CN114753611A - Curtain wall construction platform - Google Patents

Curtain wall construction platform Download PDF

Info

Publication number
CN114753611A
CN114753611A CN202210623788.6A CN202210623788A CN114753611A CN 114753611 A CN114753611 A CN 114753611A CN 202210623788 A CN202210623788 A CN 202210623788A CN 114753611 A CN114753611 A CN 114753611A
Authority
CN
China
Prior art keywords
support arm
curtain wall
vertical rod
floor
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210623788.6A
Other languages
Chinese (zh)
Inventor
李征
王科
王静磊
刘丹
郑明林
邢利超
端木永正
何腾飞
宋健
彭广谋
李威伟
许陈星
张宝
牟航
吕红升
李翔
张益浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Engineering Co Ltd of China Railway Seventh Group Co Ltd
Original Assignee
Zhengzhou Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Engineering Co Ltd of China Railway Seventh Group Co Ltd filed Critical Zhengzhou Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority to CN202210623788.6A priority Critical patent/CN114753611A/en
Publication of CN114753611A publication Critical patent/CN114753611A/en
Priority to PCT/CN2023/096702 priority patent/WO2023208250A1/en
Priority to DE212023000037.7U priority patent/DE212023000037U1/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/22Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by roofs or ceilings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/18Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by cantilevers or other provisions mounted in openings in the building, e.g. window openings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/001Safety or protective measures against falling down relating to scaffoldings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/004Storage and transport racks for scaffolding components
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/006Scaffold with cantilevered sections, e.g. to accommodate overhangs or recesses in the facade
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/10Steps or ladders specially adapted for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/28Scaffolds primarily resting on the ground designed to provide support only at a low height
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/28Scaffolds primarily resting on the ground designed to provide support only at a low height
    • E04G1/30Ladder scaffolds
    • E04G2001/302Ladder scaffolds with ladders supporting the platform
    • E04G2001/305The ladders being vertical and perpendicular to the platform

Abstract

The invention discloses a curtain wall construction platform, which comprises a bearing plate and at least two groups of support units arranged between floors side by side, wherein each support unit comprises a first vertical rod and a second vertical rod which are vertically arranged on a floor bottom plate and a support arm which is vertically connected with the first vertical rod and the second vertical rod, the support arm extends out of the floor bottom plate and is close to an upper eave of a window frame between the floors, the top end of the first vertical rod is abutted against a floor top plate, and the bearing plate is arranged on the adjacent support arm to overhang the part of the floor bottom plate; according to the invention, the first upright post and the second upright post are arranged between floors and used for lifting the support arm to a set height, and the bearing plate is erected on the support arm part of the overhanging base plate to form a platform for constructors to construct a curtain wall, so that the operation of the constructors is facilitated, the construction efficiency and the construction quality are provided, and the problems of time and labor consumption, high construction cost and poor construction quality caused by adopting a high-altitude crank arm vehicle or erecting a scaffold in the traditional curtain wall construction are solved.

Description

Curtain wall construction platform
Technical Field
The invention relates to the technical field of building construction, in particular to a curtain wall construction platform.
Background
The curtain wall is the outer wall enclosure of the building, does not bear the weight, hangs like a curtain, so is also called as a curtain wall, and is a light wall with decorative effect commonly used by modern large-scale and high-rise buildings. The outer wall frame type supporting system is a curtain wall system, and comprises a panel and a supporting structure system, can have certain displacement capacity relative to a main structure or has certain deformation capacity per se, and does not bear the outer protective structure or the decorative structure of a building acted by the main structure.
The construction of building curtain wall requires workers to operate in the high-altitude outdoor, and generally has two construction measures: scaffold and hanging flower basket. The construction of the scaffold can be carried out according to the height and the shape of the curtain wall, the adaptability is strong, but the lease, purchase and sale costs of the scaffold are high, the occupied area is large, the erection of the scaffold is time-consuming and labor-consuming, the construction can be carried out by expert argumentation, and the construction efficiency is low; the hanging basket is usually used by means of hoisting equipment, the hanging basket is lifted to a part to be constructed by the hoisting equipment, constructors and materials are placed on the hanging basket, and then construction is carried out, and due to the fact that the integral construction time of the curtain wall is long and the position of the curtain wall needs to be adjusted continuously, on one hand, the hoisting equipment needs to be rented for a long time, and the problem of high construction cost is caused; on the other hand, because the hanging flower basket is limited in size, the operation of constructors is not convenient, the construction quality of the curtain wall is influenced, and meanwhile, in the face of strong wind weather, the hanging flower basket is easy to shake, so that great potential safety hazards exist.
In the prior art, for example, an operation platform for construction of an inclined curtain wall structure with publication number CN 111287440 a comprises a bottom fixing frame and at least one top hanging frame, the top hanging frame is arranged on the top of the inclined curtain wall structure, the bottom fixing frame is arranged on the bottom of the inclined curtain wall structure, a liftable operation box body is arranged below the top hanging frame, the operation box body is connected with the top hanging frame through a hoisting rope, a guide cable is arranged in parallel on one side of the inclined curtain wall structure, the guide cable is arranged in parallel with the hoisting rope and penetrates through the operation box body, the guide cable is arranged in parallel with the inclined curtain wall structure, so that the distance between the operation box body and the inclined curtain wall structure can be kept unchanged when the operation box body is lifted, i.e. the operation box body is started, the operation box body is lifted upwards, the guide cable limits the operation track of the operation box body, and the inclined lifting of the operation platform for construction of the inclined curtain wall structure is realized, the hanging basket construction method is essentially the same as the hanging basket construction method using the hoisting equipment, and the problems of high cost and low safety factor exist.
In order to solve the problems, the invention provides a curtain wall construction platform which is used for solving the problems of high construction cost and low quality of a curtain wall.
Disclosure of Invention
The invention aims to provide a curtain wall construction platform to achieve the purposes of improving the construction quality of a curtain wall and reducing the construction cost.
In order to achieve the purpose, the invention provides the following scheme:
the utility model provides a curtain construction platform, includes the loading board and sets up two sets of at least support unit between the floor side by side, support unit including set up perpendicularly on the floor bottom plate first pole setting and second pole setting and with the support arm that first pole setting and second pole setting are connected perpendicularly, the support arm extends the floor bottom plate and is close to eaves on the window frame between the floor, the top and the floor roof of first pole setting support and lean on, the loading board sets up adjacently hang out the part of floor bottom plate on the support arm.
Preferably, first pole setting includes that first last support arm and cover are established the first support arm in the first upper support arm outside, be equipped with a plurality of first support arm altitude mixture control holes under by last to on the first support arm, first last support arm go up by down to on seted up a plurality of with first support arm altitude mixture control hole assorted first upper support arm altitude mixture control hole, first bolt runs through first support arm altitude mixture control hole and first upper support arm altitude mixture control hole will first support arm and first upper support arm are fixed.
Preferably, the second pole setting includes that support arm and cover establish support arm under the second in the second outside of supporting arm on the second, support arm is equipped with a plurality of second down support arm height adjustment holes under from the top down under the second, support arm is seted up on the second from the bottom up a plurality of with support arm height adjustment hole assorted second is gone up to the second down support arm height adjustment hole, the second bolt runs through support arm height adjustment hole and second are gone up to support arm height adjustment hole will support arm and second are gone up to the second is fixed.
Preferably, the support unit still includes first bracing and second bracing, first bracing one end sets up the support arm with the junction of first pole setting, the other end sets up the middle part of second pole setting, second bracing one end sets up the middle part of second pole setting, the other end sets up extend the part of bottom plate on the support arm and be close to the support arm is kept away from the one end of first pole setting.
Preferably, the support unit further comprises a pull rod, wherein two ends of the pull rod are respectively arranged on the first vertical rod and the second vertical rod and are both close to the bottom ends of the first vertical rod and the second vertical rod.
Preferably, one end of the support arm, which is far away from the first vertical rod, is provided with a railing, and a protective net is arranged between the railings.
Preferably, the building climbing device further comprises a climbing mechanism, wherein the climbing mechanism comprises a cantilever beam and a ladder stand, the cantilever beam is arranged on the floor bottom plate and extends out of the floor bottom plate, one end of the ladder stand is arranged on the part, extending out of the floor, of the cantilever beam, and the other end of the ladder stand is arranged on the support arm.
Preferably, the cantilever beam comprises an I-shaped steel and a connecting plate arranged on the I-shaped steel, a through hole is formed in the connecting plate, a mounting hole is formed in a position, corresponding to the through hole, of the floor bottom plate, and a third bolt penetrates through the through hole and the mounting hole in sequence to fix the connecting plate on the floor bottom plate.
Preferably, still including setting up feeding mechanism on the loading board, feeding mechanism include driving motor, with the spool, haulage rope and the hanging flower basket that the driving motor output is connected, the one end of haulage rope with the spool is connected, the other end of haulage rope with the hanging flower basket is connected.
Preferably, the ratio of the length of the arm extending in the direction of the second upright to the length of the arm between said first and second uprights is 0.5 to 0.75.
Compared with the prior art, the invention has the following technical effects:
1. according to the invention, the first upright post and the second upright post are arranged between floors and used for lifting the support arm to a set height, and the bearing plate is erected on the support arm part of the overhanging bottom plate, so that a platform for construction personnel to construct a curtain wall is formed, the operation of the construction personnel is facilitated, the construction efficiency and the construction quality are provided, and the problems of time and labor consumption, high construction cost and poor construction quality caused by adopting a high-altitude crank arm vehicle or erecting a scaffold in the traditional curtain wall construction are solved.
2. The first upright rod comprises a first upper support arm and a first lower support arm sleeved outside the first upper support arm, wherein a plurality of first lower support arm height adjusting holes are formed in the first lower support arm from top to bottom, a plurality of first upper support arm height adjusting holes matched with the first lower support arm height adjusting holes are formed in the first upper support arm from bottom to top, and a first bolt penetrates through the first lower support arm height adjusting holes and the first upper support arm height adjusting holes to fix the first lower support arm and the first upper support arm; the second upright rod comprises a second upper support arm and a second lower support arm sleeved on the outer side of the second upper support arm, the second lower support arm is provided with a plurality of second lower support arm height adjusting holes from top to bottom, the second upper support arm is provided with a plurality of second upper support arm height adjusting holes matched with the second lower support arm height adjusting holes from bottom to top, and a second bolt penetrates through the second lower support arm height adjusting holes and the second upper support arm height adjusting holes to fix the second lower support arm and the second upper support arm; the heights of the first vertical rod and the second vertical rod are adjusted to adapt to the heights of different floors.
3. The bracket unit also comprises a first inclined strut and a second inclined strut, wherein one end of the first inclined strut is arranged at the joint of the support arm and the first upright rod, the other end of the first inclined strut is arranged in the middle of the second upright rod, one end of the second inclined strut is arranged in the middle of the second upright rod, and the other end of the second inclined strut is arranged on the part of the support arm extending out of the bottom plate and close to one end of the support arm far away from the first upright rod; form stable triangle-shaped support system through setting up first bracing and second bracing, and then guarantee the stability of whole support unit.
4. In the invention, one end of a support arm, which is far away from a first upright rod, is provided with a railing, and a protective net is arranged between adjacent railings; the safety protection device is used for ensuring the safety of constructors.
Drawings
In order to more clearly illustrate the present invention or technical solutions in the prior art, the drawings required to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without inventive labor.
FIG. 1 is a schematic structural diagram of a curtain wall construction platform;
wherein, 1, a first upper support arm; 2. a first lower support arm; 3. a first upper arm height adjustment aperture; 4. a first lower support arm height adjustment aperture; 5. a second upper support arm; 6. a second lower support arm; 7. a second upper arm height adjustment aperture; 8. a second lower arm height adjustment hole; 9. a first diagonal brace; 10. a second diagonal brace; 11. a carrier plate; 12. climbing a ladder; 13. a railing; 14. i-shaped steel; 15. a connecting plate; 16. and (4) a support arm.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be obtained by a person skilled in the art without making any creative effort based on the embodiments in the present invention, belong to the protection scope of the present invention.
The invention aims to provide a curtain wall construction platform to achieve the purposes of improving the construction quality of curtain walls and reducing the construction cost.
In order to make the aforementioned objects, features and advantages of the present invention more comprehensible, the present invention is described in detail with reference to the accompanying drawings and the detailed description thereof.
Referring to fig. 1, a curtain wall construction platform comprises a bearing plate 11 and at least two sets of support units arranged between floors side by side, wherein each support unit comprises a first vertical rod and a second vertical rod vertically arranged on a floor bottom plate and a support arm 16 vertically connected with the first vertical rod and the second vertical rod, the support arm 16 extends out of the floor bottom plate and is close to an upper eave of a window frame between the floors, the top end of the first vertical rod is abutted to a floor top plate, and the bearing plate 11 is arranged on the adjacent support arm 16 to overhang the floor bottom plate. According to the invention, the first upright post and the second upright post are arranged between floors and used for lifting the support arm 16 to a set height, and the bearing plate 11 is erected on the support arm 16 part of the overhanging bottom plate to form a platform for constructors to construct a curtain wall, so that the operation of the constructors is facilitated, the construction efficiency and the construction quality are improved, and the problems of time and labor consumption, high construction cost and poor construction quality caused by adopting a high-altitude crank arm vehicle or erecting a scaffold in the traditional curtain wall construction are solved.
Referring to fig. 1, the first vertical rod includes a first upper support arm 1 and a first lower support arm 2 sleeved outside the first upper support arm 1, a plurality of first lower support arm height adjusting holes 4 are formed in the first lower support arm 2 from top to bottom, a plurality of first upper support arm height adjusting holes 3 matched with the first lower support arm height adjusting holes 4 are formed in the first upper support arm 1 from bottom to top, and a first bolt penetrates through the first lower support arm height adjusting holes 4 and the first upper support arm height adjusting holes 3 to fix the first lower support arm 2 and the first upper support arm 1; the second pole setting includes that support arm 5 and cover establish support arm 6 under the second in the support arm 5 outside on the second, support arm 6 is equipped with a plurality of second down arm height regulation holes 8 under the second from last to under, support arm 5 is seted up a plurality of and second down arm height regulation holes 8 assorted second by on the second from bottom to top and is gone up support arm height regulation hole 7, the second bolt runs through second down arm height regulation holes 8 and second up arm height regulation hole 7 and is fixed support arm 5 on with second support arm 6 and the second. The heights of the first vertical rod and the second vertical rod are adjusted to adapt to the heights of different floors.
Referring to fig. 1, the support unit further includes a first inclined strut 9 and a second inclined strut 10, one end of the first inclined strut 9 is disposed at a joint of the support arm 16 and the first upright, the other end is disposed in the middle of the second upright, one end of the second inclined strut 10 is disposed in the middle of the second upright, and the other end is disposed on a part of the support arm 16 extending out of the base plate and close to one end of the support arm 16 away from the first upright; a stable triangular supporting system is formed by arranging the first inclined strut 9 and the second inclined strut 10, and the stability of the whole support unit is further ensured.
Referring to fig. 1, the bracket unit further includes a pull rod, two ends of the pull rod are respectively disposed on the first vertical rod and the second vertical rod, and both ends of the pull rod are close to the bottom ends of the first vertical rod and the second vertical rod; further enhancing the stability of the entire rack unit.
Referring to fig. 1, a handrail 13 is arranged at one end of the support arm 16 away from the first vertical rod, and a protective net is arranged between adjacent handrails 13; the safety protection device is used for ensuring the safety of constructors.
Referring to fig. 1, the self-service mechanism is also included, the self-service mechanism comprises a cantilever beam and a ladder stand 12 which are arranged on and extend out of the floor bottom plate, one end of the ladder stand 12 is arranged on the cantilever beam and extends out of the floor, and the other end of the ladder stand 12 is arranged on a support arm 16.
Referring to fig. 1, the cantilever beam comprises an i-shaped steel 14 and a connecting plate 15 arranged on the i-shaped steel 14, a through hole is formed in the connecting plate 15, a mounting hole is formed in a position of the floor slab corresponding to the through hole, and a third bolt penetrates through the through hole and the mounting hole in sequence to fix the connecting plate 15 on the floor slab.
Referring to fig. 1, the device further comprises a feeding mechanism arranged on the bearing plate, wherein the feeding mechanism comprises a driving motor, a winding shaft connected with the output end of the driving motor, a traction rope and a hanging basket, one end of the traction rope is connected with the winding shaft, and the other end of the traction rope is connected with the hanging basket.
Further, the ratio of the length of the arm 16 extending in the direction of the second upright to the length of the arm 16 between the first upright and the second upright is 0.5 to 0.75.
The adaptation according to the actual needs is within the scope of the invention.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (10)

1. The utility model provides a curtain construction platform, its characterized in that includes the loading board and sets up two sets of at least support units between the floor side by side, support unit including set up perpendicularly on the floor bottom plate first pole setting and second pole setting and with the perpendicular support arm of connecting of first pole setting and second pole setting, the support arm extends the floor bottom plate and is close to eaves on the window frame between the floor, the top and the floor roof of first pole setting support and lean on, the loading board sets up adjacently hang out the part of floor bottom plate on the support arm.
2. The curtain wall construction platform of claim 1, wherein the first vertical rod comprises a first upper support arm and a first lower support arm sleeved outside the first upper support arm, a plurality of first lower support arm height adjusting holes are formed in the first lower support arm from top to bottom, a plurality of first upper support arm height adjusting holes matched with the first lower support arm height adjusting holes are formed in the first upper support arm from bottom to top, and a first bolt penetrates through the first lower support arm height adjusting holes and the first upper support arm height adjusting holes to fix the first lower support arm and the first upper support arm.
3. The curtain wall construction platform according to claim 2, wherein the second upright rod comprises a second upper support arm and a second lower support arm sleeved outside the second upper support arm, the second lower support arm is provided with a plurality of second lower support arm height adjusting holes from top to bottom, the second upper support arm is provided with a plurality of second upper support arm height adjusting holes matched with the second lower support arm height adjusting holes from bottom to top, and a second bolt penetrates through the second lower support arm height adjusting holes and the second upper support arm height adjusting holes to fix the second lower support arm and the second upper support arm.
4. The curtain wall construction platform according to claim 1, wherein the bracket unit further comprises a first inclined strut and a second inclined strut, one end of the first inclined strut is arranged at the joint of the supporting arm and the first upright rod, the other end of the first inclined strut is arranged in the middle of the second upright rod, one end of the second inclined strut is arranged in the middle of the second upright rod, and the other end of the second inclined strut is arranged on the supporting arm and extends out of the bottom plate and is close to one end of the supporting arm, which is far away from the first upright rod.
5. The curtain wall construction platform according to claim 4, wherein the bracket unit further comprises a pull rod, and two ends of the pull rod are respectively arranged on the first vertical rod and the second vertical rod and are close to the bottom ends of the first vertical rod and the second vertical rod.
6. The curtain wall construction platform according to claim 1, wherein a rail is arranged at one end of the support arm, which is far away from the first vertical rod, and a protective net is arranged between the adjacent rails.
7. The curtain wall construction platform according to claim 1, further comprising a people-climbing mechanism, wherein the people-climbing mechanism comprises a cantilever beam and a ladder stand, the cantilever beam is arranged on the floor bottom plate and extends out of the floor bottom plate, one end of the ladder stand is arranged on a part, extending out of a floor, of the cantilever beam, and the other end of the ladder stand is arranged on the support arm.
8. The curtain wall construction platform according to claim 7, wherein the cantilever beam comprises an I-shaped steel and a connecting plate arranged on the I-shaped steel, a through hole is formed in the connecting plate, a mounting hole is formed in a position, corresponding to the through hole, of the floor bottom plate, and a third bolt penetrates through the through hole and the mounting hole in sequence to fix the connecting plate on the floor bottom plate.
9. The curtain wall construction platform according to claim 1, further comprising a feeding mechanism arranged on the bearing plate, wherein the feeding mechanism comprises a driving motor, a winding shaft connected with an output end of the driving motor, a traction rope and a hanging basket, one end of the traction rope is connected with the winding shaft, and the other end of the traction rope is connected with the hanging basket.
10. The curtain wall construction platform of claim 1, wherein the ratio of the length of the arm extending in the direction of the second upright to the length of the arm between the first upright and the second upright is 0.5 to 0.75.
CN202210623788.6A 2022-06-02 2022-06-02 Curtain wall construction platform Pending CN114753611A (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN202210623788.6A CN114753611A (en) 2022-06-02 2022-06-02 Curtain wall construction platform
PCT/CN2023/096702 WO2023208250A1 (en) 2022-06-02 2023-05-27 Curtain wall construction platform
DE212023000037.7U DE212023000037U1 (en) 2022-06-02 2023-05-27 Construction platform for a curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210623788.6A CN114753611A (en) 2022-06-02 2022-06-02 Curtain wall construction platform

Publications (1)

Publication Number Publication Date
CN114753611A true CN114753611A (en) 2022-07-15

Family

ID=82336760

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210623788.6A Pending CN114753611A (en) 2022-06-02 2022-06-02 Curtain wall construction platform

Country Status (3)

Country Link
CN (1) CN114753611A (en)
DE (1) DE212023000037U1 (en)
WO (1) WO2023208250A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023208250A1 (en) * 2022-06-02 2023-11-02 中铁七局集团有限公司 Curtain wall construction platform

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117166813B (en) * 2023-11-03 2024-04-12 北京市第三建筑工程有限公司 Construction method for building curtain wall reconstruction external protection system

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000120262A (en) * 1998-10-15 2000-04-25 Ohbayashi Corp Scaffolding apparatus for constructing reinforced concrete wall body
CN202850470U (en) * 2012-09-14 2013-04-03 中铁八局集团建筑工程有限公司 Construction platform for installation of corner connecters of curtain wall
CN206233533U (en) * 2016-11-18 2017-06-09 中冶天工集团有限公司 The support frame of adjustable legs height
CN111287440A (en) 2020-03-31 2020-06-16 深圳市三鑫科技发展有限公司 Operation platform for construction of inclined curtain wall structure
CN214090870U (en) * 2020-09-17 2021-08-31 深圳市众基建设发展有限公司 Building scaffold capable of being moved in telescopic mode
CN214462394U (en) * 2020-12-08 2021-10-22 上海高昕节能科技有限公司 High-altitude overhanging scaffold
CN113047593A (en) * 2021-05-14 2021-06-29 中铁七局集团郑州工程有限公司 Construction method of cantilever beam scaffold
CN114046029A (en) * 2021-11-25 2022-02-15 武汉一冶建筑安装工程有限责任公司 Construction method for putting hanging basket into front and rear curtain wall outer vertical surfaces
CN114753611A (en) * 2022-06-02 2022-07-15 中铁七局集团郑州工程有限公司 Curtain wall construction platform
CN217500985U (en) * 2022-06-02 2022-09-27 中铁七局集团郑州工程有限公司 Curtain wall construction platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023208250A1 (en) * 2022-06-02 2023-11-02 中铁七局集团有限公司 Curtain wall construction platform

Also Published As

Publication number Publication date
DE212023000037U1 (en) 2023-11-24
WO2023208250A1 (en) 2023-11-02

Similar Documents

Publication Publication Date Title
CN114753611A (en) Curtain wall construction platform
CN108532769A (en) A kind of jack-up construction method of the additional elevator shaft structure of assembled
CN211524016U (en) Double-working-surface guide frame climbing type working platform and system
CN109826411A (en) A kind of climbing frame and its operation method for building
CN112267556B (en) Large-span steel structure corridor assembling construction process for narrow space
CN217500985U (en) Curtain wall construction platform
CN109184061B (en) Space structure overhanging eave suspended ceiling system structure and construction method
CN114150857A (en) Construction method of attached type automatic climbing elevator shaft safety protection platform
CN213626572U (en) Tool type external cantilever operation platform
CN113152664A (en) Steel structural framework and modularized additional elevator
CN217054267U (en) Protection device construction structure
CN111236613A (en) Protection platform for building construction and use method thereof
CN217420580U (en) Self-balancing column type double-track curtain wall mounting device
CN217028004U (en) Annular hanging basket suspension device for curtain wall construction of super high-rise building
CN214302804U (en) Double-layer hanging basket of riding horse type
JP3950800B2 (en) Suspension scaffold
CN111305433B (en) Construction structure and construction method of roof steel structure platform inclined glass curtain wall
CN114645614A (en) Rapid moving aerial work platform based on rail device
CN107035037A (en) High building top layer curtain wall frame and its installation method
CN2209702Y (en) Saffold
CN210659199U (en) Attached detachable multifunctional aerial work platform
CN208345549U (en) A kind of additional elevator shaft structure of assembled being adapted to jack-up construction
CN206844417U (en) A kind of high building top layer curtain wall frame
CN2263161Y (en) Self-lifting scaffold
CN215631510U (en) Steel construction canopy construction platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination