CN213693763U - Engineering project process control system - Google Patents
Engineering project process control system Download PDFInfo
- Publication number
- CN213693763U CN213693763U CN202022405998.7U CN202022405998U CN213693763U CN 213693763 U CN213693763 U CN 213693763U CN 202022405998 U CN202022405998 U CN 202022405998U CN 213693763 U CN213693763 U CN 213693763U
- Authority
- CN
- China
- Prior art keywords
- terminal
- communication device
- router
- gateway
- application server
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The utility model discloses an engineering project process control system, which comprises a first terminal, a fingerprint identification device, a first communication device, a second communication device, a processor, a front gateway, a second terminal, an application server and a database server; the first terminal is in wireless connection with the front gateway, the front gateway is in wireless connection with the application server, the second terminal is in wireless connection with the application server, and the application server is connected with the database server; the fingerprint identification device is connected with the first communication device, the first communication device is wirelessly connected with the second communication device, the second communication device is connected with the processor, and the processor is connected with the front gateway. The embodiment of the utility model provides an in, just can open leading gateway through fingerprint identification device's discernment, just can adopt first terminal and type the site operation information to database server through gateway and application server promptly through fingerprint identification device's discernment, avoid appearing the problem of wrong type.
Description
Technical Field
The utility model relates to an engineering management and control technical field particularly, relates to an engineering project process management and control system.
Background
In an engineering project, the variety of materials to be controlled is various, and the workload of personnel investment is large, so that an engineering project process control system is needed to perform informatization control on engineering project material requirements, material to goods, installation, acceptance and other links of a construction unit site; at present, a constructor generally adopts a first terminal and inputs field construction information into a database server through a gateway and an application server, and a management and control party generally adopts a second terminal and checks the field construction information in the database server through the application server, so that the purpose of engineering project process management and control is achieved.
The current engineering project process control system does not identify a first terminal placed on a construction unit site, namely, anyone can adopt the first terminal placed on the construction unit site and input site construction information into a database server through a gateway and an application server, and due to the fact that site personnel of the construction unit are complex, the problem of wrong input possibly occurs due to wrong operation, accuracy of engineering project process control is affected, and certain defects exist.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome prior art not enough, the utility model provides an engineering project process management and control system among the engineering project process management and control system, need just can open leading gateway through fingerprint identification device's discernment, need just can adopt first terminal and type the site operation information to database server through gateway and application server through fingerprint identification device's discernment promptly, effectively avoided appearing the problem of mistake input because of the maloperation.
Correspondingly, the embodiment of the utility model provides an engineering project process management and control system, engineering project process management and control system includes first terminal, fingerprint identification device, first communication device, second communication device, treater, leading gateway, second terminal, application server and database server;
the first terminal is in wireless connection with the front gateway, the front gateway is in wireless connection with the application server, the second terminal is in wireless connection with the application server, and the application server is connected with the database server;
the fingerprint identification device is connected with the first communication device, the first communication device is wirelessly connected with the second communication device, the second communication device is connected with the processor, and the processor is connected with the front gateway.
In an optional embodiment, the engineering project process control system further includes a first router and a second router;
the second terminal is connected with the first router, the first router is in wireless connection with the second router, and the second router is connected with the application server.
In an optional implementation manner, the first router is a first wireless VPN router, the second router is a second wireless VPN router, and the first wireless VPN router and the second wireless VPN router are wirelessly connected by a VPN bridge dedicated line.
In an optional embodiment, the first communication device and the second communication device are WIFI modules or 5G communication modules.
In an optional implementation manner, the first terminal is a mobile phone terminal.
In an optional embodiment, the front gateway is a mobile application platform 2.0 front gateway;
the mobile phone terminal is in wireless connection with the mobile application platform 2.0 front gateway;
and the mobile application platform 2.0 front gateway is in wireless connection with the application server through a mobile application platform 2.0 channel.
An embodiment of the utility model provides an engineering project process management and control system among the engineering project process management and control system, constructor operating personnel need pass through fingerprint identification device's discernment could be opened leading gateway need pass through promptly fingerprint identification device's discernment could adopt first terminal passes through leading gateway with application server types in the site operation information extremely among the database server, effectively avoided because of the problem of mistake input appears in the maloperation, guaranteed the accurate nature of engineering project process management and control, had fine practicality.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
Fig. 1 is a schematic diagram of the construction project process control system according to the embodiment of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
Fig. 1 is a schematic diagram of the construction project process control system according to the embodiment of the present invention.
The embodiment of the utility model provides an engineering project process management and control system, engineering project process management and control system includes first terminal 1, fingerprint identification device 2, first communication device 3, second communication device 4, treater 5, leading gateway 6, second terminal 7, application server 8 and database server 9.
The first terminal 1 is wirelessly connected with the front gateway 6, the front gateway 6 is wirelessly connected with the application server 8, the second terminal 7 is wirelessly connected with the application server 8, and the application server 8 is connected with the database server 9.
In specific implementation, the application server 8 and the database server 9 are arranged between a construction unit site and a management and control unit site, the application server 8 provides application access, and the database server 9 is used for storing data information of the engineering project process management and control system.
The first terminal 1 and the front gateway 6 are arranged on the site of a construction unit, the first terminal 1 moves along with an operator of a construction party on the site of the construction unit, the front gateway 6 is fixedly arranged on the site of the construction unit, the construction party adopts the first terminal 1 and carries out data information interaction with the database server 9 through the front gateway 6 and the application server 8, and site construction information is recorded into the database server 9.
The second terminal 7 is arranged on the site of a management and control unit, and a management and control party adopts the second terminal 7 and accesses the database server 9 through the application server 8 to check the site construction information stored in the database server 9, so that the purpose of engineering project process management and control is achieved.
The fingerprint identification device 2 is connected with the first communication device 3, the first communication device 3 is wirelessly connected with the second communication device 4, the second communication device 4 is connected with the processor 5, and the processor 5 is connected with the front gateway 6.
In a specific implementation, the fingerprint identification device 2, the first communication device 3, the second communication device 4 and the processor 5 are installed at a construction unit site, in the construction unit site, the fingerprint identification device 2 and the first communication device 3 are movable with the operator of the construction party, the second communication device 4 and the processor 5 are fixedly installed at the construction unit site, the first communication device 3 and the second communication device 4 are used for realizing the communication between the fingerprint identification device 2 and the processor 5, and the processor 5 is used for controlling the opening and closing of the front gateway 6.
The fingerprint identification device 2 can read fingerprint images of operators of construction parties at any time and any place, perform fingerprint comparison, generate a correct fingerprint comparison result or an incorrect fingerprint comparison result, and send the correct fingerprint comparison result or the incorrect fingerprint comparison result to the processor 5 through the first communication device 3 and the second communication device 4; when the processor 5 receives a correct fingerprint comparison result, the processor 5 starts the front gateway 6, and a construction party can adopt the first terminal 1 and input field construction information into the database server 9 through the front gateway 6 and the application server 8; when the processor 5 receives a fingerprint comparison error result, the processor 5 closes the front gateway 6, and a constructor cannot adopt the first terminal 1 and input field construction information into the database server 9 through the front gateway 6 and the application server 8.
In the embodiment of the present invention, the engineering project process management and control system further includes a first router 101 and a second router 102;
the second terminal 7 is connected to the first router 101, the first router 101 is wirelessly connected to the second router 102, and the second router 101 is connected to the application server 8.
In a specific implementation, the second terminal 7 and the first router 101 are arranged on a site of a control unit, and the second router 101, the application server 8 and the database server 9 are also arranged between a site of a construction unit and a site of a control unit; the second terminal 7 may implement a remote connection with the application server 8 through the first router 101 and the second router 102, and may remotely access the database server 9 through the application server 8 to remotely view the field construction information stored in the database server 9, thereby achieving the purpose of remote engineering project process control.
Preferably, the first router 101 is a first wireless VPN router, the second router 102 is a second wireless VPN router, and the first wireless VPN router 101 and the second wireless VPN router 102 are wirelessly connected by a VPN bridge dedicated line.
Preferably, the first communication device 3 and the second communication device 4 are WIFI modules or 5G communication modules.
The embodiment of the utility model provides an in, first terminal 1 is preferably mobile phone terminal, and the constructor operating personnel of being convenient for type the site operation information extremely in the database server 9.
When the first terminal 1 is a mobile phone terminal, the front gateway 6 preferably adopts a mobile application platform 2.0 front gateway; the mobile phone terminal 1 is in wireless connection with the mobile application platform 2.0 front gateway; the mobile application platform 2.0 front gateway is in wireless connection with the application server 8 through a mobile application platform 2.0 channel; by adopting the mobile application platform 2.0 front gateway and connecting the mobile application platform 2.0 channel with the application server 8, the site construction information can be more quickly input into the database server 9.
The embodiment of the utility model provides an engineering project process management and control system in engineering project process management and control system, constructor operating personnel need pass through fingerprint identification device 2's discernment can only be opened leading gateway 6 promptly need pass through fingerprint identification device 2's discernment can only adopt first terminal 1 passes through leading gateway 6 with application server 8 types on-the-spot construction information extremely in the database server 9, effectively avoided because of the problem that the mistake was typeeed appears in the maloperation, guaranteed the accurate nature of engineering project process management and control, had fine practicality.
Those skilled in the art will appreciate that all or part of the steps in the methods of the above embodiments may be implemented by associated hardware instructed by a program, which may be stored in a computer-readable storage medium, and the storage medium may include: a Read Only Memory (ROM), a Random Access Memory (RAM), a magnetic or optical disk, or the like.
In addition, the engineering project process management and control system provided by the embodiment of the present invention is introduced in detail, and a specific embodiment should be adopted herein to explain the principle and the implementation of the present invention, and the description of the above embodiment is only used to help understand the method and the core idea of the present invention; meanwhile, for the general technical personnel in the field, according to the idea of the present invention, there are changes in the specific implementation and application scope, to sum up, the content of the present specification should not be understood as the limitation of the present invention.
Claims (6)
1. The engineering project process control system is characterized by comprising a first terminal, a fingerprint identification device, a first communication device, a second communication device, a processor, a front gateway, a second terminal, an application server and a database server;
the first terminal is in wireless connection with the front gateway, the front gateway is in wireless connection with the application server, the second terminal is in wireless connection with the application server, and the application server is connected with the database server;
the fingerprint identification device is connected with the first communication device, the first communication device is wirelessly connected with the second communication device, the second communication device is connected with the processor, and the processor is connected with the front gateway.
2. The engineering project process management and control system of claim 1, further comprising a first router and a second router;
the second terminal is connected with the first router, the first router is in wireless connection with the second router, and the second router is connected with the application server.
3. The engineering project process management and control system according to claim 2, wherein the first router is a first wireless VPN router, the second router is a second wireless VPN router, and the first wireless VPN router and the second wireless VPN router are wirelessly connected by a VPN bridge dedicated line.
4. The engineering project process management and control system of claim 1, wherein the first communication device and the second communication device are WIFI modules or 5G communication modules.
5. The engineering project process management and control system of claim 1, wherein the first terminal is a mobile phone terminal.
6. The engineering project process management and control system of claim 5, wherein the front-facing gateway is a mobile application platform 2.0 front-facing gateway;
the mobile phone terminal is in wireless connection with the mobile application platform 2.0 front gateway;
and the mobile application platform 2.0 front gateway is in wireless connection with the application server through a mobile application platform 2.0 channel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022405998.7U CN213693763U (en) | 2020-10-26 | 2020-10-26 | Engineering project process control system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202022405998.7U CN213693763U (en) | 2020-10-26 | 2020-10-26 | Engineering project process control system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213693763U true CN213693763U (en) | 2021-07-13 |
Family
ID=76761487
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202022405998.7U Active CN213693763U (en) | 2020-10-26 | 2020-10-26 | Engineering project process control system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213693763U (en) |
-
2020
- 2020-10-26 CN CN202022405998.7U patent/CN213693763U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112468527B (en) | Linkage control system and linkage control method | |
CN105741395A (en) | Entrance guard access method and system based on two-dimension code and face identification | |
CN109509021A (en) | Abnormality recognition method, device, server and the storage medium of Behavior-based control track | |
CN103985170B (en) | A kind of cloud garage management method and device | |
CN204791237U (en) | Wireless Intelligence entrance guard's intercom system | |
CN104299303A (en) | Intelligent access control system and implementation method of intelligent access control system | |
CN106887064A (en) | A kind of access controller and gate control system based on dynamic password | |
CN113612659B (en) | Device networking test method and device, electronic device and storage medium | |
CN109688434A (en) | Offline open a court session processing method, device, terminal, system and storage medium | |
CN205899636U (en) | Intelligent gate inhibition system | |
CN108156058A (en) | Access method and device, the readable storage medium storing program for executing of intelligent gateway device | |
CN106506212A (en) | Abnormal information acquisition methods and user terminal | |
CN105992188B (en) | A kind of application update method and device | |
CN213693763U (en) | Engineering project process control system | |
CN203891662U (en) | Smart safe controlled by mobile phone and fingerprints | |
CN108683703A (en) | A kind of intelligence message board information interaction system and application method | |
CN204270387U (en) | A kind of unlock key management machine | |
CN114945189A (en) | Construction method and device of provincial-network-level 5G communication management system | |
CN211124178U (en) | Laboratory access control system based on internet of things | |
CN111277649B (en) | Data processing method, system and storage medium for gas use state | |
CN211062087U (en) | Equipment point inspection system | |
CN108287986A (en) | A kind of permission is instantaneously authorized and Repossession method and device | |
CN112911629A (en) | Network testing method and device and computer readable storage medium | |
CN110826668A (en) | Intelligent inspection recording system and method for concrete production equipment | |
CN111428890A (en) | Cabinet maintenance management method, system and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |