CN214176690U - Bury cable and spread husky auxiliary device - Google Patents

Bury cable and spread husky auxiliary device Download PDF

Info

Publication number
CN214176690U
CN214176690U CN202023276304.0U CN202023276304U CN214176690U CN 214176690 U CN214176690 U CN 214176690U CN 202023276304 U CN202023276304 U CN 202023276304U CN 214176690 U CN214176690 U CN 214176690U
Authority
CN
China
Prior art keywords
cable
articulated
lever
auxiliary device
hinge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023276304.0U
Other languages
Chinese (zh)
Inventor
申奇发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Zhongnan Engineering Corp Ltd
Original Assignee
PowerChina Zhongnan Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Zhongnan Engineering Corp Ltd filed Critical PowerChina Zhongnan Engineering Corp Ltd
Priority to CN202023276304.0U priority Critical patent/CN214176690U/en
Application granted granted Critical
Publication of CN214176690U publication Critical patent/CN214176690U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a bury cable and spread husky auxiliary device, the device includes actuating mechanism, stay cord and the anchor clamps that are used for pressing from both sides tightly or bury the cable with loosening, anchor clamps include that two openings set up relatively half embrace to press from both sides, it is articulated through burying the first hinge axis that cable axial direction arranged along following to embrace to press from both sides for two half, the lower extreme and two half armful clamp homogeneous phases of stay cord link to each other, the upper end and the actuating mechanism of stay cord link to each other, actuating mechanism can drive the stay cord and carry to draw to drive two half embrace to press from both sides around first articulated shaft is rotatory to folding up tightly and bury the cable, actuating mechanism can drive the stay cord and transfer to press from both sides to open around first articulated shaft is rotatory to burying the cable with opening with driving two half. The auxiliary sand paving device for the underground cable sand paving can reduce the original two sand paving processes into one sand paving process, reduce the acceptance times, reduce the cost and improve the efficiency and accelerate the construction progress.

Description

Bury cable and spread husky auxiliary device
Technical Field
The utility model relates to a wind-powered electricity generation construction technical field especially relates to a bury cable and spread husky auxiliary device.
Background
Wind power project fans in mountainous areas are mainly arranged along the ridge or the half-hill waist of a continuous mountain, and the fans are connected through cables. The generated energy of each fan is transformed by the box transformer and then is sent to the booster station through a cable; then the voltage of the main transformer equipment of the booster station is transformed and then the power is accessed to the national power grid through a transmission line; and then the power is connected to thousands of households through the national power grid for production and life. Due to the limitation of factors such as terrain and geology, weather conditions, construction land acquisition, forest land protection and the like, cables of wind power projects are constructed in an underground mode. The cable burying construction process comprises the following steps: digging a cable trench → clearing bottom and spreading sand → laying cable, processing joint → spreading sand and covering → covering brick → backfilling.
The wind-powered electricity generation field cable pit is tens kilometers long, has along the interior road of field to lay and lay two kinds of situations along the ridge, and the excavation depth is 1 ~ 2m, and construction process is more, and other mark section cross operations are more, and the construction degree of difficulty is great, the progress is slower and the process of checking and accepting is loaded down with trivial details. In the actual construction process, in order to accelerate the construction progress, a construction unit sometimes selects to lay a cable firstly, then lay protection sand, then lift the cable to a certain height, and the sand flows to the lower part of the cable due to self weight, so that the effect of simultaneously laying the sand and protecting the upper/lower part of the cable is achieved. However, the diameter of the wind power project cable is large, and the weight is heavy, so that the construction difficulty of the cable lifting process is high.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is overcome prior art not enough, provide a bury cable and spread husky auxiliary device, solve the cable and spread husky construction, for optimizing the cable ditch and spread husky process and raise the construction difficulty problem of cable.
In order to solve the technical problem, the utility model discloses a following technical scheme:
the utility model provides an bury cable and spread husky auxiliary device, includes actuating mechanism, stay cord and is used for pressing from both sides tight or loosen the anchor clamps of burying the cable, anchor clamps include two half armful clamps that the opening is relative to be set up, and two half armful clamps are articulated through the first articulated shaft that arranges along burying cable axial direction, the lower extreme of stay cord is connected with two half armful clamps homogeneous phase, the upper end of stay cord links to each other with actuating mechanism, actuating mechanism can drive the stay cord and carry to draw in order to drive two half armful clamps to rotate around first articulated shaft to fold up and bury the cable with pressing from both sides tightly, actuating mechanism can drive the stay cord and transfer in order to drive two half armful clamps to rotate around first articulated shaft to open thereby loosen burying the cable.
The working principle of the buried cable sand laying auxiliary device is as follows: after a section of cable is laid in the cable trench, a constructor lays sand to cover the cable; utilize cable anchor clamps to clip the cable, promote the stay cord through actuating mechanism, drive anchor clamps and clip the cable and shift up a take the altitude, the protection sand flows to the cable lower part because of the dead weight to reach the effect of spreading husky on the cable/lower part simultaneously.
As a further improvement of the above technical solution:
half embrace press from both sides including the arm lock that is used for burying the lateral wall of cable with ground, the lower extreme of arm lock is embraced towards second half and is pressed from both sides the formation of bending and be used for burying the trailing arm of the diapire butt of cable with ground, be equipped with on the arm lock towards second half and embrace the articulated arm that presss from both sides the extension, the tip of articulated arm and second half articulated arm that embraces the clamp pass through first articulated shaft is articulated, the tip of articulated arm links to each other with the stay cord.
The end of one of the hinged arms is provided with an outer ring, the end of the other hinged arm is provided with an inner ring sleeved in the outer ring, the inner ring and the outer ring are rotatably connected to form a hinged bearing, and the first hinged shaft is rotatably connected with the hinged bearing to hinge the two hinged arms.
The lower end of the pull rope is wound on the hinge bearing.
The driving mechanism comprises a vertical rod supported on the ground and a lever hinged to the upper end of the vertical rod, the lever is hinged to the vertical rod through a second hinge shaft arranged along the axial direction of the buried cable, and one end, facing the buried cable, of the lever is fixedly connected with the upper end of the pull rope.
The upper end of pole setting is equipped with U type spare, U type spare includes the horizontal part that links firmly with the pole setting to and two vertical portions fixed with the horizontal part, and the both sides of lever radial direction are located to two vertical portions, thereby the second articulated shaft passes two vertical portions and lever and is articulated pole setting and lever.
The lower extreme of pole setting is equipped with the backup pad that supports in ground, the bottom of backup pad is equipped with a plurality of steel nails of burying in the ground.
The pull rope is a steel strand.
Compared with the prior art, the utility model has the advantages of:
1. the utility model discloses a bury cable and spread husky auxiliary device, two in the cable construction sand process of spreading unites two into one, optimized construction process widely, reduced the construction degree of difficulty, reduced the process and examined the flow of accepting for bury cable construction progress, reached the same cable protection effect, have better cost reduction effect.
2. The device has simple manufacturing process and convenient carrying and use, and is a novel economic and practical production auxiliary tool.
Drawings
Fig. 1 is a schematic structural view of the auxiliary device for sanding an underground cable according to the embodiment.
Fig. 2 is a schematic structural view of the jig.
Fig. 3 is a schematic diagram of the hinge structure of two hinge arms.
Fig. 4 is a schematic structural view of the driving mechanism.
Illustration of the drawings: 1. a drive mechanism; 11. erecting a rod; 12. a lever; 13. a second hinge shaft; 14. a horizontal portion; 15. a vertical portion; 16. a support plate; 17. steel nails; 2. pulling a rope; 3. a clamp; 31. half holding clamp; 311. clamping arms; 312. a bracket arm; 313. an articulated arm; 314. an outer ring; 315. an inner ring; 32. a first hinge shaft; 4. an underground cable.
Detailed Description
The invention is further described below with reference to specific preferred embodiments, without thereby limiting the scope of protection of the invention.
Example (b):
as shown in fig. 1, the buried cable sanding auxiliary device of the present embodiment includes a driving mechanism 1, a pulling rope 2, and a clamp 3 for clamping or releasing a buried cable 4.
The clamp 3 comprises two half-holding clamps 31 with opposite openings, the two half-holding clamps 31 are hinged through a first hinge shaft 32 arranged along the axial direction of the buried cable 4, the lower end of the pull rope 2 is connected with the two half-holding clamps 31, the upper end of the pull rope 2 is connected with the driving mechanism 1, the driving mechanism 1 can drive the pull rope 2 to lift so as to drive the two half-holding clamps 31 to be rotated around the first hinge shaft 32 to be folded to tightly bury the cable 4, and the driving mechanism 1 can drive the pull rope 2 to be lowered so as to drive the two half-holding clamps 31 to be rotated around the first hinge shaft 32 to be opened to loosen the buried cable 4.
Referring to fig. 2, the half clasping clamp 31 includes a clamping arm 311 for contacting with a side wall of the buried cable 4, a lower end of the clamping arm 311 is bent toward the other half clasping clamp 31 to form a supporting arm 312 for contacting with a bottom wall of the buried cable 4, and a hinged arm 313 extending toward the other half clasping clamp 31 is provided on the clamping arm 311. Referring to fig. 3, one of the hinge arms 313 is provided at an end thereof with an outer ring 314, the other hinge arm 313 is provided at an end thereof with an inner ring 315 fitted in the outer ring 314, the inner ring 315 and the outer ring 314 are rotatably connected to form a hinge bearing, and the inner ring 315 is provided therein with a first hinge shaft 32 to hinge the two hinge arms 313. The pull rope 2 is a steel strand, and the lower end of the pull rope 2 is wound on the hinged bearing.
With continued reference to fig. 1, the drive mechanism 1 comprises an upright 11, and a lever 12 hinged to the upper end of the upright 11. The lower end of the upright 11 is provided with a support plate 16 supported on the ground, and the bottom of the support plate 16 is provided with a plurality of steel nails 17 embedded in the foundation. The lever 12 is hinged to the vertical rod 11 through a second hinge shaft 13 arranged along the axial direction of the buried cable 4, and one end of the lever 12 facing the buried cable 4 is fixedly connected with the upper end of the pull rope 2.
Referring to fig. 4, a U-shaped member is disposed at an upper end of the vertical rod 11, the U-shaped member includes a horizontal portion 14 fixedly connected to the vertical rod 11, and two vertical portions 15 fixed to the horizontal portion 14, the two vertical portions 15 are disposed at two sides of the lever 12 in a radial direction, and a second hinge shaft 13 penetrates the two vertical portions 15 and the lever 12 to hinge the vertical rod 11 and the lever 12.
The working principle of the buried cable sand laying auxiliary device is as follows: clamping the cable by using a cable clamp; the steel strand penetrates through a central circular ring hole of the cable clamp and is connected and fastened with the end part of the T-shaped lifting lever; and a proper position is selected at the cable trench edge to firmly install the T-shaped lifting lever. After the procedure of laying sand on the cable is finished, the far end of the lever is pressed down to lift the pull rope, the pull rope pulls the clamp to drive the cable to move upwards, and sandy soil flows downwards due to self weight, so that the effect of laying sand on the upper/lower parts of the cable is achieved.
The utility model relates to a novel bury cable and spread husky process auxiliary device, concrete preparation and application method as follows:
1. device manufacturing process
1) And manufacturing a T-shaped lever and a support. (see FIG. 1 and FIG. 2 for details)
Preparing materials: 25 steel nails with the length of 100 mm; 1 square steel plate with the size of 400mm multiplied by 8 mm; 2 straight steel pipes with the length of 3200mm and 800mm respectively; 1U-shaped steel tube with the bottom side of 250mm and two side edges of 200 mm; 1 smooth round steel bar with the length of 150mm and the diameter of 20 mm;
the manufacturing process comprises the following steps: uniformly welding steel nails at intervals of 100mm multiplied by 100mm on the bottom surface of a square steel plate; welding an 800mm straight steel pipe at the center of the top surface of the square steel plate; firmly welding the central point of the U-shaped steel pipe and the top end of the 800mm straight steel pipe; drilling a hole at the 1000mm position at one end of a 3200mm straight steel pipe, wherein the hole diameter is 22 mm; and inserting the smooth round steel bar into the drilled hole, and firmly welding the two ends of the smooth round steel bar and the two sides of the U-shaped steel pipe.
2) And manufacturing a cable clamp. (see FIG. 3, FIG. 4 for details)
Preparing materials: 2L-shaped steel bars with the length of 1000mm and 200mm and the diameter of 10mm are respectively arranged on two sides; 2 steel cross bars with the size of 200mm multiplied by 40mm multiplied by 10 mm; a, 1 inner steel ring is arranged, the radius of an outer circle is 14.9mm, the radius of an inner circle is 8mm, and the length is 20 mm; b, 1 outer steel ring, 20mm of outer circle radius, 15mm of inner circle radius and 20mm of length;
the manufacturing process comprises the following steps: embedding the A steel ring into the B steel ring, wherein the AB can rotate mutually; firmly welding the B steel ring and the 2 steel cross rods; and respectively welding the steel cross rods with the L-shaped steel bars, wherein the welding point is the center of the long edge.
3) And (4) steel strands. The length of the steel strand is 3m, and the length of the steel strand is adjusted according to the requirement when the steel strand is used.
4) Integral assembly
Preparing materials: manufactured T-shaped lever, support, cable clamp and steel strand
The assembling process comprises the following steps: and (3) penetrating the steel strand through a steel circular ring hole in the cable clamp, adjusting the length of the steel strand according to construction requirements, and then firmly connecting the steel strand with the short end of the T-shaped lever.
Instructions for use.
1) After the cable trench is dug, laying the cable, and then covering soil according to the required thickness;
2) selecting a proper position of the cable trench edge, vertically inserting the T-shaped lever strip steel nail base into soil and treading tightly;
3) clamping and fixing the cable by using a cable clamp;
4) force is applied to the long end of the lever, the lever is used for lifting the cable to a certain height, and fine sand flows into the lower part of the cable under the action of gravity;
5) and lifting the whole section of cable at intervals of 3m in sequence. And then leveling the whole section of sand manually.
The above description is only for the preferred embodiment of the present application and should not be taken as limiting the present application in any way, and although the present application has been disclosed in the preferred embodiment, it is not intended to limit the present application, and those skilled in the art should understand that they can make various changes and modifications within the technical scope of the present application without departing from the scope of the present application, and therefore all the changes and modifications can be made within the technical scope of the present application.

Claims (8)

1. An auxiliary device for spreading sand on an underground cable is characterized by comprising a driving mechanism (1), a pull rope (2) and a clamp (3) for clamping or loosening the underground cable (4), the clamp (3) comprises two half-holding clamps (31) with opposite openings, the two half-holding clamps (31) are hinged through a first hinge shaft (32) arranged along the axial direction of the buried cable (4), the lower end of the pull rope (2) is connected with both the two half clasping clamps (31), the upper end of the pull rope (2) is connected with the driving mechanism (1), the driving mechanism (1) can drive the pull rope (2) to lift so as to drive the two half clasping clamps (31) to rotate around the first articulated shaft (32) to be folded so as to clamp the buried cable (4), the driving mechanism (1) can drive the pull rope (2) to be lowered so as to drive the two half-clasping clamps (31) to rotate around the first hinge shaft (32) to be opened, so that the buried cable (4) is loosened.
2. The auxiliary device for sanding the buried cable according to claim 1, wherein the half clasping clamp (31) comprises a clamping arm (311) used for being connected with the side wall of the buried cable (4), the lower end of the clamping arm (311) is bent towards the other half clasping clamp (31) to form a supporting arm (312) used for being abutted against the bottom wall of the buried cable (4), an articulated arm (313) extending towards the other half clasping clamp (31) is arranged on the clamping arm (311), the end of the articulated arm (313) is articulated with the articulated arm (313) of the other half clasping clamp (31) through the first articulated shaft (32), and the end of the articulated arm (313) is connected with the pulling rope (2).
3. An underground cable sanding auxiliary device according to claim 2, wherein one of the articulated arms (313) is provided at its end with an outer ring (314) and the other articulated arm (313) is provided at its end with an inner ring (315) fitted in said outer ring (314), said inner ring (315) and outer ring (314) being rotatably connected so as to form a hinge bearing, said first hinge axis (32) being rotatably connected to the hinge bearing so as to hinge the two articulated arms (313).
4. An underground cable sanding aid according to claim 3, wherein the lower end of the pull rope (2) is wound around the hinge bearing.
5. An auxiliary device for sanding of underground cable according to any of claims 1-4, characterized in that the driving mechanism (1) comprises a vertical rod (11) supported on the ground, and a lever (12) hinged to the upper end of the vertical rod (11), the lever (12) being hinged to the vertical rod (11) by means of a second hinge axis (13) arranged along the axial direction of the underground cable (4), the end of the lever (12) facing the underground cable (4) being secured to the upper end of the pulling rope (2).
6. The buried cable sanding auxiliary device according to claim 5, wherein the upright (11) is provided at an upper end thereof with a U-shaped member, the U-shaped member includes a horizontal portion (14) fixedly connected to the upright (11), and two vertical portions (15) fixed to the horizontal portion (14), the two vertical portions (15) are respectively provided at both sides of the lever (12) in a radial direction, and the second hinge shaft (13) penetrates the two vertical portions (15) and the lever (12) to hinge the upright (11) and the lever (12).
7. An auxiliary device for spreading sand on buried cables as claimed in claim 6, wherein the lower end of the vertical rod (11) is provided with a support plate (16) supported on the ground, and the bottom of the support plate (16) is provided with a plurality of steel nails (17) buried in the ground.
8. An underground cable sanding aid according to any one of claims 1-4, wherein the pull rope (2) is a steel strand.
CN202023276304.0U 2020-12-29 2020-12-29 Bury cable and spread husky auxiliary device Active CN214176690U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023276304.0U CN214176690U (en) 2020-12-29 2020-12-29 Bury cable and spread husky auxiliary device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023276304.0U CN214176690U (en) 2020-12-29 2020-12-29 Bury cable and spread husky auxiliary device

Publications (1)

Publication Number Publication Date
CN214176690U true CN214176690U (en) 2021-09-10

Family

ID=77611061

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023276304.0U Active CN214176690U (en) 2020-12-29 2020-12-29 Bury cable and spread husky auxiliary device

Country Status (1)

Country Link
CN (1) CN214176690U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112736773A (en) * 2020-12-29 2021-04-30 中国电建集团中南勘测设计研究院有限公司 Buried cable sand laying auxiliary device and method for assisting sand laying by using buried cable sand laying auxiliary device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112736773A (en) * 2020-12-29 2021-04-30 中国电建集团中南勘测设计研究院有限公司 Buried cable sand laying auxiliary device and method for assisting sand laying by using buried cable sand laying auxiliary device

Similar Documents

Publication Publication Date Title
US7600947B2 (en) Method for installing an arch-type underbracing on a utility pole for an overhead line by using extendable excavating unit for auger crane
CN108930324B (en) Municipal road sewer pipeline construction equipment and method
CN214176690U (en) Bury cable and spread husky auxiliary device
CN101694098B (en) Recyclable prestressed tendon for soft oil support and construction method thereof
CN108203981B (en) System and method for installing steel support in cover and excavation method
CN112736773B (en) Method for assisting sand paving by using buried cable sand paving auxiliary device
CN214993840U (en) Well-digging vibration pile sinking system for prefabricated inclined piles
CN201250401Y (en) Embedded pipe in a pile of a geothermal heat pump
CN206385549U (en) For soft stratum close to underground structure foundation pit supporting system
CN205477626U (en) Middle -size and small -size section shaft is gone into well and is taken off sediment device
KR101538909B1 (en) Construction method for poles moving of electric-wire-stringing using pole holding divice
CN113373922A (en) Geothermal energy pile construction equipment and construction method thereof
CN209144866U (en) A kind of prefabricated piping lane push constructing device
CN201943065U (en) Photovoltaic foundation steel pipe pile
CN102011396A (en) Photovoltaic foundation steel pipe pile
CN217412895U (en) Traction device for raise boring pipeline construction
JP2016017652A (en) Method for installing heat pipe into precast pile
CN215208176U (en) Miniature steel pipe pile steel pipe hoist device in finite space
CN215105500U (en) Vertical buried pipe orifice elevation positioning device for natural underground operation
CN213116147U (en) Portable rotary digging equipment for construction of tower foundation pile hole in mountainous and hilly land
CN214889296U (en) Damaged pipe jacking pullback device
CN217923537U (en) Cable construction fixing anchor pile
CN220985289U (en) Large-span cable laying device for bearing platform of photovoltaic power station in complex mountain area
CN215441885U (en) Geothermal energy pile construction equipment
CN114856291B (en) Circuit rod installation device and method for communication circuit construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant