CN214835263U - Auxiliary erecting device for cable upright stanchion - Google Patents
Auxiliary erecting device for cable upright stanchion Download PDFInfo
- Publication number
- CN214835263U CN214835263U CN202121295045.8U CN202121295045U CN214835263U CN 214835263 U CN214835263 U CN 214835263U CN 202121295045 U CN202121295045 U CN 202121295045U CN 214835263 U CN214835263 U CN 214835263U
- Authority
- CN
- China
- Prior art keywords
- aluminum alloy
- pole setting
- wall
- cable
- auxiliary
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses an auxiliary erection device of cable pole setting, including central stay tube, go up the aluminum alloy pole setting, lower aluminum alloy pole setting, control panel and connection staple bolt, three national standard angle irons of group are installed to the bottom of central stay tube, and the ground anchor is all installed to the bottom of national standard angle iron, aluminum alloy pole setting is installed down on the top of central stay tube, and the top of aluminum alloy pole setting is provided with the internal thread chamber down, the top movable mounting of aluminum alloy pole setting has last aluminum alloy pole setting down, and the bottom of going up the aluminum alloy pole setting is provided with the external screw thread, and the external screw thread passes through inner structure intermeshing with the internal thread chamber, the external screw thread is provided with the connection staple bolt with the junction outer wall in internal thread chamber, and the outer wall of connecting the staple bolt installs multiunit extension bolt. The utility model discloses an auxiliary frame equipment quick installation is built, carries out quick fixed to auxiliary frame equipment and ground, has improved the work efficiency of installation cable stand.
Description
Technical Field
The utility model relates to a supplementary handing equipment technical field of cable pole setting specifically is a supplementary handing equipment of cable pole setting.
Background
The cable vertical rod is a rod for erecting electric wires as the name implies, and is one of the most basic facilities in China, various early electric wire vertical rods are started from wood rods, later, due to the development of reinforcing steel bars and reinforced concrete, the two materials replace most of the wood rods, are firmer, durable, corrosion-resistant and crack-resistant, but are heavier than the wood rods in weight, so that the cable vertical rod needs to be erected through auxiliary equipment, such as a crane, but some roads are narrower, or hoisting equipment cannot be started on a hillside, and the cable vertical rod needs to be erected through the auxiliary frame for the auxiliary erection.
The auxiliary erection device of this kind of cable pole setting on the market is various today, can satisfy people's user demand basically, but still has certain problem, and specific problem has following several:
(1) the conventional auxiliary erecting device for the cable upright stanchion is not convenient to fix auxiliary erecting equipment with the ground when in use, so that the safety of the auxiliary erecting device for the cable upright stanchion is greatly influenced when in use;
(2) when the conventional auxiliary erection device for the cable upright stanchion is used, the auxiliary erection device is generally inconvenient to assemble and build and transport to different construction sites, so that the convenience degree of the auxiliary erection device for the cable upright stanchion is greatly influenced when the auxiliary erection device is used;
(3) the conventional auxiliary erecting device for the cable upright stanchion is not convenient to quickly erect the cable upright stanchion in use, so that great trouble is brought to people in use.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an auxiliary erection device of cable pole setting to the auxiliary erection device who provides the cable pole setting among the above-mentioned background art of solution is not convenient for fix auxiliary frame equipment and ground, carries out the equipment to the auxiliary frame and assembles the dismantlement, carries out quick problem of erectting to the cable pole setting.
In order to achieve the above object, the utility model provides a following technical scheme: an auxiliary erecting device for a cable upright rod comprises a central supporting tube, an upper aluminum alloy upright rod, a lower aluminum alloy upright rod, a control panel and a connecting hoop, wherein three groups of national standard angle irons are installed at the bottom end of the central supporting tube, ground anchors are installed at the bottom ends of the national standard angle irons, the lower aluminum alloy upright rod is installed at the top end of the central supporting tube, an internal thread cavity is formed in the top end of the lower aluminum alloy upright rod, the upper aluminum alloy upright rod is movably installed at the top end of the lower aluminum alloy upright rod, an external thread is arranged at the bottom end of the upper aluminum alloy upright rod, the external thread and the internal thread cavity are mutually meshed through an internal structure, the connecting hoop is arranged on the outer wall of the joint of the external thread and the internal thread cavity, a plurality of groups of lengthening bolts are installed on the outer wall of the connecting hoop, nuts are installed at one ends of the lengthening bolts, and the lengthening bolts extend to the outer wall of the connecting hoop through bolt holes on the surface of the connecting hoop and are connected with the nuts, the outside of center stay tube is installed control panel, and the output of the inside singlechip of control panel and the input electric connection of motor.
Optionally, an electric push rod is installed at the central position of the outer wall of the upper aluminum alloy upright rod, and a connecting block is arranged on one side, away from the upper aluminum alloy upright rod, of the electric push rod.
Optionally, a support ring is installed on one side of the connecting block, and the connecting block is fixedly connected with the support ring.
Optionally, the outer wall on last aluminum alloy pole setting top installs the second fixed pulley, and the outer wall fixed connection of second fixed pulley and last aluminum alloy pole setting, the support horizontal pole is installed to last aluminum alloy pole setting outer wall of second fixed pulley below, and supports the horizontal pole and keep away from one side of last aluminum alloy pole setting and be fixed with first fixed pulley.
Optionally, a fixing ring is installed on the outer wall of the supporting cross rod below the first fixed pulley, and the top end of the fixing ring is fixedly connected with the outer wall of the supporting cross rod.
Optionally, a motor is arranged on one side of a control panel outside the central supporting tube, a rotating shaft is mounted at the output end of the motor through a coupler, a winch is arranged on one side of the rotating shaft, a hoisting steel wire rope is movably connected to the outer wall of the winch, and the hoisting steel wire rope is movably connected to the outside of the first fixed pulley and the outside of the second fixed pulley.
Optionally, the bottom that hoisting steel wire rope is close to solid fixed ring is provided with the movable pulley, and the outer wall and hoisting steel wire rope swing joint of movable pulley, the bearing couple is installed to the bottom of movable pulley, and the top of bearing couple and the exterior structure fixed connection of movable pulley.
Compared with the prior art, the beneficial effects of the utility model are that: the auxiliary erecting device for the cable upright posts realizes quick installation and erection of the auxiliary erecting equipment, quickly fixes the auxiliary erecting equipment and the ground, and improves the working efficiency of installing the cable upright posts;
(1) the auxiliary frame assembly is conveyed to a construction site where cables need to be erected by workers, external threads at the bottom end of the upper aluminum alloy upright rod are installed inside an internal thread cavity at the top end of the lower aluminum alloy upright rod to complete connection, a connecting hoop is sleeved at the joint of the upper aluminum alloy upright rod and the lower aluminum alloy upright rod, an elongated bolt is inserted into the connecting hoop through a bolt hole in the surface of the connecting hoop and extends to the outer wall of the connecting hoop, the elongated bolt is fixedly locked by a nut, and the upper aluminum alloy upright rod and the lower aluminum alloy upright rod are assembled and connected, so that the auxiliary frame assembly is quickly installed and built, and the auxiliary frame can be conveniently transported to different construction sites for construction;
(2) the ground anchor at the bottom end of the national standard angle iron is buried into the ground dug in advance by a worker under the support of the central support tube, and the whole auxiliary frame can be stably fixed with the ground due to the triangular structure of the national standard angle iron, so that the cable upright rod auxiliary frame can be quickly fixed with the ground, and the stability of equipment is improved;
(3) a traction rope is arranged on a cable vertical rod to be erected by an operator, the traction rope is hung on a bearing hook, at the moment, a motor is started by an operation control panel, a rotating shaft is driven by the motor to drive a winch to rotate, the winch drives a hoisting steel wire rope to be wound, the hoisting steel wire rope slides on a second fixed pulley under the support of an upper aluminum alloy vertical rod and slides on a first fixed pulley under the support of a support cross rod to be pulled, the terminal of the hoisting steel wire rope is fixed on a fixed ring, so that the bearing hook drives the cable vertical rod to move upwards under the sliding of a movable pulley at the other end of the hoisting steel wire rope, when the cable vertical rod rises to a certain height, the cable vertical rod cannot be assisted and supported by the operator, at the moment, an electric push rod is controlled by the operation control panel, and the electric push rod drives the support ring to support the cable vertical rod under the connection of a connecting block, the use work of the auxiliary erection device for completing the cable upright stanchion realizes that the auxiliary erection device quickly erects the cable upright stanchion.
Drawings
Fig. 1 is a schematic side view of the cross-sectional structure of the present invention;
fig. 2 is an enlarged schematic structural view of a point a in fig. 1 according to the present invention;
fig. 3 is an enlarged schematic structural view of the utility model at the position B in fig. 1;
fig. 4 is a schematic top view of the connecting hoop of the present invention;
fig. 5 is a schematic top view of the electric putter of the present invention.
In the figure: 1. a central support tube; 2. an electric push rod; 3. a load-bearing hook; 4. a movable pulley; 5. a fixing ring; 6. a first fixed pulley; 7. a second fixed pulley; 8. arranging an aluminum alloy upright rod; 9. a hoisting wire rope; 10. lower aluminum alloy upright stanchions; 11. a control panel; 12. a motor; 13. a rotating shaft; 14. a winch; 15. a ground anchor; 16. national standard angle iron; 17. an external thread; 18. an internal threaded cavity; 19. lengthening the bolt; 20. connecting a hoop; 21. a nut; 22. connecting blocks; 23. a support ring; 24. a support rail.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides an embodiment: an auxiliary erecting device for a cable upright rod comprises a central supporting tube 1, an upper aluminum alloy upright rod 8, a lower aluminum alloy upright rod 10, a control panel 11 and a connecting hoop 20. Three groups of national standard angle irons 16 are installed at the bottom end of the central supporting tube 1, and ground anchors 15 are installed at the bottom ends of the national standard angle irons 16. Lower aluminum alloy pole setting 10 is installed on the top of central stay tube 1, and the top of lower aluminum alloy pole setting 10 is provided with internal thread cavity 18, and the top movable mounting of lower aluminum alloy pole setting 10 has last aluminum alloy pole setting 8, and the bottom of going up aluminum alloy pole setting 8 is provided with external screw thread 17 to external screw thread 17 passes through inner structure intermeshing with internal thread cavity 18. The outer wall of the joint of the external thread 17 and the internal thread cavity 18 is provided with a connecting hoop 20, the outer wall of the connecting hoop 20 is provided with a plurality of groups of lengthened bolts 19, one ends of the lengthened bolts 19 are provided with nuts 21, and the lengthened bolts 19 extend to the outer wall of the connecting hoop 20 through bolt holes in the surface of the connecting hoop 20 and are connected with the nuts 21. The outside of the central support tube 1 is provided with a control panel 11, and the output end of the single chip microcomputer inside the control panel 11 is electrically connected with the input end of the motor 12.
When the auxiliary frame assembly is used, workers convey the auxiliary frame assembly to a construction site where cables need to be erected, and the external threads 17 at the bottom end of the upper aluminum alloy upright rod 8 are installed inside the internal thread cavity 18 at the top end of the lower aluminum alloy upright rod 10 to complete connection. The connecting hoop 20 is sleeved at the joint of the upper aluminum alloy vertical rod 8 and the lower aluminum alloy vertical rod 10, the lengthened bolt 19 is inserted into the connecting hoop 20 through the bolt hole in the surface of the connecting hoop 20 and extends to the outer wall of the connecting hoop 20, and then the lengthened bolt is fixed and locked by the nut 21, so that the assembly and the connection of the upper aluminum alloy vertical rod 8 and the lower aluminum alloy vertical rod 10 are completed. The auxiliary frame assembly is rapidly installed and built, and the auxiliary frame can be conveniently transported to different construction sites for construction.
Three groups of national standard angle irons 16 are installed at the bottom end of the central supporting tube 1, and ground anchors 15 are installed at the bottom ends of the national standard angle irons 16.
During the use staff under the support of center stay tube 1, buries the ground anchor 15 of 16 bottoms of national standard angle bar into the ground of digging in advance, because of the triangle-shaped structure of national standard angle bar 16, makes the auxiliary frame wholly can be fixed with ground steadily, has realized carrying out quick fixed with ground to cable pole setting auxiliary frame, has improved the stability of equipment.
Go up the central point of 8 outer walls of aluminum alloy pole setting and put and install electric putter 2, and electric putter 2 keeps away from one side of going up aluminum alloy pole setting 8 and is provided with connecting block 22, and support ring 23 is installed to one side of connecting block 22, and connecting block 22 and support ring 23 fixed connection. Go up the outer wall on 8 tops of aluminum alloy pole setting and install second fixed pulley 7, and the outer wall fixed connection of second fixed pulley 7 and last aluminum alloy pole setting 8, the support horizontal pole 24 is installed to last aluminum alloy pole setting 8 outer wall of 7 below of second fixed pulley, and the one side that last aluminum alloy pole setting 8 was kept away from to support horizontal pole 24 is fixed with first fixed pulley 6, solid fixed ring 5 is installed to the support horizontal pole 24 outer wall of 6 below of first fixed pulley, and the top of solid fixed ring 5 and the outer wall fixed connection who supports horizontal pole 24. A motor 12 is arranged on one side of a control panel 11 outside the central support tube 1, the type of the motor 12 can be YL-7112, and the output end of a singlechip inside the control panel 11 is electrically connected with the input end of the motor 12. And the output end of the motor 12 is provided with a rotating shaft 13 through a coupler, one side of the rotating shaft 13 is provided with a winch 14, the outer wall of the winch 14 is movably connected with a hoisting steel wire rope 9, and the hoisting steel wire rope 9 is movably connected with the outer parts of the first fixed pulley 6 and the second fixed pulley 7. The bottom end of the hoisting steel wire rope 9 close to the fixed ring 5 is provided with a movable pulley 4, the outer wall of the movable pulley 4 is movably connected with the hoisting steel wire rope 9, the bottom end of the movable pulley 4 is provided with a bearing hook 3, and the top end of the bearing hook 3 is fixedly connected with the external structure of the movable pulley 4.
Install the haulage rope through the staff in the cable pole setting that will erect during the use, hang the haulage rope on bearing couple 3, operation control panel 11 opens motor 12 this moment, and motor 12 drive pivot 13 drives capstan winch 14 and rotates, and capstan winch 14 drives hoisting wire rope 9 and rolls up, and hoisting wire rope 9 slides on second fixed pulley 7 under last aluminum alloy pole setting 8's support, slides on first fixed pulley 6 under the support of supporting horizontal pole 24 and pulls. Because the terminal of the hoisting steel wire rope 9 is fixed on the fixed ring 5, the other end of the hoisting steel wire rope 9 slides under the movable pulley 4 to enable the bearing hook 3 to drive the cable upright post to move upwards. When the cable pole setting rises to a take the altitude, can't assist the support to the cable pole setting through the staff already, at this moment through operation control panel 11 control electric putter 2, electric putter 2 drives support ring 23 and plays the effect of support to the cable pole setting under connecting block 22's connection, accomplishes the use work of the supplementary handing equipment of cable pole setting, has realized that supplementary frame equipment is quick erects the cable stand.
The working principle is as follows: when the auxiliary frame assembly is used, an external power supply firstly conveys the auxiliary frame assembly to a construction site where cables need to be erected through workers, the external threads 17 at the bottom end of the upper aluminum alloy upright rod 8 are installed inside the internal thread cavity 18 at the top end of the lower aluminum alloy upright rod 10 to complete connection, the connecting hoop 20 is sleeved at the joint of the upper aluminum alloy upright rod 8 and the lower aluminum alloy upright rod 10, the lengthened bolt 19 is inserted into the connecting hoop 20 through the bolt hole in the surface of the connecting hoop 20 and extends to the outer wall of the connecting hoop 20, and then the lengthened bolt is fixedly locked by the nut 21 to complete assembly connection of the upper aluminum alloy upright rod 8 and the lower aluminum alloy upright rod 10. Then, under the support of the central support tube 1, the worker buries the ground anchor 15 at the bottom end of the national standard angle iron 16 into the ground dug in advance, and due to the triangular structure of the national standard angle iron 16, the whole auxiliary frame can be stably fixed with the ground. Then, a traction rope is installed on a cable vertical rod to be erected through a worker, the traction rope is hung on the bearing hook 3, the motor 12 is started through the operation control panel 11, the motor 12 drives the rotating shaft 13 to drive the winch 14 to rotate, the winch 14 drives the hoisting steel wire rope 9 to be wound, the hoisting steel wire rope 9 slides on the second fixed pulley 7 under the support of the upper aluminum alloy vertical rod 8, and slides on the first fixed pulley 6 under the support of the support cross rod 24 to be pulled. Because the terminal of the hoisting steel wire rope 9 is fixed on the fixed ring 5, the other end of the hoisting steel wire rope 9 slides under the movable pulley 4 to enable the bearing hook 3 to drive the cable upright post to move upwards. When the cable pole setting rises to a take the altitude, can't carry out supplementary support to the cable pole setting through the staff already, at this moment through operation control panel 11 control electric putter 2, electric putter 2 drives support ring 23 and plays the effect of support to the cable pole setting under connecting block 22's connection, accomplishes the use work of the supplementary overhead mounting of cable pole setting.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Claims (7)
1. The utility model provides an auxiliary erection device of cable pole setting which characterized in that: comprises a central supporting pipe (1), an upper aluminum alloy upright stanchion (8), a lower aluminum alloy upright stanchion (10), a control panel (11) and a connecting hoop (20), wherein three groups of national standard angle irons (16) are installed at the bottom end of the central supporting pipe (1), ground anchors (15) are all installed at the bottom ends of the national standard angle irons (16), the lower aluminum alloy upright stanchion (10) is installed at the top end of the central supporting pipe (1), an internal thread cavity (18) is arranged at the top end of the lower aluminum alloy upright stanchion (10), the upper aluminum alloy upright stanchion (8) is movably installed at the top end of the lower aluminum alloy upright stanchion (10), an external thread (17) is arranged at the bottom end of the upper aluminum alloy upright stanchion (8), the external thread (17) and the internal thread cavity (18) are mutually meshed through an internal structure, the outer wall of the joint of the external thread (17) and the internal thread cavity (18) is provided with the connecting hoop (20), and the outer wall of the connecting hoop (20) is provided with a plurality of groups of bolts (19), nut (21) are all installed to the one end of extension bolt (19), and extension bolt (19) extend to the outer wall and the nut (21) of connecting staple bolt (20) through the bolt hole on connecting staple bolt (20) surface and be connected, the externally mounted of center stay tube (1) has control panel (11), and the output of control panel (11) inside singlechip and the input electric connection of motor (12).
2. The auxiliary erecting device for cable uprights according to claim 1, wherein: go up the central point of aluminum alloy pole setting (8) outer wall and put and install electric putter (2), and electric putter (2) keep away from one side of going up aluminum alloy pole setting (8) and be provided with connecting block (22).
3. An auxiliary erecting device for a cable upright according to claim 2, wherein: a supporting ring (23) is installed on one side of the connecting block (22), and the connecting block (22) is fixedly connected with the supporting ring (23).
4. The auxiliary erecting device for cable uprights according to claim 1, wherein: go up the outer wall on aluminum alloy pole setting (8) top and install second fixed pulley (7), and the outer wall fixed connection of second fixed pulley (7) and last aluminum alloy pole setting (8), last aluminum alloy pole setting (8) outer wall of second fixed pulley (7) below is installed and is supported horizontal pole (24), and supports horizontal pole (24) and keep away from one side of last aluminum alloy pole setting (8) and be fixed with first fixed pulley (6).
5. Auxiliary erecting device for cable uprights according to claim 4, characterised in that: fixed ring (5) are installed to support horizontal pole (24) outer wall of first fixed pulley (6) below, and the top of fixed ring (5) and the outer wall fixed connection of supporting horizontal pole (24).
6. The auxiliary erecting device for cable uprights according to claim 1, wherein: the control panel (11) one side of center stay tube (1) outside is provided with motor (12), and the output of motor (12) installs pivot (13) through the shaft coupling, one side of pivot (13) is provided with capstan winch (14), and the outer wall swing joint of capstan winch (14) has hoisting wire rope (9) to hoisting wire rope (9) swing joint is in the outside of first fixed pulley (6) and second fixed pulley (7).
7. An auxiliary erecting device for a cable upright according to claim 6, wherein: hoisting steel wire rope (9) are close to the bottom of solid fixed ring (5) and are provided with movable pulley (4), and the outer wall and hoisting steel wire rope (9) swing joint of movable pulley (4), bearing couple (3) are installed to the bottom of movable pulley (4), and the exterior structure fixed connection of the top of bearing couple (3) and movable pulley (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121295045.8U CN214835263U (en) | 2021-06-10 | 2021-06-10 | Auxiliary erecting device for cable upright stanchion |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121295045.8U CN214835263U (en) | 2021-06-10 | 2021-06-10 | Auxiliary erecting device for cable upright stanchion |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214835263U true CN214835263U (en) | 2021-11-23 |
Family
ID=78805002
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121295045.8U Active CN214835263U (en) | 2021-06-10 | 2021-06-10 | Auxiliary erecting device for cable upright stanchion |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214835263U (en) |
-
2021
- 2021-06-10 CN CN202121295045.8U patent/CN214835263U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105529648B (en) | Hydraulic pressure assembled crossing frame | |
US20150292263A1 (en) | Supply Frame for a Tower; Tower with a Supply Frame and Method for Erecting a Supply Frame in the Interior of a Tower | |
CN205955358U (en) | Group's tower device of interior floated armful of pole of acting as go -between | |
WO2017016369A1 (en) | Tower crane for assembling power transmission tower | |
WO2023208250A1 (en) | Curtain wall construction platform | |
US3977139A (en) | Tower having raising and lowering means | |
CN212246007U (en) | Be used for tower crane bracket welded portable platform | |
CN214835263U (en) | Auxiliary erecting device for cable upright stanchion | |
CN111852074B (en) | Adjustable lifting type supporting device | |
CN203559570U (en) | Operating platform for steel pipe support frame overhung on surrounding columns | |
CN217500985U (en) | Curtain wall construction platform | |
CN216889746U (en) | All-terrain insulating tower for distribution line pole tower operation and inverted lifting device thereof | |
CN115467505A (en) | Climbing system for overhead layer climbing frame | |
CN211818258U (en) | Temporary support frame for beam string | |
CN2893124Y (en) | Derrick support device | |
CN209742342U (en) | Climbing formula scaffold frame support increases subassembly | |
CN215772265U (en) | Novel join in marriage net low pressure overhead line crossing structure | |
CN218205631U (en) | Oblique roofing hanging flower basket erects frame | |
CN216105690U (en) | Intelligence lift jib | |
CN109779382A (en) | A kind of scalable unipods post mounting accessories for steel pipe pole construction | |
CN217105080U (en) | Pile frame | |
CN216997320U (en) | Prefabricated T roof beam template dismouting hoist | |
CN218881540U (en) | Construction protection frame | |
CN220487148U (en) | Assembled vertical plate machine | |
CN211775557U (en) | Folding cantilever operation platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |