CN210105269U - Suspension type electric hanging basket - Google Patents

Suspension type electric hanging basket Download PDF

Info

Publication number
CN210105269U
CN210105269U CN201920802945.3U CN201920802945U CN210105269U CN 210105269 U CN210105269 U CN 210105269U CN 201920802945 U CN201920802945 U CN 201920802945U CN 210105269 U CN210105269 U CN 210105269U
Authority
CN
China
Prior art keywords
bar
install
basket
support
flower basket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920802945.3U
Other languages
Chinese (zh)
Inventor
刘杨辉
卢从军
郭德取
肖玉文
姜勇
黄璜
李维
胡传贵
刘旭
黄炜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Construction Engineering Group Second Construction Engineering Co Ltd
Original Assignee
Guizhou Construction Engineering Group Second Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Construction Engineering Group Second Construction Engineering Co Ltd filed Critical Guizhou Construction Engineering Group Second Construction Engineering Co Ltd
Priority to CN201920802945.3U priority Critical patent/CN210105269U/en
Application granted granted Critical
Publication of CN210105269U publication Critical patent/CN210105269U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model relates to a construction technical field just discloses electronic hanging flower basket of suspension type, constitute including front-axle beam, inserted bar, well roof beam, back loop bar, chassis, support, the tip at the front-axle beam is installed to the inserted bar, the end of inserted bar is pegged graft and is had the sleeve pipe, install the fore-stock on the sleeve pipe, the tip at the inserted bar is installed to well roof beam, the tip at well roof beam is installed to back loop bar, the end of back loop bar is pegged graft and is had the montant. The utility model discloses directly through the effect of balancing weight for the inside weight of hanging flower basket can carry out horizontal adjustment through the balancing weight, utilizes the principle of balance, makes the hanging flower basket keep balanced state in the use, makes the hanging flower basket can bear more weight, makes simultaneously to hang the mechanism and keep vertical state in the use, can not incline forward along with the increase of hanging flower basket weight, better assurance the hanging flower basket is in stable state in the use, increases hanging flower basket in use's security.

Description

Suspension type electric hanging basket
Technical Field
The utility model relates to a construction technical field specifically is suspension type electric hanging basket and installation construction method thereof.
Background
The hanging basket is mainly suitable for decoration operation of high-rise building construction, a basket type workbench is prefabricated by profile steel, the hanging basket is hung on a cantilever beam at the top of a building through a steel wire rope, the hanging basket can be lifted along with the operation requirement, basket bodies with different lengths from one to six meters can be combined according to the construction requirement, the hanging basket is easy to assemble and disassemble and convenient to store and transport, the hanging basket is very suitable for high-rise building coating, heat preservation, plastering, veneering and other projects, and high-rise building maintenance, cleaning and installation and other high-rise operations, can also be used for elevator installation, ship maintenance, cliff operation and other related industries, is safe and reliable mechanical equipment in the field of high-rise operation, and generally adopts manual and electric hoists and winches as power.
The traditional suspension type electric hanging basket is influenced by wind power and suspension force in the using process at high altitude, and in addition, the worker works dynamically when the worker works at high altitude, so that the suspension type electric hanging basket swings back and forth in high altitude, the swinging of the hanging basket drives the steel wire rope to swing, the steel wire rope is easy to fall off from a rope pulley, the steel wire rope is clamped inside a pin shaft, the smoothness of the steel wire rope during sliding is reduced, meanwhile, a hanging mechanism of the hanging basket is mostly directly fixed on a roof, the bearing force is related to the bearing force of the hanging mechanism along with fixed strength, and a large amount of building materials are lifted and carried along with the hanging basket because the hanging basket is engaged in the work in the field of construction, the load of the bearing capacity of the suspension mechanism is inclined forwards and moves forwards from the initial position, the safety of the hanging basket in the using process is seriously influenced, the personal safety of workers cannot be guaranteed, and the use of the hanging basket is influenced.
Disclosure of Invention
Not enough to above-mentioned background art, the utility model provides an electronic hanging flower basket of suspension type, this electronic hanging flower basket possess gravity balance, the fixed advantage in high altitude, have solved the problem that the background art provided.
The utility model provides a following technical scheme: a suspended electric hanging basket comprises a front beam, an insertion rod, a middle beam, a rear loop bar, a bottom frame and a support, wherein the insertion rod is installed at the end part of the front beam, the tail end of the insertion rod is inserted with a sleeve, a front support is installed on the sleeve, the middle beam is installed at the end part of the insertion rod, the rear loop bar is installed at the end part of the middle beam, a vertical rod is inserted at the tail end of the rear loop bar, the front beam, the insertion rod, the middle beam and the rear loop bar form a hanging basket suspension mechanism, a loop board is installed on the insertion rod, an upper support is connected onto the loop board, a pin shaft is installed at the top end of the upper support, a rope wheel is installed inside the pin shaft, the tail end of the vertical rod is connected with a rear support, a counterweight branch pipe is installed on the rear support, a counterweight block is installed on the counterweight branch pipe, the vertical rod, the rear support, the counterweight branch pipe and the counterweight block, the utility model discloses a wire rope hanger plate, including wire rope hanger plate, axle sleeve, support, sucking disc, pull rod, slide bar, the slide bar outside is connected with the horizontal pole, install the extension spring between horizontal pole and the slide bar, the bottom plate is installed with the end of horizontal pole to the sucking disc.
During construction:
firstly, mounting, namely, conveying mechanical equipment such as a hanging mechanism of a hanging basket, a steel rope, a safety rope, a balance weight and the like to a mounting roof, inserting a front suspension arm inserted rod into a front support, adjusting the height of the inserted rod according to the height of a wall or other facilities of a building and fastening the inserted rod by a bolt, inserting a rear sleeve rod into a rear support, fastening the inserted rod and the front support by the bolt, respectively mounting a front beam and a rear beam into front support and rear support struts, connecting the front beam and the rear support by a middle beam, adjusting the distance between the front support and the rear support to be maximum under the condition of field conditions, mounting an upper support in the front support strut, mounting a reinforcing steel rope, adjusting a tightening rope screw buckle, tensioning the reinforcing steel rope, pre-tightening the front beam by 3-5cm to generate prestress, reinforcing the rigidity of the front beam, respectively mounting and fixing a working steel rope and the safety steel rope on a front beam hanging plate, mounting an upper limit block at a proper position of, after the error is confirmed, the suspension mechanism is moved to a working position corresponding to the corresponding working length;
secondly, mounting the basket, namely, flatly placing the basket bottom frame and heightening the basket bottom frame by 20cm, aligning and fastening connecting bolt holes of the basket bottom by using bolts, fixedly connecting the front basket frame piece and the rear basket frame piece to the basket bottom to ensure that the platform frame is straight, and respectively mounting two lifting machines on the side basket support and connecting and fastening the lifting machines on the basket frame;
thirdly, mounting the hoister, the safety lock and the electric cabinet, respectively mounting the two hoists on mounting frames at two sides of the basket frame, fastening and locking the hoists by using mounting handles, locking pins and bolts, fixing the safety lock 21 on the mounting frames to fasten safety lock rollers towards the inner side of the basket frame, mounting and fixing a hoister limiter travel switch on the safety lock 21, hanging the electric cabinet at a neutral position in the middle of a rear piece of the basket frame, respectively connecting a control cable plug and a manual switch plug of the hoister into corresponding sockets of the electric cabinet for fixation, inserting other aviation plugs into corresponding sockets of the electric cabinet, aligning a notch to ensure that no virtual connection exists when the hoists are in place, and connecting a main power supply after the hoists are determined to be;
installing a working steel wire rope, straightening the working steel wire rope laid down on the roof and a safety steel wire rope without winding, shifting a change-over switch of an electric control box to one side of a steel wire rope penetrating elevator, inserting the straightened working steel wire rope into a rope hole on the elevator, starting an uplink electric control button, and automatically winding the steel wire rope into the position by the elevator;
and fourthly, using a sucker, installing an attached sucker 23 on the blue platform after the main structure is installed, adsorbing the attached sucker 23 on the wall surface after the hanging basket reaches the working position, and then adjusting a pull rod 24 to relatively fix the hanging basket on the wall surface or the curtain wall surface so as to stably use and hang the hanging basket.
Preferably, the roof at the installation position is planar, if the roof is trimmed and laid at an angle, the roof is correspondingly protected by a waterproof heat-insulating layer, namely the bottoms of the front support and the rear support are cushioned by a wood board with enough thickness.
Preferably, the front beam hoisting point is at most 1.5 meters higher than the front support, the horizontal distance between the two suspension mechanisms corresponds to the length of the platform, the balance weight is uniformly placed in a balance weight seat of the rear support, the mass of the balance weight is determined, a fixing measure is provided to prevent the balance weight from moving, a working steel wire rope and a safety steel wire rope are put down from the front end of the roof to the ground, and the two ropes are prevented from being wound.
Preferably, the scaffold boards used on the hanging basket adopt shaping boards according to the specification and the size of the basket type workbench, and the thickness is not less than 5cm when wood boards are adopted; when the steel plate is adopted, the probe plate cannot appear due to anti-skidding measures.
Preferably, before the hanging basket is installed and used, the safety steel wire rope is placed to the ground from the roof, the safety steel wire rope is fixed at the firm position of the roof and separated from the hanging basket suspension mechanism, and the fixed end of the safety rope is strictly forbidden to be connected with any position of the hanging basket equipment.
The utility model discloses possess following beneficial effect:
1. this electronic hanging flower basket of suspension type and installation construction method thereof, through the after-poppet, the counter weight effect of counter weight branch pipe and balancing weight, directly replace the tradition to hang the hanging flower basket and can only fix on the roof, bear the weight and equal along with the bearing strength who hangs the hanging flower basket, and the utility model discloses directly through the effect of balancing weight, make the inside weight of hanging flower basket carry out horizontal adjustment through the balancing weight, utilize the principle of balance, make the hanging flower basket keep balanced state in the use, make the hanging flower basket can bear more weight, make simultaneously to hang the mechanism and keep vertical state in the use, can not incline forward along with the increase of hanging flower basket weight, better assurance the hanging flower basket is in stable state in the use, increases the security of hanging flower basket in use.
2. According to the suspended electric hanging basket and the installation and construction method thereof, under the action of the suckers, when the hanging basket moves to a high-altitude state to work, the suckers are directly adsorbed on a wall or a construction building through the cooperation of the pull rods and the tension springs, so that the hanging basket is kept in a relatively stable state in the high altitude, the problem that the hanging basket swings back and forth due to suspension and wind power is solved, the phenomenon that a steel wire rope is derailed is solved, the safety of the hanging basket in use is further improved, and the safety of workers is guaranteed.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a basket mounting structure;
FIG. 3 is a schematic view of a basket lifting structure;
fig. 4 is a schematic structural diagram of the sucker.
In the figure: 1. a front beam; 2. a wire rope hanger plate; 3. a screw; 4. a middle beam; 5. inserting a rod; 6. a sleeve; 7. a front bracket; 8. sheathing; 9. an upper pillar; 10. a pin shaft; 11. a sheave; 12. a rear loop bar; 13. a vertical rod; 14. a rear bracket; 15. a counterweight branch pipe; 16. a balancing weight; 17. a shaft sleeve; 18. a pulley; 19. a chassis; 20. a support; 21. a safety lock; 22. a steel cord; 23. a suction cup; 24. a pull rod; 25. a slide bar; 26. a cross bar; 27. a tension spring; 28. a base plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, a suspended electric hanging basket comprises a front beam 1, an inserted link 5, a middle beam 4, a rear loop bar 12, a bottom frame 19 and a support 20, wherein the inserted link 5 is installed at the end of the front beam 1, a sleeve 6 is inserted at the tail end of the inserted link 5, a front support 7 is installed on the sleeve 6, the middle beam 4 is installed at the end of the inserted link 5, the rear loop bar 12 is installed at the end of the middle beam 4, a vertical rod 13 is inserted at the tail end of the rear loop bar 12, the front beam 1, the inserted link 5, the middle beam 4 and the rear loop bar 12 form a basket hanging mechanism, a loop plate 8 is installed on the inserted link 5, an upper support 9 is connected on the loop plate 8, a pin shaft 10 is installed at the top end of the upper support 9, a rope pulley 11 is installed in the pin shaft 10, the tail end of the vertical rod 13 is connected with the rear support 14, a counterweight branch pipe 15 is installed on the rear support 14, a counterweight branch pipe 15 is, the front beam 1 and the rear loop bar 12 are both provided with a steel wire rope hanging plate 2, the steel wire rope hanging plate 2 is in threaded connection with a screw 3, the steel wire rope hanging plate 2 is provided with a shaft sleeve 17, a pulley 18 is arranged in the shaft sleeve 17, a support 20 is arranged on an underframe 19, two ends of the support 20 are provided with safety locks 21, the safety locks 21 are connected with steel ropes 22, the underframe 19, the support 20 and the safety locks 21 form a hanging basket, the steel ropes 22 are coiled with the hanging basket through the steel wire rope hanging plate 2, the shaft sleeve 17 and the pulley 18, the support 20 is provided with a suction cup 23, a pull rod 24 is arranged on a vertical rod 13, a slide rod 25 is arranged on the pull rod 24, the outer side of the slide rod 25 is connected with a cross rod 26, a tension spring 27 is arranged between the cross rod 26 and the slide rod 25, the suction cup 23 and the tail end of the, and also facilitates the removal of the suspension mechanism.
During construction:
firstly, the installation is carried out, mechanical equipment such as a hanging mechanism of a hanging basket, a steel rope 22, a safety rope, a balance weight and the like are transported to an installation roof, a front suspension arm inserted rod 5 is inserted into a front support 7, the height of the inserted rod 5 is adjusted according to the height of a wall or other facilities of a building and is fastened by a bolt, a rear sleeve rod 12 is inserted into a rear support 14, the height of the inserted rod is fastened by the bolt with the front support 7, a front beam and a rear beam are respectively installed in a front support strut and a rear support strut and are connected by a middle beam 4, the distance between the front support and the rear support is adjusted to be maximum as far as possible under the condition of field conditions, an upper support 9 is installed in the front support 7, a reinforcing steel rope 22 is installed, a tightening spiral buckle is adjusted to tighten the reinforcing steel rope, the front beam 1 is pre-tightened to be upwarped by 3-5cm to generate pre-stress, the rigidity of the front beam 1 is reinforced, a working steel, checking whether the installation is correct or not, and moving the suspension mechanism to a working position corresponding to the corresponding working length after the correctness is confirmed;
secondly, mounting the basket, namely, flatly placing the basket bottom frame 19 and raising the height by 20cm, aligning and fastening connecting bolt holes of the basket bottom by using bolts, fixedly connecting the front basket piece and the rear basket piece to the basket bottom to ensure that the platform frame is straight, and respectively mounting two lifting machines on the side basket support 20 and connecting and fastening the lifting machines on the basket frame;
thirdly, mounting the hoister, the safety lock and the electric cabinet, respectively mounting the two hoists on mounting frames at two sides of the basket frame, fastening and locking the hoists by using mounting handles, locking pins and bolts, fixing the safety lock 21 on the mounting frames to fasten safety lock rollers towards the inner side of the basket frame, mounting and fixing a hoister limiter travel switch on the safety lock 21, hanging the electric cabinet at a neutral position in the middle of a rear piece of the basket frame, respectively connecting a control cable plug and a manual switch plug of the hoister into corresponding sockets of the electric cabinet for fixation, inserting other aviation plugs into corresponding sockets of the electric cabinet, aligning a notch to ensure that no virtual connection exists when the hoists are in place, and connecting a main power supply after the hoists are determined to be;
installing a working steel wire rope, straightening the working steel wire rope laid down on the roof and a safety steel wire rope without winding, shifting a change-over switch of an electric control box to one side of a steel wire rope penetrating elevator, inserting the straightened working steel wire rope into a rope hole on the elevator, starting an uplink electric control button, and automatically winding the steel wire rope into the position by the elevator;
and fourthly, using a sucker, installing an attached sucker 23 on the blue platform after the main structure is installed, adsorbing the attached sucker 23 on the wall surface after the hanging basket reaches the working position, and then adjusting a pull rod 24 to relatively fix the hanging basket on the wall surface or the curtain wall surface so as to stably use and hang the hanging basket.
The roof at the installation position is planar, if an angle exists, the roof is trimmed and laid flat, the roof is correspondingly protected by a waterproof heat-insulating layer, and the bottoms of the front support and the rear support are padded by wood boards with enough thickness.
The front beam lifting point is located at the front support and extends out by 1.5 meters at most, the distance between the two suspension mechanisms horizontally corresponds to the length of the platform, the balance weight is uniformly placed in a balance weight seat of the rear support, the mass of the balance weight is determined, a fixing measure is provided to prevent the balance weight from moving, a working steel wire rope and a safety steel wire rope are put down from the front end of the roof to the ground, and the two ropes are prevented from being wound.
Wherein, the scaffold boards used on the hanging basket adopt shaping boards according to the specification and the size of the basket type workbench, and the thickness is not less than 5cm if wood boards are adopted; when the steel plate is adopted, the probe plate cannot appear due to anti-skidding measures.
Before the hanging basket is installed and used, the safety steel wire rope is placed to the ground from the roof, the safety steel wire rope is fixed to the firm position of the roof and separated from the hanging basket suspension mechanism, and one end, fixed by the safety rope, of the safety rope is strictly forbidden to be connected with any position of the hanging basket equipment.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (1)

1. The utility model provides an electronic hanging flower basket of suspension type which characterized in that: comprises a front beam (1), an inserted bar (5), a middle beam (4), a rear loop bar (12), a chassis (19) and a support (20), wherein the inserted bar (5) is arranged at the end part of the front beam (1), the tail end of the inserted bar (5) is inserted with a sleeve (6), a front bracket (7) is arranged on the sleeve (6), the middle beam (4) is arranged at the end part of the inserted bar (5), the rear loop bar (12) is arranged at the end part of the middle beam (4), the tail end of the rear loop bar (12) is inserted with a vertical bar (13), the front beam (1), the inserted bar (5), the middle beam (4) and the rear loop bar (12) form a hanging basket suspension mechanism, a loop plate (8) is arranged on the inserted bar (5), an upper support (9) is connected on the loop plate (8), a pin shaft (10) is arranged at the top end of the upper support (9), and a rope pulley (11) is arranged in the pin shaft (10), the end connection of montant (13) has after-poppet (14), install counter weight branch pipe (15) on after-poppet (14), install balancing weight (16) on counter weight branch pipe (15), montant (13), after-poppet (14), counter weight branch pipe (15) constitute the counter weight device with balancing weight (16), all install wire rope hanger plate (2) on front beam (1) and back loop bar (12), wire rope hanger plate (2) threaded connection has screw (3), install axle sleeve (17) on wire rope hanger plate (2), be equipped with pulley (18) in axle sleeve (17), install on chassis (19) support (20), safety lock (21) are installed at the both ends of support (20), be connected with steel cable (22) on safety lock (21), chassis (19), support (20) constitute the hanging flower basket with safety lock (21), wire rope (22) connect the hanging flower basket through wire rope hanger plate (2), axle sleeve (17), pulley (18) book, install sucking disc (23) on support (20), install pull rod (24) on montant (13), install slide bar (25) on pull rod (24), the slide bar (25) outside is connected with horizontal pole (26), install extension spring (27) between horizontal pole (26) and slide bar (25), bottom plate (28) are installed with the end of horizontal pole (26) to sucking disc (23).
CN201920802945.3U 2019-05-30 2019-05-30 Suspension type electric hanging basket Active CN210105269U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920802945.3U CN210105269U (en) 2019-05-30 2019-05-30 Suspension type electric hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920802945.3U CN210105269U (en) 2019-05-30 2019-05-30 Suspension type electric hanging basket

Publications (1)

Publication Number Publication Date
CN210105269U true CN210105269U (en) 2020-02-21

Family

ID=69563234

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920802945.3U Active CN210105269U (en) 2019-05-30 2019-05-30 Suspension type electric hanging basket

Country Status (1)

Country Link
CN (1) CN210105269U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110056177A (en) * 2019-05-30 2019-07-26 贵州建工集团第二建筑工程有限责任公司 Suspension electric hanging basket and its construction method of installation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110056177A (en) * 2019-05-30 2019-07-26 贵州建工集团第二建筑工程有限责任公司 Suspension electric hanging basket and its construction method of installation

Similar Documents

Publication Publication Date Title
CN110056177A (en) Suspension electric hanging basket and its construction method of installation
CN112431399A (en) Hanging basket for building outer wall and mounting method thereof
CN110528863B (en) Hanging basket device for outer inclined plane construction and construction method
CN215564350U (en) Hoisting structure for high-rise building construction
CN108996421B (en) Finished furniture hoisting machine and finished furniture hoisting method
CN210105269U (en) Suspension type electric hanging basket
CN107558724A (en) Merge the anti-fall wall-attached supporting seat of suspension centre formula anti-dumping
CN201264877Y (en) Small-sized material hoisting machine for building fitment
CN113738089A (en) Hanging basket integral installation construction method of specially-made hanging mechanism device
CN214302811U (en) Self-adaptive all-steel attached lifting scaffold in micro-tilt building
CN216766721U (en) Electric hanging basket system for building outer wall construction
CN111362157A (en) Hoist device for construction
CN111287441B (en) Suspended anti-shaking construction platform and construction method thereof
CN215670955U (en) Construction device for inclined curtain wall
CN206051364U (en) A kind of curtain wall profiles boom hoisting
CN211037771U (en) Hanging basket device for outer slope construction
CN209567734U (en) A kind of simple Special-purpose lifting device
CN107814318A (en) Loop wheel machine
CN210127818U (en) Lifting and translation construction hanging ladder outside floor window
CN207347124U (en) A kind of loop wheel machine lever
CN209839329U (en) Support frame is used in water supply pipe installation
CN220666881U (en) Electric hanging basket
CN204873605U (en) Fortune material is hoist device upstairs
CN214611227U (en) Curtain wall and light building material lifting machine
CN201433056Y (en) Hoisting device used for hoisting machine parts by depending on helicopter body

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant