CN115045493A - An all-steel attached lifting scaffold - Google Patents
An all-steel attached lifting scaffold Download PDFInfo
- Publication number
- CN115045493A CN115045493A CN202210701327.6A CN202210701327A CN115045493A CN 115045493 A CN115045493 A CN 115045493A CN 202210701327 A CN202210701327 A CN 202210701327A CN 115045493 A CN115045493 A CN 115045493A
- Authority
- CN
- China
- Prior art keywords
- scaffold
- wall
- fixedly connected
- frame
- attached lifting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
- E04G3/32—Hoisting devices; Safety devices
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
- E04G3/32—Hoisting devices; Safety devices
- E04G3/325—Safety devices for stabilising the mobile platform, e.g. to avoid it swinging in the wind
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
- E04G5/046—Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/14—Railings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G2003/286—Mobile scaffolds; Scaffolds with mobile platforms mobile vertically
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G2005/008—Hoisting devices specially adapted as part of a scaffold system
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/14—Railings
- E04G2005/148—Railings latticed or netted
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Movable Scaffolding (AREA)
- Road Paving Structures (AREA)
Abstract
本发明公开了一种全钢附着式升降脚手架,包括脚手架主体、货梯、附墙导座和附墙挂座,所述脚手架主体包括两个主框架和设置在两个主框架之间的三个副框架,所述货梯位于两个脚手架主体之间,本发明涉及脚手架技术领域。该全钢附着式升降脚手架,在两组脚手架之间设置货梯的时候,两组脚手架的拼接处,采用防护装置,在吊起的过程中,如果出现掉落的情况,活动板与连接杆之间的配合,可以起到防坠落的效果,提高整体的安全性,附墙导座基座选用厚度12、10、6mm钢板预制底板、前板、左右侧板及上下盖板,通过优化组合,采用榫卯方式拼装并焊接为一体,使得生产过程中制作误差降至最底,且结构强度比传统组装拼焊更加稳定牢固。
The invention discloses an all-steel attachment type lifting scaffold, which comprises a scaffold body, a freight elevator, a wall-attached guide seat and a wall-attached hanging seat. The scaffold body includes two main frames and three main frames arranged between the two main frames. A subframe is provided, wherein the freight elevator is located between two scaffolding bodies, and the invention relates to the technical field of scaffolding. The all-steel attached lifting scaffold, when a freight elevator is installed between the two sets of scaffolds, the splicing of the two sets of scaffolds adopts a protective device. During the lifting process, if there is a falling situation, the movable plate and the connecting rod The cooperation between them can prevent falling and improve the overall safety. The base of the wall-mounted guide base is made of prefabricated bottom plates, front plates, left and right side plates and upper and lower cover plates with thickness of 12, 10, 6mm. The tenon-and-mortise method is used to assemble and weld as a whole, so that the manufacturing error in the production process is minimized, and the structural strength is more stable and firm than traditional assembly and welding.
Description
技术领域technical field
本发明涉及脚手架技术领域,具体为一种全钢附着式升降脚手架。The invention relates to the technical field of scaffolding, in particular to an all-steel attachment type lifting scaffold.
背景技术Background technique
脚手架是施工现场为工人操作并解决垂直和水平运输而搭设的一种临时性的建筑工具,其主要用在外墙、内部装修或层高较高无法直接施工的地方,主要为了施工人员上下干活或外围安全网维护及高空安装构件等,它的制作材料通常有竹、木、钢管或合成材料等,早期的附着升降脚手架采用定型竖向框架、水平支承桁架与钢管扣件在现场组装为架体,附着支座安装在墙面上,电动葫芦上钩悬挂在附着支座上,下钩吊拉架体,电动葫芦通电提升架体,因其构造简单、使用方便,在建筑施工行业得到推广和应用。Scaffolding is a temporary construction tool set up on the construction site for workers to operate and solve vertical and horizontal transportation. It is mainly used in exterior walls, interior decoration or places with high storey height that cannot be directly constructed. It is mainly for construction personnel to work up and down. Or peripheral safety net maintenance and high-altitude installation components, etc., its production materials are usually bamboo, wood, steel pipe or synthetic materials, etc. The early attached lifting scaffolds used stereotyped vertical frames, horizontal support trusses and steel pipe fasteners to be assembled on site. body, the attachment support is installed on the wall, the upper hook of the electric hoist is suspended on the attachment support, the lower hook hangs the frame body, and the electric hoist lifts the frame body with electricity. Because of its simple structure and convenient use, it has been popularized and applied in the construction industry. .
一般脚手架在使用的过程中,楼层逐渐增高的情况下,都会使用到货梯,需要架设货梯的部位,那一部位的脚手架就需要拆除,脚手架都是拼装而成,拆除时直接将一整块脚手架利用吊机向上吊起即可,在吊起的过程中,可能会发生中途脱落的情况,这样的方式存在一定的危险性,而且早期的附着升降脚手架逐渐暴露出如下问题:Generally, during the use of scaffolding, when the floor gradually increases, freight elevators will be used. The part where the freight elevator needs to be erected needs to be dismantled. The scaffolding is all assembled. The crane can be used to hoist upwards. During the hoisting process, it may fall off in the middle. This method has certain dangers, and the early attached lifting scaffolds gradually exposed the following problems:
(1)采用钢管扣件搭设的架体,质量、强度受钢管、扣件质量影响较大;(1) The quality and strength of the frame built with steel pipe fasteners are greatly affected by the quality of steel pipes and fasteners;
(2)架体定型构件非标规格多,不便制造、施工组织;(2) There are many non-standard specifications of the frame body shaping components, which is inconvenient for manufacturing and construction organization;
(3)架体强度受到塔吊、施工电梯、卸料平台等施工装备的影响较大;(3) The strength of the frame body is greatly affected by construction equipment such as tower cranes, construction elevators, and unloading platforms;
(4)采用的竹、木脚手板易燃、易损坏,围护立面的密目安全网防护能力差,安全隐患较大。(4) The bamboo and wooden scaffolding boards used are flammable and easily damaged, and the dense mesh safety net on the enclosure facade has poor protection ability and great potential safety hazards.
发明内容SUMMARY OF THE INVENTION
针对现有技术的不足,本发明提供了一种全钢附着式升降脚手架,解决了安装货梯需要拆除部分脚手架时,存在一定的危险性,质量、强度受钢管、扣件质量影响较大,不便制造、施工组织的问题。Aiming at the deficiencies of the prior art, the present invention provides an all-steel attachment type lifting scaffold, which solves the danger of removing part of the scaffold when installing a freight elevator. The quality and strength are greatly affected by the quality of steel pipes and fasteners, which is inconvenient. Manufacturing and construction organization issues.
为实现以上目的,本发明通过以下技术方案予以实现:一种全钢附着式升降脚手架,包括脚手架主体、货梯、附墙导座和附墙挂座,所述脚手架主体包括两个主框架和设置在两个主框架之间的三个副框架,所述货梯位于两个脚手架主体之间,两个所述脚手架主体相邻的两个主框架的背面分别固定连接有外框和外壳,所述外壳的一侧设置有连接板,并且连接板的底部转动连接有活动板,并且外框内壁的前后之间固定连接有连接杆,所述活动板的底部与连接杆表面的顶部相接触。In order to achieve the above purpose, the present invention is achieved through the following technical solutions: an all-steel attached lifting scaffold, comprising a scaffold body, a freight elevator, a wall-attached guide seat and a wall-attached hanging seat, and the scaffold body includes two main frames and a set of There are three sub-frames between two main frames, the freight elevator is located between two scaffold bodies, and the backs of the two adjacent main frames of the two scaffold bodies are fixedly connected with an outer frame and a shell, respectively. One side of the shell is provided with a connecting plate, and the bottom of the connecting plate is rotatably connected with a movable plate, and a connecting rod is fixedly connected between the front and rear of the inner wall of the outer frame, and the bottom of the movable plate is in contact with the top of the surface of the connecting rod.
优选的,所述外壳内壁两侧之间的前后均固定连接有滑杆,并且滑杆的表面滑动连接有滑板,所述滑板的一侧与连接板的一侧固定连接,所述滑板的顶部固定连接有推杆,所述推杆的顶端贯穿外壳并延伸至外壳的顶部,所述外壳的顶部开设有与推杆相适配的滑槽,所述连接板一侧的内部固定连接有弹簧,并且弹簧的底端与活动板的顶部固定连接。Preferably, a sliding bar is fixedly connected to the front and rear between the two sides of the inner wall of the housing, and a sliding plate is slidably connected to the surface of the sliding bar, one side of the sliding plate is fixedly connected to one side of the connecting plate, and the top of the sliding plate is fixedly connected to the side of the connecting plate. A push rod is fixedly connected, the top of the push rod penetrates the casing and extends to the top of the casing, the top of the casing is provided with a chute adapted to the push rod, and a spring is fixedly connected to the inside of one side of the connecting plate , and the bottom end of the spring is fixedly connected with the top of the movable plate.
优选的,所述主框架和副框架的内部均固定连接有Z型撑,并且主框架和副框架上的Z型撑之间连接有脚手板,所述主框架与副框架之间、两个副框架之间的正面均连接有防护网片,所述主框架与副框架之间、两个副框架之间且位于及脚手板的下方连接有水平桁架。Preferably, Z-shaped braces are fixedly connected to the inside of the main frame and the sub-frame, and a scaffold board is connected between the Z-shaped braces on the main frame and the sub-frame, and between the main frame and the sub-frame, two The fronts between the sub-frames are all connected with protective mesh sheets, and a horizontal truss is connected between the main frame and the sub-frames, between the two sub-frames and below the scaffolding board.
优选的,所述副框架背面的中部且位于脚手板的背面连接有隔离翻板,所述副框架背面的底部且位于脚手板的背面连接有底部翻板。Preferably, an isolation flap is connected to the middle of the back of the sub-frame and located on the back of the scaffolding board, and a bottom flap is connected to the bottom of the back of the sub-frame and located on the back of the scaffolding board.
优选的,两个所述主框架两侧的顶部与底部均连接有挂架,并且两个挂架之间设置有电葫芦。Preferably, hangers are connected to the top and bottom of both sides of the two main frames, and an electric hoist is arranged between the two hangers.
优选的,两个所述主框架的背面均连接有导轨,并且导轨内壁的两侧之间固定连接有横杆,所述导轨背面的顶部连接有上拉座板,并且上拉座板的内部转动连接有调节拉杆,所述调节拉杆的底部转动连接有下拉座板。Preferably, the backs of the two main frames are connected with guide rails, and the two sides of the inner walls of the guide rails are fixedly connected with cross bars, the top of the back of the guide rails is connected with a pull-up seat plate, and the inner part of the pull-up seat plate is connected An adjustment pull rod is rotatably connected, and the bottom of the adjustment pull rod is rotatably connected with a pull-down seat plate.
优选的,所述附墙导座包括基座,所述基座一侧内壁的前后均转动连接有导轮组,所述导轮组与导轨的一侧滑动连接。Preferably, the wall-attaching guide seat includes a base, and a guide wheel group is rotatably connected to the front and rear of the inner wall of one side of the base, and the guide wheel group is slidably connected to one side of the guide rail.
优选的,所述基座的顶部转动连接有正牙长杆,并且正牙长杆的内部螺纹连接有与正反牙调节螺栓,所述正反牙调节螺栓表面的顶部螺纹连接有反牙短杆。Preferably, the top of the base is rotatably connected with a long orthodontic rod, and the internal thread of the long orthodontic rod is connected with a positive and negative tooth adjusting bolt, and the top of the surface of the positive and negative teeth adjusting bolt is threadedly connected with a negative tooth short rod.
优选的,所述基座的内部设置有连接块,所述连接块的内部转动连接有防坠块,并且防坠块的前方固定连接有活动摆件。Preferably, a connecting block is arranged inside the base, an anti-falling block is rotatably connected to the inside of the connecting block, and a movable pendant is fixedly connected to the front of the anti-falling block.
有益效果beneficial effect
本发明提供了一种全钢附着式升降脚手架。与现有技术相比具备以下有益效果:The invention provides an all-steel attachment type lifting scaffold. Compared with the prior art, it has the following beneficial effects:
(1)、该全钢附着式升降脚手架,通过外壳的一侧设置有连接板,并且连接板的底部转动连接有活动板,并且外框内壁的前后之间固定连接有连接杆,活动板的底部与连接杆表面的顶部相接触,外壳内壁两侧之间的前后均固定连接有滑杆,并且滑杆的表面滑动连接有滑板,滑板的一侧与连接板的一侧固定连接,滑板的顶部固定连接有推杆,推杆的顶端贯穿外壳并延伸至外壳的顶部,外壳的顶部开设有与推杆相适配的滑槽,连接板一侧的内部固定连接有弹簧,并且弹簧的底端与活动板的顶部固定连接,在两组脚手架之间设置货梯的时候,两组脚手架的拼接处,采用防护装置,在吊起的过程中,如果出现掉落的情况,活动板与连接杆之间的配合,可以起到防坠落的效果,提高整体的安全性。(1) The all-steel attached lifting scaffold is provided with a connecting plate through one side of the outer casing, and the bottom of the connecting plate is rotatably connected with a movable plate, and a connecting rod is fixedly connected between the front and rear of the inner wall of the outer frame. The bottom is in contact with the top of the surface of the connecting rod, the front and rear between the two sides of the inner wall of the casing are fixedly connected with a sliding rod, and the surface of the sliding rod is slidably connected with a sliding plate, one side of the sliding plate is fixedly connected with one side of the connecting plate, and the The top is fixedly connected with a push rod, the top of the push rod penetrates the casing and extends to the top of the casing, the top of the casing is provided with a chute adapted to the push rod, a spring is fixedly connected inside one side of the connecting plate, and the bottom of the spring is The end is fixedly connected to the top of the movable board. When a freight elevator is installed between the two sets of scaffolds, a protective device is used at the splicing of the two sets of scaffolds. During the lifting process, if there is a fall, the movable board and the connecting rod The cooperation between them can play an anti-fall effect and improve the overall safety.
(2)、该全钢附着式升降脚手架,通过附墙导座包括基座,基座一侧内壁的前后均转动连接有导轮组,导轮组与导轨的一侧滑动连接,基座的顶部转动连接有正牙长杆,并且正牙长杆的内部螺纹连接有与正反牙调节螺栓,正反牙调节螺栓表面的顶部螺纹连接有反牙短杆,基座的内部设置有连接块,连接块的内部转动连接有防坠块,并且防坠块的前方固定连接有活动摆件,附墙导座基座选用厚度12、10、6mm钢板预制底板、前板、左右侧板及上下盖板,通过优化组合,采用榫卯方式拼装并焊接为一体,使得生产过程中制作误差降至最底,且结构强度比传统组装拼焊更加稳定牢固。(2) The all-steel attached lifting scaffold includes a base through a wall-attached guide seat, and a guide wheel group is rotatably connected to the front and rear of the inner wall of one side of the base, and the guide wheel group is slidably connected to one side of the guide rail. The top is rotatably connected with an orthodontic long rod, and the inner thread of the orthodontic long rod is connected with an adjustment bolt with positive and negative teeth, the top of the surface of the positive and negative teeth adjustment bolt is threadedly connected with a short rod with negative teeth, and the interior of the base is provided with a connecting block , There is an anti-falling block connected to the inside of the connecting block, and a movable ornament is fixedly connected to the front of the anti-falling block. The base of the wall-mounted guide base is made of prefabricated bottom plate, front plate, left and right side plates and upper and lower covers with a thickness of 12, 10, 6mm. By optimizing the combination, the mortise-and-mortise method is used to assemble and weld the plates together, so that the manufacturing error in the production process is reduced to the bottom, and the structural strength is more stable and firmer than the traditional assembly and welding.
(3)、该全钢附着式升降脚手架,通过两个主框架的背面均连接有导轨,并且导轨内壁的两侧之间固定连接有横杆,导轨背面的顶部连接有上拉座板,并且上拉座板的内部转动连接有调节拉杆,调节拉杆的底部转动连接有下拉座板,工具式拉结构造分为上、下拉结座板,调节拉杆,上、下拉结座板分别锚固安装于导轨、建筑结构面,上、下拉结座板之间安装可调节拉杆,将主体结构与架体形成斜拉锚固减小架体悬臂高度。(3) The all-steel attached lifting scaffold is connected with guide rails through the backs of the two main frames, and a cross bar is fixedly connected between the two sides of the inner wall of the guide rails, and the top of the back of the guide rails is connected with a pull-up seat plate, and The inner rotatable connection of the upper pull seat plate is connected with the adjustment pull rod, and the bottom of the adjustment pull rod is rotated and connected with the pull down seat plate. An adjustable pull rod is installed between the guide rail, the building structure surface, and the upper and lower knot base plates, and the main structure and the frame body are formed by oblique anchorage to reduce the cantilever height of the frame body.
(4)、该全钢附着式升降脚手架,通过主框架和副框架的内部均固定连接有Z型撑,并且主框架和副框架上的Z型撑之间连接有脚手板,主框架与副框架之间、两个副框架之间的正面均连接有防护网片,主框架与副框架之间、两个副框架之间且位于及脚手板的下方连接有水平桁架,脚手架的钢脚手板、水平桁架等纵向构件均与内、外立杆的两侧直接连接,钢脚手板、水平桁架的节长与机位跨度成模数,水平桁架可直接紧靠钢脚手板底安装,水平桁架、立杆、立面防护网片、钢脚手板直接形成牢固的水平桁架系统,节点简单、连接强度高,且脚手板框架中心与竖向主框架、立杆框架中心交汇,框架体系受力合理,节点无附加力矩,安全性能好。(4) The all-steel attached lifting scaffold is fixedly connected with Z-shaped braces through the interior of the main frame and the sub-frame, and a scaffold is connected between the Z-shaped braces on the main frame and the sub-frame, and the main frame and the auxiliary frame are connected. The fronts between the frames and between the two sub-frames are connected with protective meshes. Between the main frame and the sub-frames, between the two sub-frames and below the scaffolding boards are connected horizontal trusses. The steel scaffolding boards of the scaffolding are connected with horizontal trusses. Longitudinal members such as horizontal trusses are directly connected to both sides of the inner and outer vertical rods. The length of the steel scaffolding board and the horizontal truss is a modulus with the span of the stand. The horizontal truss can be installed directly against the bottom of the steel scaffolding board. The horizontal truss , The vertical pole, the facade protective mesh, and the steel scaffolding plate directly form a solid horizontal truss system, with simple nodes and high connection strength, and the center of the scaffolding plate frame intersects with the vertical main frame and the center of the vertical pole frame, and the frame system is reasonably stressed. , the node has no additional torque, and the safety performance is good.
附图说明Description of drawings
图1为本发明结构的主视图;Fig. 1 is the front view of the structure of the present invention;
图2为本发明主框架和副框架结构的立体图;Fig. 2 is the perspective view of main frame and sub-frame structure of the present invention;
图3为本发明主框架和副框架结构的后视图;Fig. 3 is the rear view of main frame and sub-frame structure of the present invention;
图4为本发明主框架结构的侧视图;4 is a side view of the main frame structure of the present invention;
图5为本发明附墙导座结构的立体图;5 is a perspective view of the structure of the wall-attached guide seat of the present invention;
图6为本发明附墙挂座结构的立体图;Fig. 6 is the perspective view of the structure of the wall-mounted hanging seat of the present invention;
图7为本发明导轨结构的立体图;7 is a perspective view of the guide rail structure of the present invention;
图8为本发明主框架结构的俯视图;8 is a top view of the main frame structure of the present invention;
图9为本发明外壳和外框结构的剖视图;Fig. 9 is the sectional view of the shell and outer frame structure of the present invention;
图10为本发明图8中A处的局部放大图。FIG. 10 is a partial enlarged view of A in FIG. 8 of the present invention.
图中:1-脚手架主体、101-主框架、102-副框架、103-Z型撑、104-脚手板、105-防护网片、106-水平桁架、107-隔离翻板、108-底部翻板、109-挂架、110-电葫芦、111-导轨、112-横杆、113-上拉座板、114-调节拉杆、115-下拉座板、2-货梯、3-附墙导座、31-基座、32-导轮组、33-正牙长杆、34-正反牙调节螺栓、35-反牙短杆、36-连接块、37-防坠块、38-活动摆件、4-附墙挂座、5-外框、6-外壳、7-连接板、8-活动板、9-连接杆、10-滑杆、11-滑板、12-推杆、13-滑槽、14-弹簧。In the picture: 1-scaffold main body, 101-main frame, 102-subframe, 103-Z bracing, 104-scaffold board, 105-protective mesh, 106-horizontal truss, 107-isolation flap, 108-bottom flap Plate, 109-hanger, 110-electric hoist, 111-rail, 112-crossbar, 113-pull-up seat plate, 114-adjustment rod, 115-drop-down seat plate, 2-freight elevator, 3-wall-attached guide seat, 31-base, 32-guide wheel group, 33-orthodontic long rod, 34-positive and negative teeth adjusting bolt, 35-negative tooth short rod, 36-connecting block, 37-anti-falling block, 38-active ornament, 4 -Attached wall mount, 5-frame, 6-shell, 7-connecting plate, 8-moving plate, 9-connecting rod, 10-slider, 11-slide, 12-push, 13-chute, 14 -spring.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
请参阅图1-10,本发明提供一种技术方案:一种全钢附着式升降脚手架,包括脚手架主体1、货梯2、附墙导座3和附墙挂座4,脚手架主体1包括两个主框架101和设置在两个主框架101之间的三个副框架102,货梯2位于两个脚手架主体1之间,两个脚手架主体1相邻的两个主框架101的背面分别固定连接有外框5和外壳6,外壳6的一侧设置有连接板7,并且连接板7的底部转动连接有活动板8,并且外框5内壁的前后之间固定连接有连接杆9,活动板8的底部与连接杆9表面的顶部相接触。1-10, the present invention provides a technical solution: an all-steel attached lifting scaffold, including a scaffold body 1, a freight elevator 2, a wall-attached
脚手架的钢脚手板104、水平桁架106等纵向构件均与内、外立杆的两侧直接连接,钢脚手板104、水平桁架106的节长与机位跨度成模数,水平桁架106可直接紧靠钢脚手板104底安装,水平桁架106、立杆、立面防护网片105、钢脚手板104直接形成牢固的水平桁架系统,节点简单、连接强度高,且脚手板104框架中心与竖向主框架101、立杆框架中心交汇,框架体系受力合理,节点无附加力矩,安全性能好。Longitudinal members such as
本发明中,外壳6内壁两侧之间的前后均固定连接有滑杆10,并且滑杆10的表面滑动连接有滑板11,滑板11的一侧与连接板7的一侧固定连接,滑板11的顶部固定连接有推杆12,推杆12的顶端贯穿外壳6并延伸至外壳6的顶部,外壳6的顶部开设有与推杆12相适配的滑槽13,连接板7一侧的内部固定连接有弹簧14,并且弹簧14的底端与活动板8的顶部固定连接。In the present invention, a sliding
本发明中,主框架101和副框架102的内部均固定连接有Z型撑103,并且主框架101和副框架102上的Z型撑103之间连接有脚手板104,主框架101与副框架102之间、两个副框架102之间的正面均连接有防护网片105,主框架101与副框架102之间、两个副框架102之间且位于及脚手板104的下方连接有水平桁架106。In the present invention, Z-shaped
本发明中,副框架102背面的中部且位于脚手板104的背面连接有隔离翻板107,副框架102背面的底部且位于脚手板104的背面连接有底部翻板108。In the present invention, an
本发明中,两个主框架101两侧的顶部与底部均连接有挂架109,并且两个挂架109之间设置有电葫芦110,挂架109是附着式升降脚手架升降系统中一重要组成部分,是固定电葫芦110上、下吊点的承重结构组件,普通一般挂架分为上、下二件不同结构体,现考虑其功能一样则将其设置成为通用件,避免上、下及左、右安装方向不同需设置相应构件,从根本上减轻设备仓储管理及生产维修保养工作量。In the present invention,
本发明中,两个主框架101的背面均连接有导轨111,并且导轨111内壁的两侧之间固定连接有横杆112,导轨111背面的顶部连接有上拉座板113,并且上拉座板113的内部转动连接有调节拉杆114,调节拉杆114的底部转动连接有下拉座板115。In the present invention, the backs of the two
顶层附墙导座3安装层结构面利用2件M12膨胀螺栓固定Q235B钢制成的下拉座板115,上方导轨111二防坠梯杆档安装同材质制作的上拉座板113,座板一端压导轨11正面,一端背板压防坠梯杆形成抱箍,上下两座板间安装可以调节长度的拉杆,二端利用M16螺栓与座板紧固,拉杆由50×3方管及正反牙螺栓组成,横向间距不大于6米,转角间距不大于2米。The top-level wall-attached
本发明中,附墙导座3包括基座31,基座31一侧内壁的前后均转动连接有导轮组32,导轮组32与导轨111的一侧滑动连接。In the present invention, the wall-attached
附墙导座3基座31选用厚度12、10、6mm钢板预制底板、前板、左右侧板及上下盖板,通过优化组合,采用榫卯方式拼装并焊接为一体,使得生产过程中制作误差降至最底,且结构强度比传统组装拼焊更加稳定牢固。The
本发明中,基座31的顶部转动连接有正牙长杆33,并且正牙长杆33的内部螺纹连接有与正反牙调节螺栓34,正反牙调节螺栓34表面的顶部螺纹连接有反牙短杆35。In the present invention, the top of the
本发明中,基座31的内部设置有连接块36,连接块36的内部转动连接有防坠块37,并且防坠块37的前方固定连接有活动摆件38。In the present invention, a connecting
同时本说明书中未作详细描述的内容均属于本领域技术人员公知的现有技术。Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.
使用时,当需要将货梯2上方的脚手架主体1移除的时候,吊机将脚手架主体1向上吊起,外壳6向上移动的过程中,活动板8会在连接杆9的阻挡下向下翻转,如果突然下坠,活动板8就会位于连接杆9的上方,防止外壳6继续下降,起到一定的防护效果,当其中一个脚手架主体1快速下降的过程中,其导轨111上的横杆112下降就会带动防坠块37和活动摆件38进行旋转,速度过快的时候防坠块37就会卡在横杆112之间,防止脚手架主体1继续下降。When in use, when the scaffold body 1 above the freight elevator 2 needs to be removed, the crane lifts the scaffold body 1 upward. During the upward movement of the
需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。It should be noted that, in this document, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any relationship between these entities or operations. any such actual relationship or sequence exists. Moreover, the terms "comprising", "comprising" or any other variation thereof are intended to encompass a non-exclusive inclusion such that a process, method, article or device that includes a list of elements includes not only those elements, but also includes not explicitly listed or other elements inherent to such a process, method, article or apparatus.
尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, and substitutions can be made in these embodiments without departing from the principle and spirit of the invention and modifications, the scope of the present invention is defined by the appended claims and their equivalents.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202210701327.6A CN115045493B (en) | 2022-06-21 | 2022-06-21 | A kind of all-steel attached lifting scaffold |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202210701327.6A CN115045493B (en) | 2022-06-21 | 2022-06-21 | A kind of all-steel attached lifting scaffold |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN115045493A true CN115045493A (en) | 2022-09-13 |
| CN115045493B CN115045493B (en) | 2025-05-27 |
Family
ID=83162482
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202210701327.6A Active CN115045493B (en) | 2022-06-21 | 2022-06-21 | A kind of all-steel attached lifting scaffold |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN115045493B (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115788001A (en) * | 2023-02-08 | 2023-03-14 | 山西锦辉工程检测有限公司 | Split lifting type attached scaffold and construction method thereof |
| CN118793256A (en) * | 2024-09-13 | 2024-10-18 | 北京市第三建筑工程有限公司 | Fully rigid attached lifting scaffolding with a lifting and lowering protection platform on the top |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20110137864A (en) * | 2010-06-18 | 2011-12-26 | 양종덕 | Builder lift |
| CN204001655U (en) * | 2014-07-04 | 2014-12-10 | 绵阳德信机械设备租赁有限公司 | Integrated form attached lift scaffold |
| CN212836630U (en) * | 2020-07-16 | 2021-03-30 | 江西金力建筑机械设备有限责任公司 | All-steel integrated operation scaffold |
-
2022
- 2022-06-21 CN CN202210701327.6A patent/CN115045493B/en active Active
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20110137864A (en) * | 2010-06-18 | 2011-12-26 | 양종덕 | Builder lift |
| CN204001655U (en) * | 2014-07-04 | 2014-12-10 | 绵阳德信机械设备租赁有限公司 | Integrated form attached lift scaffold |
| CN212836630U (en) * | 2020-07-16 | 2021-03-30 | 江西金力建筑机械设备有限责任公司 | All-steel integrated operation scaffold |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115788001A (en) * | 2023-02-08 | 2023-03-14 | 山西锦辉工程检测有限公司 | Split lifting type attached scaffold and construction method thereof |
| CN118793256A (en) * | 2024-09-13 | 2024-10-18 | 北京市第三建筑工程有限公司 | Fully rigid attached lifting scaffolding with a lifting and lowering protection platform on the top |
| CN118793256B (en) * | 2024-09-13 | 2024-12-31 | 北京市第三建筑工程有限公司 | Fully rigid attached lifting scaffolding with a lifting and lowering protection platform on the top |
Also Published As
| Publication number | Publication date |
|---|---|
| CN115045493B (en) | 2025-05-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN115045493A (en) | An all-steel attached lifting scaffold | |
| CN214195484U (en) | An all-steel attached lifting scaffold | |
| WO2023240812A1 (en) | Overall construction platform structure and method for adding core tube wall body in air | |
| CN211499713U (en) | All-steel attached lifting scaffold | |
| CN102287045B (en) | Square steel tube lifting outside scaffold | |
| CN207934495U (en) | The box dual-purpose novel compositions ladder cage of combination | |
| CN201502170U (en) | Horizontal supporting device of building external frame | |
| CN206784884U (en) | Curved-surface building climbing device | |
| CN204676865U (en) | A kind of building scaffold | |
| CN211313320U (en) | Roof framework layer adheres to no counter weight ann and tears hanging flower basket suspension mechanism open | |
| CN209568688U (en) | A kind of elevating construction platform | |
| CN206636157U (en) | A steel structure suitable for construction site assembly | |
| CN216476221U (en) | A construction scaffolding fixing mechanism | |
| CN207228591U (en) | A kind of architectural engineering scaffold | |
| CN110552495A (en) | assembled building combined tool type outer protective frame system and construction method thereof | |
| CN112942789B (en) | Water drop type curtain wall construction method | |
| CN117090408A (en) | Attached lifting protection shed and installation and lifting method thereof | |
| CN209855192U (en) | A stereotyped elevator hoistway automatic lifting frame | |
| CN210067397U (en) | Intelligent integrated all-steel attached lifting scaffold | |
| CN107642241A (en) | The stress supporting construction and construction method of a kind of prefabricated balcony | |
| CN114229653A (en) | A construction elevator attaching wall device integrated in the synchronous climbing of lightweight top formwork platform | |
| CN106760464A (en) | Elevator shaft operating platform and its construction method | |
| CN111910905A (en) | A vertical main frame of a lifting operation safety protection platform for high-rise building construction | |
| CN219260750U (en) | A bridge side construction hanging basket | |
| CN206957170U (en) | A kind of scaffold for building being easily installed |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |

