CN114944174A - Intelligent information storage system for project declaration - Google Patents

Intelligent information storage system for project declaration Download PDF

Info

Publication number
CN114944174A
CN114944174A CN202210677995.XA CN202210677995A CN114944174A CN 114944174 A CN114944174 A CN 114944174A CN 202210677995 A CN202210677995 A CN 202210677995A CN 114944174 A CN114944174 A CN 114944174A
Authority
CN
China
Prior art keywords
information
declaration
project
module
information storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210677995.XA
Other languages
Chinese (zh)
Inventor
唐明明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Ruixuan Technology Consulting Co Ltd
Original Assignee
Anhui Ruixuan Technology Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Ruixuan Technology Consulting Co Ltd filed Critical Anhui Ruixuan Technology Consulting Co Ltd
Priority to CN202210677995.XA priority Critical patent/CN114944174A/en
Publication of CN114944174A publication Critical patent/CN114944174A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G11INFORMATION STORAGE
    • G11BINFORMATION STORAGE BASED ON RELATIVE MOVEMENT BETWEEN RECORD CARRIER AND TRANSDUCER
    • G11B33/00Constructional parts, details or accessories not provided for in the other groups of this subclass
    • G11B33/02Cabinets; Cases; Stands; Disposition of apparatus therein or thereon
    • G11B33/06Cabinets; Cases; Stands; Disposition of apparatus therein or thereon combined with other apparatus having a different main function
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/109Time management, e.g. calendars, reminders, meetings or time accounting
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/18Status alarms
    • G08B21/24Reminder alarms, e.g. anti-loss alarms

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Emergency Management (AREA)
  • Economics (AREA)
  • Data Mining & Analysis (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to the technical field of information storage, in particular to an intelligent information storage system for project declaration, which comprises a project declaration information storage device main body, wherein the project declaration information storage device main body is electrically connected with an alarm through a communication network port, the project declaration information storage device main body is electrically connected with a computer terminal through the communication network port, an information input and extraction control panel is arranged in the project declaration information storage device main body and is used for inputting and extracting project information in the project declaration information storage device main body, a declaration date reminding control panel is arranged in the project declaration information storage device main body and is used for monitoring project information declaration conditions in the project declaration information storage device main body, finally, project declaration personnel are prevented from missing project declaration time, and the existing project declaration information storage system is optimized.

Description

Intelligent information storage system for project declaration
Technical Field
The invention relates to the technical field of information storage, in particular to an intelligent information storage system for project declaration.
Background
The information storage technology refers to a technology for storing information across time, and mainly comprises a data compression technology, a micro storage technology, an optical disc storage technology and the like.
Project declaration information needs to be stored in an information storage device, but the existing storage system can only store information and cannot timely feed back project declaration completion conditions, a large amount of project declaration information is stored in the system, project information which is not declared timely is inevitably omitted, and the influence on enterprises is caused by missing of project declaration time.
Disclosure of Invention
The invention aims to solve the defects in the prior art and provides an intelligent information storage system for project declaration.
In order to achieve the above purposes, the technical scheme adopted by the invention is as follows: an intelligent information storage system for project declaration comprises a project declaration information storage device main body, wherein the project declaration information storage device main body is electrically connected with an alarm through a communication network port, the project declaration information storage device main body is electrically connected with a computer terminal through the communication network port, an information input and extraction control panel is arranged in the project declaration information storage device main body, the information input and extraction control panel is used for inputting and extracting project information in the project declaration information storage device main body, a declaration date reminding control panel is arranged in the project declaration information storage device main body, and the declaration date reminding control panel is used for monitoring project information declaration conditions in the project declaration information storage device main body; when the project declaration information storage device works, the project declaration information storage device main body is used for storing project declaration information, the alarm is used for giving an alarm to remind a project declaration person, the computer terminal is used for carrying out manual operation on the information stored in the project declaration information storage device main body, the information input and extraction control panel is used for extracting and inputting the project declaration information, and the declaration date reminding control panel is used for checking whether the stored information is declared.
Preferably, the information input and extraction control panel comprises an information input receiving module, an information integration module and an information extraction sending module, the information input receiving module is used for inputting project information, the information integration module is used for integrating the project information, the information extraction sending module is used for extracting the project information, the information extraction sending module is electrically connected to the information integration module, the information integration module is electrically connected to the information input receiving module, the information integration module and the information extraction sending module are all electrically connected to the information input and extraction control panel, and the information input and extraction control panel is electrically connected to the project declaration information storage device main body; when the system works, the information input receiving module is used for inputting project information, the information integration module is used for integrating the project information, and the information extraction sending module is used for extracting the project information.
Preferably, the declaration date reminding control board comprises a declaration date comparison module, an alarm control module and a declaration success verification module, the declaration date comparison module is used for comparing project declaration dates, the alarm control module is used for controlling the alarm to be turned on and off, the declaration success verification module is used for verifying project declaration conditions, the declaration date comparison module is electrically connected to the alarm control module, the alarm control module is electrically connected to the declaration date comparison module, the alarm control module and the declaration success verification module are all electrically connected to the declaration date reminding control board, and the declaration date reminding control board is electrically connected to the project declaration information storage device main body; during work, the declaration date comparison module is used for comparing project declaration dates, the alarm control module is used for controlling the alarm to be turned on and off, and the declaration success verification module is used for verifying project declaration conditions.
Preferably, the project declaration information storage device main body is electrically connected with a power supply through a power supply interface; when the project declaration information storage device works, the power supply is used for supplying power to the project declaration information storage device main body, and the problem that the project declaration information storage device main body cannot be normally used due to power failure is avoided.
Preferably, the declaration date comparison module comprises E1 network connection, E2 project declaration date information extraction, E3 current date information extraction, E4 date information coincidence calculation and E5 result uploading to the equipment.
Preferably, the alarm control module comprises an F1 network connection, an F2 check that the ornament buckle receives an alarm opening command, an F3 opening alarm and an F4 closing alarm.
Preferably, the declaration success verification module comprises a G1 network connection, a G2 project declaration completion degree information receiving module, a G3 closing alarm and a G4 opening alarm.
Compared with the prior art, the invention has the following beneficial effects:
in the scheme, project declaration information can be recorded through an information recording and receiving module in an information extraction control panel, the recorded information is typeset and integrated through an information integration module, the recorded project declaration information is extracted and transmitted through an information extraction and transmission module, the project declaration date is compared with the current date through a declaration date comparison module in a declaration date reminding control panel, the project declaration date is the same as the current date, the alarm control module is used for carrying out alarm reminding on project declaration personnel, the project declaration personnel is prevented from missing the project declaration time, finally whether the project declaration is successful or not is finally confirmed through a declaration success verification module, if the project declaration is not successful, the alarm is opened again to remind the project declaration personnel to report again, and finally the project declaration time of the project declaration personnel is avoided, the existing project declaration information storage system is optimized.
Drawings
FIG. 1 is a perspective view of the present invention;
FIG. 2 is a functional block diagram of the present invention;
FIG. 3 is a flow chart of the operation of the present invention;
FIG. 4 is a flowchart of a claim date comparison process of the present invention;
FIG. 5 is a flow chart of the alarm control process of the present invention;
FIG. 6 is a flow chart of the present invention reporting a successful verification process.
In the figure: 1. a project declaration information storage device main body; 2. an information input and extraction control panel; 3. a date reporting reminding control panel; 4. a power source; 5. an alarm; 6. a computer terminal; 201. an information input receiving module; 202. an information integration module; 203. an information extraction and transmission module; 301. a declaration date comparison module; 302. an alarm control module; 303. and reporting a successful verification module.
Detailed Description
The following description is presented to disclose the invention so as to enable any person skilled in the art to practice the invention. The preferred embodiments described below are by way of example only, and other obvious variations will occur to those skilled in the art.
As shown in fig. 1-6, the intelligent storage system for project declaration information comprises a project declaration information storage device main body 1, wherein the project declaration information storage device main body 1 is electrically connected with an alarm 5 through a communication network port, the project declaration information storage device main body 1 is electrically connected with a computer terminal 6 through the communication network port, an information input and extraction control board 2 is arranged in the project declaration information storage device main body 1, the information input and extraction control board 2 is used for inputting and extracting project information in the project declaration information storage device main body 1, a declaration date reminding control board 3 is arranged in the project declaration information storage device main body 1, and the declaration date reminding control board 3 is used for monitoring project information declaration conditions in the project declaration information storage device main body 1; when the project declaration information storage device works, a project declaration information storage device main body 1 is used for storing project declaration information, an alarm 5 is used for giving an alarm to remind a project declaration person, a computer terminal 6 is used for carrying out manual operation on the information stored in the project declaration information storage device main body 1, an information input and extraction control plate 2 is used for extracting and inputting the project declaration information, and a declaration date reminding control plate 3 is used for checking whether the stored information is declared.
Specifically, the information entry and extraction control panel 2 includes an information entry receiving module 201, an information integration module 202 and an information extraction sending module 203, the information entry receiving module 201 is used for entering project information, the information integration module 202 is used for integrating project information, the information extraction sending module 203 is used for extracting project information, the information extraction sending module 203 is electrically connected to the information integration module 202, the information integration module 202 is electrically connected to the information entry receiving module 201, the information integration module 202 and the information extraction sending module 203 are all electrically connected to the information entry and extraction control panel 2, and the information entry and extraction control panel 2 is electrically connected to the project declaration information storage device main body 1; during work, the information input receiving module 201 is used for inputting project information, the information integration module 202 is used for integrating the project information, and the information extraction sending module 203 is used for extracting the project information.
Specifically, the declaration date reminding control panel 3 comprises a declaration date comparison module 301, an alarm control module 302 and a declaration success check module 303, wherein the declaration date comparison module 301 is used for comparing project declaration dates, the alarm control module 302 is used for controlling the alarm 5 to be turned on and off, the declaration success check module 303 is used for checking project declaration conditions, the declaration date comparison module 301 is electrically connected to the alarm control module 302, the alarm control module 302 is electrically connected to the declaration date comparison module 301, the alarm control module 302 and the declaration success check module 303 are all electrically connected to the declaration date reminding control panel 3, and the declaration date reminding control panel 3 is electrically connected to the project declaration information storage device main body 1; during work, the declaration date comparison module 301 is used for comparing project declaration dates, the alarm control module 302 is used for controlling the alarm 5 to be turned on and off, and the declaration success verification module 303 is used for verifying project declaration conditions.
Specifically, the project declaration information storage device main body 1 is electrically connected with a power supply 4 through a power supply interface; in operation, the power supply 4 is used for supplying power to the project declaration information storage device main body 1, so as to prevent the project declaration information storage device main body 1 from being used normally when the power is not supplied.
Specifically, the declaration date comparison module 301 includes opening a network connection at E1, extracting project declaration date information at E2, extracting current date information at E3, calculating coincidence degree of E4 date information, and uploading an E5 result to the device.
Specifically, the alarm control module 302 includes F1 network connection, F2 check that the fob receives an alarm open command, F3 alarm open, and F4 alarm close.
Specifically, the declaration success checking module 303 opens a network connection through G1, receives project declaration completion information through G2, closes an alarm through G3, and opens an alarm through G4.
The working principle of the invention is as follows:
the method comprises the following steps: a, starting a software system;
step two: b, starting information input receiving for inputting and receiving project declaration information;
step three: c, starting information integration for typesetting and integrating the stored project declaration information;
step four: d, starting information extraction and sending for extracting and sending project declaration information;
step five: e, starting reporting date comparison for comparing the current date with the project information reporting date;
step six: f, starting alarm control for controlling the alarm to be turned on and off;
step seven: g, starting reporting success check for checking whether the project is successfully reported or not;
step eight: h, completing system startup.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are merely illustrative of the principles of the invention, but that various changes and modifications may be made without departing from the spirit and scope of the invention, which is defined by the appended claims and their equivalents.

Claims (7)

1. An intelligent information storage system for project declaration, comprising a project declaration information storage device main body (1), it is characterized in that the project declaration information storage device main body (1) is electrically connected with an alarm (5) through a communication network port, the project declaration information storage device main body (1) is electrically connected with a computer terminal (6) through a communication network port, an information input and extraction control panel (2) is arranged in the project declaration information storage device main body (1), the information input and extraction control panel (2) is used for inputting and extracting project information in the project declaration information storage device main body (1), a reporting date reminding control board (3) is arranged in the project reporting information storage device main body (1), the reporting date reminding control board (3) is used for monitoring the reporting condition of the project information in the project reporting information storage device main body (1).
2. The intelligent information storage system for project declaration according to claim 1, wherein the information entry and extraction control board (2) includes an information entry receiving module (201), an information integration module (202) and an information extraction sending module (203), the information entry receiving module (201) is used for entering project information, the information integration module (202) is used for integrating project information, the information extraction sending module (203) is used for extracting project information, the information extraction sending module (203) is electrically connected to the information integration module (202), the information integration module (202) is electrically connected to the information entry receiving module (201), the information integration module (202) and the information extraction sending module (203) are electrically connected to the information entry and extraction control board (2), the information input and extraction control panel (2) is electrically connected with the project declaration information storage device main body (1).
3. The intelligent information storage system for project declaration according to claim 2, wherein the declaration date reminding control board (3) comprises a declaration date comparison module (301), an alarm control module (302) and a declaration success check module (303), the declaration date comparison module (301) is used for comparing project declaration dates, the alarm control module (302) is used for controlling the alarm (5) to be opened and closed, the declaration success check module (303) is used for checking project declaration conditions, the declaration date comparison module (301) is electrically connected to the alarm control module (302), the alarm control module (302) is electrically connected to the declaration date comparison module (301), the alarm control module (302) and the declaration success check module (303) are all electrically connected to the declaration date reminding control board (3), the declaration date reminding control plate (3) is electrically connected with the project declaration information storage device main body (1).
4. The intelligent storage system for information for project declaration according to claim 3, wherein the project declaration information storage apparatus main body (1) is electrically connected to a power supply (4) through a power supply interface.
5. The intelligent storage system for information used for project declaration according to claim 4, wherein the declaration date comparison module (301) includes E1 for network connection, E2 for extracting project declaration date information, E3 for extracting current date information, E4 for calculating coincidence of date information, and E5 for uploading result to equipment.
6. The intelligent storage system for information for project declaration according to claim 5, wherein said alarm control module (302) includes F1 network connection, F2 check button receiving alarm opening command, F3 alarm opening and F4 alarm closing.
7. The intelligent storage system for information used for project declaration according to claim 6, wherein said declaration success checking module (303) includes G1 opening network connection, G2 receiving project declaration completion information, G3 closing alarm and G4 opening alarm.
CN202210677995.XA 2022-06-16 2022-06-16 Intelligent information storage system for project declaration Pending CN114944174A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210677995.XA CN114944174A (en) 2022-06-16 2022-06-16 Intelligent information storage system for project declaration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210677995.XA CN114944174A (en) 2022-06-16 2022-06-16 Intelligent information storage system for project declaration

Publications (1)

Publication Number Publication Date
CN114944174A true CN114944174A (en) 2022-08-26

Family

ID=82910927

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210677995.XA Pending CN114944174A (en) 2022-06-16 2022-06-16 Intelligent information storage system for project declaration

Country Status (1)

Country Link
CN (1) CN114944174A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030055520A1 (en) * 2001-09-03 2003-03-20 Kazuo Tomii LSI manufacturing support server, LSI manufacturing support method, and LSI manufacturing support program
CN106802883A (en) * 2017-01-13 2017-06-06 深圳市慧通关网络科技有限公司 A kind of method and apparatus declared
CN107944732A (en) * 2017-12-06 2018-04-20 企创创(广州)科技有限公司 A kind of science and technology item consultative service system based on internet
JP2018180874A (en) * 2017-04-12 2018-11-15 富士通株式会社 Date/time information extraction method, date/time information extraction device, and date/time information extraction program
CN109739834A (en) * 2018-12-25 2019-05-10 青岛高企通互联网有限公司 A kind of science and technology item intelligent declaration system based on cloud computing
CN111583073A (en) * 2020-05-11 2020-08-25 云南美冠文化发展有限公司 Cultural creative industry intellectual property management system and method based on big data
CN112150324A (en) * 2020-10-19 2020-12-29 江苏云标科技有限公司 Intellectual property management and maintenance system under enterprise network cloud standard multi-main-body view angle

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030055520A1 (en) * 2001-09-03 2003-03-20 Kazuo Tomii LSI manufacturing support server, LSI manufacturing support method, and LSI manufacturing support program
CN106802883A (en) * 2017-01-13 2017-06-06 深圳市慧通关网络科技有限公司 A kind of method and apparatus declared
JP2018180874A (en) * 2017-04-12 2018-11-15 富士通株式会社 Date/time information extraction method, date/time information extraction device, and date/time information extraction program
CN107944732A (en) * 2017-12-06 2018-04-20 企创创(广州)科技有限公司 A kind of science and technology item consultative service system based on internet
CN109739834A (en) * 2018-12-25 2019-05-10 青岛高企通互联网有限公司 A kind of science and technology item intelligent declaration system based on cloud computing
CN111583073A (en) * 2020-05-11 2020-08-25 云南美冠文化发展有限公司 Cultural creative industry intellectual property management system and method based on big data
CN112150324A (en) * 2020-10-19 2020-12-29 江苏云标科技有限公司 Intellectual property management and maintenance system under enterprise network cloud standard multi-main-body view angle

Similar Documents

Publication Publication Date Title
CN107945328B (en) Office intelligent lock control system and method
CN105539869B (en) Unmanned plane maintaining-managing system and method
US5341290A (en) Modular system for printing and processing financial documents
CN112380504A (en) Face recognition-based nuclear power station mobile working terminal borrowing method and system
CN112634115A (en) Intelligent weighing system and method for port goods
CN110378803B (en) Industrial power outage and transmission C2C platform and method
CN109347698A (en) User terminal operations order and echo message monitoring method under a kind of linux system
CN114944174A (en) Intelligent information storage system for project declaration
CN101246605A (en) Multifunctional one-card type work attendance card punching system
CN112380507A (en) Method and system for borrowing mobile working terminal of nuclear power station based on work card verification
CN112380505A (en) Identity card verification-based nuclear power station mobile working terminal returning method and system
JPS59109676A (en) Security system
CN201311667Y (en) Multifunctional one-card type attendance card punching system
CN110738284A (en) IC card full-automatic card issuing, writing and recycling method
CN211062087U (en) Equipment point inspection system
CN112435003A (en) Control method for standard operation, production management platform and storage medium
CN114240370A (en) Enterprise Internet of things office integrated management system and management method thereof
CN111683123B (en) Uploading and downloading system and uploading and downloading operation method thereof
CN213693763U (en) Engineering project process control system
CN113066212B (en) Convenient and safe entrance informing system and method
CN103117084A (en) Information removal device and method for secret involved storage medium
CN2753709Y (en) Winch opening intelligent control device
CN210172080U (en) Whole process management and control system for endoscope cleaning
CN114488919A (en) Construction method and device applied to full-automatic scene linkage system
CN211454668U (en) Enterprise employee attendance system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination