CN114856291B - Circuit rod installation device and method for communication circuit construction - Google Patents
Circuit rod installation device and method for communication circuit construction Download PDFInfo
- Publication number
- CN114856291B CN114856291B CN202210532577.1A CN202210532577A CN114856291B CN 114856291 B CN114856291 B CN 114856291B CN 202210532577 A CN202210532577 A CN 202210532577A CN 114856291 B CN114856291 B CN 114856291B
- Authority
- CN
- China
- Prior art keywords
- communication
- bottom plate
- rod body
- bushing
- steel cable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/34—Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
- E04H12/347—Arrangements for setting poles in the ground
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Load-Engaging Elements For Cranes (AREA)
Abstract
The invention discloses a circuit rod mounting device for communication circuit construction and a mounting method thereof, wherein the circuit rod mounting device comprises a limiting plate, a first bushing, an upright post, a bottom plate, a manual winch, a positioning pile, a second anchor ear and a through groove; the outer wall of one end of the communication rod body, which is far away from the second anchor ear, is sheathed with a first anchor ear, a pulley is arranged in the upper end of the upright post, the manual winch is connected with a steel cable, and the steel cable passes through the pulley to be connected with the first anchor ear; the bottom plate lower surface is provided with first bush, and the equal embedding of bottom plate both sides surface is installed the sleeve pipe that the equidistance distributes, the inside all grafting of sleeve pipe has the spud. According to the invention, the communication rod body is more effectively limited, so that safety accidents in the installation process can be avoided, and the communication rod is safer and more reliable.
Description
Technical Field
The invention relates to the technical field of communication construction, in particular to a circuit rod installation device and a circuit rod installation method for communication circuit construction.
Background
The communication line is a path that ensures the transfer of information. At present, long-distance trunk transmission is mainly supplemented by optical cables and wireless transmission such as satellite, microwave and the like; the inter-province and intra-province long-distance transmission is mainly based on an optical cable, and is assisted by a microwave and satellite circuit; the local network and the access network line are mainly optical cables, and the copper cables are auxiliary. In the communication line laying process, overhead mode is mainly adopted for laying lines in rural and suburban areas. Therefore, in the construction process, the line pole for erecting the communication line is required to be installed, the traditional communication line pole is usually installed by adopting a tripod for hoisting or a pole hole for manually opening a chute, a scissor and a fork for supporting, the safety of the installation process is low, the supporting rod is heavy, and the site carrying is inconvenient.
Through mass search, the prior art is found that the publication number is: CN111794515B discloses a method for installing and constructing a power construction cement telegraph pole, which uses a power construction cement telegraph pole installation and construction device, the power construction cement telegraph pole installation and construction device comprises a base, a fixing device and a clamping unit, the fixing device is installed on the upper surface of the base, the clamping unit is installed in the fixing device, and the top end surface of the fixing device is fixedly connected with the top end surface of the clamping unit through a fixing bolt. The invention can solve the following problems in the installation of the cement telegraph pole for electric power construction at present: when the cement telegraph pole is installed, the bottom end of the telegraph pole is buried in a foundation pit and filled with soil or concrete to ensure the stability of the telegraph pole, but the problem that the soil is loosened due to the fact that soil is damped and soaked in water is buried with the soil to cause potential safety hazards, the bottom end of the telegraph pole is fixed with the concrete, the weight of the telegraph pole is greatly increased, and the telegraph pole is difficult to move due to the change of a later-period line.
To sum up, in the existing communication pole installation process, most of the communication poles need to be installed by adopting a tripod to hoist or manually mining scissors and fork to support, the lower ends of the communication poles can be placed in the electric pole holes, the defects that the safety of the installation process is low, the support rods are heavy, and the on-site transportation is inconvenient exist, a large number of workers are needed to cooperate to operate in the installation process, and after the communication poles are hoisted, the communication poles swing in the air, so that the stability of the communication poles is not guaranteed, and safety accidents are easy to occur.
Disclosure of Invention
The invention aims to provide a circuit rod mounting device for communication circuit construction and a mounting method thereof, which are used for solving the problems in the background technology.
In order to achieve the above purpose, the present invention provides the following technical solutions: the utility model provides a circuit pole installation device and installation method for communication line construction, includes limiting plate, first bush, stand, bottom plate, manual hoist engine, locating pile, second staple bolt and logical groove, logical groove has been seted up to bottom plate upper surface one side, logical groove both sides symmetry welding has the limiting plate, the spout has all been seted up on the limiting plate surface, the communication pole body is arranged in between the limiting plate, communication pole body one end surface has cup jointed the second staple bolt, second staple bolt both ends outer wall is provided with the slide bar that runs through the spout inside;
the outer wall of one end of the communication rod body, which is far away from the second anchor ear, is sheathed with a first anchor ear, a pulley is arranged in the upper end of the upright post, the manual winch is connected with a steel cable, and the steel cable passes through the pulley to be connected with the first anchor ear;
the bottom plate lower surface is provided with first bush, and the equal embedding of bottom plate both sides surface is installed the sleeve pipe that the equidistance distributes, the inside all grafting of sleeve pipe has the spud.
Preferably, one end of the through groove penetrates through the edge of one side of the bottom plate, and second reinforcing rods which are symmetrically distributed are welded between the outer wall of the opposite side of the limiting plate and the upper surface of the bottom plate;
the sliding groove is in a quarter circular arc design, the upper end of the sliding groove is designed in a downward vertical mode, and one end of the sliding groove corresponds to the circle center of the circular arc on the inner wall of one end of the through groove.
Preferably, first reinforcing rods are welded between the outer walls of the two sides of the upright posts and the bottom plate, the upright posts are positioned between the limiting plates and the manual winding machine, and hooks are arranged between the steel cables and the first anchor ears.
Preferably, a second bushing is arranged on one side of the first bushing, the first bushing and the inner wall of the second bushing form a closed circle, and a connecting plate is welded on the upper surface of the first bushing;
symmetrically distributed screws are inserted between the bottom plate and the connecting plate.
Preferably, the outer wall of the lower end of the sleeve is rotationally sleeved with a rotating sleeve, and the outer walls of the two sides of the rotating sleeve are symmetrically provided with rollers.
Preferably, the mounting method is as follows:
s1: the staff erects the first bushing and the second bushing, connects the bottom plate and the first bushing through bolts, inserts the positioning pile into the ground, and fixes the bottom plate;
s2: the staff moves one end of the communication rod body between the limiting plates, sleeves the second anchor ear on the surface of one end of the communication rod body, and installs the first anchor ear on the other end of the communication rod body;
s3: after a worker winds the steel cable on the surface of the pulley, the steel cable is connected with the first hoop through the hook, the manual winch winds the steel cable to drive the communication rod body to rotate along the inside of the chute, and when the second hoop moves to the upper end of the chute, the steel cable slides along a notch of the chute, which is perpendicular to the ground, so that the lower end of the communication rod body is arranged in the first bushing and the second bushing;
s4: after the communication pole body is inserted into the first bushing and the second bushing, the lower end of the communication pole body is arranged in the pole hole, the second hoop is detached by a worker, the screw and the positioning pile are detached, the bottom plate can be removed, the first bushing and the second bushing are detached subsequently, backfilling is carried out between the pole hole and the communication pole body, and the installation of the communication pole body is completed.
Compared with the prior art, the invention has the beneficial effects that: according to the invention, the electric pole hole is reinforced through the first bushing and the second bushing, so that the influence on the stable running of the lower end of the communication pole body in the interior caused by the collapse of the electric pole hole in the installation process is avoided, and the bottom plate can be positioned to a certain extent after the first bushing and the second bushing are combined, so that the stability of the bottom plate can be ensured and the installation accuracy can be ensured;
in the installation, between limiting plate is arranged in to the one end of communication pole body, and manual hoist engine rolling steel cable can drive the communication pole body and rotate between the limiting plate, and when the communication pole body was in the vertical state, the communication pole body can be along the spout in falling to the pole hole naturally, and at communication pole body rotation in-process, there is the limiting plate to carry out spacingly to communication pole body both sides, has ensured the stability of communication pole body at the in-process of lifting by crane, factor of safety is higher.
Drawings
FIG. 1 is a schematic diagram of a front view of the present invention;
FIG. 2 is an enlarged schematic view of a second anchor ear of the present invention;
FIG. 3 is a schematic top view of the present invention;
fig. 4 is an enlarged schematic view of the first bushing and the second bushing according to the present invention.
In the figure: 1. the first hoop; 2. a communication lever body; 3. a limiting plate; 4. a first bushing; 5. a column; 6. a bottom plate; 7. a manual hoist; 8. positioning piles; 9. a wire rope; 10. a pulley; 11. a chute; 12. the second hoop; 13. a hook; 14. a roller; 15. a rotating sleeve; 16. a through groove; 17. a slide bar; 18. a sleeve; 19. a first reinforcing rod; 20. a screw; 21. a second reinforcing rod; 22. a connecting plate; 23. and a second bushing.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
In the description of the present invention, it should be noted that the directions or positional relationships indicated by the terms "upper", "lower", "inner", "outer", "front", "rear", "both ends", "one end", "the other end", etc. are based on the directions or positional relationships shown in the drawings, are merely for convenience of describing the present invention and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific direction, be configured and operated in the specific direction, and thus should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it should be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "provided," "connected," and the like are to be construed broadly, and may be fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present invention will be understood in specific cases by those of ordinary skill in the art.
Referring to fig. 1 to 4, four embodiments of the present invention are provided: a circuit pole mounting device for communication circuit construction and a mounting method thereof are provided:
embodiment one:
a circuit pole installation device for communication line construction, including limiting plate 3, first bush 4, stand 5, bottom plate 6, manual hoist engine 7, locating pile 8, second staple bolt 12 and logical groove 16, logical groove 16 has been seted up to bottom plate 6 upper surface one side, logical groove 16 bilateral symmetry welding has limiting plate 3, spout 11 has all been seted up on limiting plate 3 surface, between limiting plate 3 was arranged in to communication pole body 2, second staple bolt 12 has been cup jointed on communication pole body 2 one end surface, second staple bolt 12 both ends outer wall is provided with the slide bar 17 that runs through spout 11 inside, spout 11 is quarter circle arc design, and spout 11 upper end adopts downward perpendicular form design, and spout 11 one end is corresponding with the centre of a circle of logical groove 16 one end inner wall circular arc. In the installation, the limiting plate 3 is arranged in to one end of communication pole body 2 between, and manual hoist engine 7 rolling steel cable 9 can drive communication pole body 2 and rotate between limiting plate 3, and when communication pole body 2 was in the vertical state, communication pole body 2 can be along spout 11 natural fall to the pole hole in, and in communication pole body 2 rotation in-process, there is limiting plate 3 to carry out spacingly to communication pole body 2 both sides, has ensured communication pole body 2 stability in the lifting by crane in-process, and factor of safety is higher
The bottom plate 6 can be hoisted and carried by adopting the existing equipment, after the bottom plate 6 is transported to a preset place, a worker erects the first bushing 4 and the second bushing 23, connects the bottom plate 6 with the first bushing 4 through the screw 20, and simultaneously inserts the positioning pile 8 into the ground to fix the bottom plate 6; the staff moves one end of the communication rod body 2 to between the limiting plates 3, sleeves the second anchor ear 12 on the surface of one end of the communication rod body 2, and installs the first anchor ear 1 on the other end of the communication rod body 2; after the staff winds steel cable 9 on pulley 10 surface, be connected with first staple bolt 1 through couple 13, manual hoist engine 7 rolling steel cable 9 drives communication pole body 2 and rotates along spout 11 inside, and when second staple bolt 12 moved to spout 11 upper end, can slide along the notch of spout 11 perpendicular to ground for communication pole body 2 lower extreme is arranged in inside first bush 4 and second bush 23.
When inconvenient transport communication pole body 2, can lift by crane the mode that machinery was cooperated with the manpower and carry out communication pole body 2 and remove, adopt to lift by crane machinery to lift by crane communication pole body 2 to the position department of 0.5 meters distance to ground, first staple bolt 1 and second staple bolt 12 are installed to the staff is manual to place the one end of communication pole body 2 between limiting plate 3, and connect steel cable 9 and couple 13 with first staple bolt 1, realize the communication pole body 2 installation under the complicated installation condition.
Embodiment two:
the outer wall of one end of the communication rod body 2, which is far away from the second anchor ear 12, is sheathed with a first anchor ear 1, a pulley 10 is arranged in the upper end of the upright post 5, a steel cable 9 is connected with the manual winch 7, and the steel cable 9 passes through the pulley 10 to be connected with the first anchor ear 1;
the first anchor ear 1 is two arc components in second anchor ear 12 and constitutes, the junction adopts the mode of bolt grafting to connect, screw up through the bolt, realize that first anchor ear 1 and second anchor ear 12 are connected with communication pole body 2 surface stability, bottom plate 6 lower surface is provided with first bush 4, and the sleeve pipe 18 of equidistance distribution is all installed in the embedding of bottom plate 6 both sides surface, sleeve pipe 18 inside has all pegged graft spud 8, spud 8 inserts in the ground soil, can fix bottom plate 6, ensure the stability of follow-up use, lead to groove 16 one end and run through bottom plate 6 one side edge, the limiting plate 3 all welds the second stiffening rod 21 of symmetric distribution away from between one side outer wall and the bottom plate 6 upper surface mutually, second stiffening rod 21 can provide the support limiting plate 3 both sides, ensure that limiting plate 3 can keep, stability when improving communication pole body 2 rotates, prevent to appear shifting and lead to toppling over when communication pole body 2 rotates and rise, cause the straight accident.
The first reinforcing rods 19 are welded between the outer walls of the two sides of the upright post 5 and the bottom plate 6, the height of the upright post 5 is 2m, the first reinforcing rods 19 can provide supporting force in four directions of the upright post 5, stability and mechanical strength of the upright post 5 are kept, the upright post 5 is located between the limiting plate 3 and the manual winch 7, the hook 13 is arranged between the steel cable 9 and the first hoop 1, the manual winch 7 winds the steel cable 9, the communication rod body 2 is driven to rotate along the inside of the sliding groove 11, when the second hoop 12 moves to the upper end of the sliding groove 11, the communication rod body can slide along the notch of the sliding groove 11 perpendicular to the ground, and the lower end of the communication rod body 2 is arranged in the inside of the first lining 4 and the second lining 23.
Embodiment III:
the first bush 4 one side is provided with the second bush 23, and first bush 4 and second bush 23 inner wall constitute a closed circular, and first bush 4 upper surface welding has connecting plate 22, and peg graft between bottom plate 6 and the connecting plate 22 has symmetrical distribution's screw 20, and first bush 4 and second bush 23 consolidate the pole hole, avoid collapsing and influence the stable row in arranging the inside in communication pole body 2 lower extreme in the pole hole in the installation to after first bush 4 and the second bush 23 combine, can also carry out the location to a certain extent to bottom plate 6, can ensure the stability of bottom plate 6 and ensure the accuracy of installation.
The outer wall of the lower end of the sleeve 18 is rotationally sleeved with the rotating sleeve 15, the rollers 14 are symmetrically arranged on the outer walls of the two sides of the rotating sleeve 15, the rollers 14 can freely rotate on the lower surface of the sleeve 18 through the rotating sleeve 15, the base plate 6 can be conveniently moved, the flexibility of the whole movement of equipment is improved, movable components are integrally adopted, the base plate 6 can be flexibly carried and transported, compared with the existing large-scale equipment, the movable components can be hoisted into a transport vehicle to flexibly transport and transport the movable components, the movable components can be used for mountain lands, meanwhile, when the distance between the communication rod body 2 and the base plate 6 is far, workers can install the first hoop 1 at one end of the communication rod body 2, the manual winch 7 is adopted to pull the steel cable 9 to move, the communication rod body 2 can also be pulled, the movable components can be applied to the communication rod body 2 under the mountain traction, the labor intensity of workers for transporting the communication rod body 2 is saved, and the movable components are more convenient to use.
Embodiment four:
a circuit pole installation method for communication circuit construction is as follows:
s1: the staff erects the first bush 4 and the second bush 23, connects the bottom plate 6 and the first bush 4 through the screw 20, inserts the positioning pile 8 into the ground, and fixes the bottom plate 6;
s2: the staff moves one end of the communication rod body 2 to between the limiting plates 3, sleeves the second anchor ear 12 on the surface of one end of the communication rod body 2, and installs the first anchor ear 1 on the other end of the communication rod body 2;
s3: after a worker winds the steel cable 9 on the surface of the pulley 10, the steel cable 9 is connected with the first anchor ear 1 through the hook 13, the manual winch 7 winds the steel cable 9 to drive the communication rod body 2 to rotate along the inside of the chute 11, and when the second anchor ear 12 moves to the upper end of the chute 11, the steel cable slides along a notch of the chute 11 perpendicular to the ground, so that the lower end of the communication rod body 2 is arranged in the first lining 4 and the second lining 23;
s4: after the communication rod body 2 is inserted into the first bushing 4 and the second bushing 23, the lower end of the communication rod body 2 is placed in the electric pole hole, a worker removes the second hoop 12 and removes the screw 20 and the positioning pile 8, the bottom plate 6 can be removed, then the first bushing 4 and the second bushing 23 are removed, backfilling is carried out between the electric pole hole and the communication rod body 2, and the installation of the communication rod body 2 is completed.
Working principle: the staff erects the first bush 4 and the second bush 23, and connect the bottom plate 6 with the first bush 4 through the screw 20, the first bush 4 and the second bush 23 consolidate the electric pole hole, avoid collapsing the electric pole hole in the installation process and influence the stable row in the interior of the communication pole body 2, and after the first bush 4 and the second bush 23 combine, can also position the bottom plate 6 to a certain extent, can ensure the stability of the bottom plate 6 and ensure the accuracy of installation, insert the locating pile 8 into the ground, fix the bottom plate 6, the staff moves one end of the communication pole body 2 to between the limiting plates 3, cup joint the second hoop 12 on one end surface of the communication pole body 2, and install the first hoop 1 on the other end of the communication pole body 2, the staff winds the steel cable 9 on the surface of the pulley 10, connect with the first hoop 1 through the hook 13, the manual winch 7 winds the steel cable 9, drive the communication pole body 2 to rotate along the interior of the chute 11, when the second hoop 12 moves to the upper end of the chute 11, can slide along the chute 11, make the communication pole body 2 slide down along the chute 11, and the lower end of the communication pole body 2 is arranged in the first bush 23; after the communication rod body 2 is inserted into the first bushing 4 and the second bushing 23, the lower end of the communication rod body 2 is placed in the electric pole hole, a worker removes the second hoop 12 and removes the screw 20 and the positioning pile 8, the bottom plate 6 can be removed, then the first bushing 4 and the second bushing 23 are removed, backfilling is carried out between the electric pole hole and the communication rod body 2, and the installation of the communication rod body 2 is completed.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Claims (6)
1. A circuit pole installation device for communication line construction, includes limiting plate (3), first bush (4), stand (5), bottom plate (6), manual hoist engine (7), spud pile (8), second staple bolt (12) and logical groove (16), its characterized in that: a through groove (16) is formed in one side of the upper surface of the bottom plate (6), limiting plates (3) are symmetrically welded on two sides of the through groove (16), sliding grooves (11) are formed in the surfaces of the limiting plates (3), a communication rod body (2) is arranged between the limiting plates (3), a second hoop (12) is sleeved on the surface of one end of the communication rod body (2), and sliding rods (17) penetrating through the sliding grooves (11) are arranged on the outer walls of two ends of the second hoop (12);
the communication pole body (2) is away from the outer wall of one end of the second anchor ear (12) and is sleeved with the first anchor ear (1), a pulley (10) is arranged at the inner part of the upper end of the upright post (5), the manual winch (7) is connected with a steel cable (9), and the steel cable (9) passes through the pulley (10) to be connected with the first anchor ear (1);
the novel steel plate is characterized in that a first bushing (4) is arranged on the lower surface of the bottom plate (6), sleeves (18) distributed at equal intervals are embedded and installed on the surfaces of two sides of the bottom plate (6), and positioning piles (8) are inserted into the sleeves (18).
2. A line pole mounting apparatus for communication line construction as claimed in claim 1, wherein: one end of the through groove (16) penetrates through the edge of one side of the bottom plate (6), and second reinforcing rods (21) which are symmetrically distributed are welded between the outer wall of one side, opposite to the side, of the limiting plate (3) and the upper surface of the bottom plate (6);
the sliding groove (11) is in a quarter circular arc design, the upper end of the sliding groove (11) is designed in a downward vertical mode, and one end of the sliding groove (11) corresponds to the circle center of the circular arc on the inner wall of one end of the through groove (16).
3. A line pole mounting apparatus for communication line construction as claimed in claim 1, wherein: a first reinforcing rod (19) is welded between the outer walls of the two sides of the upright post (5) and the bottom plate (6), the upright post (5) is positioned between the limiting plate (3) and the manual winch (7), and a hook (13) is arranged between the steel cable (9) and the first hoop (1).
4. A line pole mounting apparatus for communication line construction as claimed in claim 1, wherein: a second bushing (23) is arranged on one side of the first bushing (4), the first bushing (4) and the inner wall of the second bushing (23) form a closed round shape, and a connecting plate (22) is welded on the upper surface of the first bushing (4);
symmetrically distributed screws (20) are inserted between the bottom plate (6) and the connecting plate (22).
5. A line pole mounting apparatus for communication line construction as claimed in claim 1, wherein: the outer wall of the lower end of the sleeve (18) is rotationally sleeved with a rotating sleeve (15), and the outer walls of the two sides of the rotating sleeve (15) are symmetrically provided with rollers (14).
6. A pole mounting method for communication line construction according to claims 1 to 5, characterized in that: the installation method comprises the following steps:
s1: the staff erects the first bushing (4) and the second bushing (23), connects the bottom plate (6) and the first bushing (4) through the screw (20), inserts the locating pile (8) into the ground at the same time, and fixes the bottom plate (6);
s2: the staff moves one end of the communication rod body (2) to a position between the limiting plates (3), the second anchor ear (12) is sleeved on the surface of one end of the communication rod body (2), and the first anchor ear (1) is arranged at the other end of the communication rod body (2);
s3: after a worker winds a steel cable (9) on the surface of a pulley (10), the steel cable is connected with a first hoop (1) through a hook (13), a manual winch (7) winds the steel cable (9) to drive a communication rod body (2) to rotate along the inside of a sliding groove (11), and when a second hoop (12) moves to the upper end of the sliding groove (11), the steel cable slides along a notch of the sliding groove (11) perpendicular to the ground, so that the lower end of the communication rod body (2) is arranged in a first lining (4) and a second lining (23);
s4: after the communication rod body (2) is inserted into the first lining (4) and the second lining (23), the lower end of the communication rod body (2) is placed in the electric pole hole, a worker removes the second hoop (12) and removes the screw (20) and the positioning pile (8), the bottom plate (6) can be removed, then the first lining (4) and the second lining (23) are removed, backfilling is carried out between the electric pole hole and the communication rod body (2), and the installation of the communication rod body (2) is completed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210532577.1A CN114856291B (en) | 2022-05-10 | 2022-05-10 | Circuit rod installation device and method for communication circuit construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210532577.1A CN114856291B (en) | 2022-05-10 | 2022-05-10 | Circuit rod installation device and method for communication circuit construction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN114856291A CN114856291A (en) | 2022-08-05 |
CN114856291B true CN114856291B (en) | 2023-05-05 |
Family
ID=82637781
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210532577.1A Active CN114856291B (en) | 2022-05-10 | 2022-05-10 | Circuit rod installation device and method for communication circuit construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114856291B (en) |
Citations (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB446795A (en) * | 1935-07-01 | 1936-05-06 | Bernhard Mcmahon | Improvements relating to the repair and anchorage of telegraph poles and the like |
FR1411070A (en) * | 1964-07-02 | 1965-09-17 | Chaudronnerie De L Ouest Soc D | Simple tilting silo installation process |
FR1455816A (en) * | 1965-01-11 | 1966-10-21 | Chantiers De La Seine Maritime | Improvements to high-rise construction processes |
GB201415288D0 (en) * | 2014-08-29 | 2014-10-15 | Cpd Powerline Ltd | Pole erection apparatus and method |
CN106245983A (en) * | 2016-08-25 | 2016-12-21 | 无锡市同腾复合材料有限公司 | The hydraulic vertical rod-type installation method of compound polyurethane material electric pole |
CN107916823A (en) * | 2017-11-30 | 2018-04-17 | 江西省互电气有限公司 | A kind of electric pole aids in fixing bracket |
CN108104577A (en) * | 2017-12-21 | 2018-06-01 | 国网江苏省电力公司泰州供电公司 | A kind of electric power network electric pole stringer and construction method |
CN108729734A (en) * | 2018-06-05 | 2018-11-02 | 中机国能电力工程有限公司 | A kind of simple high-voltage direct-burried bar fixed frame |
CN209963647U (en) * | 2019-08-06 | 2020-01-17 | 中铁电气化局集团有限公司 | Hoisting device for assembling power equipment on electric pole |
CN110886531A (en) * | 2019-12-05 | 2020-03-17 | 陈小雨 | Overhead transmission line electric power tower installation construction method |
CN110905270A (en) * | 2019-11-28 | 2020-03-24 | 国网河南省电力公司平顶山供电公司 | Erecting rod straightening device for power grid erection |
CN111794515A (en) * | 2020-07-23 | 2020-10-20 | 潘春燕 | Installation and construction method for electric power construction cement telegraph pole |
CN212002582U (en) * | 2020-04-23 | 2020-11-24 | 中国铁塔股份有限公司雅安市分公司 | Communication tower with high stability |
CN112727229A (en) * | 2020-12-24 | 2021-04-30 | 肇庆市小凡人科技有限公司 | A pole setting device for communication engineering |
CN113548598A (en) * | 2021-04-22 | 2021-10-26 | 中建八局装饰工程有限公司 | GRC (glass fiber reinforced concrete) wrapped column veneer mounting system, construction method and round wrapped column veneer structure |
CN215768401U (en) * | 2021-09-06 | 2022-02-08 | 成敏 | Bridge tunnel non-contact crack detection measuring device |
CN216587967U (en) * | 2021-11-17 | 2022-05-24 | 江苏铭远杆塔有限公司 | Box type counterweight type foundation fast-assembling base station communication rod |
CN217159113U (en) * | 2022-06-15 | 2022-08-09 | 山东锐光电子工程科技有限公司 | Electric power construction is with erectting auxiliary device |
CN115162822A (en) * | 2022-06-29 | 2022-10-11 | 国网河南省电力公司安阳供电公司 | Power grid telegraph pole erecting device and construction method |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9388599B2 (en) * | 2014-02-27 | 2016-07-12 | Parsons Corporation | Wind tower erection system |
-
2022
- 2022-05-10 CN CN202210532577.1A patent/CN114856291B/en active Active
Patent Citations (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB446795A (en) * | 1935-07-01 | 1936-05-06 | Bernhard Mcmahon | Improvements relating to the repair and anchorage of telegraph poles and the like |
FR1411070A (en) * | 1964-07-02 | 1965-09-17 | Chaudronnerie De L Ouest Soc D | Simple tilting silo installation process |
FR1455816A (en) * | 1965-01-11 | 1966-10-21 | Chantiers De La Seine Maritime | Improvements to high-rise construction processes |
GB201415288D0 (en) * | 2014-08-29 | 2014-10-15 | Cpd Powerline Ltd | Pole erection apparatus and method |
CN106245983A (en) * | 2016-08-25 | 2016-12-21 | 无锡市同腾复合材料有限公司 | The hydraulic vertical rod-type installation method of compound polyurethane material electric pole |
CN107916823A (en) * | 2017-11-30 | 2018-04-17 | 江西省互电气有限公司 | A kind of electric pole aids in fixing bracket |
CN108104577A (en) * | 2017-12-21 | 2018-06-01 | 国网江苏省电力公司泰州供电公司 | A kind of electric power network electric pole stringer and construction method |
CN108729734A (en) * | 2018-06-05 | 2018-11-02 | 中机国能电力工程有限公司 | A kind of simple high-voltage direct-burried bar fixed frame |
CN209963647U (en) * | 2019-08-06 | 2020-01-17 | 中铁电气化局集团有限公司 | Hoisting device for assembling power equipment on electric pole |
CN110905270A (en) * | 2019-11-28 | 2020-03-24 | 国网河南省电力公司平顶山供电公司 | Erecting rod straightening device for power grid erection |
CN110886531A (en) * | 2019-12-05 | 2020-03-17 | 陈小雨 | Overhead transmission line electric power tower installation construction method |
CN212002582U (en) * | 2020-04-23 | 2020-11-24 | 中国铁塔股份有限公司雅安市分公司 | Communication tower with high stability |
CN111794515A (en) * | 2020-07-23 | 2020-10-20 | 潘春燕 | Installation and construction method for electric power construction cement telegraph pole |
CN112727229A (en) * | 2020-12-24 | 2021-04-30 | 肇庆市小凡人科技有限公司 | A pole setting device for communication engineering |
CN113548598A (en) * | 2021-04-22 | 2021-10-26 | 中建八局装饰工程有限公司 | GRC (glass fiber reinforced concrete) wrapped column veneer mounting system, construction method and round wrapped column veneer structure |
CN215768401U (en) * | 2021-09-06 | 2022-02-08 | 成敏 | Bridge tunnel non-contact crack detection measuring device |
CN216587967U (en) * | 2021-11-17 | 2022-05-24 | 江苏铭远杆塔有限公司 | Box type counterweight type foundation fast-assembling base station communication rod |
CN217159113U (en) * | 2022-06-15 | 2022-08-09 | 山东锐光电子工程科技有限公司 | Electric power construction is with erectting auxiliary device |
CN115162822A (en) * | 2022-06-29 | 2022-10-11 | 国网河南省电力公司安阳供电公司 | Power grid telegraph pole erecting device and construction method |
Non-Patent Citations (1)
Title |
---|
架空配电线路拉线安装施工技术分析;伍敬怡;;电子世界(第22期);全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN114856291A (en) | 2022-08-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110697590B (en) | Wire lifting device for electrified vertical removing pole and ground potential vertical removing method | |
CN111794754B (en) | Pipe piece assembled derrick and construction method thereof | |
JP6554341B2 (en) | Construction method of foundation pile | |
CN104695752A (en) | Rapid repairing tower system and erection method thereof | |
CN108203981B (en) | System and method for installing steel support in cover and excavation method | |
CN111395395A (en) | Installation process of subway deep foundation pit cover excavation lower supporting system | |
CN114856291B (en) | Circuit rod installation device and method for communication circuit construction | |
CN206987509U (en) | Supply line's electric pole plants lever apparatus | |
CN210086026U (en) | A shaped steel landing stage structure for concrete level supports | |
CN117416873A (en) | Lifting assembly | |
CN112281681B (en) | Pile driver for bridge girder and using method thereof | |
CN214176690U (en) | Bury cable and spread husky auxiliary device | |
KR20090129250A (en) | Assembly type auxiliary tower crane for power transmission tower and its installation method | |
CN212612488U (en) | Movable underwater concrete pouring guide pipe trolley | |
CN113417566A (en) | Vibroflotation pile construction equipment and vibroflotation pile construction method | |
CN208932809U (en) | Lifting appliance for square jacking pipe | |
CN212050249U (en) | Earthwork transportation equipment suitable for sinking portal construction | |
CN115977129B (en) | Assembled round open caisson device and installation method | |
CN219587294U (en) | Rain shed for open caisson construction | |
CN219469634U (en) | Simple and easy convenient many pipe fittings automatic lifting device | |
CN218560888U (en) | Ground buried pipe installation lifting appliance for shallow geothermal construction | |
JPH06257142A (en) | Reinforcement cage installing device and reinforcement cage assembling and installing method using this device | |
CN213772989U (en) | Pile driver for bridge | |
CN214835263U (en) | Auxiliary erecting device for cable upright stanchion | |
CN116143007B (en) | Underground leaching uranium mining submersible pump well descending device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |