CN111287440A - Operation platform for construction of inclined curtain wall structure - Google Patents
Operation platform for construction of inclined curtain wall structure Download PDFInfo
- Publication number
- CN111287440A CN111287440A CN202010240777.0A CN202010240777A CN111287440A CN 111287440 A CN111287440 A CN 111287440A CN 202010240777 A CN202010240777 A CN 202010240777A CN 111287440 A CN111287440 A CN 111287440A
- Authority
- CN
- China
- Prior art keywords
- curtain wall
- wall structure
- construction
- guide
- box body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 48
- 229910000831 Steel Inorganic materials 0.000 claims description 24
- 239000010959 steel Substances 0.000 claims description 24
- 230000000712 assembly Effects 0.000 claims description 6
- 238000000429 assembly Methods 0.000 claims description 6
- 238000009434 installation Methods 0.000 abstract description 9
- 239000000463 material Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005246 galvanizing Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
- E04G3/32—Hoisting devices; Safety devices
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses an operating platform for construction of an inclined curtain wall structure, which comprises a bottom fixing frame and at least one top hanging frame, wherein the top hanging frame is arranged at the top of the inclined curtain wall structure, the bottom fixing frame is arranged at the bottom of the inclined curtain wall structure, a liftable operating box body is arranged below the top hanging frame, the operating box body is connected with the top hanging frame through a lifting rope, a guide rope is arranged on one side of the inclined curtain wall structure in parallel, and the guide rope penetrates through the operating box body and is arranged in parallel with the lifting rope. The guide cable and the inclined curtain wall structure are arranged in parallel, so that the distance between the operation box body and the inclined curtain wall structure can be kept unchanged when the operation box body is lifted, the operation box body is started, the operation box body is lifted upwards, the guide cable limits the running track of the operation box body, the inclined lifting of the operation platform for construction of the inclined curtain wall structure is realized, and the installation requirement of the inclined curtain wall structure (or other special-shaped curtain wall structures) is met.
Description
Technical Field
The invention relates to the technical field of construction of building curtain walls, in particular to an operating platform for construction of an inclined curtain wall structure.
Background
The construction of building curtain wall requires workers to operate in the high-altitude outdoor, and generally has two construction measures: scaffold and hanging flower basket. The scaffold can be set up according to the physique of curtain, strong adaptability. But the scaffold also has the shortcoming such as the expense is high, occupy the place, and the hanging flower basket is used nimble, and the expense is lower relatively, does not occupy the place, does not hinder other work kind constructions, therefore the hanging flower basket also uses very generally. However, the conventional gondola has a significant disadvantage compared to the scaffold: the scaffold can be basically suitable for curtain walls with all shapes, and the common hanging basket has poor adaptability to curtain walls with complex shapes, such as inclined curtain walls. Because the common hanging basket can only be vertically lifted, the distance between the hanging basket and the inclined curtain wall (or other special-shaped curtain walls) cannot be guaranteed to be unchanged during lifting, the distance cannot meet the requirement, and workers cannot perform curtain wall installation operation in the hanging basket. Therefore, the common hanging basket cannot meet the installation requirement of the inclined curtain wall (or other special-shaped curtain walls).
Disclosure of Invention
The invention aims to overcome the defects of the prior art and provides an operation platform for construction of an inclined curtain wall structure.
In order to achieve the purpose, the invention adopts the following technical scheme: the utility model provides an operation platform is used in slope curtain wall construction, includes bottom mount and at least one top gallows, the top gallows sets up in the top of slope curtain wall construction, the bottom mount set up in the bottom of slope curtain wall construction, top gallows below is provided with the operation box of liftable, the operation box through hang heavy rope with top gallows connects, slope curtain wall construction one side parallel arrangement has the guide cable, the guide cable wear to locate the operation box and with hang heavy rope parallel arrangement.
The further technical scheme is as follows: the bottom mount with the bottom of slope curtain wall construction is connected fixedly, be equipped with fixed pulley on the mount of bottom, slope curtain wall construction rear is provided with hand block, the direction cable is walked around fixed pulley is connected with hand block, through hand block adjusts the tensile force of direction cable is in order to adjust the operation box with the distance of the wall of slope curtain wall construction.
The further technical scheme is as follows: the operation box body includes case body and at least one power direction subassembly, the power direction subassembly includes motor and direction locating part, the direction locating part set up in the top of case body, the top of direction locating part is equipped with guide pulley and hoisting pulley, guide pulley is used for placing the guide rope, hoisting pulley is used for placing the lifting rope, the motor with the lifting rope is connected.
The further technical scheme is as follows: the lifting pulley is arranged in front of the guide pulley.
The further technical scheme is as follows: the guide limiting part is fixedly connected with the box body through a bolt.
The further technical scheme is as follows: the top gallows with slope curtain structure top is connected fixedly, just top gallows one end is connected fixedly with main part roofing steel construction, and the other end is equipped with preceding pulley and back pulley respectively, preceding pulley is used for hanging the hoisting rope, the back pulley is used for hanging the direction cable.
The further technical scheme is as follows: and one end of a top hanging bracket connected with the main roof steel structure is provided with two connecting parts, namely a front connecting part and a rear connecting part, the front connecting part is a semicircular supporting steel part, and the rear connecting part is fixedly connected with the main roof steel structure through a hoop.
The further technical scheme is as follows: the operation platform for the construction of the inclined curtain wall structure is provided with a safety rope, a safety lock is arranged on an operation box body, the upper end of the safety rope is fixedly connected with the main roof steel structure, and the lower end of the safety rope is connected with the safety lock.
The further technical scheme is as follows: the power direction subassembly is two, and two the power direction subassembly set up in the both sides of case body.
The further technical scheme is as follows: the number of the top hanging brackets is two, and the two top hanging brackets are arranged above the side of the box body.
Compared with the prior art, the invention has the beneficial effects that: the operation platform for the construction of the inclined curtain wall structure is characterized in that a top hanging bracket is arranged at the top of the inclined curtain wall structure, a bottom fixing bracket is arranged at the bottom of the inclined curtain wall structure, a liftable operation box body is arranged below the top hanging bracket, the operation box body is connected with the top hanging bracket through a lifting rope, a guide rope is arranged in parallel on one side of the inclined curtain wall structure, and the guide rope penetrates through the operation box body and is arranged in parallel with the lifting rope. The guide cable plays a role in presetting a lifting track of the operation box body, the guide cable is arranged in parallel with the inclined curtain wall structure, so that the distance between the operation box body and the inclined curtain wall structure can be kept unchanged when the operation box body is lifted, the operation box body is started, the operation box body is lifted upwards, the guide cable limits the running track of the operation box body, the inclined lifting of the operation platform for construction of the inclined curtain wall structure is realized, and the installation requirement of the inclined curtain wall structure (or other special-shaped curtain wall structures) is met.
The foregoing description is only an overview of the technical solutions of the present invention, and in order to make the technical means of the present invention more clearly understood, the present invention may be implemented according to the content of the description, and in order to make the above and other objects, features, and advantages of the present invention more apparent, the following detailed description will be given of preferred embodiments.
Drawings
FIG. 1 is a schematic view of an operating platform for construction of an inclined curtain wall structure;
FIG. 2 is a schematic view of an operating box;
FIG. 3 is a front view of the guide stop;
fig. 4 is a front view of the top hanger.
Reference numerals
1. A bottom mount; 11. fixing the pulley; 2. a top hanger; 21. a front pulley; 22. a rear pulley; 23. a front connecting part; 24. a rear connection portion; 3. an inclined curtain wall structure; 31. a chain block; 4. operating the box body; 41. a box body; 42. a motor; 43. a guide limit piece; 431. a guide pulley; 432. a lifting pulley; 5. hoisting a weight rope; 6. a guide cable; 7. a safety cord; 8. main part roofing steel construction.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be described in detail with reference to the accompanying drawings and the detailed description.
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like, indicate orientations and positional relationships based on those shown in the drawings, and are used only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be considered as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically defined otherwise.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "connected," "secured," and the like are to be construed broadly and can, for example, be connected or detachably connected or integrated; can be mechanically or electrically connected; either directly or indirectly through intervening media, either internally or in any other relationship. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
In the present invention, unless otherwise expressly stated or limited, "above" or "below" a first feature means that the first and second features are in direct contact, or that the first and second features are not in direct contact but are in contact with each other via another feature therebetween. Also, the first feature being "on," "above" and "over" the second feature includes the first feature being directly on and obliquely above the second feature, or merely indicating that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature includes the first feature being directly under and obliquely below the second feature, or simply meaning that the first feature is at a lesser elevation than the second feature.
In the description herein, references to the description of the term "one embodiment," "some embodiments," "an example," "a specific example," or "some examples," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above should not be understood to necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples. Furthermore, various embodiments or examples described in this specification can be combined and combined by one skilled in the art.
As shown in fig. 1 to 4, an operation platform for construction of an inclined curtain wall structure comprises a bottom fixing frame 1 and at least one top hanging frame 2, wherein the top hanging frame 2 is arranged at the top of the inclined curtain wall structure 3, the bottom fixing frame 1 is arranged at the bottom of the inclined curtain wall structure 3, a liftable operation box body 4 is arranged below the top hanging frame 2, the operation box body 4 is connected with the top hanging frame 2 through a lifting rope 5, a guide rope 6 is arranged on one side of the inclined curtain wall structure 3 in parallel, and the guide rope 6 penetrates through the operation box body 4 and is arranged in parallel with the lifting rope 5. The guide cable 6 plays a role in presetting a lifting track for the operation box body 4, the guide cable 6 is arranged in parallel with the inclined curtain wall structure 3, so that the distance between the operation box body 4 and the inclined curtain wall structure 3 is kept unchanged when the operation box body is lifted, the operation box body 4 is started, the operation box body 4 is lifted upwards, the guide cable 6 limits the running track of the operation box body 4, the inclined lifting of the operation platform for construction of the inclined curtain wall structure 3 is realized, and the installation requirement of the inclined curtain wall structure 3 (or other special-shaped curtain wall structures) is met.
Specifically, as shown in fig. 1, the bottom fixing frame 1 is fixedly connected to the bottom of the inclined curtain wall structure 3, the bottom fixing frame 1 is provided with a fixed pulley 11, the rear of the inclined curtain wall structure 3 is provided with a manual block 31, the guide cable 6 bypasses the fixed pulley 11 and is connected with the manual block 31, and the tension of the guide cable 6 is adjusted by the manual block 31 to adjust the distance between the operation box 4 and the wall surface of the inclined curtain wall structure 3. During operation, the tension force of the guide cable 6 is controlled through the hand-operated block 31, so that the distance between the operation box body 4 and the wall surface of the inclined curtain wall structure 3 is controlled, and a worker can conveniently carry out curtain wall installation operation.
Specifically, as shown in fig. 2, the operation box 4 includes a box body 41 and at least one power guide assembly, the power guide assembly includes a motor 42 and a guide limiting member 43, the guide limiting member 43 is disposed above the box body 41, a guide pulley 431 and a lifting pulley 432 are disposed on the top of the guide limiting member 43, the guide pulley 431 is used for placing the guide rope 6, the lifting pulley 432 is used for placing the lifting rope 5, and the motor 42 is connected with the lifting rope 5. When the motor 42 is activated, the operating box 4 moves along the trajectory of the guide cable 6 via the guide pulley 431. The inclined lifting is realized, and the installation requirement of the inclined curtain wall structure 3 is met.
Specifically, as shown in fig. 2 to 3, the lifting pulley 432 is provided in front of the guide pulley 431. The lifting pulley 432 is even behind the guide pulley 431 so that the operating case 4 does not interfere with both during the lifting.
Specifically, as shown in fig. 2, the guide stoppers 43 are fixed to the box body 41 by bolting. The connecting device is connected and fixed in a bolt connecting mode, the connection is reliable, and the operation is simple.
Specifically, as shown in fig. 1 and 4, the top hanger 2 is fixedly connected to the top of the inclined curtain wall structure 3, one end of the top hanger 2 is fixedly connected to the main roof steel structure 8, and the other end of the top hanger 2 is provided with a front pulley 21 and a rear pulley 22 respectively, the front pulley 21 is used for hanging the lifting rope 5, and the rear pulley 22 is used for hanging the guide rope 6.
Specifically, as shown in fig. 1 and 4, two connecting portions, namely a front connecting portion 23 and a rear connecting portion 24, are arranged at one end of the top hanger 2 connected to the main roof steel structure 8, the front connecting portion 23 is a semicircular supporting steel member, and the rear connecting portion 24 is fixedly connected to the main roof steel structure 8 through a hoop.
Specifically, steel structures such as the semicircular supporting steel piece and the hoop are made of Q235 steel and subjected to hot dip galvanizing treatment.
Specifically, as shown in fig. 1 and 2, the operation platform for the construction of the inclined curtain wall structure is provided with a safety rope 7, the operation box body 4 is provided with a safety lock, the upper end of the safety rope 7 is fixedly connected with a main roof steel structure 8, and the lower end of the safety rope is connected with the safety lock. By arranging the safety rope 7 and the safety lock, the safety of operators can be guaranteed, and the safety of measures is improved.
Specifically, the number of the guide cables 6 corresponds to the number of the power guide assemblies, and the number of the power guide assemblies is two, and the two power guide assemblies are disposed on two sides of the box body 41. The two power guide assemblies run synchronously and keep the same lifting speed, so that the operation box body 4 is more stable in the lifting process.
Specifically, the number of the top hangers 2 is two, and the two top hangers 2 are disposed laterally above the box body 41. The rear pulleys 22 provided on the two top spreaders 2 can be used to suspend the two guide ropes 6 and the front pulleys 21 can be used to suspend the two hoist ropes 5, which provides the advantage of making the operating box 4 more stable when lifted.
Specifically, the bottom fixing frame 1 is fixed on the bottom surface through a steel plate and a bolt, and is firmly connected.
Specifically, the guide rope 6, the sling rope 5 and the safety rope 7 are all steel wire ropes.
Specifically, the operation platform for the construction of the inclined curtain wall structure can be applied to the construction of curtain walls with various inclination angles, and can be used for selecting steel wire ropes with different diameters through calculation and checking and also can be suitable for the requirements of construction operation boxes 4 with different sizes and different construction loads.
Specifically, this operation platform is used in slope curtain wall construction is fixed in main part roofing steel construction 8 through top gallows 2, and fixed pulley 11 is fixed in ground, and the back pulley 22 of guide cable 6 upper end string in top gallows 2 passes the guide pulley 431 that sets up on operation box 4 in the middle of, and the lower extreme passes fixed pulley 11 and is connected with hand hoist 31. The upper end of the lifting rope 5 is hung on the front pulley 21 of the top hanging frame 2, and the middle of the lifting rope passes through the lifting pulley 432 and then is connected with the motor 42. The tensile force of guide cable 6 is controlled through hand block 31 during operation to the distance of control platform case body 41 and slope curtain wall structure curtain wall face makes things convenient for the workman to carry out the curtain installation operation. The safety lock is arranged in the operation box body 4, the lower end of the safety rope 7 penetrates through the safety lock, and the upper end of the safety rope is hung on the main roof steel structure 8, so that the safety of operators is guaranteed, and the safety of measures is improved.
Compared with the prior art, the operation platform for the construction of the inclined curtain wall structure is characterized in that the top hanging bracket is arranged at the top of the inclined curtain wall structure, the bottom fixing bracket is arranged at the bottom of the inclined curtain wall structure, the liftable operation box body is arranged below the top hanging bracket, the operation box body is connected with the top hanging bracket through the hoisting rope, the guide rope is arranged in parallel at one side of the inclined curtain wall structure, and the guide rope penetrates through the operation box body and is arranged in parallel with the hoisting rope. The guide cable plays a role in presetting a lifting track of the operation box body, the guide cable is arranged in parallel with the inclined curtain wall structure, so that the distance between the operation box body and the inclined curtain wall structure can be kept unchanged when the operation box body is lifted, the operation box body is started, the operation box body is lifted upwards, the guide cable limits the running track of the operation box body, the inclined lifting of the operation platform for construction of the inclined curtain wall structure is realized, and the installation requirement of the inclined curtain wall structure (or other special-shaped curtain wall structures) is met.
The technical contents of the present invention are further illustrated by the examples only for the convenience of the reader, but the embodiments of the present invention are not limited thereto, and any technical extension or re-creation based on the present invention is protected by the present invention. The protection scope of the invention is subject to the claims.
Claims (10)
1. The utility model provides an operation platform is used in slope curtain wall construction, its characterized in that, includes bottom mount and at least one top gallows, the top gallows sets up in the top of slope curtain wall construction, the bottom mount set up in the bottom of slope curtain wall construction, top gallows below is provided with the operation box of liftable, the operation box through the hoisting rope with top gallows connects, slope curtain wall construction one side parallel arrangement has the guide cable, the guide cable wear to locate the operation box and with hoisting rope parallel arrangement.
2. The operating platform for the construction of the inclined curtain wall structure according to claim 1, wherein the bottom fixing frame is fixedly connected with the bottom of the inclined curtain wall structure, a fixed pulley is arranged on the bottom fixing frame, a manual block is arranged behind the inclined curtain wall structure, the guide cable is connected with the manual block by bypassing the fixed pulley, and the tension of the guide cable is adjusted by the manual block so as to adjust the distance between the operating box body and the wall surface of the inclined curtain wall structure.
3. The operation platform for the construction of the inclined curtain wall structure according to claim 2, wherein the operation box body comprises a box body and at least one power guide assembly, the power guide assembly comprises a motor and a guide limiting part, the guide limiting part is arranged above the box body, a guide pulley and a lifting pulley are arranged at the top of the guide limiting part, the guide pulley is used for placing the guide rope, the lifting pulley is used for placing the lifting rope, and the motor is connected with the lifting rope.
4. The inclined curtain wall structure construction work platform of claim 3, wherein the lifting pulley is arranged in front of the guide pulley.
5. The operation platform for the construction of the inclined curtain wall structure according to claim 3, wherein the guide limiting piece is fixedly connected with the box body through a bolt.
6. The operation platform for the construction of the inclined curtain wall structure as claimed in claim 4, wherein the top hanging bracket is fixedly connected with the top of the inclined curtain wall structure, one end of the top hanging bracket is fixedly connected with a main roof steel structure, the other end of the top hanging bracket is respectively provided with a front pulley and a rear pulley, the front pulley is used for hanging the lifting rope, and the rear pulley is used for hanging the guide rope.
7. The operation platform for the construction of the inclined curtain wall structure according to claim 6, wherein one end of the top hanging bracket connected with the main roof steel structure is provided with two connecting parts, namely a front connecting part and a rear connecting part, the front connecting part is a semicircular supporting steel part, and the rear connecting part is fixedly connected with the main roof steel structure through a hoop.
8. The operation platform for the construction of the inclined curtain wall structure as claimed in claim 7, wherein a safety rope is arranged on the operation platform for the construction of the inclined curtain wall structure, a safety lock is arranged on the operation box body, the upper end of the safety rope is fixedly connected with the steel structure of the main roof, and the lower end of the safety rope is connected with the safety lock.
9. The operation platform for the construction of the inclined curtain wall structure according to claim 3, wherein the number of the power guide assemblies is two, and the two power guide assemblies are arranged on two sides of the box body.
10. The inclined operation platform for curtain wall structure construction as claimed in claim 9, wherein the number of the top hangers is two, and the two top hangers are disposed laterally above the box body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010240777.0A CN111287440A (en) | 2020-03-31 | 2020-03-31 | Operation platform for construction of inclined curtain wall structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010240777.0A CN111287440A (en) | 2020-03-31 | 2020-03-31 | Operation platform for construction of inclined curtain wall structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111287440A true CN111287440A (en) | 2020-06-16 |
Family
ID=71027576
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010240777.0A Pending CN111287440A (en) | 2020-03-31 | 2020-03-31 | Operation platform for construction of inclined curtain wall structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111287440A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE212023000037U1 (en) | 2022-06-02 | 2023-11-24 | China Railway Seventh Group Co., Ltd | Construction platform for a curtain wall |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20010054821A (en) * | 1999-12-08 | 2001-07-02 | 김문환 | Lifter for construction of a pier |
CN203095547U (en) * | 2013-01-24 | 2013-07-31 | 成都嘉泽正达科技有限公司 | Hanging basket installation system used for beveled building |
CN207974504U (en) * | 2018-03-15 | 2018-10-16 | 北京城建集团有限责任公司 | Climbing type hanging basket system for tilting decoration of exterior wall construction |
CN208122049U (en) * | 2018-04-04 | 2018-11-20 | 梁王义 | A kind of inclined lift operating platform |
CN211899576U (en) * | 2020-03-31 | 2020-11-10 | 深圳市三鑫科技发展有限公司 | Operation platform for construction of inclined curtain wall structure |
-
2020
- 2020-03-31 CN CN202010240777.0A patent/CN111287440A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20010054821A (en) * | 1999-12-08 | 2001-07-02 | 김문환 | Lifter for construction of a pier |
CN203095547U (en) * | 2013-01-24 | 2013-07-31 | 成都嘉泽正达科技有限公司 | Hanging basket installation system used for beveled building |
CN207974504U (en) * | 2018-03-15 | 2018-10-16 | 北京城建集团有限责任公司 | Climbing type hanging basket system for tilting decoration of exterior wall construction |
CN208122049U (en) * | 2018-04-04 | 2018-11-20 | 梁王义 | A kind of inclined lift operating platform |
CN211899576U (en) * | 2020-03-31 | 2020-11-10 | 深圳市三鑫科技发展有限公司 | Operation platform for construction of inclined curtain wall structure |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE212023000037U1 (en) | 2022-06-02 | 2023-11-24 | China Railway Seventh Group Co., Ltd | Construction platform for a curtain wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211899576U (en) | Operation platform for construction of inclined curtain wall structure | |
CN213011574U (en) | Rapid unhooking device and hoisting mechanism | |
CN110054091B (en) | Concrete pipe pile lifting appliance | |
CN111287440A (en) | Operation platform for construction of inclined curtain wall structure | |
CN215055468U (en) | ALC wallboard installation hoisting device for building finishing engineering | |
WO2022027883A1 (en) | Cantilever crane | |
CN209583455U (en) | A kind of outdoor handling machine for building | |
CN115947240A (en) | Hoisting machine lifting device | |
CN215291554U (en) | Slant traction guide rope lock device | |
CN217079619U (en) | Large-span construction hanging basket system | |
CN213085125U (en) | Elevator shaft traction rotary telescopic construction elevator | |
CN114873506A (en) | Electromechanical pipeline hoisting device | |
CN211569866U (en) | Hoist for PC component convenient to adjust assembly dimension | |
CN210105269U (en) | Suspension type electric hanging basket | |
CN2213146Y (en) | Adjustable lift sub for lifting steel plate | |
CN210029743U (en) | Lifting appliance for high-rise prefabricated composite slab construction | |
CN205294671U (en) | Device of falling roof beam | |
CN206636185U (en) | The treadle of false work of laborsaving assembly pulley is installed | |
CN212608991U (en) | Rear-mounted slideway slot hoisting device | |
CN221590352U (en) | Electric hanging basket support type hanging mechanism | |
CN221165732U (en) | Electromechanical device installs auxiliary device | |
CN217102693U (en) | Container type glass curtain wall hoisting equipment | |
US20090200529A1 (en) | Multi-use hoist system | |
CN209835485U (en) | Four-hoisting-point synchronous hoisting device | |
CN217783206U (en) | Electric railway open wagon small door opening and closing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |