CN201264877Y - Small-sized material hoisting machine for building fitment - Google Patents
Small-sized material hoisting machine for building fitment Download PDFInfo
- Publication number
- CN201264877Y CN201264877Y CNU2008200131277U CN200820013127U CN201264877Y CN 201264877 Y CN201264877 Y CN 201264877Y CN U2008200131277 U CNU2008200131277 U CN U2008200131277U CN 200820013127 U CN200820013127 U CN 200820013127U CN 201264877 Y CN201264877 Y CN 201264877Y
- Authority
- CN
- China
- Prior art keywords
- cross beam
- vertical columns
- moved cross
- movable
- window
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000463 material Substances 0.000 title claims abstract description 18
- 229910000831 Steel Inorganic materials 0.000 claims description 10
- 239000010959 steel Substances 0.000 claims description 10
- 238000005034 decoration Methods 0.000 abstract description 3
- 238000004519 manufacturing process Methods 0.000 abstract description 2
- 238000000034 method Methods 0.000 abstract description 2
- 230000032258 transport Effects 0.000 description 6
- 238000010276 construction Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 235000020004 porter Nutrition 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to a small material lifting machine used for decoration of buildings, belonging to the technical field of design and manufacture of material lifting machinery. The utility model is characterized in that the upper part of a fixed upright column is provided with a movable sleeve; the upper part of the movable sleeve is provided with a movable cross beam; and an electric hoist is arranged below the movable cross beam. The using method of the material lifting machine is as follows: the fixed upright column fixedly supports an upper window and a lower window; the wall of the windows are clamped by a wall fixing clamp; and when a lifting hook of the electric hoist lifts to the windows, a lock handle of a movable lock is opened, the movable cross beam is tripped so as to lead the lifted material to be delivered into the window, and then the lifting delivery is finished. The fixed upright column and the wall fixing clamp are arranged, thus playing a role of balancing weight and leading the extended part of the movable cross beam to be capable of bearing the weight of the lifted material. The product has simple structure and reasonable design and solves the problems of the troubles of setting up a fixed frame and a delivering platform when a winder is used for delivering the materials and large labor intensity of manual handling.
Description
Technical field
The utility model belongs to the design and the manufacturing technology field of material lifting machine.
Background technology
In the interior decoration operation of skyscraper,, have plenty of the winch of employing and transport at present, transport by manpower exactly in addition if various materials are transported on the high-rise building.If adopt winch to transport, just must at first build fixed mount, and then on certain altitude, build delivery platform again and could realize.Very loaded down with trivial details.Yet be far from suitable for the small-sized unit in charge of construction that is engaged in resident's house decoration.Because small-sized unit or individual do not possess the condition of equipment and manpower.Be exactly by manpower various materials to be transported to upstairs in addition, its efficient is very low, has increased porter's labour intensity again.Also not identical with the utility model in practice at present product is used.
Summary of the invention
The purpose of this utility model provides a kind of a kind of material hoisting machine that is specifically designed to the skyscraper room finish, and the installing trouble and the manpower that in use exist with the solution existing installation transport the big problem of labour intensity.
Structure of the present utility model is as shown in drawings: be made of vertical columns, moved cross beam and hoist ceiling crane.On the top of vertical columns one moving casing is arranged, a pin is arranged on moving casing.On moving casing top one moved cross beam is arranged.Front end at moved cross beam has a traction wheel.One spacing shelves are arranged on the moved cross beam at traction wheel rear portion.Below moved cross beam, have hoist ceiling crane.On hoist ceiling crane, have the dancer roll frame, in the dancer roll frame, have dancer roll.Dancer roll contacts with moved cross beam.Pars intermedia at vertical columns has the steel wire axle.Have steel rope on the steel wire axle.Steel rope is fixed on the hoist ceiling crane by guide wheel on the moved cross beam and traction wheel.On vertical columns, have the wall mounted card.Have the adjustment screw rod in the bottom of vertical columns.Adjust on the screw rod pin-and-hole is arranged.Using method of the present utility model is: the upper end of vertical columns is against on the room on the window, and the lower end of vertical columns is against down on the window.According to window size, regulate and adjust screw rod, stretch in the pin-and-hole with adjusting pin, rotate the adjustment screw rod and make the adjustment screw rod drive the vertical columns elongation, vertical columns is against on window and the following window securely.Again wall mounted card two pawls are enclosed within on the inside and outside wall of window wall.With the screw rod on the spanner adjustment wall mounted card, make the wall mounted card firmly block wall again.For preventing the moved cross beam swing, the pin on the moving casing is pinned.Can use.When the hoist ceiling crane suspension hook hangs material when being raised to window, open movable lock lock handle, pull moved cross beam, make the suspended object material be admitted to window.Promptly finishing lifting transports.The utility model is simple in structure, and is reasonable in design.Because vertical columns and wall mounted card have played the effect of counterweight, and the moved cross beam that leans out can be born by the weight of lifting object.Can successfully material be hung from ground and rise to high-rise building.Be easy to use flexibly, solved the big problem of labour intensity of building fixed mount and transporting flat-bed trouble and a dead lift with the winch convey materials.Waste material after the construction and rubbish can be transported to ground by this hoisting machine again.Be a kind of desirable equipment that the skyscraper material transports that is used for.
Description of drawings
Fig. 1 is the utility model structural representation
1-traction wheel, 2-dancer roll 3-spacing shelves 4-hoist ceiling crane 5-moved cross beam 6-moving casing 7-pin 8-steel wire axle 9-wall mounted card 10-vertical columns 11-adjustment screw rod
Fig. 2 is the utility model vertical columns section-drawing
5-moved cross beam, 6-moving casing, 10-vertical columns 11-adjustment screw rod 12-pin-and-hole
The specific embodiment
Structure of the present utility model is as shown in drawings: be made of vertical columns, moved cross beam and hoist ceiling crane.On the top of vertical columns 10 moving casing 6 is arranged, a pin 7 is arranged on moving casing.One moved cross beam 5 is arranged on moving casing top.Front end at moved cross beam has a traction wheel 1.One spacing shelves 3 are arranged on the moved cross beam at traction wheel rear portion.Below moved cross beam, have hoist ceiling crane 4.On hoist ceiling crane, have the dancer roll frame, in the dancer roll frame, have dancer roll 2.Dancer roll contacts with moved cross beam.Pars intermedia at vertical columns has steel wire axle 8.Have steel rope on the steel wire axle.Steel rope is fixed on the hoist ceiling crane by guide wheel on the moved cross beam and traction wheel.On vertical columns, have wall mounted card 9.Have adjustment screw rod 11 in the bottom of vertical columns.Adjust on the screw rod pin-and-hole 12 is arranged.
Claims (1)
- Building finishing small-sized material hoisting machine, it is characterized in that: a moving casing (6) is arranged on the top of vertical columns (10), one pin (7) is arranged on moving casing, one moved cross beam (5) is arranged on moving casing top, front end at moved cross beam has a traction wheel (1), one spacing shelves (3) are arranged on the moved cross beam at traction wheel rear portion, below moved cross beam, have hoist ceiling crane (4), on hoist ceiling crane, have the dancer roll frame, in the dancer roll frame, have dancer roll (2), pars intermedia at vertical columns has steel wire axle (8), on vertical columns, have wall mounted card (9), have adjustment screw rod (11) in the bottom of vertical columns, adjusting on the screw rod has a pin-and-hole (12).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2008200131277U CN201264877Y (en) | 2008-05-21 | 2008-05-21 | Small-sized material hoisting machine for building fitment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2008200131277U CN201264877Y (en) | 2008-05-21 | 2008-05-21 | Small-sized material hoisting machine for building fitment |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201264877Y true CN201264877Y (en) | 2009-07-01 |
Family
ID=40831237
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNU2008200131277U Expired - Fee Related CN201264877Y (en) | 2008-05-21 | 2008-05-21 | Small-sized material hoisting machine for building fitment |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201264877Y (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103771272A (en) * | 2012-10-27 | 2014-05-07 | 招远泽洋工具制造有限公司 | Self-use weight crane |
| CN103803429A (en) * | 2014-02-21 | 2014-05-21 | 深圳技师学院 | Portable lorry-mounted lifting mechanism |
| CN105174078A (en) * | 2015-10-21 | 2015-12-23 | 无锡港盛重型装备有限公司 | Cantilever beam crane |
| CN106698287A (en) * | 2017-01-09 | 2017-05-24 | 中冶宝钢技术服务有限公司 | Device and method for cleaning cold steel in roller |
| CN107555326A (en) * | 2017-09-06 | 2018-01-09 | 苏州优银机械有限公司 | A kind of simple type movable cantilever device |
| CN111591905A (en) * | 2020-07-03 | 2020-08-28 | 姚政 | Adjustable support of crane |
-
2008
- 2008-05-21 CN CNU2008200131277U patent/CN201264877Y/en not_active Expired - Fee Related
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103771272A (en) * | 2012-10-27 | 2014-05-07 | 招远泽洋工具制造有限公司 | Self-use weight crane |
| CN103803429A (en) * | 2014-02-21 | 2014-05-21 | 深圳技师学院 | Portable lorry-mounted lifting mechanism |
| CN105174078A (en) * | 2015-10-21 | 2015-12-23 | 无锡港盛重型装备有限公司 | Cantilever beam crane |
| CN106698287A (en) * | 2017-01-09 | 2017-05-24 | 中冶宝钢技术服务有限公司 | Device and method for cleaning cold steel in roller |
| CN107555326A (en) * | 2017-09-06 | 2018-01-09 | 苏州优银机械有限公司 | A kind of simple type movable cantilever device |
| CN111591905A (en) * | 2020-07-03 | 2020-08-28 | 姚政 | Adjustable support of crane |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201264877Y (en) | Small-sized material hoisting machine for building fitment | |
| CN207844936U (en) | A kind of auxiliary lifting devices of tower crane attached mounting-demounting | |
| CN201136745Y (en) | Portable small-sized hoisting machine | |
| CN207243378U (en) | Prefabricated assembled ultra-high overweight inside and outside wall board erecting device | |
| CN106995186A (en) | Building materials transporting equipment for building and its method of work provided with pressure sensor | |
| CN103723636A (en) | Indoor lifting device | |
| CN204454401U (en) | A kind of high-rise material small hoist assembling device | |
| CN205241084U (en) | Lifting machine | |
| CN202016811U (en) | Hoisting device of high-rise building | |
| CN101423178B (en) | Mobile portable swing machine | |
| CN202016812U (en) | Hoist frame used at window | |
| CN201264878Y (en) | Easy-to-detach hoisting combined rack | |
| CN201411334Y (en) | Simple traveling crane | |
| CN116657872B (en) | A stable building construction mounting frame | |
| CN111362157A (en) | Hoist device for construction | |
| CN219341469U (en) | Lifting device for building construction | |
| CN214611227U (en) | Curtain wall and light building material lifting machine | |
| CN203295074U (en) | Telescopic two-dimensional full-automatic miniature cantilever crane | |
| CN220467385U (en) | Cantilever hanging bracket device for vertical transportation | |
| CN201232015Y (en) | Flat-arm window type hoisting machine | |
| CN211444796U (en) | Glass curtain wall mounting crane | |
| CN107311060B (en) | Mechanical whole-course weight-limiting power-off protection device and jack applied by same | |
| CN209815559U (en) | Safe type overhead hoist is used in high-rise building construction | |
| CN113213315A (en) | Transfer method for building partition board | |
| CN217747433U (en) | Movable hanging bracket for producing crusher |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C17 | Cessation of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090701 Termination date: 20110521 |