KR20090129250A - Assembly type auxiliary tower crane for power transmission tower and its installation method - Google Patents

Assembly type auxiliary tower crane for power transmission tower and its installation method Download PDF

Info

Publication number
KR20090129250A
KR20090129250A KR1020080055421A KR20080055421A KR20090129250A KR 20090129250 A KR20090129250 A KR 20090129250A KR 1020080055421 A KR1020080055421 A KR 1020080055421A KR 20080055421 A KR20080055421 A KR 20080055421A KR 20090129250 A KR20090129250 A KR 20090129250A
Authority
KR
South Korea
Prior art keywords
assembly
anchor
crane
transmission tower
boom
Prior art date
Application number
KR1020080055421A
Other languages
Korean (ko)
Inventor
황철욱
복기용
Original Assignee
(자)자유이엔씨
지에스네오텍(주)
현대건설주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (자)자유이엔씨, 지에스네오텍(주), 현대건설주식회사 filed Critical (자)자유이엔씨
Priority to KR1020080055421A priority Critical patent/KR20090129250A/en
Publication of KR20090129250A publication Critical patent/KR20090129250A/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/84Slewing gear

Abstract

PURPOSE: An assembly-type sub crane for transmission tower assembly construction and an installation method thereof are provided to make rotation work possible by installing a turn table and simply stand a support by laying a lower anchor. CONSTITUTION: A turn table(10) is composed of a fixing lower plate(11) and a rotary upper plate(12). The lower end of a boom(20) is connected to the left edge of the upper side center of the rotary upper plate. In the upper end of the boom, a guide pulley(21) is installed. A support steel tower(30) is installed in the upper side center of the rotary upper plate. Ground wires(40) steadily support the support steel tower. One end of a first winch(51) is connected to the top of the boom. The other end of the first winch is connected to a working wire(42).

Description

송전철탑 조립공사용 조립형 보조크레인 및 그 설치방법{Assembly type auxiliary tower crane for power transmission tower and its installation method}Assembly type auxiliary tower crane for power transmission tower and its installation method

본 발명은 턴테이블의 설치로 크레인의 회전작업이 가능하며 제품의 경량화로 운반이 쉽고 설치가 간단하며 산악지형의 암반지역 및 경사지형에 관계없이 설치할 수 있는 송전철탑 조립공사용 조립형 보조크레인 및 그 설치방법에 관한 것이다.The present invention is possible to rotate the crane by the installation of the turntable, light weight of the product is easy to transport and easy to install, and can be installed irrespective of the mountainous rock area and inclined terrain assembling auxiliary crane and the installation of the transmission tower assembly It is about a method.

일반적으로 송전철탑의 조립공사는 기초공사 완료 후 기초 구조물로부터 구조물을 조립하여 지상 수십 미터 상공으로 전선을 연결할 수 있도록 철 구조물을 세우는 공사로, 지금까지는 조립봉을 사용하거나 동력윈치를 이용한 재래식 방법이 주로 사용되었다.In general, assembling construction of transmission tower is to assemble the structure from the basic structure after the completion of the foundation work and to set up the steel structure so that the electric wires can be connected several tens of meters above the ground. Until now, conventional methods using assembly rods or power winches have been used. Mainly used.

이러한 조립봉을 사용하거나 동력윈치를 이용한 방법은 사용기구가 단순하고 사용기구를 공사지역으로 운반하기 용이한 장점은 있으나, 송전철탑이 대형화되면 서부터 긴 조립봉 사용과 이에 따른 인상 단위 중량의 제한으로 최근에는 이동식 크레인, 철탑크레인 등의 조립용 장비를 이용하고 있다.The use of such assembly rods or power winches has the advantage of simplicity of use mechanisms and easy transportation of them to construction areas.However, as transmission towers become larger, the use of long assembly rods and the resulting unit weight limitations In recent years, mobile cranes, tower cranes and other equipment for assembly are used.

그러나 이동식 크레인 및 철탑크레인은 국내에서 몇 대 안 되는 고가의 장비로 장시간 임대시 과다한 경비가 지출되며, 이동식 크레인 및 철탑크레인을 공사현장으로 운반시 운반이 용이하도록 분해한 다음 삭도 및 헬기를 이용하여 공사현장으로 운반하나 장비의 무게가 10ton 이상으로 헬기운반시 고가의 운임비용이 소요되는 문제점이 있었다.However, mobile cranes and tower cranes are one of the few expensive equipment in Korea, and excessive expenses are spent for long time rental.The mobile cranes and tower cranes are disassembled for easy transportation when transported to the construction site. Transported to the construction site, but the weight of the equipment is more than 10tons, there was a problem that the expensive freight cost when carrying the helicopter.

그리고 이동식 크레인 및 철탑크레인은 작업반경이 너무 넓고 장비가 수입품인 경우가 대부분 이어서 공사도중 고장이 발생할 경우 수리하는데 수일이 걸려 공사를 지연시키는 문제점이 있었다.In addition, mobile cranes and tower cranes have a problem that delays construction by taking a few days to repair them if a failure occurs during the construction because the work radius is too wide and the equipment is mostly imported.

본 발명은 상기와 같은 문제점을 해결하기 위해 발명한 것으로, 본 발명의 목적은 제품의 경량화로 운반이 수월하며 순수 국내기술로 제작되므로 고장발생시 신속한 수리를 할 수 있으며, 턴테이블이 설치되어 있어 회전작업이 가능한 송전철탑 조립공사용 조립형 보조크레인을 제공함에 그 목적이 있다.The present invention has been invented to solve the above problems, the object of the present invention is easy to carry with light weight of the product and made by purely domestic technology, so that can be repaired quickly when a failure occurs, turntable is installed to rotate work Its purpose is to provide a prefabricated auxiliary crane for this transmission tower assembly.

또한, 산악지형의 암반지역 및 경사지형에 관계없이 송전철탑 조립공사용 조립형 보조크레인을 안전하게 설치할 수 있도록 한 송전철탑 조립공사용 조립형 보조크레인의 설치방법을 제공함에 그 목적이 있다.It is also an object of the present invention to provide a method of installing an auxiliary auxiliary crane for a transmission tower assembly engineer for safely installing an auxiliary auxiliary crane for a transmission tower assembly regardless of a mountainous rock region or a slope.

본 발명은 상기와 같은 기술적 과제를 해결하기 위해, 중앙에는 중앙으로부터 상향으로 연장되는 중심축이 설치되고 상면 가장자리 일단에는 축설된 구동기어가 위쪽을 향하도록 구동모터가 고정설치되는 고정하판과, 상기 고정하판의 상향으로 대향 설치되는 것으로서 저면에는 상기 구동모터의 구동기어와 맞물림되는 종동기어가 설치되며 저면 중앙에는 상기 중심축의 상부에 결합되는 회전베어링이 설치되는 회전상판으로 이루어지는 턴테이블과; 하단은 상하로의 움직임이 자유롭도록 회전상판의 상면 중앙의 좌측 가장자리에 연결설치되고 상단에는 승강물을 끌어올리는 승강와이어가 경유하는 안내도르래가 설치되는 붐과; 상기 붐의 바로 옆에 위치하도록 회전상판의 상면 중앙에 설치되는 것으로서 상부에는 승강와이어가 경유 하는 제1활차가 설치되고 상기 제1활차의 바로 아래에는 작동와이어가 경유하는 제2활차가 설치되며 상면에는 지선과 연결되면서 하부에 설치된 베어링에 의해 선회 가능한 스위블이 설치되는 지지철탑과; 상기 지지철탑을 안정적으로 지지할 수 있도록 상부 끝단은 스위블과 연결되고 하부 끝단은 긴장된 상태로 지지철탑을 중심으로 턴테이블의 후방과 좌우 지면에 고정설치되는 지선과; 상기 지지철탑의 뒤쪽에 위치하도록 회전상판의 상면 후방에 설치되는 것으로서 한쪽 끝단은 붐의 상부와 연결되고 다른 쪽 끝단은 제2활차를 경유하는 작동와이어에 있어 이 작동와이어의 다른 쪽 끝단과 연결되는 제1윈치와; 상기 제1원치의 바로 옆에 나란하게 위치하도록 회전상판의 상면 후방에 설치되는 것으로서 한쪽 끝단은 붐의 안내도르래를 경유하여 승강물과 연결되고 다른 쪽 끝단은 제1활차를 경유하는 승강와이어에 있어 이 승강와이어 다른 쪽 끝단과 연결되는 제2윈치를; 포함하여 구성됨을 특징으로 한다.The present invention, in order to solve the technical problem as described above, the central axis is installed in the center extending upward from the center and the fixed lower plate is fixed to the drive motor is installed so that the drive gear is arranged upward at one end of the upper edge, A turntable which is installed to face upwards of the fixed lower plate and has a driven gear engaged with the drive gear of the driving motor at a bottom thereof, and a rotary table having a rotary bearing coupled to an upper portion of the central axis at a center of the bottom thereof; The lower part is connected to the left edge of the center of the upper surface of the rotating top plate to be freely moved up and down, and the upper part of the boom is installed with a guide pulley through the lifting wire for lifting the lifting object; It is installed in the center of the upper surface of the rotating top plate so as to be located next to the boom. A first pulley through which the lifting wire passes is installed, and a second pulley through the operation wire is installed directly below the first pulley. It has a support steel tower that is connected to the branch line and the swiveling swivel is installed by a bearing installed in the lower; An upper end connected to the swivel so that the support tower can be stably supported, and a branch line fixed to the rear and left and right grounds of the turntable around the support tower in a state where the lower end is tense; It is installed at the rear of the upper surface of the rotating top plate so as to be located behind the supporting steel tower, and one end is connected to the upper part of the boom and the other end is connected to the other end of the operation wire in the operation wire via the second pulley. A first winch; It is installed at the rear of the upper surface of the rotary top plate so as to be located next to the first base side by side, one end is connected to the lifting object via the guide pulley of the boom, and the other end is in the lifting wire passing through the first pulley. A second winch connected to the other end of the lifting wire; Characterized in that configured to include.

또한, 토사지역일 경우의 송전철탑 조립공사용 조립형 보조크레인 설치방법에 있어서, 앵커를 설치할 수 있도록 앵커에 부합되는 크기로 송전철탑 조립공사용 조립형 보조크레인 설치지역의 지면을 굴착하여 앵커설치공간을 형성하는 제1단계와; 상기 앵커설치공간에 앵커를 삽입하여 앵커의 상면이 지면보다 올라오도록 앵커를 설치하는 제2단계와; 턴테이블의 저면이 앵커 상면에 안치되도록 고정설치하고, 턴테이블 상면에 송전철탑 조립공사용 조립형 보조크레인의 구조물을 설치하는 제3단계를; 포함하여 이루어짐을 특징으로 한다.In addition, in the case of earth and sand area, in the method of installing subsidiary cranes for the assembly of power transmission tower assembly, the anchor installation space is excavated by excavating the ground of the subsidiary crane installation area for the assembly of power transmission tower assembly in the size corresponding to the anchor to install the anchor. Forming a first step; Inserting an anchor into the anchor installation space to install the anchor so that an upper surface of the anchor rises above the ground; A third step of fixing the bottom surface of the turntable to be anchored to an upper surface of the turntable, and installing a structure of an assembled auxiliary crane for a transmission tower assembly engineer on the upper surface of the turntable; It is characterized by including the.

또한, 상기 앵커는 가로 및 세로가 각 1m인 정육면체의 철 구조물로 이루어 지며 앵커설치공간에는 복수의 앵커가 상하 일렬로 볼트에 의해 체결되어 설치됨을 특징으로 한다.In addition, the anchor is made of a steel structure of a cube each 1m in length and width, and the anchor installation space is characterized in that the plurality of anchors are fastened by bolts in a line up and down.

또한, 암반지역일 경우의 송전철탑 조립공사용 조립형 보조크레인 설치방법에 있어서, 지주를 설치할 수 있도록 지주에 부합되는 크기로 송전철탑 조립공사용 조립형 보조크레인 설치지역의 지면에 사각형의 꼭짓점과 같이 4군데를 천공하여 지주설치공을 형성하는 제1단계와; 상기 각 지주설치공에 지주를 삽입하여 각 지주설치공에 삽입된 지주의 상면이 평행하면서 지면보다 높도록 설치하는 제2단계와; 턴테이블의 저면이 각 지주 상면에 안치되도록 고정설치하고 턴테이블 상면에 송전철탑 조립공사용 조립형 보조크레인의 구조물 설치하는 제3단계를; 포함하여 이루어짐을 특징으로 한다.In addition, in the case of rock area, the method of installing subsidiary crane of the assembly line for power transmission tower assembly is similar to the vertices of the square on the ground of the installation area of the subsidiary crane installation of the assembly line for transmission tower assembly. A first step of forming a support installation hole by drilling a site; Inserting the support posts into the support posts so that the upper surface of the support posts inserted into the support posts is parallel and installed higher than the ground; A third step of fixing the bottom surface of the turntable so as to be placed on the upper surface of each strut, and installing a structure of an assembled auxiliary crane for a transmission tower assembly engineer on the top of the turntable; It is characterized by including the.

또한, 상기 지주는, 직경이 0.1m 이며 길이가 2m의 강관으로 이루어짐을 특징으로 한다.In addition, the pillar is characterized in that the steel pipe is 0.1m in diameter and 2m in length.

본 발명의 송전철탑 조립공사용 조립형 보조크레인은 제품의 경량화로 운반이 수월하며 순수 국내기술로 제작되므로 고장발생시 애프터서비스가 신속하다.The assembly auxiliary crane of the transmission tower assembly of the present invention is easy to carry with light weight of the product, and is manufactured by pure domestic technology, so that after-sales service is quick in case of failure.

또한, 송전철탑 조립공사용 조립형 보조크레인에 턴테이블 설치되어 있어 회전작업이 가능하며, 하부 앵커가 매립형으로 매설되므로 지지물의 세움이 매우 간단하다.In addition, the turntable is installed on the auxiliary crane for assembly of the transmission tower assembly, it is possible to rotate the work, and since the lower anchor is embedded in the buried type, the mounting of the support is very simple.

최대 3.5톤의 중량물의 인상이 가능하며 산악지형의 암반지역 및 경사지형에 관계없이 설치할 수 있다.Up to 3.5 tons of heavy weights can be raised and can be installed regardless of mountainous rock areas or slopes.

본 발명은, 중앙에는 중앙으로부터 상향으로 연장되는 중심축이 설치되고 상면 가장자리 일단에는 축설된 구동기어가 위쪽을 향하도록 구동모터가 고정설치되는 고정하판과, 상기 고정하판의 상향으로 대향 설치되는 것으로서 저면에는 상기 구동모터의 구동기어와 맞물림되는 종동기어가 설치되며 저면 중앙에는 상기 중심축의 상부에 결합되는 회전베어링이 설치되는 회전상판으로 이루어지는 턴테이블과; 하단은 상하로의 움직임이 자유롭도록 회전상판의 상면 중앙의 좌측 가장자리에 연결설치되고 상단에는 승강물을 끌어올리는 승강와이어가 경유하는 안내도르래가 설치되는 붐과; 상기 붐의 바로 옆에 위치하도록 회전상판의 상면 중앙에 설치되는 것으로서 상부에는 승강와이어가 경유하는 제1활차가 설치되고 상기 제1활차의 바로 아래에는 작동와이어가 경유하는 제2활차가 설치되며 상면에는 지선과 연결되면서 하부에 설치된 베어링에 의해 선회 가능한 스위블이 설치되는 지지철탑과; 상기 지지철탑을 안정적으로 지지할 수 있도록 상부 끝단은 스위블과 연결되고 하부 끝단은 긴장된 상태로 지지철탑을 중심으로 턴테이블의 후방과 좌우 지면에 고정설치되는 지선과; 상기 지지철탑의 뒤쪽에 위치하도록 회전상판의 상면 후방에 설치되는 것으로서 한쪽 끝단은 붐의 상부와 연결되고 다른 쪽 끝단은 제2활차를 경유하는 작동와이어에 있어 이 작동와이어의 다른 쪽 끝단과 연결되는 제1윈치와; 상기 제1원치의 바로 옆에 나란하게 위치하도록 회전상판의 상면 후방에 설치되는 것으로서 한쪽 끝단은 붐의 안내도르래를 경유하여 승강물과 연결되고 다른 쪽 끝단은 제1활차를 경유하는 승강와이어에 있어 이 승강와이어 다른 쪽 끝단과 연결되는 제2윈치를; 포함하여 구성됨을 특징으로 한다.The present invention has a central shaft extending upward from the center at the center and a fixed lower plate to which the driving motor is fixed to be installed so that the driving gear is arranged upward at one end of the upper surface, and is installed to face upward of the fixed lower plate. A turntable having a driven gear engaged with a drive gear of the driving motor at a bottom thereof, and a rotating top plate having a rotating bearing coupled to an upper portion of the central axis at a center thereof; The lower part is connected to the left edge of the center of the upper surface of the rotating top plate to be freely moved up and down, and the upper part of the boom is installed with a guide pulley through the lifting wire for lifting the lifting object; It is installed in the center of the upper surface of the rotating top plate so as to be located next to the boom. A first pulley through which the lifting wire passes is installed, and a second pulley through the operation wire is installed directly below the first pulley. It has a support steel tower that is connected to the branch line and the swiveling swivel is installed by a bearing installed in the lower; An upper end connected to the swivel so that the support tower can be stably supported, and a branch line fixed to the rear and left and right grounds of the turntable around the support tower in a state where the lower end is tense; It is installed at the rear of the upper surface of the rotating top plate so as to be located behind the supporting steel tower, and one end is connected to the upper part of the boom and the other end is connected to the other end of the operation wire in the operation wire via the second pulley. A first winch; It is installed at the rear of the upper surface of the rotary top plate so as to be located next to the first base side by side, one end is connected to the lifting object via the guide pulley of the boom, and the other end is in the lifting wire passing through the first pulley. A second winch connected to the other end of the lifting wire; Characterized in that configured to include.

또한, 토사지역일 경우의 송전철탑 조립공사용 조립형 보조크레인 설치방법에 있어서, 앵커를 설치할 수 있도록 앵커에 부합되는 크기로 송전철탑 조립공사용 조립형 보조크레인 설치지역의 지면을 굴착하여 앵커설치공간을 형성하는 제1단계와; 상기 앵커설치공간에 앵커를 삽입하여 앵커의 상면이 지면보다 올라오도록 앵커를 설치하는 제2단계와; 턴테이블의 저면이 앵커 상면에 안치되도록 고정설치하고, 턴테이블 상면에 송전철탑 조립공사용 조립형 보조크레인의 구조물을 설치하는 제3단계를; 포함하여 이루어짐을 특징으로 한다.In addition, in the case of earth and sand area, in the method of installing subsidiary cranes for the assembly of power transmission tower assembly, the anchor installation space is excavated by excavating the ground of the subsidiary crane installation area for the assembly of power transmission tower assembly in the size corresponding to the anchor to install the anchor. Forming a first step; Inserting an anchor into the anchor installation space to install the anchor so that an upper surface of the anchor rises above the ground; A third step of fixing the bottom surface of the turntable to be anchored to an upper surface of the turntable, and installing a structure of an assembled auxiliary crane for a transmission tower assembly engineer on the upper surface of the turntable; It is characterized by including the.

또한, 상기 앵커는 가로 및 세로가 각 1m인 정육면체의 철 구조물로 이루어지며 앵커설치공간에는 복수의 앵커가 상하 일렬로 볼트에 의해 체결되어 설치됨을 특징으로 한다.In addition, the anchor is made of a steel structure of a cube having a horizontal and vertical angle of 1m each, characterized in that the anchor installation space is installed by a plurality of anchors are fastened by bolts in a row.

또한, 암반지역일 경우의 송전철탑 조립공사용 조립형 보조크레인 설치방법에 있어서, 지주를 설치할 수 있도록 지주에 부합되는 크기로 송전철탑 조립공사용 조립형 보조크레인 설치지역의 지면에 사각형의 꼭지점과 같이 4군데를 천공하여 지주설치공을 형성하는 제1단계와; 상기 각 지주설치공에 지주를 삽입하여 각 지주설치공에 삽입된 지주의 상면이 평행하면서 지면보다 높도록 설치하는 제2단계와; 턴테이블의 저면이 각 지주 상면에 안치되도록 고정설치하고 턴테이블 상면에 송전철탑 조립공사용 조립형 보조크레인의 구조물을 설치하는 제3단계를; 포함하여 이 루어짐을 특징으로 한다.In addition, in the case of rock area, in the method of installing subsidiary cranes for the assembly line of power transmission towers, the squares are located on the ground of the installation site for the installation of subsidiary cranes of the assembly line for transmission tower assembly. A first step of forming a support installation hole by drilling a site; Inserting the support posts into the support posts so that the upper surface of the support posts inserted into the support posts is parallel and installed higher than the ground; A third step of fixing the bottom surface of the turntable so as to be placed on an upper surface of each strut, and installing a structure of an assembled auxiliary crane for a transmission tower assembly engineer on the top of the turntable; It is characterized by including this.

또한, 상기 지주는, 직경이 0.1m 이며 길이가 2m의 강관으로 이루어짐을 특징으로 한다.In addition, the pillar is characterized in that the steel pipe is 0.1m in diameter and 2m in length.

도 1은 본 발명의 실시예에 따른 측면도이고 도 2는 본 발명의 실시예에 따른 평면도를 각각 도시한 것으로서, 이하 첨부되는 도면을 참조하여 본 발명의 송전철탑 조립공사용 조립형 보조크레인의 구성을 설명하면 다음과 같다.Figure 1 is a side view according to an embodiment of the present invention and Figure 2 is a plan view according to an embodiment of the present invention, respectively, with reference to the accompanying drawings, the configuration of the assembled auxiliary crane for the transmission tower assembly engineering of the present invention The explanation is as follows.

본 발명의 송전철탑 조립공사용 조립형 보조크레인은 도 1, 2에 도시된 바와 같이, 하부에 설치되는 턴테이블(10)과, 상기 턴테이블(10) 위에 설치되는 붐(20) 및 상기 붐(20)을 지지하는 지지철탑(30)과, 상기 지지철탑(30)을 지지하는 지선(40)과, 상기 턴테이블(10) 위에 설치되는 제1, 2윈치(51, 52)로 구성되는 것으로서 이를 구체적으로 살펴보면 다음과 같다.As shown in FIGS. 1 and 2, the assembly type auxiliary crane of the transmission tower assembly of the present invention includes a turntable 10 installed below, a boom 20 installed above the turntable 10, and the boom 20. It is composed of a support steel tower 30 for supporting the support, the branch line 40 for supporting the support steel tower 30, and the first, second winches (51, 52) installed on the turntable 10 specifically Looking at it as follows.

상기 턴테이블(10)은 하부에 설치되는 고정하판(11)과 상기 고정하판(11)의 상향으로 대향 설치되는 회전상판(12)으로 구성된다.The turntable 10 is composed of a fixed lower plate 11 installed on the lower side and a rotating upper plate 12 installed to face upward of the fixed lower plate 11.

즉, 상기 고정하판(11)은 사각의 판체로 구성되는 것으로서 상면 중앙에는 회전상판(12)의 저면 중앙에 설치된 회전베어링(17)과 결합되는 중심축(13)이 상향으로 연장형성되며, 상면 가장자리 일단에는 회전상판(12)의 종동기어(16)와 맞물림되는 구동기어(15)가 축설되는 구동모터(14)가 설치된다.That is, the fixed lower plate 11 is composed of a rectangular plate body in the center of the upper surface is formed with a central axis 13 coupled to the rotary bearing 17 installed in the center of the bottom surface of the rotary upper plate 12 is extended upward, One end of the edge is provided with a drive motor 14 in which a drive gear 15 is engaged with the driven gear 16 of the rotary top plate 12.

물론 상기 구동모터(14)는 설치시 구동기어(15) 쪽이 회전상판(12)의 종동기어(16)와 맞물림되도록 상향으로 설치되고 반대쪽은 고정하판(11)에 고정설치된다.Of course, the drive motor 14 is installed upward so that the drive gear 15 side is engaged with the driven gear 16 of the rotary upper plate 12 when installed, and the opposite side is fixed to the fixed lower plate 11.

그리고 고정하판(11)의 위쪽에는 고정하판(11)과 대향으로 설치되는 고정하판(11)과 동일한 사각 판체의 회전상판(12)이 설치되는데, 이 회전상판(12)의 저면에는 종동기어(16)가 설치되며 이 종동기어(16)는 구동모터(14)의 구동기어(15)와 맞물림 설치된다.And the upper part of the fixed lower plate 11 is provided with a rotary top plate 12 of the same square plate body as the fixed lower plate 11 which is installed opposite the fixed lower plate 11, the lower surface of the rotary top plate 12 is driven gear ( 16) is installed and the driven gear 16 is engaged with the drive gear 15 of the drive motor (14).

또한, 회전상판(12) 저면 중앙에는 상기 고정하판(11)의 중심축(13) 상부에 대응하여 결합되는 회전베어링(17)이 설치된다.In addition, a rotary bearing 17 is installed at the center of the bottom surface of the rotary upper plate 12 to correspond to the upper portion of the central axis 13 of the fixed lower plate 11.

상기 붐(20)은, 도 2와 같이 회전상판(12)의 상면 중앙의 좌우 가장자리 중 어느 한쪽에 설치되는 것으로서, 붐(20)의 하단은 전후로의 움직임이 자유롭도록 회전상판(12)과 연결설치된다.The boom 20 is installed on either one of the left and right edges of the center of the upper surface of the rotary upper plate 12, as shown in Figure 2, the lower end of the boom 20 is connected to the rotary upper plate 12 so as to be free to move back and forth Is installed.

그리고 상기 붐(20)의 상부 끝단에는 승강와이어(41)가 경유하는 안내도르래(21)를 설치하여 승강와이어(41)의 이동이 안정적으로 이루어지게 한다.In addition, the upper end of the boom 20 is provided with a guide pulley 21 through which the elevating wire 41 passes so that the elevating wire 41 can be moved stably.

상기 붐(20) 후방 상부는 작동와이어(42)의 한쪽 끝단과 연결하여 고정하판(11)과 연결된 붐(20)의 하단은 하단을 중심으로 붐(20)이 상, 하로 움직일 수 있도록 힌지 형태로 고정하판(11)과 연결설치한다.The rear upper part of the boom 20 is connected to one end of the operation wire 42 and the lower end of the boom 20 connected to the fixed lower plate 11 is hinged so that the boom 20 can move up and down about the lower end. Install with a fixed bottom plate (11).

상기 지지철탑(30)은 붐(20) 하단의 바로 옆에 위치하도록 고정하판(11)의 대략 중앙에 설치되어 붐(20)과 연결되는 승강와이어(41) 및 작동와이어(42)를 지지하는 역할을 한다.The support steel tower 30 is installed in the center of the fixed lower plate 11 so as to be located right next to the bottom of the boom 20 to support the lifting wire 41 and the operation wire 42 connected to the boom 20. Play a role.

상기 지지철탑(30)의 상부에는 승강와이어(41)가 경유하는 제1활차(31)가 고정설치되고 그 바로 아래에는 작동와이어(42)가 경유하는 제2활차(32)가 순차적으로 설치된다.The first pulley 31 through which the elevating wire 41 passes is fixedly installed on the upper portion of the supporting steel tower 30, and a second pulley 32 through which the working wire 42 passes through is installed sequentially. .

상기 지지철탑(30)의 상면 중앙에는 하부에 베어링(34)이 설치된 스위블(33)이 설치되는데 이 스위블(33)의 상부에는 지지철탑(30)을 지지하는 지선(40)의 상부 끝단과 연결된다.In the center of the upper surface of the support tower 30, a swivel 33 having a bearing 34 is installed in the lower portion of the support swivel 33 is connected to the upper end of the branch line 40 for supporting the support tower 30 (30) do.

상기 스위블(33)의 하부에는 베어링(34)이 설치되어 있어 360°회전할 수 있기 때문에 턴테이블(10)이 회전하더라도 지선(40)이 꼬일 염려는 없다.Since the bearing 34 is installed at the lower portion of the swivel 33 and rotates 360 °, the branch wire 40 does not have to be twisted even when the turntable 10 rotates.

상기 제1윈치(31)는, 한쪽 끝단이 붐(20)과 연결된 작동와이어(42)의 다른 쪽 끝단과 연결되어 붐(20)이 상하로 움직일 수 있게 하는 것으로서, 붐(20) 후방에 위치하도록 회전상판(12)의 상면 후방에 설치된다.The first winch 31 is connected to the other end of the operation wire 42 connected to one end of the boom 20 to allow the boom 20 to move up and down, and is located behind the boom 20. It is installed in the rear of the upper surface of the rotating upper plate 12.

또한, 상기 제2윈치(52)는 한쪽 끝단이 안내도르래(21)를 경유하여 승강물(60)과 연결되는 승강와이어(41)의 다른 쪽 끝단과 연결되어 승강물(60)을 인상할 수 있도록 하는 것으로서, 지지철탑(30)의 후방 및 제1원치의 바로 옆에 위치하도록 회전상판(12)의 상면 후방에 설치된다.In addition, one end of the second winch 52 may be connected to the other end of the elevating wire 41 connected to the elevating material 60 via the guide pulley 21 to raise the elevating material 60. As such, it is installed at the rear of the upper surface of the rotary top plate 12 so as to be located behind the support pylon 30 and right next to the first element.

그리고 작동와이어(42)는, 붐(20) 상, 하로 움직이게 하는 와이어로서 한쪽 끝단은 붐(20) 상부 후방과 연결되고 다른 쪽 끝단은 지지철탑(30)의 제2활차(32)를 경유하여 제1윈치(51)와 연결된다.And the operation wire 42 is a wire for moving up and down the boom 20, one end is connected to the upper rear of the boom 20 and the other end is via the second pulley 32 of the support tower (30) It is connected to the first winch 51.

승강와이어(41)는, 승강물(60)을 인상하는 와이어로서 한쪽 끝단은 붐(20) 상부에 설치된 안내도르래(21)를 경유하여 승강물(60)과 연결되고 다른 쪽 끝단은 제1활차(31)를 경유하여 제2윈치(52)와 연결된다.The lifting wire 41 is a wire for lifting the lifting object 60, one end of which is connected to the lifting object 60 via a guide pulley 21 installed at the upper portion of the boom 20, and the other end thereof is the first pulley. It is connected to the second winch 52 via 31.

한편, 지선(40)은 지지철탑(30)을 안정적으로 지지하기 위해 지지철탑(30)을 중심으로 후방 및 좌우 양측으로 설치되는 것으로서, 상부 끝단은 지지철탑(30) 상면에 형성된 스위블(33)과 연결되며, 다른 쪽 끝단은 회전상판(12)의 후방 및 좌우의 지면에 고정설치된다.Meanwhile, the branch line 40 is installed to both the rear and left and right sides of the support steel tower 30 to stably support the support steel tower 30, and the upper end is a swivel 33 formed on the top surface of the support steel tower 30. It is connected with, the other end is fixed to the ground of the rear and left and right of the rotary top plate (12).

도 3은 본 발명의 실시예에 따른 송전철탑 조립공사용 조립형 보조크레인의 설치지역이 토사지역인 경우의 시공과정도이다.3 is a construction process diagram in the case where the installation area of the transmission auxiliary tower assembly assembly auxiliary crane according to an embodiment of the present invention is the earth and sand area.

도시된 바와 같이 토사지역에 송전철탑 조립공사용 조립형 보조크레인을 설치할 경우에는, 제1단계에서는 가로 세로 1m의 정육면체의 철 구조물로 이루어지는 앵커(101)를 설치할 수 있도록 지면을 굴착하여 앵커설치공간(102)을 마련한다.As shown, in the case of installing the prefabricated auxiliary crane for the transmission tower assembly engineer in the earth and sand region, the first step is to excavate the ground to install the anchor 101 consisting of a steel structure of a cube of 1m horizontal and vertical anchor installation space ( 102).

제2단계에서는, 앵커설치공간(102)에 2개의 앵커(101)를 상하 일렬로 나란하게 설치하고 이때, 2개의 앵커(101)는 볼트로 결합하고 위쪽에 설치되는 앵커(101)의 상면은 턴테이블(10)이 지면에 닿지 않도록 지면보다 높게 설치한다.In the second step, two anchors 101 are installed side by side in the anchor installation space 102 in a line up and down, and at this time, the two anchors 101 are coupled by bolts and the upper surface of the anchor 101 installed above The turntable 10 is installed higher than the ground so as not to touch the ground.

제3단계에서는, 지면보다 높게 설치된 앵커(101) 상면에 고정하판(11) 안치되도록 턴테이블(10)을 앵커(101)에 고정설치하고 턴테이블(10) 위에 붐(20), 지지철탑(30), 제1, 2윈치(51, 52), 지선(40), 승강와이어(41), 작동와이어(42) 등의 송전철탑 조립공사용 조립형 보조크레인을 구성하는 구조물을 설치한다.In the third step, the turntable 10 is fixed to the anchor 101 so that the lower plate 11 is settled on the upper surface of the anchor 101 installed higher than the ground, and the boom 20 and the support steel tower 30 on the turntable 10. , First, second winch (51, 52), branch line (40), lifting wire (41), working wire (42), such as a structure that constitutes the assembled auxiliary crane for transmission tower assembly engineering.

도 4는 본 발명의 실시예에 따른 송전철탑 조립공사용 조립형 보조크레인의 설치지역이 암반지역인 경우의 시공과정도이다.Figure 4 is a construction process diagram when the installation area of the assembled auxiliary crane for transmission tower assembly construction according to an embodiment of the present invention is a rock area.

도시된 바와 같이 암반지역에 송전철탑 조립공사용 조립형 보조크레인을 설치할 경우에는, 제1단계에서는 직경 0.1m, 길이 2m의 강관으로 이루어지는 지주(201)를 설치할 수 있도록 지면에 지주(201)에 부합되는 지주설치공(202)을 천공한다.As shown, in the case of installing the prefabricated auxiliary crane for the transmission tower assembly engineer in the rock area, the first step corresponds to the support 201 on the ground so that the support 201 made of steel pipes having a diameter of 0.1 m and a length of 2 m can be installed. The perforated installation hole 202 is drilled.

이때, 지면에 천공되는 지주설치공(202)은 4개의 지주(201)를 결합할 수 있도록 정사각형의 꼭짓점과 같이 4군데를 천공한다.At this time, the strut installation hole 202 to be drilled in the ground perforated four places, such as the vertex of the square so as to combine the four struts 201.

제2단계에서는, 천공된 4군데의 지주설치공(202)에 각각 지주(201)를 삽입하여 설치하되, 각 지주(201) 상면은 평행으로 동일하게 하면서 지면보다 높게 하여 턴테이블(10)이 지면에 닿지 않게 한다.In the second step, the pillars 201 are inserted into and installed in each of the four perforated pillar installation holes 202, but the upper surface of each pillar 201 is the same in parallel and higher than the ground so that the turntable 10 is grounded. Do not touch

제3단계에서는, 지면보다 높게 설치된 지주(201) 상면에 고정하판(11)이 안 치되도록 턴테이블(10)을 지주(201)에 고정설치하고 턴테이블(10) 위에 붐(20), 지지철탑(30), 제1, 2윈치(51, 52), 지선(40), 승강와이어(41), 작동와이어(42) 등의 송전철탑 조립공사용 조립형 보조크레인을 구성하는 구조물을 설치한다.In the third step, the turntable 10 is fixed to the support 201 so that the fixed lower plate 11 is placed on the upper surface of the support 201 installed higher than the ground, and the boom 20 and the support steel tower (on the turn table 10 are installed). 30), the first, second winch (51, 52), branch line 40, the lifting wire 41, the operation wire 42, such as a structure for constituting the assembled auxiliary crane for the transmission tower assembly engineer.

이상에서 살펴본 바와 같이 본 발명의 송전철탑 조립공사용 조립형 보조크레인은 경량으로 운반이 용이하고 설치가 매우 쉬운 것으로서, 이하 첨부되는 도면을 참조하여 본 발명의 작용을 살펴보면 다음과 같다.As described above, the assembly-type auxiliary crane of the transmission tower assembly assembly of the present invention is light in weight, easy to carry, and very easy to install, and looks at the operation of the present invention with reference to the accompanying drawings.

도 1, 2와 같이 승강물(60)을 인상하고 싶을 경우에는 승강와이어(41)의 한쪽 끝단을 승강물(60)에 연결한 다음 제2윈치(52)를 작동시켜 승강와이어(41)를 끌어당기면 승강물(60)의 인상이 이루어진다.When the lifting object 60 is to be lifted as shown in FIGS. 1 and 2, one end of the lifting wire 41 is connected to the lifting object 60, and then the second winch 52 is operated to lift the lifting wire 41. Pulling raises the lifting object 60.

이와 같이 승강물(60)이 인상된 상태에서 턴테이블(10)을 좌우로 회전하여 승강물(60)을 원하는 위치로 운반한다.In this manner, the lifting table 60 is rotated to the left and right in the state in which the lifting object 60 is lifted to carry the lifting object 60 to a desired position.

즉, 고정하판(11)에 설치된 구동모터(14)에 전원이 인가됨과 동시에 구동기어(15)가 회전하게 되며, 이때 구동기어(15)는 회전상판(12) 저면에 설치된 종동기어(16)와 맞물려 있기 때문에 구동기어(15)와 함께 종동기어(16) 또한 회전하게 된다.That is, power is applied to the drive motor 14 installed on the fixed lower plate 11 and the drive gear 15 rotates. At this time, the drive gear 15 is the driven gear 16 installed on the bottom surface of the rotary top plate 12. And the driven gear 16 also rotates together with the drive gear 15.

따라서, 고정하판(11)의 중심축(13)을 중심으로 회전상판(12)이 좌우로 회전함에 따라 회전상판(12) 위에 설치된 붐(20)의 각도가 틀어지게 되어 승강물(60)을 원하는 위치까지 이동할 수 있다.Therefore, as the top plate 12 rotates to the left and right about the central axis 13 of the fixed bottom plate 11, the angle of the boom 20 installed on the top plate 12 is twisted, thereby lifting the lifting object 60. You can move to the location you want.

원하는 위치로 이동한 승강물(60)은 제2원치(52) 작동하여 승강와이어(41)를 인상할 때와 반대로 풀어주면 승강물(60)이 원하는 위치에 안착된다.When the lifting object 60 moved to the desired position is released as opposed to when the lifting device 41 is lifted by operating the second primary 52, the lifting object 60 is seated at the desired position.

한편, 승강와이어(41)는 붐(20)에 설치된 안내도르래(21)와 지지철탑(30)에 설치된 제1활차(31)을 경유하면서 이동하기 때문에 작동이 부드럽고 안정적으로 이루어진다.On the other hand, since the lifting wire 41 moves while passing through the guide pulley 21 installed on the boom 20 and the first pulley 31 installed on the supporting steel tower 30, the operation is made smooth and stable.

그리고 붐(20)의 상, 하로의 작동은 제1윈치(51)에 의해 이루어진다.And the operation of the boom 20 up and down is made by the first winch 51.

즉, 작동와이어(42)의 한쪽 끝단은 붐(20)과 연결되고 작동와이어(42)의 다른 쪽 끝단은 제2활차(32)을 경유하여 제1윈치(51)와 연결되므로 제1윈치(51)가 작동와이어(42)를 끌어당기면 붐(20)은 상승하고 반대로 작동와이어(42)를 풀어주면 붐(20)이 하강하게 된다.That is, one end of the operation wire 42 is connected to the boom 20 and the other end of the operation wire 42 is connected to the first winch 51 via the second pulley 32 so that the first winch ( When the 51 pulls the operation wire 42, the boom 20 rises and, on the contrary, when the operation wire 42 is released, the boom 20 descends.

여기서, 붐(20)의 하단은 회전상판(12)과 힌지 형태로 연결되어 있어 붐(20)이 상, 하로 자유롭게 움직일 수 있다.Here, the lower end of the boom 20 is connected to the rotary top plate 12 in the form of a hinge so that the boom 20 can move freely up and down.

또한, 회전상판(12)의 좌, 우로의 회전시 스위블(33)이 선회하지 않을 경우 지선(40)의 상부 끝단이 스위블(33)에 감기는 문제가 발생할 수 있으나, 스위블(33) 하부에는 베어링(34)이 설치되어 있어 회전상판(12)이 회전하더라도 스위블(33)이 360°회전하기 때문에 지선(40)이 감기는 문제는 발생하지 않는다.In addition, if the swivel 33 does not turn when the left and right of the rotary top plate 12 rotates, a problem may occur in that the upper end of the branch line 40 is wound around the swivel 33, but the lower portion of the swivel 33 Since the bearing 34 is installed so that the swivel 33 rotates 360 ° even if the rotary top plate 12 rotates, the problem that the branch line 40 is wound does not occur.

한편, 송전철탑 조립공사용 조립형 보조크레인 설치방법은 일반토사일 경우와 암반일 경우에 따라 설치방법이 달라진다.On the other hand, the installation method of the assembled auxiliary crane for the transmission tower assembly engineering works is different depending on the case of soil and rock.

먼저, 일반토사인 경우에는 지면을 굴착하여 가로 세로 각 1m의 정육면체 철 구조물로 이루어지는 앵커(101) 설치를 위한 앵커설치공간(102)을 마련한다.First, in the case of general soil excavation the ground to provide an anchor installation space 102 for the installation of the anchor 101 consisting of a cube steel structure of 1m in width and length.

그리고 이 앵커설치공간(102)에 2개의 앵커(101)가 상하로 나란하게 설치되도록 넣은 다음 2개의 앵커(101)를 볼트로 체결한 다음 앵커(101)와 앵커설치공간(102) 사이의 틈을 토사로 채워 메운다.Then, two anchors 101 are installed in the anchor installation space 102 to be installed side by side up and down, and then the two anchors 101 are fastened with bolts, and then a gap between the anchor 101 and the anchor installation space 102 is provided. Fill with earth and sand to fill it.

이때, 2개의 앵커(101) 중 위쪽에 설치된 앵커(101)는 상면이 지면보다 높게 하여 턴테이블(10)의 설치시 고정하판(11)의 바닥이 고르지 않는 지면에 닿지 않게 한다.At this time, the anchor 101 installed on the upper side of the two anchors 101 is higher than the ground so that the bottom of the fixed lower plate 11 does not touch the uneven ground when the turntable 10 is installed.

이와 같이 앵커(101) 설치작업이 완료되면 그 위에 송전철탑 조립공사용 조립형 보조크레인을 설치한다.As such, when the installation of the anchor 101 is completed, the auxiliary auxiliary crane is installed on the transmission tower assembly engineer.

앵커(101)의 상면이 지면보다 높이 설치되어 있어 그 위에 놓이는 턴테이블(10)의 바닥 또한 지면에 닿지 않는 수평상태로 설치되므로 수평을 맞추기 위한 아우트트리거(outrigger)와 같은 장치가 필요 없다.Since the upper surface of the anchor 101 is installed higher than the ground, the bottom of the turntable 10 placed thereon is also installed in a horizontal state not touching the ground, so that an apparatus such as an outrigger for leveling is not required.

일반토사와 달리 암반일 경우에는, 암반으로 이루어진 지면에 정사각형의 꼭짓점과 같이 4개의 구멍을 뚫어 지주설치공(202)을 마련하고, 여기에 길이 2m 직경 0.1m의 강관으로 이루어진 지주(201)를 삽입한다.Unlike ordinary earth and sand, in the case of rock, the four holes are formed in the ground made of rock, such as a vertex, and a support installation hole 202 is provided. Insert it.

이때, 각 지주(201)의 상면은 수평을 이루도록 지면보다 약간 높게 설치하여 턴테이블(10)의 바닥이 고르지못한 지면에 닿지 않게 한다.At this time, the upper surface of each strut 201 is installed slightly higher than the ground to be horizontal so that the bottom of the turntable 10 does not touch the uneven ground.

이와 같이 지주(201)의 설치가 완료되면 지주(201)에 턴테이블(10)을 먼저 고정설치하고 나머지 송전철탑 조립공사용 조립형 보조크레인을 구성하는 구조물을 설치한다.As such, when the installation of the support 201 is completed, the turntable 10 is first fixedly installed on the support 201, and then the structure constituting the rest of the transmission tower assembly assembly type auxiliary crane is installed.

각 지주(201)는 상면이 수평을 이루도록 지면보다 높게 설치되어 있어 턴테이블(10)의 바닥이 지면에 닿지않는 수평상태로 설치되므로 수평을 맞추기 위한 아우트트리거(outrigger)와 같은 장치가 필요 없다.Each strut 201 is installed higher than the ground so that the top surface is horizontal, so that the bottom of the turntable 10 is installed in a horizontal state without touching the ground, so that an apparatus such as an outrigger for leveling is not required.

도 1은 본 발명의 실시예에 따른 측면도.1 is a side view according to an embodiment of the present invention.

도 2는 본 발명의 실시예에 따른 평면도.2 is a plan view according to an embodiment of the present invention.

도 3은 본 발명의 실시예에 따른 송전철탑 조립공사용 조립형 보조크레인의 설치지역이 토사지역인 경우의 시공과정도.Figure 3 is a construction process diagram when the installation area of the transmission auxiliary tower assembly assembly type auxiliary crane according to an embodiment of the present invention is the earth and sand area.

도 4는 본 발명의 실시예에 따른 송전철탑 조립공사용 조립형 보조크레인의 설치지역이 암반지역인 경우의 시공과정도.Figure 4 is a construction process diagram when the installation area of the prefabricated auxiliary crane for transmission tower assembly construction according to an embodiment of the present invention is a rock area.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

10:턴테이블 11:고정하판 12:회전상판10: turntable 11: fixed bottom plate 12: swivel top plate

13:중심축 14:구동모터 15:구동기어13: Center Shaft 14: Drive Motor 15: Drive Gear

16:종동기어 17:회전베어링 20:붐16: driven gear 17: rotary bearing 20: boom

21:안내도르래 30:지지철탑 31:제1활차21: guide pulley 30: support steel tower 31: first pulley

32:제2활차 33:스위블 34:베어링32: second pulley 33: swivel 34: bearing

40:지선 41:승강와이어 42:작동와이어40: branch line 41: lifting wire 42: working wire

51:제1윈치 52:제2윈치 60:승강물51: first winch 52: second winch 60: lifting

101:앵커 102:앵커설치공간 201:지주101: anchor 102: anchor installation space 201: holding

202:지주설치공202: holding installation work

Claims (5)

중앙에는 중앙으로부터 상향으로 연장되는 중심축이 설치되고 상면 가장자리 일단에는 축설된 구동기어가 위쪽을 향하도록 구동모터가 고정설치되는 고정하판과, 상기 고정하판의 상향으로 대향 설치되는 것으로서 저면에는 상기 구동모터의 구동기어와 맞물림되는 종동기어가 설치되며 저면 중앙에는 상기 중심축의 상부에 결합되는 회전베어링이 설치되는 회전상판으로 이루어지는 턴테이블과;A central shaft extending upward from the center is installed at the center, and a fixed lower plate to which the drive motor is fixedly installed at one end of the upper edge thereof is installed upward, and is installed to face upward of the fixed lower plate. A turntable which is provided with a driven gear meshed with a drive gear of the motor and having a rotary top plate installed at the center of the bottom thereof with a rotating bearing coupled to an upper portion of the central shaft; 하단은 상하로의 움직임이 자유롭도록 회전상판의 상면 중앙의 좌측 가장자리에 연결설치되고 상단에는 승강물을 끌어올리는 승강와이어가 경유하는 안내도르래가 설치되는 붐과;The lower part is connected to the left edge of the center of the upper surface of the rotating top plate to be freely moved up and down, and the upper part of the boom is installed with a guide pulley through the lifting wire for lifting the lifting object; 상기 붐의 바로 옆에 위치하도록 회전상판의 상면 중앙에 설치되는 것으로서 상부에는 승강와이어가 경유하는 제1활차가 설치되고 상기 제1활차의 바로 아래에는 작동와이어가 경유하는 제2활차가 설치되며 상면에는 지선과 연결되면서 하부에 설치된 베어링에 의해 선회 가능한 스위블이 설치되는 지지철탑과;It is installed in the center of the upper surface of the rotating top plate so as to be located next to the boom. A first pulley through which the lifting wire passes is installed, and a second pulley through the operation wire is installed directly below the first pulley. It has a support steel tower that is connected to the branch line and the swiveling swivel is installed by a bearing installed in the lower portion; 상기 지지철탑을 안정적으로 지지할 수 있도록 상부 끝단은 스위블과 연결되고 하부 끝단은 긴장된 상태로 지지철탑을 중심으로 턴테이블의 후방과 좌우 지면에 고정설치되는 지선과;An upper end connected to the swivel so that the support tower can be stably supported, and a branch line fixed to the rear and left and right grounds of the turntable around the support tower in a state where the lower end is tense; 상기 지지철탑의 뒤쪽에 위치하도록 회전상판의 상면 후방에 설치되는 것으로서 한쪽 끝단은 붐의 상부와 연결되고 다른 쪽 끝단은 제2활차를 경유하는 작동와이어에 있어 이 작동와이어의 다른 쪽 끝단과 연결되는 제1윈치와;It is installed at the rear of the upper surface of the rotating top plate so as to be located behind the supporting steel tower, and one end is connected to the upper part of the boom and the other end is connected to the other end of the operation wire in the operation wire via the second pulley. A first winch; 상기 제1원치의 바로 옆에 나란하게 위치하도록 회전상판의 상면 후방에 설치되는 것으로서 한쪽 끝단은 붐의 안내도르래를 경유하여 승강물과 연결되고 다른 쪽 끝단은 제1활차를 경유하는 승강와이어에 있어 이 승강와이어 다른 쪽 끝단과 연결되는 제2윈치를; 포함하여 구성됨을 특징으로 하는 송전철탑 조립공사용 조립형 보조크레인.It is installed at the rear of the upper surface of the rotary top plate so as to be located next to the first base side by side, one end is connected to the lifting object via the guide pulley of the boom, and the other end is in the lifting wire passing through the first pulley. A second winch connected to the other end of the lifting wire; Transmission crane assembly assembly crane, characterized in that configured to include. 토사지역일 경우의 송전철탑 조립공사용 조립형 보조크레인 설치방법에 있어서,In the method of installing a prefabricated auxiliary crane for a transmission tower assembly engineer in the case of earth and sand, 앵커를 설치할 수 있도록 앵커에 부합되는 크기로 송전철탑 조립공사용 조립형 보조크레인 설치지역의 지면을 굴착하여 앵커설치공간을 형성하는 제1단계와;A first step of forming an anchor installation space by excavating the ground of a prefabricated auxiliary crane installation area of a transmission tower assembly engineer in a size corresponding to the anchor to install an anchor; 상기 앵커설치공간에 앵커를 삽입하여 앵커의 상면이 지면보다 올라오도록 앵커를 설치하는 제2단계와;Inserting an anchor into the anchor installation space to install the anchor so that an upper surface of the anchor rises above the ground; 제 1항과 같이 구성되는 턴테이블의 저면이 앵커 상면에 안치되도록 고정설치하고, 턴테이블 상면에 제 1항과 같이 송전철탑 조립공사용 조립형 보조크레인의 구조물을 설치하는 제3단계를; 포함하여 이루어짐을 특징으로 하는 송전철탑 조립공사용 조립형 보조크레인 설치방법.A third step of fixing the bottom surface of the turntable configured as described in claim 1 to be placed on an upper surface of the anchor, and installing a structure of an assembled auxiliary crane for a transmission tower assembly engineer as in claim 1 on the upper surface of the turntable; Method of installing the prefabricated secondary crane assembly for transmission tower assembly characterized in that it comprises a. 제 2항에 있어서,The method of claim 2, 상기 앵커는 가로 및 세로가 각 1m인 정육면체의 철 구조물로 이루어지며 앵커설치공간에는 복수의 앵커가 상하 일렬로 볼트에 의해 체결되어 설치됨을 특징으로 하는 송전철탑 조립공사용 조립형 보조크레인 설치방법.The anchor is made of a steel structure of a cube each 1m in width and length, and the anchor installation space is a secondary crane installation method for the assembly of a transmission tower assembly, characterized in that a plurality of anchors are fastened by bolts installed in a vertical row. 암반지역일 경우의 송전철탑 조립공사용 조립형 보조크레인 설치방법에 있어서,In the method of installing a prefabricated auxiliary crane for a transmission tower assembly engineer in a rock area, 지주를 설치할 수 있도록 지주에 부합되는 크기로 송전철탑 조립공사용 조립형 보조크레인 설치지역의 지면에 사각형의 꼭짓점과 같이 4군데를 천공하여 지주설치공을 형성하는 제1단계와;A first step of forming a post installation hole by drilling four places such as a vertex of a rectangle on the ground of the transmission subassembly installation area for a transmission tower assembly engineer to have a size corresponding to the post so as to install the post; 상기 각 지주설치공에 지주를 삽입하여 각 지주설치공에 삽입된 지주의 상면이 평행하면서 지면보다 높도록 설치하는 제2단계와;Inserting the support posts into the support posts so that the upper surface of the support posts inserted into the support posts is parallel and installed higher than the ground; 제 1항과 같이 구성되는 턴테이블의 저면이 각 지주 상면에 안치되도록 고정설치하고 턴테이블 상면에 제 1항과 같이 송전철탑 조립공사용 조립형 보조크레인의 구조물 설치하는 제3단계를; 포함하여 이루어짐을 특징으로 하는 송전철탑 조립공사용 조립형 보조크레인 설치방법.A third step of fixing the bottom surface of the turntable configured as described in claim 1 to be placed on the upper surface of each support, and installing the structure of the assembled auxiliary crane used for the transmission tower assembly engineer as described in claim 1 on the upper surface of the turntable; Method of installing the prefabricated secondary crane assembly for transmission tower assembly characterized in that it comprises a. 제 4항에 있어서,The method of claim 4, wherein 상기 지주는, 직경이 0.1m 이며 길이가 2m의 강관으로 이루어짐을 특징으로 하는 송전철탑 조립공사용 조립형 보조크레인 설치방법.Wherein the pillar is a 0.1m diameter and 2m long steel pipe assembly assembly crane installation method characterized in that made of a steel pipe of 2m in length.
KR1020080055421A 2008-06-12 2008-06-12 Assembly type auxiliary tower crane for power transmission tower and its installation method KR20090129250A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080055421A KR20090129250A (en) 2008-06-12 2008-06-12 Assembly type auxiliary tower crane for power transmission tower and its installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080055421A KR20090129250A (en) 2008-06-12 2008-06-12 Assembly type auxiliary tower crane for power transmission tower and its installation method

Publications (1)

Publication Number Publication Date
KR20090129250A true KR20090129250A (en) 2009-12-16

Family

ID=41689363

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080055421A KR20090129250A (en) 2008-06-12 2008-06-12 Assembly type auxiliary tower crane for power transmission tower and its installation method

Country Status (1)

Country Link
KR (1) KR20090129250A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102583167A (en) * 2012-02-21 2012-07-18 北京联合大学 Derrick crane
CN104386595A (en) * 2014-10-29 2015-03-04 四川锦城建筑机械有限责任公司 Luffing jib tower crane
CN108545645A (en) * 2018-05-31 2018-09-18 国网青海省电力公司海东供电公司 A kind of lifting auxiliary threader
CN112962659A (en) * 2021-02-07 2021-06-15 上海建工二建集团有限公司 Construction elevator foundation and construction method of construction elevator

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102583167A (en) * 2012-02-21 2012-07-18 北京联合大学 Derrick crane
CN104386595A (en) * 2014-10-29 2015-03-04 四川锦城建筑机械有限责任公司 Luffing jib tower crane
CN108545645A (en) * 2018-05-31 2018-09-18 国网青海省电力公司海东供电公司 A kind of lifting auxiliary threader
CN108545645B (en) * 2018-05-31 2023-11-07 国网青海省电力公司海东供电公司 Auxiliary threading device for hoisting
CN112962659A (en) * 2021-02-07 2021-06-15 上海建工二建集团有限公司 Construction elevator foundation and construction method of construction elevator

Similar Documents

Publication Publication Date Title
BRPI1101612B1 (en) Construction method of a hybrid tower
CN109403354B (en) Construction method for deep foundation pit support of inverted retaining wall of cyclone well
CN204012118U (en) A kind of earth rod with vertically-guided function is installed power set
CN105863042A (en) All-steel structure building and construction method thereof
CN106193054A (en) A kind of support system for subway foundation pit and construction method thereof
KR20090129250A (en) Assembly type auxiliary tower crane for power transmission tower and its installation method
CN112942398A (en) Assembled open caisson construction system and process
JP6658616B2 (en) Construction method of pile type structure
CN111074903B (en) Foundation pit construction method with steel support capable of being turned over
CN206128080U (en) A support system for subway foundation pit
JP7022393B2 (en) How to install retractable surface system and retractable surface system
JP2001248375A (en) Suspension mobile type pile driving device and pile driving method using it
CN209940332U (en) Small-size machine of lifting in civil engineering
CN114701949A (en) Method for installing main girder of bridge crane of main power house of pump station
KR101538909B1 (en) Construction method for poles moving of electric-wire-stringing using pole holding divice
CN216583900U (en) All-directional rotary small crane
CN111503373A (en) Underground pipeline protection structure and construction method thereof
CN214246523U (en) Civil engineering safety scaffold
CN219219037U (en) Urban comprehensive pipe rack deep foundation pit support
CN113737833B (en) Open caisson construction formwork and construction method thereof
CN213682095U (en) Device for shifting pile machine
CN218406713U (en) Can have enough to meet need formula to encorbelment gazebo suitable for deep basal pit building
CN115977129A (en) Assembly type circular open caisson device and installation method
CN114856291B (en) Circuit rod installation device and method for communication circuit construction
KR102295251B1 (en) Mound Leveling Method for Oceanic Construction

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application
J201 Request for trial against refusal decision
J121 Written withdrawal of request for trial