 杭州江润科技有限公司 Rain sewage pipe hoist and mount system that slides
CN111456195A (en) * 2020-04-15 2020-07-28 广东景源建设工程有限公司 Municipal road sewer pipeline construction equipment and method
CN211288989U (en) * 2019-10-22 2020-08-18 梁顺利 Pipeline connecting device for hydraulic engineering
CN111620258A (en) * 2020-06-03 2020-09-04 梁国莉 A pipe laying fixing device for hydraulic and hydroelectric engineering
MA47523A (en) * 2019-03-29 2020-09-30 Citic Dicastal Co Ltd WHEEL HUB POSITIONING DEVICE
CN211920659U (en) * 2020-02-29 2020-11-13 松辽水利水电开发有限责任公司 Water conservancy construction pipe laying assistor
CN212334503U (en) * 2020-05-01 2021-01-12 邵卫国 Support frame for water conservancy and hydropower construction
CN212559212U (en) * 2020-04-26 2021-02-19 陈文兵 Pipeline placer is used in city construction
CN213037267U (en) * 2020-07-10 2021-04-23 沈永相 Pipeline hoisting device
CN213299058U (en) * 2020-09-27 2021-05-28 武汉超临界设备工程有限公司 Auxiliary device is measured in insulating pipeline construction
CN113233323A (en) * 2021-06-08 2021-08-10 江苏溧阳晶鑫建设有限公司 Civil construction pipeline laying device with spacing regulatory function
CN213929691U (en) * 2020-10-18 2021-08-10 天津科安佳消防工程有限公司 Fire engineering is with construction hoisting device
CN113307181A (en) * 2021-06-25 2021-08-27 温州市正龙市政建设有限公司 Municipal administration rain sewage pipeline laying device
CN214305574U (en) * 2021-01-21 2021-09-28 安徽建开建设工程有限公司 Highway pipeline laying device
CN214368158U (en) * 2021-01-04 2021-10-08 河南江堰水利水电工程有限公司 Pipe burying device for hydraulic and hydroelectric engineering
CN215048045U (en) * 2020-12-08 2021-12-07 上海程识市政交通工程有限公司 Crane for road construction
WO2021253198A1 (en) * 2020-06-15 2021-12-23 南京江东实业总公司清江公司 Clamping and placing device for liquid crystal television screen
CN215402613U (en) * 2021-07-30 2022-01-04 梁新荣 Hoisting mechanism used during pipeline construction
CN113979319A (en) * 2021-11-18 2022-01-28 吴疆 Municipal administration heating pipe network lays installing the system
CN215854723U (en) * 2021-08-12 2022-02-18 上海宏炫密封科技有限公司 Hydraulic petroleum pipeline hoisting, carrying and installing equipment
US20220128172A1 (en) * 2020-10-27 2022-04-28 Benchmark Harris System and method for protection of under-slab utilities from changes in soil volume
CN216715395U (en) * 2021-12-02 2022-06-10 李一明 A supplementary low tube equipment for hydraulic engineering
CN114604747A (en) * 2022-03-11 2022-06-10 南京蓝尔图革科技有限公司 Hydraulic engineering pipeline hoist device
CN216836909U (en) * 2021-11-04 2022-06-28 天津市纽斯达科技有限公司 Municipal pipeline laying device with distance adjusting function

Patent Citations (33)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB189612139A (en) * 1896-06-03 1897-05-15 Adolf Bleichert Improvements in and connected with Gripping Devices for Suspended Cable or Rope Railways.
US3747357A (en) * 1972-03-20 1973-07-24 R Erickson Vehicle for underground installation of flexible utility lines and the like
US4039087A (en) * 1976-11-17 1977-08-02 Sandvick Robert M Sen Pipe laying apparatus
RU2018760C1 (en) * 1991-06-28 1994-08-30 Институт проблем транспорта энергоресурсов Device for withdrawal of pipe line from ground
NO20002065D0 (en) * 2000-04-18 2000-04-18 Kongsberg Offshore As Connection tools and methods for connecting pipelines
KR100954499B1 (en) * 2009-03-27 2010-04-22 나남열 The device connection of smart hock to transfer concrete-pipe
GB201222992D0 (en) * 2012-12-20 2013-01-30 Balfour Beatty Plc Method and apparatus for the installation of cables or pipes in tunnels
WO2016037214A1 (en) * 2014-09-12 2016-03-17 Parry Russell John Improved pipe joining device
MA47523A (en) * 2019-03-29 2020-09-30 Citic Dicastal Co Ltd WHEEL HUB POSITIONING DEVICE
CN210286436U (en) * 2019-06-03 2020-04-10 杭州江润科技有限公司 Rain sewage pipe hoist and mount system that slides
CN110421332A (en) * 2019-08-08 2019-11-08 简辽 Steel pipe butt-jointing device of the jacking construction with safeguard structure
CN211288989U (en) * 2019-10-22 2020-08-18 梁顺利 Pipeline connecting device for hydraulic engineering
CN211920659U (en) * 2020-02-29 2020-11-13 松辽水利水电开发有限责任公司 Water conservancy construction pipe laying assistor
CN111456195A (en) * 2020-04-15 2020-07-28 广东景源建设工程有限公司 Municipal road sewer pipeline construction equipment and method
CN212559212U (en) * 2020-04-26 2021-02-19 陈文兵 Pipeline placer is used in city construction
CN212334503U (en) * 2020-05-01 2021-01-12 邵卫国 Support frame for water conservancy and hydropower construction
CN111620258A (en) * 2020-06-03 2020-09-04 梁国莉 A pipe laying fixing device for hydraulic and hydroelectric engineering
WO2021253198A1 (en) * 2020-06-15 2021-12-23 南京江东实业总公司清江公司 Clamping and placing device for liquid crystal television screen
CN213037267U (en) * 2020-07-10 2021-04-23 沈永相 Pipeline hoisting device
CN213299058U (en) * 2020-09-27 2021-05-28 武汉超临界设备工程有限公司 Auxiliary device is measured in insulating pipeline construction
CN213929691U (en) * 2020-10-18 2021-08-10 天津科安佳消防工程有限公司 Fire engineering is with construction hoisting device
US20220128172A1 (en) * 2020-10-27 2022-04-28 Benchmark Harris System and method for protection of under-slab utilities from changes in soil volume
CN215048045U (en) * 2020-12-08 2021-12-07 上海程识市政交通工程有限公司 Crane for road construction
CN214368158U (en) * 2021-01-04 2021-10-08 河南江堰水利水电工程有限公司 Pipe burying device for hydraulic and hydroelectric engineering
CN214305574U (en) * 2021-01-21 2021-09-28 安徽建开建设工程有限公司 Highway pipeline laying device
CN113233323A (en) * 2021-06-08 2021-08-10 江苏溧阳晶鑫建设有限公司 Civil construction pipeline laying device with spacing regulatory function
CN113307181A (en) * 2021-06-25 2021-08-27 温州市正龙市政建设有限公司 Municipal administration rain sewage pipeline laying device
CN215402613U (en) * 2021-07-30 2022-01-04 梁新荣 Hoisting mechanism used during pipeline construction
CN215854723U (en) * 2021-08-12 2022-02-18 上海宏炫密封科技有限公司 Hydraulic petroleum pipeline hoisting, carrying and installing equipment
CN216836909U (en) * 2021-11-04 2022-06-28 天津市纽斯达科技有限公司 Municipal pipeline laying device with distance adjusting function
CN113979319A (en) * 2021-11-18 2022-01-28 吴疆 Municipal administration heating pipe network lays installing the system
CN216715395U (en) * 2021-12-02 2022-06-10 李一明 A supplementary low tube equipment for hydraulic engineering
CN114604747A (en) * 2022-03-11 2022-06-10 南京蓝尔图革科技有限公司 Hydraulic engineering pipeline hoist device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117091006A (en) * 2023-10-18 2023-11-21 冠诚建设集团有限公司 Industrial pipeline installation connecting device
CN117091006B (en) * 2023-10-18 2024-01-16 冠诚建设集团有限公司 Industrial pipeline installation connecting device

Also Published As

Publication number Publication date
CN115111432B (en) 2023-08-08

Similar Documents

Publication Publication Date Title
CN105947613B (en) A kind of automatic turnover machine
CN109873209A (en) A kind of rectangular aluminum hull lithium battery electric core enters casing equipment
CN115111432A (en) Urban rainwater sewage pipe network construction is with placing structure
CN109184593B (en) Multi-purpose catwalk
WO2022033401A1 (en) Pipe tool transferring system and conveying method
CN106672878B (en) Automatic refrigerant filling machine
CN205892171U (en) Trigger on brick die
CN115234706A (en) Pipeline laying equipment for pipeline reconstruction construction and method thereof
CN106703718A (en) Sucker rod running and pulling device and sucker rod running and pulling system
CN213006635U (en) Rubber tube connects interfacing apparatus
CN212599803U (en) Welded pipe conveying device
CN111439416B (en) Angle steel collecting system and collecting method thereof
CN109941888B (en) Stopper rod transfer device
CN111472697B (en) Automatic operation device for small workover
CN106946031A (en) A kind of end plate automatic charging device
CN108706026B (en) Brick transporting device for building construction
CN206886176U (en) A kind of end plate automatic charging device
CN216945167U (en) Two clamping jaw pipeline centre gripping conveying mechanism
CN207858057U (en) A kind of automatic soldering device of battery automatic laser welding machine
CN206158776U (en) Great mining height hydraulic support intelligence erection equipment
JPH07317995A (en) Mounting/demounting method for valve cap of gas container and device therefor
CN114592810A (en) Be used for integrated intelligent device of coal prospecting drill loading and unloading drilling rod in pit
CN212682886U (en) Automatic feeding system for longitudinal steel bars
CN116122752A (en) Automatic change drilling rod discharging equipment
CN209850912U (en) Robot automatic grabbing waiting device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant