CN115045493A - An all-steel attached lifting scaffold - Google Patents

An all-steel attached lifting scaffold Download PDF

Info

Publication number
CN115045493A
CN115045493A CN202210701327.6A CN202210701327A CN115045493A CN 115045493 A CN115045493 A CN 115045493A CN 202210701327 A CN202210701327 A CN 202210701327A CN 115045493 A CN115045493 A CN 115045493A
Authority
CN
China
Prior art keywords
scaffold
wall
fixedly connected
frame
attached lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210701327.6A
Other languages
Chinese (zh)
Other versions
CN115045493B (en
Inventor
成洋华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Rikai Construction And Installation Engineering Co ltd
Original Assignee
Jiangsu Rikai Construction And Installation Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Rikai Construction And Installation Engineering Co ltd filed Critical Jiangsu Rikai Construction And Installation Engineering Co ltd
Priority to CN202210701327.6A priority Critical patent/CN115045493B/en
Publication of CN115045493A publication Critical patent/CN115045493A/en
Application granted granted Critical
Publication of CN115045493B publication Critical patent/CN115045493B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • E04G3/325Safety devices for stabilising the mobile platform, e.g. to avoid it swinging in the wind
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G2005/008Hoisting devices specially adapted as part of a scaffold system
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • E04G2005/148Railings latticed or netted

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Movable Scaffolding (AREA)
  • Road Paving Structures (AREA)

Abstract

本发明公开了一种全钢附着式升降脚手架,包括脚手架主体、货梯、附墙导座和附墙挂座,所述脚手架主体包括两个主框架和设置在两个主框架之间的三个副框架,所述货梯位于两个脚手架主体之间,本发明涉及脚手架技术领域。该全钢附着式升降脚手架,在两组脚手架之间设置货梯的时候,两组脚手架的拼接处,采用防护装置,在吊起的过程中,如果出现掉落的情况,活动板与连接杆之间的配合,可以起到防坠落的效果,提高整体的安全性,附墙导座基座选用厚度12、10、6mm钢板预制底板、前板、左右侧板及上下盖板,通过优化组合,采用榫卯方式拼装并焊接为一体,使得生产过程中制作误差降至最底,且结构强度比传统组装拼焊更加稳定牢固。

Figure 202210701327

The invention discloses an all-steel attachment type lifting scaffold, which comprises a scaffold body, a freight elevator, a wall-attached guide seat and a wall-attached hanging seat. The scaffold body includes two main frames and three main frames arranged between the two main frames. A subframe is provided, wherein the freight elevator is located between two scaffolding bodies, and the invention relates to the technical field of scaffolding. The all-steel attached lifting scaffold, when a freight elevator is installed between the two sets of scaffolds, the splicing of the two sets of scaffolds adopts a protective device. During the lifting process, if there is a falling situation, the movable plate and the connecting rod The cooperation between them can prevent falling and improve the overall safety. The base of the wall-mounted guide base is made of prefabricated bottom plates, front plates, left and right side plates and upper and lower cover plates with thickness of 12, 10, 6mm. The tenon-and-mortise method is used to assemble and weld as a whole, so that the manufacturing error in the production process is minimized, and the structural strength is more stable and firm than traditional assembly and welding.

Figure 202210701327

Description

一种全钢附着式升降脚手架An all-steel attached lifting scaffold

技术领域technical field

本发明涉及脚手架技术领域,具体为一种全钢附着式升降脚手架。The invention relates to the technical field of scaffolding, in particular to an all-steel attachment type lifting scaffold.

背景技术Background technique

脚手架是施工现场为工人操作并解决垂直和水平运输而搭设的一种临时性的建筑工具,其主要用在外墙、内部装修或层高较高无法直接施工的地方,主要为了施工人员上下干活或外围安全网维护及高空安装构件等,它的制作材料通常有竹、木、钢管或合成材料等,早期的附着升降脚手架采用定型竖向框架、水平支承桁架与钢管扣件在现场组装为架体,附着支座安装在墙面上,电动葫芦上钩悬挂在附着支座上,下钩吊拉架体,电动葫芦通电提升架体,因其构造简单、使用方便,在建筑施工行业得到推广和应用。Scaffolding is a temporary construction tool set up on the construction site for workers to operate and solve vertical and horizontal transportation. It is mainly used in exterior walls, interior decoration or places with high storey height that cannot be directly constructed. It is mainly for construction personnel to work up and down. Or peripheral safety net maintenance and high-altitude installation components, etc., its production materials are usually bamboo, wood, steel pipe or synthetic materials, etc. The early attached lifting scaffolds used stereotyped vertical frames, horizontal support trusses and steel pipe fasteners to be assembled on site. body, the attachment support is installed on the wall, the upper hook of the electric hoist is suspended on the attachment support, the lower hook hangs the frame body, and the electric hoist lifts the frame body with electricity. Because of its simple structure and convenient use, it has been popularized and applied in the construction industry. .

一般脚手架在使用的过程中,楼层逐渐增高的情况下,都会使用到货梯,需要架设货梯的部位,那一部位的脚手架就需要拆除,脚手架都是拼装而成,拆除时直接将一整块脚手架利用吊机向上吊起即可,在吊起的过程中,可能会发生中途脱落的情况,这样的方式存在一定的危险性,而且早期的附着升降脚手架逐渐暴露出如下问题:Generally, during the use of scaffolding, when the floor gradually increases, freight elevators will be used. The part where the freight elevator needs to be erected needs to be dismantled. The scaffolding is all assembled. The crane can be used to hoist upwards. During the hoisting process, it may fall off in the middle. This method has certain dangers, and the early attached lifting scaffolds gradually exposed the following problems:

(1)采用钢管扣件搭设的架体,质量、强度受钢管、扣件质量影响较大;(1) The quality and strength of the frame built with steel pipe fasteners are greatly affected by the quality of steel pipes and fasteners;

(2)架体定型构件非标规格多,不便制造、施工组织;(2) There are many non-standard specifications of the frame body shaping components, which is inconvenient for manufacturing and construction organization;

(3)架体强度受到塔吊、施工电梯、卸料平台等施工装备的影响较大;(3) The strength of the frame body is greatly affected by construction equipment such as tower cranes, construction elevators, and unloading platforms;

(4)采用的竹、木脚手板易燃、易损坏,围护立面的密目安全网防护能力差,安全隐患较大。(4) The bamboo and wooden scaffolding boards used are flammable and easily damaged, and the dense mesh safety net on the enclosure facade has poor protection ability and great potential safety hazards.

发明内容SUMMARY OF THE INVENTION

针对现有技术的不足,本发明提供了一种全钢附着式升降脚手架,解决了安装货梯需要拆除部分脚手架时,存在一定的危险性,质量、强度受钢管、扣件质量影响较大,不便制造、施工组织的问题。Aiming at the deficiencies of the prior art, the present invention provides an all-steel attachment type lifting scaffold, which solves the danger of removing part of the scaffold when installing a freight elevator. The quality and strength are greatly affected by the quality of steel pipes and fasteners, which is inconvenient. Manufacturing and construction organization issues.

为实现以上目的,本发明通过以下技术方案予以实现:一种全钢附着式升降脚手架,包括脚手架主体、货梯、附墙导座和附墙挂座,所述脚手架主体包括两个主框架和设置在两个主框架之间的三个副框架,所述货梯位于两个脚手架主体之间,两个所述脚手架主体相邻的两个主框架的背面分别固定连接有外框和外壳,所述外壳的一侧设置有连接板,并且连接板的底部转动连接有活动板,并且外框内壁的前后之间固定连接有连接杆,所述活动板的底部与连接杆表面的顶部相接触。In order to achieve the above purpose, the present invention is achieved through the following technical solutions: an all-steel attached lifting scaffold, comprising a scaffold body, a freight elevator, a wall-attached guide seat and a wall-attached hanging seat, and the scaffold body includes two main frames and a set of There are three sub-frames between two main frames, the freight elevator is located between two scaffold bodies, and the backs of the two adjacent main frames of the two scaffold bodies are fixedly connected with an outer frame and a shell, respectively. One side of the shell is provided with a connecting plate, and the bottom of the connecting plate is rotatably connected with a movable plate, and a connecting rod is fixedly connected between the front and rear of the inner wall of the outer frame, and the bottom of the movable plate is in contact with the top of the surface of the connecting rod.

优选的,所述外壳内壁两侧之间的前后均固定连接有滑杆,并且滑杆的表面滑动连接有滑板,所述滑板的一侧与连接板的一侧固定连接,所述滑板的顶部固定连接有推杆,所述推杆的顶端贯穿外壳并延伸至外壳的顶部,所述外壳的顶部开设有与推杆相适配的滑槽,所述连接板一侧的内部固定连接有弹簧,并且弹簧的底端与活动板的顶部固定连接。Preferably, a sliding bar is fixedly connected to the front and rear between the two sides of the inner wall of the housing, and a sliding plate is slidably connected to the surface of the sliding bar, one side of the sliding plate is fixedly connected to one side of the connecting plate, and the top of the sliding plate is fixedly connected to the side of the connecting plate. A push rod is fixedly connected, the top of the push rod penetrates the casing and extends to the top of the casing, the top of the casing is provided with a chute adapted to the push rod, and a spring is fixedly connected to the inside of one side of the connecting plate , and the bottom end of the spring is fixedly connected with the top of the movable plate.

优选的,所述主框架和副框架的内部均固定连接有Z型撑,并且主框架和副框架上的Z型撑之间连接有脚手板,所述主框架与副框架之间、两个副框架之间的正面均连接有防护网片,所述主框架与副框架之间、两个副框架之间且位于及脚手板的下方连接有水平桁架。Preferably, Z-shaped braces are fixedly connected to the inside of the main frame and the sub-frame, and a scaffold board is connected between the Z-shaped braces on the main frame and the sub-frame, and between the main frame and the sub-frame, two The fronts between the sub-frames are all connected with protective mesh sheets, and a horizontal truss is connected between the main frame and the sub-frames, between the two sub-frames and below the scaffolding board.

优选的,所述副框架背面的中部且位于脚手板的背面连接有隔离翻板,所述副框架背面的底部且位于脚手板的背面连接有底部翻板。Preferably, an isolation flap is connected to the middle of the back of the sub-frame and located on the back of the scaffolding board, and a bottom flap is connected to the bottom of the back of the sub-frame and located on the back of the scaffolding board.

优选的,两个所述主框架两侧的顶部与底部均连接有挂架,并且两个挂架之间设置有电葫芦。Preferably, hangers are connected to the top and bottom of both sides of the two main frames, and an electric hoist is arranged between the two hangers.

优选的,两个所述主框架的背面均连接有导轨,并且导轨内壁的两侧之间固定连接有横杆,所述导轨背面的顶部连接有上拉座板,并且上拉座板的内部转动连接有调节拉杆,所述调节拉杆的底部转动连接有下拉座板。Preferably, the backs of the two main frames are connected with guide rails, and the two sides of the inner walls of the guide rails are fixedly connected with cross bars, the top of the back of the guide rails is connected with a pull-up seat plate, and the inner part of the pull-up seat plate is connected An adjustment pull rod is rotatably connected, and the bottom of the adjustment pull rod is rotatably connected with a pull-down seat plate.

优选的,所述附墙导座包括基座,所述基座一侧内壁的前后均转动连接有导轮组,所述导轮组与导轨的一侧滑动连接。Preferably, the wall-attaching guide seat includes a base, and a guide wheel group is rotatably connected to the front and rear of the inner wall of one side of the base, and the guide wheel group is slidably connected to one side of the guide rail.

优选的,所述基座的顶部转动连接有正牙长杆,并且正牙长杆的内部螺纹连接有与正反牙调节螺栓,所述正反牙调节螺栓表面的顶部螺纹连接有反牙短杆。Preferably, the top of the base is rotatably connected with a long orthodontic rod, and the internal thread of the long orthodontic rod is connected with a positive and negative tooth adjusting bolt, and the top of the surface of the positive and negative teeth adjusting bolt is threadedly connected with a negative tooth short rod.

优选的,所述基座的内部设置有连接块,所述连接块的内部转动连接有防坠块,并且防坠块的前方固定连接有活动摆件。Preferably, a connecting block is arranged inside the base, an anti-falling block is rotatably connected to the inside of the connecting block, and a movable pendant is fixedly connected to the front of the anti-falling block.

有益效果beneficial effect

本发明提供了一种全钢附着式升降脚手架。与现有技术相比具备以下有益效果:The invention provides an all-steel attachment type lifting scaffold. Compared with the prior art, it has the following beneficial effects:

(1)、该全钢附着式升降脚手架,通过外壳的一侧设置有连接板,并且连接板的底部转动连接有活动板,并且外框内壁的前后之间固定连接有连接杆,活动板的底部与连接杆表面的顶部相接触,外壳内壁两侧之间的前后均固定连接有滑杆,并且滑杆的表面滑动连接有滑板,滑板的一侧与连接板的一侧固定连接,滑板的顶部固定连接有推杆,推杆的顶端贯穿外壳并延伸至外壳的顶部,外壳的顶部开设有与推杆相适配的滑槽,连接板一侧的内部固定连接有弹簧,并且弹簧的底端与活动板的顶部固定连接,在两组脚手架之间设置货梯的时候,两组脚手架的拼接处,采用防护装置,在吊起的过程中,如果出现掉落的情况,活动板与连接杆之间的配合,可以起到防坠落的效果,提高整体的安全性。(1) The all-steel attached lifting scaffold is provided with a connecting plate through one side of the outer casing, and the bottom of the connecting plate is rotatably connected with a movable plate, and a connecting rod is fixedly connected between the front and rear of the inner wall of the outer frame. The bottom is in contact with the top of the surface of the connecting rod, the front and rear between the two sides of the inner wall of the casing are fixedly connected with a sliding rod, and the surface of the sliding rod is slidably connected with a sliding plate, one side of the sliding plate is fixedly connected with one side of the connecting plate, and the The top is fixedly connected with a push rod, the top of the push rod penetrates the casing and extends to the top of the casing, the top of the casing is provided with a chute adapted to the push rod, a spring is fixedly connected inside one side of the connecting plate, and the bottom of the spring is The end is fixedly connected to the top of the movable board. When a freight elevator is installed between the two sets of scaffolds, a protective device is used at the splicing of the two sets of scaffolds. During the lifting process, if there is a fall, the movable board and the connecting rod The cooperation between them can play an anti-fall effect and improve the overall safety.

(2)、该全钢附着式升降脚手架,通过附墙导座包括基座,基座一侧内壁的前后均转动连接有导轮组,导轮组与导轨的一侧滑动连接,基座的顶部转动连接有正牙长杆,并且正牙长杆的内部螺纹连接有与正反牙调节螺栓,正反牙调节螺栓表面的顶部螺纹连接有反牙短杆,基座的内部设置有连接块,连接块的内部转动连接有防坠块,并且防坠块的前方固定连接有活动摆件,附墙导座基座选用厚度12、10、6mm钢板预制底板、前板、左右侧板及上下盖板,通过优化组合,采用榫卯方式拼装并焊接为一体,使得生产过程中制作误差降至最底,且结构强度比传统组装拼焊更加稳定牢固。(2) The all-steel attached lifting scaffold includes a base through a wall-attached guide seat, and a guide wheel group is rotatably connected to the front and rear of the inner wall of one side of the base, and the guide wheel group is slidably connected to one side of the guide rail. The top is rotatably connected with an orthodontic long rod, and the inner thread of the orthodontic long rod is connected with an adjustment bolt with positive and negative teeth, the top of the surface of the positive and negative teeth adjustment bolt is threadedly connected with a short rod with negative teeth, and the interior of the base is provided with a connecting block , There is an anti-falling block connected to the inside of the connecting block, and a movable ornament is fixedly connected to the front of the anti-falling block. The base of the wall-mounted guide base is made of prefabricated bottom plate, front plate, left and right side plates and upper and lower covers with a thickness of 12, 10, 6mm. By optimizing the combination, the mortise-and-mortise method is used to assemble and weld the plates together, so that the manufacturing error in the production process is reduced to the bottom, and the structural strength is more stable and firmer than the traditional assembly and welding.

(3)、该全钢附着式升降脚手架,通过两个主框架的背面均连接有导轨,并且导轨内壁的两侧之间固定连接有横杆,导轨背面的顶部连接有上拉座板,并且上拉座板的内部转动连接有调节拉杆,调节拉杆的底部转动连接有下拉座板,工具式拉结构造分为上、下拉结座板,调节拉杆,上、下拉结座板分别锚固安装于导轨、建筑结构面,上、下拉结座板之间安装可调节拉杆,将主体结构与架体形成斜拉锚固减小架体悬臂高度。(3) The all-steel attached lifting scaffold is connected with guide rails through the backs of the two main frames, and a cross bar is fixedly connected between the two sides of the inner wall of the guide rails, and the top of the back of the guide rails is connected with a pull-up seat plate, and The inner rotatable connection of the upper pull seat plate is connected with the adjustment pull rod, and the bottom of the adjustment pull rod is rotated and connected with the pull down seat plate. An adjustable pull rod is installed between the guide rail, the building structure surface, and the upper and lower knot base plates, and the main structure and the frame body are formed by oblique anchorage to reduce the cantilever height of the frame body.

(4)、该全钢附着式升降脚手架,通过主框架和副框架的内部均固定连接有Z型撑,并且主框架和副框架上的Z型撑之间连接有脚手板,主框架与副框架之间、两个副框架之间的正面均连接有防护网片,主框架与副框架之间、两个副框架之间且位于及脚手板的下方连接有水平桁架,脚手架的钢脚手板、水平桁架等纵向构件均与内、外立杆的两侧直接连接,钢脚手板、水平桁架的节长与机位跨度成模数,水平桁架可直接紧靠钢脚手板底安装,水平桁架、立杆、立面防护网片、钢脚手板直接形成牢固的水平桁架系统,节点简单、连接强度高,且脚手板框架中心与竖向主框架、立杆框架中心交汇,框架体系受力合理,节点无附加力矩,安全性能好。(4) The all-steel attached lifting scaffold is fixedly connected with Z-shaped braces through the interior of the main frame and the sub-frame, and a scaffold is connected between the Z-shaped braces on the main frame and the sub-frame, and the main frame and the auxiliary frame are connected. The fronts between the frames and between the two sub-frames are connected with protective meshes. Between the main frame and the sub-frames, between the two sub-frames and below the scaffolding boards are connected horizontal trusses. The steel scaffolding boards of the scaffolding are connected with horizontal trusses. Longitudinal members such as horizontal trusses are directly connected to both sides of the inner and outer vertical rods. The length of the steel scaffolding board and the horizontal truss is a modulus with the span of the stand. The horizontal truss can be installed directly against the bottom of the steel scaffolding board. The horizontal truss , The vertical pole, the facade protective mesh, and the steel scaffolding plate directly form a solid horizontal truss system, with simple nodes and high connection strength, and the center of the scaffolding plate frame intersects with the vertical main frame and the center of the vertical pole frame, and the frame system is reasonably stressed. , the node has no additional torque, and the safety performance is good.

附图说明Description of drawings

图1为本发明结构的主视图;Fig. 1 is the front view of the structure of the present invention;

图2为本发明主框架和副框架结构的立体图;Fig. 2 is the perspective view of main frame and sub-frame structure of the present invention;

图3为本发明主框架和副框架结构的后视图;Fig. 3 is the rear view of main frame and sub-frame structure of the present invention;

图4为本发明主框架结构的侧视图;4 is a side view of the main frame structure of the present invention;

图5为本发明附墙导座结构的立体图;5 is a perspective view of the structure of the wall-attached guide seat of the present invention;

图6为本发明附墙挂座结构的立体图;Fig. 6 is the perspective view of the structure of the wall-mounted hanging seat of the present invention;

图7为本发明导轨结构的立体图;7 is a perspective view of the guide rail structure of the present invention;

图8为本发明主框架结构的俯视图;8 is a top view of the main frame structure of the present invention;

图9为本发明外壳和外框结构的剖视图;Fig. 9 is the sectional view of the shell and outer frame structure of the present invention;

图10为本发明图8中A处的局部放大图。FIG. 10 is a partial enlarged view of A in FIG. 8 of the present invention.

图中:1-脚手架主体、101-主框架、102-副框架、103-Z型撑、104-脚手板、105-防护网片、106-水平桁架、107-隔离翻板、108-底部翻板、109-挂架、110-电葫芦、111-导轨、112-横杆、113-上拉座板、114-调节拉杆、115-下拉座板、2-货梯、3-附墙导座、31-基座、32-导轮组、33-正牙长杆、34-正反牙调节螺栓、35-反牙短杆、36-连接块、37-防坠块、38-活动摆件、4-附墙挂座、5-外框、6-外壳、7-连接板、8-活动板、9-连接杆、10-滑杆、11-滑板、12-推杆、13-滑槽、14-弹簧。In the picture: 1-scaffold main body, 101-main frame, 102-subframe, 103-Z bracing, 104-scaffold board, 105-protective mesh, 106-horizontal truss, 107-isolation flap, 108-bottom flap Plate, 109-hanger, 110-electric hoist, 111-rail, 112-crossbar, 113-pull-up seat plate, 114-adjustment rod, 115-drop-down seat plate, 2-freight elevator, 3-wall-attached guide seat, 31-base, 32-guide wheel group, 33-orthodontic long rod, 34-positive and negative teeth adjusting bolt, 35-negative tooth short rod, 36-connecting block, 37-anti-falling block, 38-active ornament, 4 -Attached wall mount, 5-frame, 6-shell, 7-connecting plate, 8-moving plate, 9-connecting rod, 10-slider, 11-slide, 12-push, 13-chute, 14 -spring.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

请参阅图1-10,本发明提供一种技术方案:一种全钢附着式升降脚手架,包括脚手架主体1、货梯2、附墙导座3和附墙挂座4,脚手架主体1包括两个主框架101和设置在两个主框架101之间的三个副框架102,货梯2位于两个脚手架主体1之间,两个脚手架主体1相邻的两个主框架101的背面分别固定连接有外框5和外壳6,外壳6的一侧设置有连接板7,并且连接板7的底部转动连接有活动板8,并且外框5内壁的前后之间固定连接有连接杆9,活动板8的底部与连接杆9表面的顶部相接触。1-10, the present invention provides a technical solution: an all-steel attached lifting scaffold, including a scaffold body 1, a freight elevator 2, a wall-attached guide seat 3 and a wall-attached hanging seat 4, and the scaffold body 1 includes two The main frame 101 and the three sub-frames 102 arranged between the two main frames 101, the freight elevator 2 is located between the two scaffolding bodies 1, and the backs of the two main frames 101 adjacent to the two scaffolding bodies 1 are fixedly connected respectively. The outer frame 5 and the casing 6 are provided with a connecting plate 7 on one side of the casing 6, and a movable plate 8 is rotatably connected to the bottom of the connecting plate 7, and a connecting rod 9 is fixedly connected between the front and rear of the inner wall of the outer frame 5, and the movable plate 8 The bottom of the connecting rod 9 is in contact with the top of the surface.

脚手架的钢脚手板104、水平桁架106等纵向构件均与内、外立杆的两侧直接连接,钢脚手板104、水平桁架106的节长与机位跨度成模数,水平桁架106可直接紧靠钢脚手板104底安装,水平桁架106、立杆、立面防护网片105、钢脚手板104直接形成牢固的水平桁架系统,节点简单、连接强度高,且脚手板104框架中心与竖向主框架101、立杆框架中心交汇,框架体系受力合理,节点无附加力矩,安全性能好。Longitudinal members such as steel scaffolding boards 104 and horizontal trusses 106 of the scaffolding are directly connected to both sides of the inner and outer vertical poles. Installed close to the bottom of the steel scaffolding board 104, the horizontal truss 106, the vertical rod, the facade protective mesh 105, and the steel scaffolding board 104 directly form a solid horizontal truss system, with simple nodes and high connection strength. Converging to the center of the main frame 101 and the vertical pole frame, the frame system is reasonably stressed, the nodes have no additional moment, and the safety performance is good.

本发明中,外壳6内壁两侧之间的前后均固定连接有滑杆10,并且滑杆10的表面滑动连接有滑板11,滑板11的一侧与连接板7的一侧固定连接,滑板11的顶部固定连接有推杆12,推杆12的顶端贯穿外壳6并延伸至外壳6的顶部,外壳6的顶部开设有与推杆12相适配的滑槽13,连接板7一侧的内部固定连接有弹簧14,并且弹簧14的底端与活动板8的顶部固定连接。In the present invention, a sliding bar 10 is fixedly connected to the front and rear between both sides of the inner wall of the housing 6, and a sliding plate 11 is slidably connected to the surface of the sliding bar 10. One side of the sliding plate 11 is fixedly connected to one side of the connecting plate 7, and the sliding plate 11 The top of the push rod 12 is fixedly connected with the push rod 12, the top of the push rod 12 penetrates the casing 6 and extends to the top of the casing 6, and the top of the casing 6 is provided with a chute 13 that matches the push rod 12. A spring 14 is fixedly connected, and the bottom end of the spring 14 is fixedly connected with the top of the movable plate 8 .

本发明中,主框架101和副框架102的内部均固定连接有Z型撑103,并且主框架101和副框架102上的Z型撑103之间连接有脚手板104,主框架101与副框架102之间、两个副框架102之间的正面均连接有防护网片105,主框架101与副框架102之间、两个副框架102之间且位于及脚手板104的下方连接有水平桁架106。In the present invention, Z-shaped braces 103 are fixedly connected inside the main frame 101 and the sub-frame 102, and a scaffolding board 104 is connected between the Z-shaped braces 103 on the main frame 101 and the sub-frame 102. The main frame 101 and the sub-frame 102 and between the two sub-frames 102 are connected with protective meshes 105 on the front, between the main frame 101 and the sub-frames 102, between the two sub-frames 102 and below the scaffolding board 104 are connected with horizontal trusses 106.

本发明中,副框架102背面的中部且位于脚手板104的背面连接有隔离翻板107,副框架102背面的底部且位于脚手板104的背面连接有底部翻板108。In the present invention, an isolation flap 107 is connected to the middle of the back of the sub-frame 102 and located on the back of the scaffolding board 104 , and a bottom flap 108 is connected to the bottom of the back of the sub-frame 102 and located on the back of the scaffolding board 104 .

本发明中,两个主框架101两侧的顶部与底部均连接有挂架109,并且两个挂架109之间设置有电葫芦110,挂架109是附着式升降脚手架升降系统中一重要组成部分,是固定电葫芦110上、下吊点的承重结构组件,普通一般挂架分为上、下二件不同结构体,现考虑其功能一样则将其设置成为通用件,避免上、下及左、右安装方向不同需设置相应构件,从根本上减轻设备仓储管理及生产维修保养工作量。In the present invention, hangers 109 are connected to the tops and bottoms of both sides of the two main frames 101, and an electric hoist 110 is arranged between the two hangers 109. The hangers 109 are an important component of the attached lifting scaffolding lifting system. The part is the load-bearing structural component that fixes the upper and lower lifting points of the electric hoist 110. The ordinary general hanger is divided into two different structures, the upper and the lower. Considering that its functions are the same, it is set as a common part to avoid the upper, lower and lower parts. If the left and right installation directions are different, corresponding components need to be set up, which will fundamentally reduce the workload of equipment storage management and production maintenance.

本发明中,两个主框架101的背面均连接有导轨111,并且导轨111内壁的两侧之间固定连接有横杆112,导轨111背面的顶部连接有上拉座板113,并且上拉座板113的内部转动连接有调节拉杆114,调节拉杆114的底部转动连接有下拉座板115。In the present invention, the backs of the two main frames 101 are connected with guide rails 111 , and the two sides of the inner walls of the guide rails 111 are fixedly connected with cross bars 112 . An adjustment pull rod 114 is rotatably connected to the inside of the plate 113 , and a pull-down seat plate 115 is rotatably connected to the bottom of the adjustment pull rod 114 .

顶层附墙导座3安装层结构面利用2件M12膨胀螺栓固定Q235B钢制成的下拉座板115,上方导轨111二防坠梯杆档安装同材质制作的上拉座板113,座板一端压导轨11正面,一端背板压防坠梯杆形成抱箍,上下两座板间安装可以调节长度的拉杆,二端利用M16螺栓与座板紧固,拉杆由50×3方管及

Figure BDA0003704335300000071
正反牙螺栓组成,横向间距不大于6米,转角间距不大于2米。The top-level wall-attached guide seat 3 is installed on the structural surface of the layer with 2 pieces of M12 expansion bolts to fix the pull-down seat plate 115 made of Q235B steel. Pressing the front of the guide rail 11, one end of the back plate presses the anti-falling ladder rod to form a hoop, a tie rod with adjustable length is installed between the upper and lower seat plates, and the two ends are fastened with the seat plate by M16 bolts.
Figure BDA0003704335300000071
It is composed of positive and negative teeth bolts, the horizontal spacing is not more than 6 meters, and the corner spacing is not more than 2 meters.

本发明中,附墙导座3包括基座31,基座31一侧内壁的前后均转动连接有导轮组32,导轮组32与导轨111的一侧滑动连接。In the present invention, the wall-attached guide base 3 includes a base 31 . The front and rear of the inner wall of one side of the base 31 are rotatably connected with a guide wheel group 32 , and the guide wheel group 32 is slidably connected to one side of the guide rail 111 .

附墙导座3基座31选用厚度12、10、6mm钢板预制底板、前板、左右侧板及上下盖板,通过优化组合,采用榫卯方式拼装并焊接为一体,使得生产过程中制作误差降至最底,且结构强度比传统组装拼焊更加稳定牢固。The base 31 of the wall-mounted guide base 3 is made of prefabricated bottom plates, front plates, left and right side plates and upper and lower cover plates with thicknesses of 12, 10, and 6 mm. By optimizing the combination, the mortise and tenon method is used to assemble and weld into one, which makes the production error in the production process. It is reduced to the bottom, and the structural strength is more stable and firm than traditional assembly welding.

本发明中,基座31的顶部转动连接有正牙长杆33,并且正牙长杆33的内部螺纹连接有与正反牙调节螺栓34,正反牙调节螺栓34表面的顶部螺纹连接有反牙短杆35。In the present invention, the top of the base 31 is rotatably connected with the orthodontic long rod 33, and the inner thread of the orthodontic long rod 33 is connected with the positive and negative teeth adjusting bolts 34, and the top of the surface of the positive and negative teeth adjusting bolts 34 is threadedly connected with a reverse thread. Teeth short rod 35.

本发明中,基座31的内部设置有连接块36,连接块36的内部转动连接有防坠块37,并且防坠块37的前方固定连接有活动摆件38。In the present invention, a connecting block 36 is provided inside the base 31 , an anti-falling block 37 is rotatably connected to the inside of the connecting block 36 , and a movable rocker 38 is fixedly connected to the front of the anti-falling block 37 .

同时本说明书中未作详细描述的内容均属于本领域技术人员公知的现有技术。Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.

使用时,当需要将货梯2上方的脚手架主体1移除的时候,吊机将脚手架主体1向上吊起,外壳6向上移动的过程中,活动板8会在连接杆9的阻挡下向下翻转,如果突然下坠,活动板8就会位于连接杆9的上方,防止外壳6继续下降,起到一定的防护效果,当其中一个脚手架主体1快速下降的过程中,其导轨111上的横杆112下降就会带动防坠块37和活动摆件38进行旋转,速度过快的时候防坠块37就会卡在横杆112之间,防止脚手架主体1继续下降。When in use, when the scaffold body 1 above the freight elevator 2 needs to be removed, the crane lifts the scaffold body 1 upward. During the upward movement of the casing 6, the movable plate 8 will be turned downward under the blocking of the connecting rod 9. , if it falls suddenly, the movable plate 8 will be located above the connecting rod 9 to prevent the housing 6 from continuing to descend, and has a certain protective effect. The falling will drive the anti-falling block 37 and the movable pendant 38 to rotate. When the speed is too fast, the anti-falling block 37 will be stuck between the cross bars 112 to prevent the scaffold body 1 from continuing to descend.

需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。It should be noted that, in this document, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any relationship between these entities or operations. any such actual relationship or sequence exists. Moreover, the terms "comprising", "comprising" or any other variation thereof are intended to encompass a non-exclusive inclusion such that a process, method, article or device that includes a list of elements includes not only those elements, but also includes not explicitly listed or other elements inherent to such a process, method, article or apparatus.

尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, and substitutions can be made in these embodiments without departing from the principle and spirit of the invention and modifications, the scope of the present invention is defined by the appended claims and their equivalents.

Claims (9)

1. The utility model provides an all steel inserted lift scaffold, includes scaffold main part (1), goods lift (2), attaches wall guide holder (3) and attaches wall and hang seat (4), scaffold main part (1) includes two main frames (101) and sets up three auxiliary frame (102) between two main frames (101), goods lift (2) are located between two scaffold main parts (1), its characterized in that: two the back of two adjacent main frames (101) of scaffold body (1) is fixedly connected with frame (5) and shell (6) respectively, one side of shell (6) is provided with connecting plate (7) to the bottom of connecting plate (7) is rotated and is connected with fly leaf (8), and fixedly connected with connecting rod (9) between the front and back of frame (5) inner wall, the bottom of fly leaf (8) contacts with the top on connecting rod (9) surface.
2. An all-steel attached lifting scaffold according to claim 1, characterized in that: equal fixedly connected with slide bar (10) around between shell (6) inner wall both sides to the surperficial sliding connection of slide bar (10) has slide (11), one side of slide (11) and one side fixed connection of connecting plate (7), top fixedly connected with push rod (12) of slide (11), the top of push rod (12) runs through shell (6) and extends to the top of shell (6), spout (13) with push rod (12) looks adaptation are seted up to the top of shell (6), inside fixedly connected with spring (14) of connecting plate (7) one side to the bottom of spring (14) and the top fixed connection of fly leaf (8).
3. An all-steel attached lifting scaffold according to claim 1, characterized in that: the inside of main frame (101) and subframe (102) all fixedly connected with Z type props (103) to be connected with scaffold board (104) between Z type props (103) on main frame (101) and subframe (102), between main frame (101) and subframe (102), the front between two subframes (102) all is connected with protection net piece (105), between main frame (101) and subframe (102), between two subframes (102) and be located and the below of scaffold board (104) is connected with horizontal truss (106).
4. An all-steel attached lifting scaffold according to claim 1, characterized in that: the middle part of the back of the subframe (102) and the back of the scaffold board (104) are connected with an isolation turning plate (107), and the bottom of the back of the subframe (102) and the back of the scaffold board (104) are connected with a bottom turning plate (108).
5. An all-steel attached lifting scaffold according to claim 1, characterized in that: the top and the bottom of two sides of the main frame (101) are both connected with hanging racks (109), and an electric hoist (110) is arranged between the two hanging racks (109).
6. An all-steel attached lifting scaffold according to claim 1, characterized in that: two the back of main frame (101) all is connected with guide rail (111) to fixedly connected with horizontal pole (112) between the both sides of guide rail (111) inner wall, the top at the guide rail (111) back is connected with pull-up seat board (113), and the inside of pull-up seat board (113) is rotated and is connected with regulation pull rod (114), the bottom of adjusting pull rod (114) is rotated and is connected with pull-down seat board (115).
7. An all-steel attached lifting scaffold according to claim 6, characterized in that: attach wall guide holder (3) and include base (31), all rotate around base (31) one side inner wall and be connected with guide pulley group (32), guide pulley group (32) and one side sliding connection of guide rail (111).
8. An all-steel attached lifting scaffold according to claim 7, characterized in that: the top of base (31) is rotated and is connected with orthodontic stock (33) to the inside threaded connection of orthodontic stock (33) has with positive and negative tooth adjusting bolt (34), the top threaded connection on positive and negative tooth adjusting bolt (34) surface has anti-tooth quarter butt (35).
9. An all-steel attached lifting scaffold according to claim 7, characterized in that: the anti-falling device is characterized in that a connecting block (36) is arranged inside the base (31), an anti-falling block (37) is rotatably connected inside the connecting block (36), and a movable swinging part (38) is fixedly connected in front of the anti-falling block (37).
CN202210701327.6A 2022-06-21 2022-06-21 A kind of all-steel attached lifting scaffold Active CN115045493B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210701327.6A CN115045493B (en) 2022-06-21 2022-06-21 A kind of all-steel attached lifting scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210701327.6A CN115045493B (en) 2022-06-21 2022-06-21 A kind of all-steel attached lifting scaffold

Publications (2)

Publication Number Publication Date
CN115045493A true CN115045493A (en) 2022-09-13
CN115045493B CN115045493B (en) 2025-05-27

Family

ID=83162482

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210701327.6A Active CN115045493B (en) 2022-06-21 2022-06-21 A kind of all-steel attached lifting scaffold

Country Status (1)

Country Link
CN (1) CN115045493B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115788001A (en) * 2023-02-08 2023-03-14 山西锦辉工程检测有限公司 Split lifting type attached scaffold and construction method thereof
CN118793256A (en) * 2024-09-13 2024-10-18 北京市第三建筑工程有限公司 Fully rigid attached lifting scaffolding with a lifting and lowering protection platform on the top

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110137864A (en) * 2010-06-18 2011-12-26 양종덕 Builder lift
CN204001655U (en) * 2014-07-04 2014-12-10 绵阳德信机械设备租赁有限公司 Integrated form attached lift scaffold
CN212836630U (en) * 2020-07-16 2021-03-30 江西金力建筑机械设备有限责任公司 All-steel integrated operation scaffold

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110137864A (en) * 2010-06-18 2011-12-26 양종덕 Builder lift
CN204001655U (en) * 2014-07-04 2014-12-10 绵阳德信机械设备租赁有限公司 Integrated form attached lift scaffold
CN212836630U (en) * 2020-07-16 2021-03-30 江西金力建筑机械设备有限责任公司 All-steel integrated operation scaffold

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115788001A (en) * 2023-02-08 2023-03-14 山西锦辉工程检测有限公司 Split lifting type attached scaffold and construction method thereof
CN118793256A (en) * 2024-09-13 2024-10-18 北京市第三建筑工程有限公司 Fully rigid attached lifting scaffolding with a lifting and lowering protection platform on the top
CN118793256B (en) * 2024-09-13 2024-12-31 北京市第三建筑工程有限公司 Fully rigid attached lifting scaffolding with a lifting and lowering protection platform on the top

Also Published As

Publication number Publication date
CN115045493B (en) 2025-05-27

Similar Documents

Publication Publication Date Title
CN115045493A (en) An all-steel attached lifting scaffold
CN214195484U (en) An all-steel attached lifting scaffold
WO2023240812A1 (en) Overall construction platform structure and method for adding core tube wall body in air
CN211499713U (en) All-steel attached lifting scaffold
CN102287045B (en) Square steel tube lifting outside scaffold
CN207934495U (en) The box dual-purpose novel compositions ladder cage of combination
CN201502170U (en) Horizontal supporting device of building external frame
CN206784884U (en) Curved-surface building climbing device
CN204676865U (en) A kind of building scaffold
CN211313320U (en) Roof framework layer adheres to no counter weight ann and tears hanging flower basket suspension mechanism open
CN209568688U (en) A kind of elevating construction platform
CN206636157U (en) A steel structure suitable for construction site assembly
CN216476221U (en) A construction scaffolding fixing mechanism
CN207228591U (en) A kind of architectural engineering scaffold
CN110552495A (en) assembled building combined tool type outer protective frame system and construction method thereof
CN112942789B (en) Water drop type curtain wall construction method
CN117090408A (en) Attached lifting protection shed and installation and lifting method thereof
CN209855192U (en) A stereotyped elevator hoistway automatic lifting frame
CN210067397U (en) Intelligent integrated all-steel attached lifting scaffold
CN107642241A (en) The stress supporting construction and construction method of a kind of prefabricated balcony
CN114229653A (en) A construction elevator attaching wall device integrated in the synchronous climbing of lightweight top formwork platform
CN106760464A (en) Elevator shaft operating platform and its construction method
CN111910905A (en) A vertical main frame of a lifting operation safety protection platform for high-rise building construction
CN219260750U (en) A bridge side construction hanging basket
CN206957170U (en) A kind of scaffold for building being easily installed

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant