CN201943065U CN2010206967010U CN201020696701U CN201943065U CN 201943065 U CN201943065 U CN 201943065U CN 2010206967010 U CN2010206967010 U CN 2010206967010U CN 201020696701 U CN201020696701 U CN 201020696701U CN 201943065 U CN201943065 U CN 201943065U
Authority
CN
China
Prior art keywords
pile
steel pipe
photovoltaic
foundation
pile body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206967010U
Other languages
Chinese (zh)
Inventor
季军
薄其明
桑运荣
卢伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGXIA BRANCH COMPANY CHINA HUADIAN Corp
Original Assignee
NINGXIA BRANCH COMPANY CHINA HUADIAN Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGXIA BRANCH COMPANY CHINA HUADIAN Corp filed Critical NINGXIA BRANCH COMPANY CHINA HUADIAN Corp
Priority to CN2010206967010U priority Critical patent/CN201943065U/en
Application granted granted Critical
Publication of CN201943065U publication Critical patent/CN201943065U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a photovoltaic foundation steel pipe pile which comprises a pile tip, a pile body, a pile top plate and an adjusting sleeve, wherein the pile tip is arranged at the lower end of the pile body, the adjusting sleeve is sheathed and fixed at the top end of the pile body, and the pile top plate is welded at the top end of the pile body. The photovoltaic foundation steel pipe pile has a simple structure, and is compact and reasonable and attractive in appearance; and the adjusting sleeve can be adjusted within a certain range according to the embedded height of the steel pipe pile, so that the flexibility is higher and the range of application is wider. Compared with similar power stations, the structure reduces the working load of foundation excavation and backfilling, and greatly decreases earth volume; under the condition of a same investment, the difficulty that the concrete in winter can not constructed is solved, the foundation construction speed is quickened, and the labor intensity of constructors is lowered; and the construction difficulty of building a large photovoltaic power station foundation in westward desert regions of China can be effectively solved.

Description

A kind of photovoltaic basis steel pipe pile
Technical field
The utility model relates to a kind of photovoltaic basis steel pipe pile, specifically can can't substitute the steel pipe pile that uses under the situation on fluid concrete basis on ground, belongs to desert photovoltaic power plant bracket basic technology field.
Background technology
In large-scale desert photovoltaic plant project, in order effectively to reduce the foundation construction cost, convenient construction, reduce the constructor, reduce constructor's labour intensity, reduce the large-scale photovoltaic electric field piece of smooth land, the abominable natural conditions that are unfavorable for cast in situs have been overcome, effectively solved in western Desert Area, build a large-sized photovoltaic electric field foundation construction difficult problem, also effectively overcome simultaneously under the conditions such as winter temperature is low, transportation difficulty, construction foundation excavation difficulty, cause the cost of engineering to increase, the construction delays duration, form the certain economic loss.
Summary of the invention
The purpose of this utility model is to overcome above-mentioned weak point of the prior art, thereby installation aspect, a kind of piling bar basis is provided, the production efficiency height, and labour intensity is low, can overcome the steel pipe pile basis, a kind of photovoltaic basis of constructional difficulties under the special weather condition.
According to the technical scheme that the utility model provides, a kind of photovoltaic basis steel pipe pile comprises the stake point, and pile body is regulated sleeve pipe, and described pile body lower end is provided with the stake point, and described regulating sleeve pipe box dress is fixed on the pile body top.
Described pile body top is welded with a top board, and stake top board and adjusting sleeve pipe weld, and adds weldering reinforcement gusset at vertical four direction.The sharp otch of described stake is welded into pyramid.
The utlity model has following advantage:
The utility model is simple in structure, compact and reasonable, handsome in appearance; Regulating sleeve pipe can be according to the adjusting of highly making certain limit of imbedding of steel pipe pile, and flexibility is higher, and the scope of application is more extensive.With similar power station relatively, this structure decrease the workload of foundation excavation and backfill, significantly reduced earth volume; Under equal investment situation, solved the difficulty that cold weather concrete can't be constructed, accelerated foundation construction speed, reduced constructor's labour intensity; Can effectively solve western Desert Area, build a large-sized photovoltaic electric field foundation construction difficult problem in China.
Description of drawings
Fig. 1 is the utility model structural representation.
Fig. 2 is the utility model pile body top welding stake top board structure schematic diagram.
The specific embodiment
The utility model is described in further detail below in conjunction with the embodiment in the accompanying drawing:
Fig. 1-shown in Figure 2 comprises stake point 1, and pile body 2 is regulated sleeve pipe 3.Described pile body 2 lower ends are provided with stake point 1, and the top on whole steel pipe pile basis is with the fixing pile body 2 of the form suit of regulating sleeve pipe 3, highly regulate the arrival design attitude after the employing welding manner fix.
Described pile body 2 tops are welded with a top board 4, and stake top board 4 and adjusting sleeve pipe 3 weld, and add weldering reinforcement gusset at vertical four direction.
The utility model steel pipe pile is made:
D114 steel pipe pile height 2.85m (not comprising the stake point).The stake point welds the stake point by the roll of steel plate weldering again by figure elder generation bulkhead D114 * 10 of weldering.The 100mm that also pile body can be extended, the sharp otch of stake is welded into pyramid.Absolute altitude is regulated sleeve pipe and is treated to weld after stake is squeezed into.Steel pipe is the conventional galvanizing pipe, requires the thick 0.5mm of brush asphalt varnish.Steel are Q235.Welding rod is E43, and weld seam is 4mm.
Pile foundation construction of the present utility model requires:
The utility model is owing to the control of strength in the piling process is uneven, and pile foundation top mark height is difficult to control consistent, and ad hoc meter absolute altitude is regulated sleeve pipe.Must not be offset greater than 25mm in the pile foundation center.Pile foundation pile body depth of drive error is ± 100mm.Absolute altitude is regulated the sleeve pipe postwelding and is required with pile foundation top mark height from design terrace+0.50 meter.Drive piles again after can only getting out the frozen soil part when frozen soil appears in the top layer, job site with the drill bit of D114.Must not enlarge the bore diameter and the degree of depth.
The utility model privileged sites are handled:
The utility model has the cable trench place near pile foundation, requiring the cable furrow bank is the thick C20 concrete of 200mm furrow bank, and furrow bank bankets outward and must layering put in order real.When cable trench wall thickness during less than 200mm, the cable furrow bank is arrangement of reinforcement suitably.The pile foundation seat must layering be put in order real before equipment is installed and used at the backfill or the place of loosening the soil.
The utility model stake top board requires:
The stake top board is regulated the logical weldering of the thick weld seam of sleeve pipe 4mm with the stake top mark is high, and adds weldering at vertical four direction and strengthen gusset.
When the utility model uses, can use pile driver that steel pipe pile is squeezed at the anchor point of measuring in advance, steel pipe pile be imbedded the control that should note design elevation in the process, and height tolerance among a small circle can be regulated by the sleeve pipe regulated at steel pipe pile top.
The link that should be noted that is: the control of pile body 2 top absolute altitudes, the control of pile body verticality can adopt welding manner to fix with after regulating sleeve pipe 3 tops and being adjusted to design elevation.

Claims (4)

1. photovoltaic basis steel pipe pile, it is characterized in that: comprise stake point (1), a pile body (2), regulate sleeve pipe (3), described pile body (2) lower end is provided with stake point (1), and described adjusting sleeve pipe (3) suit is fixed on pile body (2) top.
2. a kind of photovoltaic as claimed in claim 1 basis steel pipe pile is characterized in that: described pile body (2) top welding stake top board (4).
3. a kind of photovoltaic as claimed in claim 2 basis steel pipe pile, it is characterized in that: described top board (4) welds with regulating sleeve pipe (3), and adds weldering reinforcement gusset in vertical direction.
4. a kind of photovoltaic as claimed in claim 1 basis steel pipe pile is characterized in that: described stake point (1) otch is welded into pyramid.
CN2010206967010U 2010-12-31 2010-12-31 Photovoltaic foundation steel pipe pile Expired - Fee Related CN201943065U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206967010U CN201943065U (en) 2010-12-31 2010-12-31 Photovoltaic foundation steel pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206967010U CN201943065U (en) 2010-12-31 2010-12-31 Photovoltaic foundation steel pipe pile

Publications (1)

Publication Number Publication Date
CN201943065U true CN201943065U (en) 2011-08-24

Family

ID=44470413

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206967010U Expired - Fee Related CN201943065U (en) 2010-12-31 2010-12-31 Photovoltaic foundation steel pipe pile

Country Status (1)

Country Link
CN (1) CN201943065U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102011396A (en) * 2010-12-31 2011-04-13 中国华电集团公司宁夏分公司 Photovoltaic foundation steel pipe pile
CN104314075A (en) * 2014-10-14 2015-01-28 大连力宏建筑材料有限公司 Conical concrete pile tip, tubular pile provided with pile tip and production method of tubular pile

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102011396A (en) * 2010-12-31 2011-04-13 中国华电集团公司宁夏分公司 Photovoltaic foundation steel pipe pile
CN104314075A (en) * 2014-10-14 2015-01-28 大连力宏建筑材料有限公司 Conical concrete pile tip, tubular pile provided with pile tip and production method of tubular pile

Similar Documents

Publication Publication Date Title
CN201531020U (en) Blade drill pipe steel pile special for a surface solar power station
CN104389318B (en) Reinforced concrete-steel structure hybrid gravity foundation for offshore wind power and construction method thereof
CN204098043U (en) After staying soil, excavation is in conjunction with inner support Retaining Structure with Double-row Piles
CN102776899A (en) Anti-floating structure of shallow-buried shield tunnel
CN103114595A (en) Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch
CN201538975U (en) Seepage-proofing joint of underground continuous wall
CN102359112A (en) Method for bracing foundation pit by using steel box piles
CN101575859B (en) Anti-seepage joint of underground continuous walls and construction method thereof
CN100406652C (en) Tower crane foundation with stiffened steel structure
CN205329709U (en) Mountain region photovoltaic support foundation structure
CN201943065U (en) Photovoltaic foundation steel pipe pile
CN102011396A (en) Photovoltaic foundation steel pipe pile
CN103938641A (en) Foundation construction technology of large-scale photovoltaic power station in desert
CN202117073U (en) Eccentric assembly type foundation of transmission line tower
CN203498860U (en) Anchor rod foundation structure with concrete blocks for photovoltaic module brackets
CN106498957B (en) Steel sheet pile cofferdam construction platform and integral construction method
CN207891882U (en) The special spiral ground stud of photovoltaic bracket
CN201502065U (en) Anchor rod joint excavation compound basis
CN106602980A (en) Desert land root-type photovoltaic panel solar power generation device
CN114960715B (en) Underground engineering surge treatment device and control method
CN103790156A (en) Square buckle plate mechanical pile splicing method for precast square piles
CN103790157A (en) Circular buckle plate mechanical pile splicing method for precast square piles
CN102454169A (en) Solar photovoltaic power station foundation construction method
CN206385549U (en) For soft stratum close to underground structure foundation pit supporting system
CN208266902U (en) A kind of anti-pulling piling bar for photovoltaic power plant bracket basis

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110824

Termination date: 20191231