CN218205631U - A hanging basket erecting frame for sloping roof - Google Patents
A hanging basket erecting frame for sloping roof Download PDFInfo
- Publication number
- CN218205631U CN218205631U CN202222498534.4U CN202222498534U CN218205631U CN 218205631 U CN218205631 U CN 218205631U CN 202222498534 U CN202222498534 U CN 202222498534U CN 218205631 U CN218205631 U CN 218205631U
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- rod
- frame
- holes
- sliding sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本实用新型公开了一种斜屋面吊篮搭设架,涉及建筑施工设备领域,技术方案为,包括矩形杆状的悬挑架,悬挑架为截面形状为矩形的中空杆,悬挑架上滑动设置两个滑动套,每个滑动套上固定调节杆,每个调节杆的下端均活动设置一个安装角钢,两个安装角钢对向设置;两个调节杆之间的悬挑架上滑动设置一个滑套,滑套上固定设置上支柱,上支柱和调节杆分别位于悬挑架的上下两侧;上支柱的上端转动设置滚轮,悬挑架的两端分别转动设置“U”形的安装环,两个安装环的闭合端均固定设置一个钢绳,钢绳的中部绕过滚轮。本实用新型的有益效果是:克服了斜面屋面吊篮搭设的困难,采用无配重式吊篮进行搭设,减少了配重块的搬运,缩短了吊篮搭设时间。
The utility model discloses a slanted roof hanging basket erecting frame, which relates to the field of building construction equipment. The technical proposal includes a rectangular rod-shaped suspension frame, the suspension frame is a hollow rod with a rectangular cross section, and slides on the suspension frame Two sliding sleeves are set, each sliding sleeve is fixed with an adjusting rod, and the lower end of each adjusting rod is provided with an installation angle steel, and the two installation angle steels are set opposite to each other; a sliding bracket is installed on the suspension frame between the two adjustment rods. Sliding sleeve, the upper pillar is fixed on the sliding sleeve, the upper pillar and the adjustment rod are respectively located on the upper and lower sides of the suspension frame; the upper end of the upper pillar is rotated to set the roller, and the two ends of the suspension frame are respectively rotated to set "U"-shaped installation rings A steel rope is fixedly arranged at the closed ends of the two installation rings, and the middle part of the steel rope goes around the roller. The beneficial effects of the utility model are: it overcomes the difficulty of setting up the hanging basket on the inclined roof, adopts the hanging basket without counterweight to set up, reduces the transportation of the counterweight, and shortens the erecting time of the hanging basket.
Description
技术领域technical field
本实用新型涉及建筑施工设备领域,特别涉及一种斜屋面吊篮搭设架。The utility model relates to the field of building construction equipment, in particular to a hanging basket erecting frame for inclined roofs.
背景技术Background technique
建筑幕墙发展已有几十年历史,而施工吊篮是建筑幕墙施工中必不可缺的一种施工机械。传统的施工中,需吊篮安装架设在屋面上后,建筑结构的外装工程方才具备施工条件。The building curtain wall has been developed for decades, and the construction hanging basket is an indispensable construction machine in the construction of the building curtain wall. In traditional construction, the external decoration of the building structure is ready for construction only after the hanging basket is installed and erected on the roof.
吊篮安装时先将吊篮支架设置于屋面上,再在吊篮支架的后部增加配重块。这样的吊篮安装必须在屋面工程施工完毕后才能开始考虑到建筑结构的外装工程的施工,工程施工效率低下,同时传统的吊篮需要大量的配重块,配重块的运输与安装占用了大量的人力物力,降低了施工效率,同时配重块的存在无法实现屋面工程与幕墙工程的同步施工。When installing the hanging basket, first set the hanging basket support on the roof, and then add a counterweight to the rear of the hanging basket support. The installation of such a hanging basket must be completed after the roofing project is completed before the construction of the exterior of the building structure can be considered. The construction efficiency is low. A large amount of manpower and material resources reduce the construction efficiency, and the existence of the counterweight blocks cannot realize the simultaneous construction of the roofing project and the curtain wall project.
实用新型内容Utility model content
针对上述技术问题,本实用新型提供一种斜屋面吊篮搭设架。Aiming at the above technical problems, the utility model provides a hanging basket erecting frame on a sloping roof.
其技术方案为,包括矩形杆状的悬挑架,所述悬挑架为截面形状为矩形的中空杆,所述悬挑架上滑动设置两个滑动套,每个所述滑动套上固定调节杆,每个所述调节杆的下端均活动设置一个安装角钢,两个所述安装角钢对向设置;The technical solution is to include a rectangular rod-shaped suspension frame, the suspension frame is a hollow rod with a rectangular cross-sectional shape, two sliding sleeves are slidably arranged on the suspension frame, and each sliding sleeve is fixed and adjusted. Rods, the lower end of each of the adjustment rods is provided with a mounting angle steel, and the two mounting angle steels are arranged opposite to each other;
两个所述调节杆之间的悬挑架上滑动设置一个滑套,所述滑套上固定设置上支柱,所述上支柱和所述调节杆分别位于悬挑架的上下两侧;所述上支柱的上端转动设置滚轮,所述悬挑架的两端分别转动设置“U”形的安装环,所述安装环的开口端两端分别位于所述悬挑架的两侧,两个所述安装环的闭合端均固定设置一个钢绳,所述钢绳的中部绕过滚轮。A sliding sleeve is slidably arranged on the suspension frame between the two adjusting rods, and an upper pillar is fixedly arranged on the sliding sleeve, and the upper pillar and the adjusting rod are respectively located on the upper and lower sides of the suspension frame; The upper end of the upper pillar is rotated to set rollers, and the two ends of the suspension frame are respectively rotated to set a "U"-shaped installation ring, and the two ends of the opening end of the installation ring are respectively located on both sides of the suspension frame. A steel rope is fixedly arranged at the closed end of the installation ring, and the middle part of the steel rope goes around the roller.
优选为,所述调节杆的杆体上阵列设置若干个贯穿的安装孔;Preferably, the rod body of the adjusting rod is provided with several through mounting holes in an array;
所述安装角钢的水平部上固定设置调节板,所述调节板的板体上开设两个贯穿的通孔,两个所述通孔与任意两个安装孔对应,下部的一个所述通孔与所述调节杆通过紧固螺栓连接。An adjustment plate is fixedly arranged on the horizontal part of the installation angle steel, and two through holes are opened on the body of the adjustment plate, and the two through holes correspond to any two installation holes, and one of the lower through holes It is connected with the adjusting rod through fastening bolts.
优选为,两个所述安装角钢之间通过对拉螺栓连接,对拉螺栓的两端分别贯穿对拉角钢的上部通孔并延伸到调节杆的两侧,对拉螺栓的两端螺纹上分别螺纹连接一个锁紧螺母,两个锁紧螺母分别位于两个调节杆的外侧。Preferably, the two installation angles are connected by a pull bolt, and the two ends of the pull bolt respectively pass through the upper through hole of the pull angle steel and extend to both sides of the adjustment rod, and the threads of the two ends of the pull bolt respectively A locking nut is threadedly connected, and the two locking nuts are respectively located on the outer sides of the two adjusting rods.
优选为,所述悬挑架的杆体上阵列设置若干个定位孔,所述滑动套及滑套的套体上设置两个限位孔,所述定位孔与限位孔对应;Preferably, a plurality of positioning holes are arranged in an array on the rod body of the cantilever frame, and two limiting holes are arranged on the sliding sleeve and the sleeve body of the sliding sleeve, and the positioning holes correspond to the limiting holes;
还包括活动设置在所述限位孔内的限位销。It also includes a limit pin movably arranged in the limit hole.
优选为,所述安装角钢水平部的中部设置贯穿的预留孔。Preferably, the middle part of the horizontal part of the installation angle steel is provided with a through-reserved hole.
优选为,所述悬挑架的一端活动设置埋板,埋板的板体上设置若干个固定孔,所述埋板的中部固定设置固定杆,所述固定杆与所述悬挑架的一端插接。Preferably, one end of the cantilever frame is movable with a buried plate, several fixing holes are set on the plate body of the buried plate, a fixed rod is fixedly arranged in the middle of the buried plate, and the fixed rod is connected with one end of the cantilever frame. Docking.
优选为,所述悬挑架远离埋板的一端下方转动设置滑轮,所述滑轮上设置吊索,所述吊索与吊篮连接。Preferably, a pulley is rotated under the end of the suspension frame away from the buried plate, and a sling is arranged on the pulley, and the sling is connected to the hanging basket.
优选为,所述安装角钢与所述调节板在竖直面的投影的夹角为锐角。Preferably, the included angle between the installation angle steel and the projection of the adjusting plate on the vertical plane is an acute angle.
本实用新型实施例提供的技术方案带来的有益效果是:1、克服了斜面屋面吊篮搭设的困难,采用无配重式吊篮进行搭设,减少了配重块的搬运,缩短了吊篮搭设时间。The beneficial effects brought by the technical solution provided by the embodiment of the utility model are: 1. Overcoming the difficulty of erecting the hanging basket on the inclined roof, the hanging basket without counterweight is used for erecting, which reduces the handling of the counterweight and shortens the hanging basket Set up time.
2、该吊篮搭设方式施工适应性强,施工高度大,占用施工场地少,施工效率高,架设方便,用工少等特点。用于高层建筑的外墙施工和装修或幕墙和外墙构件的安装,高层建筑的外墙维修,保养及清洗。本产品操作简单,安装拆卸方便,移位容易,安全可靠,使用本产品可免除常规配重的生产、搬运,使施工成本大大降低。2. The hanging basket erection method has strong construction adaptability, large construction height, less construction site occupation, high construction efficiency, convenient erection, and less labor. It is used for the construction and decoration of exterior walls of high-rise buildings or the installation of curtain walls and exterior wall components, as well as the repair, maintenance and cleaning of exterior walls of high-rise buildings. This product is easy to operate, easy to install and disassemble, easy to shift, safe and reliable. Using this product can avoid the production and transportation of conventional counterweights, which greatly reduces the construction cost.
附图说明Description of drawings
图1为本实用新型实施例的使用状态示意图。Fig. 1 is a schematic view of the use state of the embodiment of the utility model.
图2为本实用新型实施例的埋板与悬挑架的示意图。Fig. 2 is a schematic diagram of the buried plate and the cantilever frame of the embodiment of the utility model.
图3为本实用新型实施例的整体结构示意图。Fig. 3 is a schematic diagram of the overall structure of the embodiment of the utility model.
图4为本实用新型实施例的调节角钢结构示意图。Fig. 4 is a schematic diagram of the structure of the adjustment angle steel in the embodiment of the utility model.
其中,附图标记为:1、悬挑架;2、滑动套;3、调节杆;4、安装角钢;5、滑套;6、上支柱;7、滚轮;8、安装环;9、钢绳;10、安装孔;11、调节板;12、通孔;13、紧固螺栓;14、对拉螺栓;15、定位孔;16、限位孔;17、预留孔;18、埋板;19、固定杆;21、吊索;100、女儿墙;101、吊篮。Wherein, the reference signs are: 1, suspension frame; 2, sliding sleeve; 3, adjusting rod; 4, installation angle steel; 5, sliding sleeve; 6, upper pillar; 7, roller; 8, installation ring; 9, steel Rope; 10, mounting hole; 11, adjusting plate; 12, through hole; 13, fastening bolt; 14, pull bolt; 15, positioning hole; 16, limit hole; 17, reserved hole; 18, buried plate ; 19, fixed rod; 21, sling; 100, parapet; 101, hanging basket.
具体实施方式detailed description
为了使本实用新型的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本实用新型进行进一步详细说明。当然,此处所描述的具体实施例仅用以解释本实用新型,并不用于限定本实用新型。In order to make the purpose, technical solution and advantages of the utility model clearer, the utility model will be further described in detail below in conjunction with the accompanying drawings and embodiments. Of course, the specific embodiments described here are only used to explain the utility model, and are not intended to limit the utility model.
需要说明的是,在不冲突的情况下,本实用新型创造中的实施例及实施例中的特征可以相互组合。It should be noted that, in the case of no conflict, the embodiments and the features in the embodiments of the utility model can be combined with each other.
在本实用新型创造的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型创造和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型创造的限制。此外,术语“第一”、“第二”等仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”等的特征可以明示或者隐含地包括一个或者更多个该特征。在本实用新型创造的描述中,除非另有说明,“多个”的含义是两个或两个以上。In describing the present invention, it should be understood that the terms "center", "longitudinal", "transverse", "upper", "lower", "front", "rear", "left", "right" , "vertical", "horizontal", "top", "bottom", "inner", "outer" and other indicated orientations or positional relationships are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing this The utility model creations and simplified descriptions do not indicate or imply that the devices or elements referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore should not be construed as limitations on the utility model creations. In addition, the terms "first", "second", etc. are used for descriptive purposes only, and should not be understood as indicating or implying relative importance or implicitly specifying the quantity of the indicated technical features. Thus, a feature defined as "first", "second", etc. may expressly or implicitly include one or more of that feature. In the description of the utility model creation, unless otherwise specified, "plurality" means two or more than two.
在本实用新型创造的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以通过具体情况理解上述术语在本实用新型创造中的具体含义。In the description of the utility model creation, it should be noted that, unless otherwise specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection or a A detachable connection, or an integral connection; it may be a mechanical connection or an electrical connection; it may be a direct connection or an indirect connection through an intermediary, and it may be an internal communication between two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the invention of the utility model through specific situations.
实施例1Example 1
参见图1至图4,本实用新型提供一种斜屋面吊篮搭设架,包括矩形杆状的悬挑架1,悬挑架1为截面形状为矩形的中空杆,悬挑架1上滑动设置两个滑动套2,每个滑动套2上固定调节杆3,每个调节杆3的下端均活动设置一个安装角钢4,两个安装角钢4对向设置;Referring to Fig. 1 to Fig. 4, the utility model provides a hanging basket erecting frame on a sloping roof, which includes a rectangular rod-
两个调节杆3之间的悬挑架1上滑动设置一个滑套5,滑套5上固定设置上支柱6,上支柱6和调节杆3分别位于悬挑架1的上下两侧;上支柱6的上端转动设置滚轮7,悬挑架1的两端分别转动设置“U”形的安装环8,安装环8的开口端两端分别位于悬挑架1的两侧,两个安装环8的闭合端均固定设置一个钢绳9,钢绳9的中部绕过滚轮7;A
钢绳9的一端设置花篮紧固器,花篮紧固器位于靠近悬挑架1屋面上的一端,通过花篮紧固器调节钢绳9的松紧度,进一步的实现悬挑架1的整体刚性,有效的提高本装置的承载重量。One end of the
调节杆3的杆体上阵列设置若干个贯穿的安装孔10;A plurality of through mounting holes 10 are arranged in an array on the rod body of the adjusting
安装角钢4的水平部上固定设置调节板11,调节板11的板体上开设两个贯穿的通孔12,两个通孔12与任意两个安装孔10对应,下部的一个通孔12与调节杆3通过紧固螺栓13连接。Adjusting
两个安装角钢4之间通过对拉螺栓14连接,对拉螺栓14的两端分别贯穿对拉角钢的上部通孔12并延伸到调节杆3的两侧,对拉螺栓14的两端螺纹上分别螺纹连接一个锁紧螺母,两个锁紧螺母分别位于两个调节杆3的外侧。The two
悬挑架1的杆体上阵列设置若干个定位孔15,滑动套2及滑套5的套体上设置两个限位孔16,定位孔15与限位孔16对应;A plurality of
还包括活动设置在限位孔16内的限位销。It also includes a limit pin that is movably arranged in the
安装角钢4水平部的中部设置贯穿的预留孔17;通过贯穿预留孔17的螺栓将安装角钢4固定在女儿墙100上,The middle part of the horizontal part of the
悬挑架1的一端活动设置埋板18,埋板18的板体上设置若干个固定孔,埋板18的中部固定设置固定杆19,固定杆19与悬挑架1的一端插接。One end of the
悬挑架1远离埋板18的一端下方转动设置滑轮,滑轮上设置吊索21,吊索21与吊篮101连接。A pulley is rotated under the end of the
本实用新型使用时,将两个调节角钢4固定在女儿墙100上,根据现场的实际情况,控制调节板11在调节杆3上的位置,并使用紧固螺栓13固定,同时使用对拉螺栓14将两个调节杆3进行固定,同时使用贯穿埋板18固定孔的化学锚栓将埋板18固定在混凝土墙体上,固定杆19插入悬挑架1内,并使用螺栓将固定杆19与悬挑架1之间进行固定,悬挑架1搭设完成,将吊篮101通过吊索21与滑轮进行连接,便于进行幕墙施工,同时不会影响屋面的施工。When the utility model is in use, two adjusting
实施例2Example 2
在实施例1的基础上,安装角钢4与调节板11在竖直面的投影的夹角为锐角。由于女儿墙100存在坡度,一般为12度,调节安装角钢4与调节板11的之间的夹角为78度,并将调节板11与角钢4进行焊接固定,使安装角钢4适应有角度的女儿墙100,同时整体结构不受女儿墙100角度的影响,整体始终保持竖直的状态。On the basis of
以上所述仅为本实用新型的较佳实施例,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present utility model shall be included in this utility model. within the scope of protection of utility models.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202222498534.4U CN218205631U (en) | 2022-09-21 | 2022-09-21 | A hanging basket erecting frame for sloping roof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202222498534.4U CN218205631U (en) | 2022-09-21 | 2022-09-21 | A hanging basket erecting frame for sloping roof |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN218205631U true CN218205631U (en) | 2023-01-03 |
Family
ID=84635720
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202222498534.4U Active CN218205631U (en) | 2022-09-21 | 2022-09-21 | A hanging basket erecting frame for sloping roof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN218205631U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117468692A (en) * | 2023-11-03 | 2024-01-30 | 华北冶建工程建设有限公司 | Hanging basket suspension mechanism |
| CN120095469A (en) * | 2025-04-21 | 2025-06-06 | 中建八局第一建设有限公司 | A kind of I-beam welding tool for green building construction |
-
2022
- 2022-09-21 CN CN202222498534.4U patent/CN218205631U/en active Active
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117468692A (en) * | 2023-11-03 | 2024-01-30 | 华北冶建工程建设有限公司 | Hanging basket suspension mechanism |
| CN120095469A (en) * | 2025-04-21 | 2025-06-06 | 中建八局第一建设有限公司 | A kind of I-beam welding tool for green building construction |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103526699B (en) | Method for replacing pipe bridge hanging steel ropes | |
| CN207513156U (en) | Telescopic frame body for building | |
| CN114922435A (en) | Construction method of bolt-sphere joint net rack of garbage power station | |
| CN111335618B (en) | Drawknot system of assembled suspension scaffold | |
| CN115467505A (en) | Climbing system for overhead layer climbing frame | |
| CN108532968A (en) | A kind of assembled support device of steel bar truss floor support plate composite floor system | |
| CN206554487U (en) | A kind of roofing hanging basket | |
| CN117145043A (en) | Prefabricated corridor, corridor end connection structure and construction method | |
| CN115596242A (en) | A support system for retaining exterior walls of existing buildings and its construction method | |
| CN104818675A (en) | Assembly method of steel bar segment | |
| CN113550550A (en) | Overhanging unit type scaffold convenient to assemble and disassemble | |
| CN109440942B (en) | Installation structure and construction process of factory building roof grid | |
| CN109252656B (en) | High-rise building climbing template and assembling, pouring and lifting method | |
| CN110318550B (en) | Inclined roof safety belt hanging device and installation process thereof | |
| CN114033189A (en) | Large-area high-altitude grid structure aluminum grid ceiling construction device and construction method | |
| CN221031335U (en) | Climbing frame attached steel upright post of roof framework layer and climbing system | |
| CN208534069U (en) | The assembled support device of steel bar truss floor support plate composite floor system | |
| CN203559570U (en) | Operating platform for steel pipe support frame overhung on surrounding columns | |
| CN208604911U (en) | A kind of novel suspention beam bracket | |
| CN212428008U (en) | Lower supporting type overhanging scaffold construction device | |
| CN115853314A (en) | Parapet top overhanging component supporting device and construction method | |
| CN105804389B (en) | Clamping groove type scaffold and manufacturing and mounting method thereof | |
| CN104594617B (en) | A span wire scaffold frame for construction of high-rise roof structure | |
| CN211647244U (en) | A two-way adjustable layered hanging basket | |
| CN216076322U (en) | Portable horizontal floor hangs hole fixed bolster |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |
